CONTACT INFORMATION:
View contact information...
EXPERIENCE
Jan. 2006 – Present Excel Contractors, Inc. Baton Rouge, Louisiana
Electrical Supervisor
Managed electrical crews during electrical rebuild of refinery at Murphy Oil Refinery, Chalmette, Louisiana.
Projects completed at refinery.
Removal of all existing electrical components and replacing wiring, motors, transformers and power monitoring systems.
1996 - 2005 Superior Industrial Construction, Inc. Jackson, Alabama
Project Superintendent, Projects Manager
Managed safety, estimating, planning and scheduling on construction / maintenance projects at four paper mills and two chemical plants. Provided pipe fitters, pipe welders, millwrights, civil, structural steel erectors, supervisors, estimators, electrical and instrumentation for multiple projects at all sites.
Projects completed by Superior over the last ten years include the following.
Upgrade of existing Bleach Plant, installation of two package boilers, major repairs to the recovery boiler and precipitator, upgrade to existing water treatment plant, upgrade on electrical and instrumentation # 1 paper machine, total gear replacement on all four sections #1 paper machine and supplied 30 – 40 people for general maintenance projects, 200 people for shutdowns.
Completed ten years of business at four mills and two plants without a lost time accident.
1988 – 1995 Industrial Services of Mobile, Inc. Mobile, Alabama
Project Superintendent, Project Manager
Managed safety, estimating, planning and Scheduling on construction / maintenance projects at Two paper mills, two chemical plants and for Chevron USA, Houston, Texas.Completed total rebuild of six Chevron truck-loading facilities at Pascagoula, Ms., Panama City, Fla., Montgomery, Ala., Birmingham, Ala., Collins, Ms., Opelousas, La.
Awarded recognition for outstanding performance for completion of all Chevron projects on time and without a doctor's case or lost time injury.
1986 – 1988 Foley Contractors, Inc. Pine Hill, Alabama
Pipe & Instrument Superintendent
Complete upgrade and rebuild of lube oil, instrumentation and electrical system on #1 and #2 paper machines on the run.
1973 – 1986 BE & K Construction, Inc. Birmingham, Alabama
Multiple Projects
Instrument Foreman / Fitter / Tech
Brown & Root Inc. Houston, Texas
Multiple Projects
Instrument Foreman / Fitter
Pipe Fitter
EDUCATION
1987 – 1989 Southwest State Technical College, Mobile, Alabama
Completed associate degree in Instrumentation Technology
Finished #2 in class with 4.0 GPA
1974 – 1980 Brown & Root Construction, Houston, Texas
Instrument Fitter I & II
Pipe Fitter I & II
Electrical I
1972 Jackson High School, Jackson, Alabama
High School Diploma
MAJOR PROJECTS Completed and Supervised By Larry L. Allday
Electrical System Upgrade – Total upgrade all electrical centers and switch gear in Refineries and Paper mills.
Instrumentation System Upgrade – Total upgrade all instrumentation and controls in refinery and paper mills.
Recovery Boiler and Precipitator rebuild.- Piping, structural steel, boiler tube and pump rebuild.
Total rebuild on six Chevron Truck loading facilities – Civil, concrete, piping, electrical and instrumentation.
Rebuild of Waste Water Clarifier – Replace clarifier and all associated piping, pumps, concrete, electrical and instrumentation.
Upgrade of Water System – Replace all associated piping and pumps.
Structural Steel Replacement – Replace all steel associated with digester supports.
Remove and re-pour foundations for digesters.
REFERENCES:
Available upon request.
View contact information... |