Demonstrated planner with diverse experience and knowledge in Airport project, Gas and Oil Projects and general MEP projects. Strong Engineering and Management background combined with certification in project management courses. Adept at learning new concepts quickly, works well under pressure, and communicates ideas clearly and effectively.
EDUCATION:
Bachelors Degree in Electrical & Electronics Engineering (2001)
M.S University, TamilNadu, India.
Certificate Course in PRIMAVERA, Project planning software
Certificate course in SURE TRACK PROJECT MANAGER, Project planning software
Certificate course in AUTOCAD 2000
Certificate course in C, C++ High Level Languages
CAREER HISTORY & ACCOMPLISHMENTS:
Project Planner. Thermo, L.L.C., Dubai, U.A.E.
(2005 to present)
Dubai International Airport Expansion Project (Terminal 3 and Concourse 2)
* Worked directly with Projects Control Manager and with Project Management Team of this multi-billion airport expansion project.
* Detailed construction programming of Special Airport System (SAS) and MEP systems from design engineering stage through detailed engineering, submittals, procurement, installation and testing & commissioning.
* Detailed program for Medium voltage primary service includes installation of loop cable, RMU and transformers, MDBs, SCADA for monitoring, and commissioning of circuit loops.
* Detailed program for primary chilled water system includes main & riser piping installation, non destructive testing, hydro testing, filling, flushing, chemical cleaning, and commissioning of circuit loops.
* Design & analysis of Special Airport Systems interface program. Prepared coordination program for MEP services with other Baggage Handling System contractor (Siemens).
* Detailed commissioning plan of Medium Voltage (Closed loop design) and primary chilled water systems for Wild Air requirements.
* Prepared alternate plans to ensure timely delivery of Wild Air requirements.
* Detailed commissioning plan for SAS and Extra Low Voltage systems (Structured cabling, Computer network, Building Management system and Integration system).
* Prepares weekly report to client that includes major site issues, detailed monitoring reports, red flag issues, progressing items, tracking reports, critical path analysis.
* Research on the causes and effects of delays in the project and preparation of mitigation plans.
* Liaise between main contractor, project management team, and project packages on contractual progress updating of the Clause 14 program.
Project Planner (Corporate). Carlo Gavazzi Arabia Co. Ltd. Jeddah, Saudi Arabia
(January 2004- June 2005).
Expansion of Water treatment facilities Phase 2, KJO, Al Khafji KSA.
3x350 MW Steam Power Plant Project Stage 2, ALSTHOM, Shoaiba, KSA.
Multi stage flash desalination plant, Saudi-Kuwait Joint Operations, Al Khafji KS.A.
* Detailed price break down structure for engineering, procurement and construction activities
* Monthly cash flow statement preparation and analysis
* Cost control analysis and reports
* Monthly invoicing for engineering, procurement and construction activities based on monthly progress.
* Technical proposals
* Develop work plan based on bid documents.
* Prepared engineering deliverables and material summary from bid documents.
* Set construction methodology and procedures for electrical erection considering standards such as NEC, IEC, and Aramco standards.
* Front end schedule for proposed projects.
Electrical Engineer. Carlo Gavazzi Arabia Co. Ltd. Jeddah, Saudi Arabia
(Jan.2003 - Nov 2003)
Gas Oil Separation Plant, Saudi Aramco, Harad, KSA.
* Supervised the Installation of Medium Voltage, Low Voltage Power protection and Measurement systems for the substation of the GOSP.
* Coordinated and Guided the laying of MV & LV Primary cables from MCC to the equipment location through Cable Trays, Trenches and ducts
* Supervised the laying of instrument and control cables from Marshalling Panel, Interposing relay panel, DC Panel to the Junction boxes at the site.
* Supervised the Installation of Industrial Lighting systems which includes Task lighting, Street lighting, Indoor lighting, industrial power socket systems, Convenience socket systems for Normal and Emergency conditions.
* Studying, locating and Site Engineering of Field Instruments form Piping and instrumentation diagrams.
* Supervised the installation of Field Instruments which monitor, control and records the various process variables such as pressure, temperature, level, flow, analyzing.
* Site Engineering and commissioning of DCS panels and supervised the installation of cable laying and termination between Marshalling Panel, Field Terminal Assembly, High Process Manager and Consoles.
* Studying, Documenting and Site Engineering of Logic loop diagrams for loop testing and commissioning.
* Supervised the installation of Electrical Heat tracing systems for process pipes of Gas Oil separation Plant.
* Supervised the installation of Gas leakage detection systems for the process pipes of the plant.
* Supervised the installation of cathodic protection systems for under ground pipes and water storage tanks.
* Prepared the As Built drawings of Electrical, Instrumentation, Fire fighting installations and submitted for CADing and approval
FIELD ELECTRICAL ENGINEER SUDHA & ASSOCIATES Trivandrum, Kerala, India
(August 2001 to December 2002)
220KV Sub Station, Kerala State Electricity Board, Kollam, Kerala, India
* Erection of Bus bars, Transformers, Protection systems, Switchgears, Power and Control Cable Laying
* Supervised the complete installation of overhead bus bars for 220kV substation.
* Supervised the assembly, oil filling, installation, mechanical & electrical testing of transformers.
* Supervised the complete assembly, erection and testing of Surge arresters, C.T, P.T, Air and SF6 Circuit breakers.
* Supervised the assembly, erection, termination, testing of switchgears and DC systems panels.
* Supervised the laying of secondary control cables and LV power cables from the Junction box to the equipments through conduits and cable trays.
* Supervised the Installation of Lighting systems which includes, Street lighting, Indoor lighting, for Normal and Emergency conditions.
* Supervised the termination of lighting and power panel as per termination drawings.
* Preparation of As Built Drawings