To work as a Senior Planning/Scheduling Engineer or Planner/Scheduler (as suitable) and be involved in high-challenging tasks of Project Management such as establishment of Schedules including of its effective monitoring/update, controlling and reporting. Furthermore, to have an active role and be able to utilize my extensive planning experiences in different huge projects (Industrial, Oil and Gas, Buildings and Infrastructures) comprising of Design/Engineering, Procurement, Construction, Commissioning and Handover.

EXPERIENCE SUMMARY:
Sixteen (16) years of relevant work experience (domestic and abroad) in several huge projects comprising of Heavy Structural Steel and Process Piping Fabrication/ Erection, Ship Building/ Dry-docking/ Repairs, Bulk Plant Fuel Oil Storage Tanks, Combined Cycle Gas Power Plants, Natural Gas Plant - Onshore, Multi-billion barrels capacity of Underground Oil Storage Tanks (Concrete and Steel Lined) with complete system/ancillaries, High-rise buildings and other infrastructures, entailing various works phases and multi-disciplines from Design, Procurement, Construction/Installation, Commissioning and Handover.

Jan. 2005 – Present MIDMAC Contracting, Doha QatarPlanning, Estimating and Engineering Services (PEES) DepartmentSenior Planning EngineerPrepare Tender Schedule including Progress S-curves, Histogrammes and other relevant technical submissions in accordance with the Instructions to Tenderer, scope of work, BOQ, drawings, specifications, etc. Upon Project/Contract award, prepare detailed Project Construction Schedule complete with all resources (manhours, weightings, major materials) in accordance with the final contract and budget. The Project Construction Schedule including S-curves, Indicative Cash Flows, Manpower and Major Materials histogrammes are then submitted to Client for approval and subsequently handed over to Execution Team (Project Manager) for implementation – monitoring/update and control. Projects comprise of high rise/tower buildings (400+m high), airport roads/interchanges, world-class convention centre, science/technology transfer building/parks, Texas Engineering buildings, etc.

Dec. 2000 – Dec. 2004 ABV Rock Group KB, Kingdom of Saudi ArabiaSaudi Strategic Storage Plant Project (SSSP) – Multi-million barrels of Underground Oil Storage Tanks complete with all Electro-mechanical systems and ancillariesSenior Planning Engineer (Project Site and Project Head Office)Project Control Dept. - Planning Section Head; Overall Project Planning, Scheduling, Coordination, Progress Reporting (Engineering, Procurement, Construction, Installation and System Commissioning and Handover) including Quantity Surveys and Invoicing/ Payment Certificates all in accordance with the Project Control Departments/Project-wide procedures and manuals. Establishment, implementation and coordination/ follow-up of Integrated or Master Schedule including Detailed Schedules (lower levels) for various Production Disciplines and Subcontractors while ensuring that production targets are effectively attained. Provides management reports (i.e. progress S-Curves, narratives, Engineering Deliverables, manpower/major resources, long lead procurement/equipment, schedule look ahead /highlights, etc) being utilized both by our own Management and Client. Analyze production progress delays and accordingly recommend necessary corrective actions. Represents Planning Section in all meetings such as Progress, Schedule and production coordination both within our own Management and with the Client.

Project Head Office, special assignment (Sep. 2002 – Nov. 2003); Planning/scheduling and coordination of Multi-Discipline Detail Design/Engineering for our 2 Project Sites (Undertaken by Design Consultants - Foster Wheeler Corp. based in London and ABV AB based in Stockholm). The tasks include setting up and control of Detailed Design Schedule (FEED to Construction) and Progress Control System (Database) comprising thousands of Design Packages with respective Deliverables (Drawings, Datasheets, Documents and Specifications) and involving several works phases. These Schedules and Progress Reports form part of the respective Project Site's Integrated or Master Schedule.

Aug.2000–Dec. 2000 Foster Wheeler Philippines Inc.Malampaya Onshore Natural Gas Plant - Shell PhilippinesPlanning EngineerThe Plant processes the natural gas coming from an Offshore Platform via 500km underwater Pipeline and subsequently deliver the processed gas thru underground pipeline to newly Constructed two separate Power Plants with a combined capacity of 2700 MW (one of which stated below, which I also worked with).
Being on management/consultant team, had been responsible for several Subcontractors Planning/Scheduling, Coordination and Reporting. Subcontracts comprise of fabrication and erection of Structural Steel Supports/Pipe Racks, Piping for Process Trains, Tanks/Vessels and Flares Structure. Had been attending on periodical planning and coordination meetings with Subcontractors management team and tackle/resolve production problems, delays and other relevant issues as required. Check/finalize Subcontractors detailed schedules/programmes and progress reports prior to integration to main project schedule/progress.

Mar.1999– Aug. 2000 Daelim Philippines Inc. (Raytheon Ebasco Ltd US - Management Consultant)KEILCO 1200MW Combined Cycle Power Plant - Ilijan, Batangas City, PhilippinesPlanning EngineerOverall project planning/scheduling, implementation/coordination, progress reporting (S-Curves, histogrammes, narratives, resources' analysis, etc.), major materials/equipment planning, etc. Update, control and implement the detailed production schedule and ensuring the completion of agreed milestones and specific targets. Attending on Planning and Coordination meetings within our own Management and Client.

Sep. 1992 – Aug. 1998 ABV Rock Group KB, Kingdom of Saudi ArabiaSaudi Strategic Storage Plant Project (SSSP) – Multi-million barrels of Underground Oil Storage Tanks complete with all Electro-mechanical systems and ancillariesSenior Planning Engineer – Steel Works and Installation Department

Initially as Planning Engineer/Estimator for Steel Works Department and responsible for detailed planning, scheduling, quantity surveys/estimates and budgeting works comprising prefabrication, painting and erection of huge underground Storage Tanks steel lining, tunnel roof/wall/floor mounted structural steel modules/supports/racks for mechanical/electrical installations. Had been responsible in preparation of Management Reports such as production schedules, progress, man-hour, equipment and materials procurement status.

Promoted as a Planning Technical Supervisor (Deputy Planning Section Head) and being the one directly responsible for supervision, training and support of Planning Engineers and Quantity Surveyors. I have also established Database system used for progress monitoring, materials planning/controlling, manpower, documentation and other management reporting.

Further promoted to Senior Planning Engineer (Section Head) and responsible for the Department's overall Production Planning/Scheduling and Coordination. Had been attending in Management meetings and participated in decision-making particularly concerning production efficiency, budgets/costs and proper resources' utilization. Concurrently, assigned as Design Coordinator for follow-up of Design Changes, Site queries, Non-Conformances, Clarification Requests and other technical matters relevant to Civil and Structural Steel Construction.Special accomplishment includes setup/development and implementation computerized Progress Updating/reporting Database, which has also linked to updating of Primavera Project Schedules.

Aug. 1989 – Sep. 1992 Phil. National Oil Company (PNOC) Dockyard & Eng'g. CorporationSan Miguel, Bauan, Batangas, PhilippinesPlanning & Control Engineer – Production Planning & Control DepartmentInitially, had worked as Structural Engineer (3 mos.) to supervise the prefabrication/erection of misc. steel structures, platforms and supports (for U.S. John Brown Engineering Project – 10 units Power Plant and Fuel Barges).On my 4th month, had been transferred to Planning Department, trained and designated as Planning & Control Engineer. Had been responsible for the overall planning/scheduling, estimates, and budgets of any assigned projects and controlling of same. Projects comprise of ship building/dry docking and repairs, prefabrication/erection of fuel oil storage tanks and LPG pressurized vessels, structural steel supports/platforms and other similar structures. Some of the vital tasks involved were establishment and monitoring of progress, budget, cost, resources histograms/ S-curves, analyzing time schedule and progress delays as well as the productivity. Had been assigned as Project Engineer for special projects (off sites) involving erection of pressurized vessels, steam pipelines and construction of service buildings for power plant project. Had been attending in pre-bid conferences and prepared tender/package proposal (estimates, time schedules, histograms, key resources, etc) for prospective projects.

Jan. 1989 – Aug. 1989 Atlantic Gulf & Pacific Co. of Manila (AG&P)Batangas Marine & Fabrication Yard (BMFY)San Roque, Bauan, Batangas, PhilippinesCadet Engineer/TraineeCadet Engineer/Trainee for three (3) months (both Lectures and On the Job Training), concerning various Standard Procedures for Steel Construction such as Prefabrication, Assembly/fit-up, Surface Preparation/Painting and Erection. Having been completed the extensive training, had worked as Assistant Shop engineer doing the detailed materials take off, layouts, fit up checks, etc., which are all processes related to heavy structural steel and piping fabrication. Performed basic welding and QC inspection, production checking and prepared daily production reports.

1989 – 1992, 1998 - 2000 Private PracticeBatangas City, PhilippinesCivil Engineer/ConsultantWhile working locally in the Philippines, had been preparing structural design for vertical RC building (residential/commercial), technical specifications and doing construction supervision/ inspections as well as being the Project Owners' representative/consultant.

EDUCATION/HONORS
1983 – 1988 Batangas State University (formerly Pablo Borbon Mem. Inst. of Tech. - PBMIT)Bachelor of Science in Civil Engineering(Full Institute/Academic Scholar, winner for numerous College Academic competitions and ranked 4th for Outstanding Graduates)Board Placer in Civil Engineering Licensure Examination of Nov. 1988 (Lic. No. 0056568)1991–1992 Batangas State University (formerly Pablo Borbon Mem. Inst. of Tech. - PBMIT)Masters in Business Management (completed 16 units; subjects comprising of: Organization and Management Theory, Quantitative Approaches to Project Management, Financial Management, Production Planning and Controlling, Management Information System – MIS and Decision Making)

SPECIAL SKILLS/PROFESSIONAL TRAINING (Local and Abroad)
- Strong experience and proven success in Project Planning/Scheduling, Controlling and Coordination.
- Expert and hands-on experience in computerized Planning/Scheduling software such as Primavera Project Planner v3.1, Microsoft Project, as well as MS Access Databases facilities, being used for progress reporting/controlling and data processing (export/import data to/from Planning/Scheduling programs).
- Great technical and managerial skills in the field of Project Planning/Scheduling. Has the capability to train and support both Planning and Production Staff.
- Had attended the following professional trainings and seminars:- Production Planning, Scheduling and Controlling- Bar Charts and PERT CPM Techniques and application- Introduction to ABV Rock Group Quality Control Systems- Introduction and Implementation of ISO 9000 series- Budgeting and Cost Controlling- Effective Supervision- Employees Performance Evaluation- Artemis/Planet 7000- Primavera Project Planner (Basic and Advanced)- Several Civil Engineering Technical Seminars (sponsored by Phil. Institute of Civil Engineers)- Soil Engineering/ Improvements

References
Available upon request

View contact information...
«« previous resume next resume »»
Search Results (Resumes 2801 to 2850 of 4812)Go to Search Parameters...
Brief Description
An experienced multi-disciplined electrical engineer with 28 years experience in the oil and gas(onshore and offshore), petrochemical, construction industry with functional expertise in project management, materials specification and procurement, sales distribution, marketing and business developm
Experienced Nine Year Superintendent Commerical / Residential
Approximately 3 years experience in Production Planning, Scheduling & Inventory Control, ERP(BaaN)implementation, Production, Manufacturing, Industrial Engg., Production Management, Process Re-engg., Product Development, Product Costing.
civil engineer having a good knowledge of computers
Engineer’s degree in mechanics Speciality: “Construction and exploitation gas and oil pipelines, gas storages and petroleum storage depots”
Well versed in P3e, P3 and MS Projects with very good knowledge of spread sheets and MS Access database. Have experience of Petrochemical, Oil & Gas and Chemical Projects. Have also seccessfully executed few projects as Project Manager.
Scaffolding & Safety
Power generation, substations, transmission and distribution, circuit breakers, machines, service, plants, computer.
To acquire a technical/management position where engineering experience and managerial skills will significantly contribute to use the skills obtained through my experience and qualifications to benefit my employer and grow my self with organization.
Instrument Technician with 19 years experience, trade and some college. Computer literate. Can do any of maintenance, planning, construction, installation, supervision, pre-commissioning, QC, calibration, documentation, faultfinding, wiring, loop checks, and more.
Well-rounded professional office/field experience in project controls, process engineering, environmental engineering, construction, management, sales, and business consulting. Industries: oil and gas, federal government contracting, residential construction.
Former Australia SF; SAS Regt. 19 yrs int'l experience, 3 yrs Regional Manager China & Sth EA. Strategic planner drawing on yrs in difficult & demanding environments.
Sr. Project Controls Planner/Scheduler
Project Management, Cost Control, Estimating
Over 19 years in Oil and Gas and Petrochemical Projects involved in Mechanical Completions, Pre-commissioning, Commissioning, Operating and Training. I have good experience in Gas Treatment and also have good Offshore experience.
Heavy Lift / Rigging Superintendent, Rigging Engineer, Rigging Supervisor
Work well with others, Willing to become a leader, Able run Electrical Tools
A degree holder in Mechanical Engineering from University of Malaya,Kuala Lumpur.Have been involved in the construction & operation of power plant almost 1.5 years.Have ASNT Level 2 Qualification in PT & MPT and PCN Level 2 in RI & UT
16 yrs Experience in E&I of Oil/Gas/Petrochem/Metal/Cement industires, direct and EPIC
Highly qualified Project Management Professional offering more than 20 years of project and construction management experience in managing and administering complex engineering and construction projects. Results focused and effectual leader with proven ability to set up project management systems
QUALIFICATION:B-TECH in CIVIL ENGINEERING. PROFESSION: STRUCTURAL /GEO-TECHNICAL ENGINEER.
Application for the post of Excavator Operator
Operation Manager for Corrosion Engineer & Inspector
Logistics and Procurement Specialist
Experienced mechanical engineer with 5+ years of practice in designing and improving mechanical systems, obtaining product certifications and troubleshooting assembly line and field issues
Employed as Sales Applications Engineer, I have supplied industrial, marine, mobile construction, process plant and aerospace markets pumps, valves, hydraulic & pneumatic components and systems since 1986.
QA/QC ELECTRICAL /MATERIAL,ELECTRICAL TESTING,CONSTRUCTION.
BE- MECHANICAL, Overall 3.5 years experience in the Equipment Designing
Automation Engineer, PLC/SCADA programmer
Electrical Foreman / Service Technician
Excellent customer service skills and telephone etiquette
I was completed b.sc. in chemistry and also completed diploma in industrial fire and safety.Iam having 7 years 6 months experience as a safety officer.In this experience 5 years in Indian and 2 yaer 6 months gulf countries.
Fire Prevention & Protection Engineer with additional qualification Dip. in Industrial Safety, having 12+ yrs. exp. in oil & gas.
Computer software knowledge: Supervisory Control and Data Acquisition (SCADA) software’s - iNEXUS Pro, - Wonderware inTouch, - iFIX Intellution, Echelon Lonmaker for Windows, LNS DDE, PC literate - Microsoft Office, Windows, VPN – Virtual Private Network and IE
I am a experienced mining engineer having experience in drilling & blasting
GRADUATED WITH MBBS DEGREE (FIRST DIVISION) FROM SSR MEDICAL COLLEGE,UNIVERSITY OF MAURITIUS,IN 2005,COMPLETED INTERNSHIP FROM St STEPHENS HOSPITAL,NEW DELHI,PRESENTLY WORKING AS A MEDICAL OFFICER WITH HIMACHAL PRADESH STATE GOVT.
H.S.E. Part 1 Air Diver
Management Professional 20+ yrs exp.
My career spans over than 14 years of work experience in Civil and Structural Designer related to the Civil Works, Onshore, High Rise Building, Marine and Industrial Building.
12 year U.S.Air Froce NDT TECH
(Always Speak Truth) With 18 years of experience as an audit, accounting and finance professional, I intend to build upon my expertise in internal audit of a reputed concern and only willing to serve and settle permanently in MADINA TUL MUNWWARA, Kingdom of Saudi Arabia
Civil Engineer, board topnotcher and full Academic/University scholar. Expert and hands-on experience in Primavera P3.
Experienced EPC Project Executive with proven results through leadership and technical aptitude.
To obtain a challenging job where I can utilize my experience and skills to add value to the company. •Electrical engineer with over 18 years of hands-on experience.
I have been working in the Petro-Chemical Busines for 25 +years( construction and maintenance.) I 've been a Supervisor, Superintendent & Project Manager. Heavy expirence in Piping ,Fabrication, Rigging, I have with all disciplines.I have worked in the U.S. and abroad.
Mechanical Engineer having expereince in Hydraulic & Pnumatic - Static machinery
Mechanical Piping Engineer
I am hard working and very focused in my work and desire to achieve more in life. I love challenging jobs and I can work in a team and am able to lead a team.
Comprehensive international leadership in Environmental, Health, Safety and Sustainability. Extensive experience in Asia with top multinational firms. Excellent cross-cultural skills in Indonesia, Singapore, Malaysia, Thailand, Philippines and China. Speaks Bahasa Indonesia conversationally.
Planning, Scheduling and Cost Control Engineer
First   Prev   51   52   53   54   55   56   [ 57 ]   58   59   60   61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80   81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   Last
Seach Parameters

Change search parameters...
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com