Project Controls (PC) in industry is my focus. The design/configuration &
ultimate application of systems for the Project Control program, from estimating through project closeout. The ideal system is relatively simple &
the goals are almost always the same: control the date, cost & quality of the deliverable.
I would like to emphasize that I am not an 'IT' type. My stock in trade is the pragmatic configuration and application of Primavera software to 'real world' projects. I have a wealth of field experience.
Current
I have been in the Boise GE Energy Services office for 2 years. I have served as the Master Scheduler for this division's Boise & Chicago offices as well as Administrator & Superuser for Primavera Software for North
America. Project support services are being consolidated under GEPS in
Atlanta and my position was eliminated. My last day was 27feb04.
Project experience:
7 Oil & gas projects
5 Electrical Utility projects
4 High Tech microchip projects
3 Mining projects
2 Industrial & material handling projects
1 Infrastructure project
1 Sewage project
Of these, 4 were international.
Also, of these projects, 7 were in camp/hardship conditions.
Profile
I have 24 years of experience in direct construction, project management, project controls, scheduling, estimating and planning. The vast majority of my project history deals with large scope and complexity. In my capacity as project controls manager on numerous jobs, I have ensured that both contractual terms and cost/scheduling documents are in place. I have 13 years of experience with Primavera Software and considered an expert planner/scheduler with an emphasis on critical path analysis and resource forecasting. My recent experience as a project manager in semiconductor and advanced technology industries reflects my overall knowledge of general construction management. I continually receive high marks from owners and G.C.'s in managing time and resources, and my communication skills.
Project History
GE Energy Services: Jan. 02 - Present
Master Planner/Scheduler Contract employee through GEAS. Design fabrication and installation of electric utility asset protection systems. Resource and time management using P3e & Teamplay software. Various projects continental U.S. $200,000 to $4,000,000
ICON OF BOISE: Oct. 98 – Jan. 02
Principal/Co-owner
Commercial projects, including a seismic retrofit to an historic multi-level masonry building originally erected in 1876. Responsible for all aspects of business.
Various projects, Boise, Idaho
$100,000 to $600,000
Micron Construction/Kaiser Advanced Technology: Jan. 95 – Oct. 98
Project Manager Responsible for all phases of general contracting: operations, cost & schedule control, client relations, contract negotiations & execution, quality control, administration, safety & security. The project included 25,000 SF of Class 10 and 1000 Clean rooms & all peripheral & support structures & systems. Micron Technology, Inc. Fab 1 Expansion, Boise, ID$79,000,000Project Manager Responsible for all phases of general contracting: operations, cost & schedule control, client relations, contract negotiations & execution, quality control, administration, safety & security. Various projects, including clean rooms, mechanical systems, power supply and civil. Micron Technology, Inc., Boise, ID$1,000,000 to $10,000,000 Project Manager and Superintendent Remodel existing warehouse space into 10,000 SF of Class 1000 clean room and packing areas in five weeks. Job was done with sketches as the drawings were delivered two weeks before project completion. SGS Thomson Burn-In & Test Facility, Phoenix, AZ$900,000Project Planner Fast track project completing microchip Fabs and Ancillary structures. Coordinate subcontractor Primavera submittals and maintain overall network. Motorola Phase 2 Fabs, Phoenix, AZ$80,000,000
Contract Consultant: Sept. 90 – Dec. 94
Project Control Manager, ADTECHS Responsible for construction cost and scheduling controls, authoring schedules, chart of accounts and the systems to control them. Responsible for pinpointing problems and formulating solutions, managing staff of cost engineers, planner/schedulers and estimators. KETF Nuclear Waste Effluent Treatment Facility for D.O.E., Hanford, WA$47,000,000Contract Consultant, Cont'd Project Control Engineer, Joy MK Responsible for construction scheduling controls, authoring schedules, and the systems to control them. Responsible for pinpointing problems and formulating solutions and managing planning staff. Lambton Generating Station Desulpherization for Ontario Hydro, Courtright, Ontario, Canada$220,000,000Project Control Engineer, G*UB*MK Responsible for construction scheduling controls, authoring schedules, and the systems to control them. Responsible for pinpointing problems and formulating solutions, Bull Run Power Plant Boiler Replacement and Systems Upgrade for TVA, Oak Ridge, TNBoilers Replacement $20,000,000 Project Control Engineer, RMI Responsible for construction cost and scheduling controls, authoring schedules, chart of accounts and the systems to control them. Responsible for pinpointing problems and formulating solutions, managing staff of cost engineers and planner/schedulers.250 Well enhanced oil recovery systems for Caltex, Pekanburu, Sumatra$450,000,000Page 2Master Scheduler, Fluor Daniel Mining & Minerals Responsible for construction scheduling controls, authoring schedules, and the systems to control them. Responsible for pinpointing problems and formulating solutions, managing staff of planner/schedulers.52KTPD Copper Mill Expansion Project for Freeport McMoran Gold, Tembagapura, Irian Jaya.$75,000,000Master Scheduler Client Representative, R.L. Angeline Associates Responsible for construction cost and scheduling controls, authoring schedules, and the systems to control them. Responsible for pinpointing problems and formulating solutions, coordinated a large staff of planner/schedulers.777 Manufacturing facilities project for the Boeing Company, Everett, WA$1,700,000,000
Echo Bay Exploration, Capital Projects: Nov. 88 – Sept. 90
Project Planner & Client Representative, Echo Bay Explorations Design/Build Gold Mill, TIC General Contractor Kettle River Gold Mill Project, Republic, WA$49,000,000 Project Planner, Echo Bay Exploration Conceptual, feasibility and estimate stage project planning. Various projects, Juneau, AK$14,000,000
Morrison Knudsen Companies: Mar. 78 – Nov. 88
Scheduling Coordinator, MHK Associates: Devise the construction plan and apply it to a calendar; monitor progress. Eastern Distribution Center for U.S. Army C.O.E., New Cumberland, PA$220,000,000Lead Scheduling Engineer, National Projects, Inc. Devise the construction plan and apply it to a calendar; monitor progress. Southside Wastewater Treatment Plant for the City of Dallas, Dallas TX$90,000,000Lead Scheduling Engineer, National Structures, Inc. Devise the construction plan and apply it to a calendar; monitor progress. Central Gas Facility module installation for ARCO Oil, Prudhoe Bay, AK$35,000,000Lead Scheduling Engineer, Astoria Oil Services Devise the construction plan and apply it to a calendar; monitor progress.1985 and 1986 Sealift modules for ARCO Oil, Astoria, OR$140,000,000 Reports Engineer, Oil and Gas Division Gather, analyze and publish project time and resource data, write narratives. 1983 Sealift Modules for SOHIO Oil, Richmond, CA$80,000,000 Fab Shop Engineer, Oil and Gas Division Layout pipe from field notes, weld mapping, ISO's, as-builts, scheduling and materials purchasing.1982 Pipeline for SOHIO Oil, Prudhoe, AK$12,000,000Reports Engineer, Oil and Gas DivisionGather, analyze and publish project time and resource data; write narratives. Gathering centre module installation for ARCO Oil, Kaparuk, AK$95,000,000Senior Reports Technician, (Contract) Heavy & Marine Division Gather, analyze and publish project time and resource data; write narratives, various projects. Technical report publishing, Boise, ID$12,000,000 to $1,400,000,000 Senior Reports Technician, MKSACGather, analyze and publish project time and resource data; write narratives.Military Complex Infrastructure for Saudi M.O.D.A., Hafar Al Batin, Saudi Arabia$1,800,000,000
H.P. Foley Electrical Contractors: Aug. 83 – Oct. 84
Scheduling Engineer
Devise the construction plan and apply it to a calendar; monitor progress.
Diablo Canyon Nuclear Power Plant for Pacific Gas and Electric, Avila Beach, CA