Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #39708 next resume »»
CONTACT INFORMATION:
View contact information...

PROFILE
Organized, detail–oriented and excellent trouble shooter
Developed Operating Security Limits (OSL) for the Ontario Bulk Electricity System (BES)
Provided market/security limits to the System Control Center (SCC) on a 24x7 hours basis
Provided security limits for the present and the future outage schedule to the Outage Integration Office.
Analyzed short and long term outage schedule and identify security concerns.

EXPERIENCE AND ACCOMPLISHMENTS
Nov 2002 - present: Self employed as PTI/PSS/E consultant and new generator connection assessment consultant.
Using PTI/PSSE Transient and Linear Analysis Programs I have calculated EIGENVALUES of a group of generators. The eigenvalue results will be used to design and tune the respective power system stabilizers (PSS). Recently completed various connection reliability and connection assessment studies for the IMO/IESO.

1980-2002 Independent Electricity Market Operator (IMO), Ontario
Using PTI/PSSE Load Flow and Transient Study programs and based on the existing guidelines (PPG), which include voltage, transient, relay margin, thermal, load (mw, mx) etc criteria calculated OSL for the following Ontario system interfaces:

- East-West Transfer West vs. Ontario-Manitoba Transfer East
- Ontario-Manitoba Interconnection Flows.
- Sudbury Flow West
- Sudbury Flow West (Local)
- Kenora Local Area Inflow
- Lakehead 230/115 kV Transfer
- Transfer West of Mackenzie
- Transfer East of Mackenzie

* Provided short term planning studies to the Planning and Technical Depts.
* Prepared test procedures for new generating station.
* Retrieved and analyzed power system disturbance data.
* Designed coded and tested large loadflow data conversion program

ADDITIONAL EXPERIENCE
1974-1980 Ontario Hydro
In the IT area designed, coded and tested real time Power System Data Logging and Reporting (PSDLR) functions:
- MW Accumulator Function
- Hearn Gas Consumption Function
- Beck Forebay Water Levels Function
- System Flow Sheets Function
- Hourly Production Data, Daily Energy and Peak Function
- Unit Setup and Unit Limitation Function
- Morning Report Function

Supervised staff, prepared software related documentations and PERT
charts, maintained software etc.

EDUCATION/ PROFESSIONAL DEVELOPMENT
M. Sc. Electrical Engineering (Diplom Ingenieur)
Technical University, Munich, Germany
Professional Engineer, Ontario

References: Available on request. Status: Canadian Citizen and as per the NAFTA agreement I need a simple TN-1 visa to work in the USA.

Below is the IESO web site for the new generation connection planning study prepared by me for the engineering and consulting company Kestrel Power Engineering Ltd. This study has been approved and published by the IESO (Ontario). To see my report, please refer to the APPENDIX 1.

http://www.ieso.ca/imoweb/pubs/caa/caa_SIAReport_2004-128.pdf

Note: I am providing below the details of my extensive Outage Coordination, Integration and Management experience:

Here in Ontario we apply an Outage Coordination procedure called the WINTOP, i.e.: Weekly Integrated Transmission Outage Plan. This plan has several levels:

Level I: The real time BES (Bulk Electricity System) operations including the forced outages. In case of forced outage, immediate emergency operating limits are provided by the outage coordination to the system control operators and after performing studies these limits are updated.
- Level II: One week or 7 days period, starting every Friday. In this time slot, using all the approved outages the BES 'operating window', FERC:889:TTC/ATC, is calculated. No outages are accepted from the field in this period. Using
- PTI/PSSE transient, voltage and thermal studies are performed
- Using the market rules, the BES demand and the resources are also established.
- Level III: Five weeks period. In this period all the BES security related outages are identified and resolved. Outages from the field may be accepted. BES operating window is calculated and updated as required. Majority of the outages are processed, finalized and approved in this period.
- Level IV: Six week to two years period; Major Power System component changes such as
- HV transformer replacements, which may require extended outages, are processed and approved. In case of extended outages (> 6 weeks) the ABB EMS software may need modification because some extended outages (i.e. Critical Elements) may degrade the definition of the normal system and n-1 system. This period also covers small system upgrades and short term system planning items such as adding reactors and/or capacitor banks etc.

The above WINTOP plan is also a part of the IMO/IESO Market Rules, FERC:888/889. The whole WINTOP process is fully computerized and there are about ten participants located in the various geographic location of the BES who use this process. All these participants, (i.e. field/regional office and construction staff, generating stations, weather office, control room, outage coordination, MISO, NYISO, studies section etc.) must follow their fixed time to enter and update the WINTOP file. Generally the WINTOP process, regular face to face meetings are not required. However, there are the weekly meetings, next to the control room, to finalize the available transmission (FERC:TTC/ATC), the load forecast, the required resources (i.e.: IESO generations(MW & MX) plus imports from NYISO, MISO etc.) and the market prices for the next 48 hours of the market. For the IESO's 48 hours real time demand and the market operation please see:

View contact information...
«« previous resume next resume »»
Search Results (Resumes 801 to 850 of 4363)Go to Search Parameters...
Brief Description
I'm A Civil Engineer graduate with 14 years experience in the Gulf country seeking for new job.
I am a 29 year old white Kenyan. I am a Logistics consultant specializing in Warehousing and Mechanical handling training.
Jean-Francois Zaky is a construction manager in a well-established construction company in Houston, Texas. Mr. Zaky has more than 11 years experience in the construction business. He is a U.S. citizen born in Houston, Texas. Mr. Zaky speaks fluent Arabic language.
Degreed Construction Superintendent for both Commercial and Residential projects with over 15 years of experience.
Supervising the Production staff to make sure of high productivity and efficiency.
I am a qualified mechanical Engineer specialized in Acoustics
Testing,repairing and troubleshooting electronics down to component level.
Planning & Scheduling, Construction
Construction Manager
Handles a group of people with a different kinds of work trade in quality assurance, inspection, records, work evaluation and recommendation.
OBJECTIVE: A Management/Field Position in Civil Engineering or Construction Management.
Transmission Planning Engineer, BES Operations Engineer, PTI/PSSE Consultant
Electrical Engineer with 12 years experience mainly with GE USA in the field of industrial project in steel, power and coal sector
Fifteen years in human resource (HR) leadership roles. Certified by SHRM as a SPHR, MBA with experience administering/interpreting HR policies and developing/implementing innovative people practices to increase profitability. Certified Team Leader/Facilitator and TQM Tools Trainer.
Qualification Bachelor Degree in Civil Engineering Total Professional Experience 14 Years and 2 Months –Include 4 years and 9 months in Singapore & 2 yrs. in Malaysia.
Electrical Engnineer with experience in system design and maintenance planning of electrical facilities including motors, motor starters, switchgears, power distribution, and cabling.
Document Controller
Have experience running track excavators, dozer, roller, grader, backhoe, skiddsteer, haul trucks, semi truck, many more and class a cdl, run family company in construction and excavation for over 10 years
To secure a challenging position in an environment which provides opportunities on acquired expertise and experience as well as a position with career growth potential in a competitive aerospace.
Responsible all electrical installations, wiring, piping, motor control
20 years overseas contracting, Mining and Construction
Proactive and versatile drafting professional with a solid reputation for generating long-term results in a short-term world. Effective problem-solver who interfaces well with management, co-workers and clients. Able to meet aggressive deadlines, juggle multiple priorities independently or in a team
Experience in Middle East
Well Experienced Human Resources Professional in Recruitment, Salary Administration, Writing of Job Writing, Employee Relation, Employee Record Administration, Leave Record, and Settlement
Execute all structural works, finishing works. Aware of survey works. Using computer software proffessionally
20 plus years of experience in all aspects of the electrical field, last 17 in Industrial work.
I am interested in a permanent position as Director or Manager in Safety, Risk Management or Loss Control and/or Environmental Management. Enclosed is my résumé for your review. Sincerely, Damien G. Barr, CSE, AEP
Senior Contracts Manager 25+ yrs experience in Power Plants, Airports, Water Treatment Plants, major civils, UK, Malaysia, Pakistan, Gibraltar. Contracts Management from inception to completion (EPC + Supplier)with broad knowledge of planning, cost control and project management.
Planning/Scheduling
Experienced Cad Manager/Project Coordinator. Multi Discipline Design. Proficient with 3d modelling using Autocad, ADT33, Autoplant, CadDuct and MultiSteel. Also experienced in using Microstation, PDMS, Prime Medusa and ProCadam. Engineering background - Structural/Civil.
Experienced in total project control from tendering stage through to commissioning and hand?over. Experienced in managing and training of multinational workforces. Experienced in Labour selection and control procedures.
a. 10 years in Qty. Survey and Cost Estimates for multi-million dollar Int'l Projects. b.10 years in Electrical Power Projects for Power Plants, HV OHL Transmission Lines and Substations. c. 2 years in multi-million dollar Military a
1) GULF EXPERIENCE (21 YEARS). 5 YEARS EMPLOYED AS PROJECT ENGR IN ALMORAM CO SULTANATE OF OMAN. 2)Past 9 years from 1989 to 1998 worked as E& M Engineer at UNITED CONTRACTING Company. 3)3) 7 Years ( 1977 – 1984) worked as maintenance supervisor in ARAMCO at SAUDI ARABIA.
Profesional in the industry with technical management and sales background.
PERSONAL RESUME
23 years project management
Over 20 yrs of QA/QC Manager, Construction Manager, Project Manager
Full Project Life-Cycle Control and Maintenance Implementation.
Maintenance Specialist
as per attached
31 years experience (10 years international)in project and contract management of large scale industrial projects in the oil & gas (onshore & offshore), alumina, petroleum, brewing, iron ore, nickel, gold and general mining industries.
To secure a challenging and rewarding career in the Electronic Repair Industry that puts emphasis on increasing responsibilities, personal growth, professional achievement, continued education and a company that offers opportunities for career advancement.
A dedicated, committed individual who is both practical and adaptable positive and versatile a self-starter with an ability to motivate individuals to achieve results a team player. Years of experience in the industry, available for work anywhere, longing to work oversea's, reliable and felxible.
I am very interested to offer years of hands on construction management and or supervision to you for the unannounced position in the selected communities in the areas you mentioned anywhere in the USA.
Experienced UK qualified accountant. Finance and administration Manager in large construction projects in North Africa employing 1,500 site construction workers.
Free! Coal Geologist/Geotechnical Engineer
My job duties included scheduling, overseeing, and inspecting various jobs sales, clerical, scheduling and overseeing jobs, as well as site surveys and project submittals. .
BS Electronics and Communications Engineering, Proficient in Microsoft Office XP (Word, Excel, and PowerPoint), Taken up CCNA Sem 1-4 of CISCO Networking Academy, Knowledgeable in Autocad,
I have worked in the Industrial,and the commercial construction for years, I'am goal oriented,i started from the bottom which is cement finishing, to carpentry rough and trim, I have ran a variety of machines and now i look forward to go further with moore expeience with this company.
Mechanical/Construction/Millwright Superintendent
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   [ 17 ]   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com