Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #46852
next resume »»
CONTACT INFORMATION:
View contact information...
AVAILABILITY: IMMEDIATE MOBILIZATION
TITLE:
INTERNATIONAL PROJECT MANAGER
SUMMARY:
Over 30+ years experience in the Petro-Chemical, and Power Generation Industries Worldwide. Expertise includes Construction, Start-Up, Operations and Maintenance of Oil Refineries, Chemical Plants, Combined Cycle, Gas, Oil and Coal Fired Power Generation Facilities. I have experience in both Greenfield and Brownfield Projects, and have used my Financial Management, Logistic and Life Support management skills in harsh environments. Leadership and getting the very best of Team and Equipment in difficult situations is one of my strong suits, making projects run more smoothly and come in on a timely manner. Supervisory / Management skills demonstrated on domestic and foreign multi-million dollar projects. Along with the skills listed above, I bring the experience of a Veteran with Military / Security Experience. I have training and expertise in handling Emergency Situations, Fire Suppression, the Handling of Hazardous Materials, and have recently held an interim Governmental D.O.D. Security Clearance. These strengths along with a strong working knowledge of procedural efficacies dealing with vendors, governmental entities and sub-contractors make me a "well rounded" and versatile asset to any project.
QUALIFICATIONS / EXPERIENCE
Project Manager
Project Manager / Iraq
Senior Sector Advisor / New Generation / Iraq
Owner's Rep
Construction Manager
Site Manager
Start-Up Manager
Lead Start-Up Engineer
Start-Up Engineer/ Puerto Rico
Supervisor Pre-Commission Cleaning / Africa / Puerto Rico
Chemical Plant Process Operator / 1st Class Millwright / Supervisor
Oil Refinery Operator and Operations Supervisor
Co-Gen Start-Up Engineer
Power Plant Operator and Operations Supervisor
Military Veteran / Security and Small Arms Instructor
Fire Suppression / Emergency Medical Technician
EXPERIENCE DETAIL:
CONSTRUCTION MANAGER 2-1-05 to Present
PKA Inc.
Pittsburg, PA
Mr. Barnett was responsible for the construction and oversight of the refurbishment of existing and out-dated Substations in and around the greater Pittsburgh, PA area. Mr. Barnett has been involved with all aspects of this construction endeavor from initial contract negotiations through final close-out of the completed refurbished Substations. Mr. Barnett was also involved with the "Green Field" construction of these Substations from cradle to grave as well. Responsibilities included, but not limited to, complete oversight of all crafts involved in this construction endeavor, tracking of equipment and supplies, long lead time equipment tracking, structural steel, underground as well as Trenwah duct bank installation. Mr. Barnett was also responsible for heavy equipment foundations, marshalling and interface cabinets, safety oversight for the Project on a day to day basis, and interfacing with and generating requisite reports to the Client.
PROJECT MANAGER
GE Power Recovery Project Manager 1-05 to 12-05
Contracted through Penpower to:
GE
Paulsboro, NJ
Mr. Barnett performed as the GE Power Recovery Project Manager for this Turbo-Expander Power Recovery Facility. As Project Manager, Mr. Barnett oversaw all phases of this new and innovative Project from Contract Negotiations to Final Completion. This Turbo-Expander Power Recovery Project produces 18MW of power utilizing waste heat and gas from an existing process.
PROJECT MANAGER
Baghdad Project Manager 6-04 - 11-04
Contracted through Penpower to:
GE
Baghdad, Iraq
Mr. Barnett performed as the Baghdad Project Manager in this joint venture supporting the Infrastructure Reconstruction Program for USAID in Iraq. Mr. Barnett's responsibilities included, but not limited to, implementation of an Assessment Program for nineteen (19) existing Power Facilities, Gas Turbine and Thermal, Project financial management, logistic and life support management, reports for the Client, recruitment and hiring of qualified personnel and all aspects of Security arrangements both in the field as well as in Baghdad. Day to day monitoring of the field assessment implementation of security safeguards as well as remote camp construction security to support the Project was of primary concern. Due to the ever changing security demands in Iraq, this issue was foremost in the vanguard of concerns for the Project. Due to the complexity of the Project, further details can be supplied as required.
SENIOR SECTOR ADVISOR NEW GENERATION / IRAQ 10/03 – 06/04
Contracted through IRG to:
USAID Baghdad, Iraq
Baghdad, Iraq
Mr. Barnett performed as the Senior Advisor for New Generation under the USAID Iraq Infrastructure Reconstruction Program. Mr. Barnett's responsibilities included frequent direct interaction with the Minister of Electricity of Iraq in identifying new generation power projects, viable sites for new generation and the fuel type and quantity required for the new generation. Mr. Barnett oversaw the project management and financial disbursement of more than 1 billion in contracts for USAID to its implementing partners. Mr. Barnett oversaw, interfaced with and advised Bechtel, USAID Prime Contractor, to facilitate the completion of new generation projects. Mr. Barnett worked closely with the Coalition Provisional Authority on the viability of the projects identified as well as security, transportation and sourcing and delivery routing of major equipment and camp locations as well as related logistics. Mr. Barnett was the source for information on restructuring the power distribution grid in Iraq, as well as the proposed rebuilding of the natural gas development and delivery infrastructure for Iraq's generation assets. Mr. Barnett worked closely with the USAID Contracting Officers identifying issues and recommending solutions for the electric sector. Mr. Barnett was supported by and worked closely with the United States Army Corps of Engineers on the quality assurance and control for new generation as well as other technical facets of the electrical sector in Iraq.
OWNER'S REP / MECHANICAL CONSTRUCTION / START-UP 3/03 – 6/03
Contracted to NGS
Greenport Power Project
Greenport, NY 11944
Mr. Barnett performed as the Owner's Rep and was responsible for the completion of construction and initial start-up and commissioning of 1 (one) Pratt&Whitney FT-8 Swift Pac with Water Injection and Evaporative Coolers. This FT-8 Swift Pac is one of the first of Pratt&Whitney's new Turbine design to be installed and go commercial. The Pratt&Whitney turbines operate on Citech software in conjunction with Woodward Controls. Mr. Barnett was also tasked with the BOP configuration and integration into the Start-Up and Commissioning of the SCR with Ammonia injection for the control of NOX and CO. This was in accordance with New York regulations. Responsibilities also included generating field engineering changes, the compilation of Start-Up Packages, all BOP Flushing of Equipment, operator training, procedure writing, CEMS training and Demin-Water training and developing a Site Lock-Out / Tag Out Procedure.
SITE MANAGER / CONSTRUCTION MANAGER 5/02 – 3/03
COMMISSIONING / START-UP
Contracted Through: Defined Source Cooperative, Inc to:
PRENCO Svcs. (Division of Alstom Power)/PEPCO
Construction / Commissioning Management Alliance Program
La Paloma Combined Cycle Site (HRSG Commissioning Oversight)
NIH (National Institutes Of Health) Bethesda, MD
NIH Combined Cycle Project (Greenfield Oversight)
Mr. Barnett performed as part of an ongoing Alliance Program. Serving as Site Manager, he reported directly to the Site Project Manager. Duties included scheduling, managing site budget, site engineering, overseeing and providing direction for all disciplined Superintendents and associated sub-contractors, client interface, vendor interface, coordination with home office project management team including engineering, as well as all administrative reporting. Scope of work included HRSG installation and commissioning oversight and construction completion, commissioning oversight and complete system integration related to the existing NIH Central Boiler House of a Greenfield gas turbine combined cycle 23 MW facility at the NIH Campus in Bethesda, Maryland.
Mr. Barnett was tasked with the demolition of an existing incineration facility and the construction of a new building including all drainage, sewer, concrete, duct banks, roofing, electrical, instrumentation and HVAC installations to house a Alstom GT 10 23MW Combustion Turbine with Co-Generation for the production of 150# saturated steam to augment heating for the NIH Campus. Mr. Barnett worked closely with the PEPCO Project Manager in the completion of this facility.
START-UP MANAGER 1/02 – 5/02
Contracted Through PIC to:
Burns & Roe
Foothills Project
Catlettsburg, KY 41129
Facility consists of 2 (Two) Westinghouse 501-FD's, Combustion turbines, with evaporative coolers with Fogging Systems, Hot SCR with Ammonia injection operating on Tele-Perm (TXP) DCS. Responsibilities included but not limited to: Overseeing completion of construction, initial start-up and commissioning of all plant equipment, performing BOP configuration, overseeing I/O point checkouts, complete integration of all systems to the existing Riverside Power Plant, compiling Start-Up Packages, creating Daily Run Schedules (including MW output & gas usage). The Start-Up responsibilities of the Foothills Power Project were completed one month ahead of schedule.
START-UP MANAGER 9/01-1/02
Contracted through PIC to:
Cal Peak Energy
Border LLC Site
San Diego, CA 92154
Mr. Barnett was responsible for the completion of construction and initial start-up and commissioning of 1 (one) Pratt&Whitney FT-8 Twin Pac DLN w/Evaporative Coolers. The Pratt&Whitney turbines operated on Citech software in conjunction with Woodward Controls. Mr. Barnett was also tasked with the BOP configuration and integration into the Start-Up and commissioning of the SCR with Ammonia injection for the control of NOX and CO in accordance with California regulations. Responsibilities also included the compilation of Start-Up Packages, nomination of daily natural gas usage, operator training, procedure writing, CEMS training and Demin-Water training and developing a Site Lock-Out / Tag-Out Procedure.
SITE MANAGER 2/01-8/01
Contracted through PIC to:
Ameren Energy
Columbia, MO 65202
Mr. Barnett was responsible for the complete installation of 4 (four) GE Frame 6B combustion turbines and Alstom generators in a simple cycle configuration. Included in the scope of work were all civil, mechanical, concrete, structural, electrical, and instrumentation work related to this Installation. He also performed all pertinent BOP work as well as overseeing the engineering and construction of a new 16" Natural Gas Pipe-Line to serve this facility. This project was completed on schedule.
LEAD START-UP ENGINEER 10/00-2/01
Contracted through Universal Energy to:
Duke Fluor-Daniel
McClain Energy Facility
New Castle, OK 73065
Mr. Barnett supervised the completion of construction and initial start-up and commissioning of all equipment associated with this Duke Energy power producing facility. Major equipment included but not limited to 2 (two) 7FA G.E. gas turbines with hydrogen-cooled generators, 2 (two) ABB Triple-Heat steam producing HRSG's, totaling 500 MW. The GE gas turbines operated on the Mark VI software and controls. Ancillary equipment included but not limited to: The flushing of the closed-loop cooling system, HRSG degrease, Compressed Air Blows, Auxiliary Boiler boil-out, and Steam Blows.
LEAD START-UP ENGINEER 05/00-9/00
Contracted by PIC to:
Dayton Power & Light
Greenville, OH
Supervised completion of construction and implemented the initial start-up & commissioning of all equipment associated with this Dayton Power & Light energy producing facility. Major equipment includes but not limited to 4 (four) Pratt&Whitney FT8 Twin-Pac Gas Turbines w/Evaporative Coolers and Water-Injection. Pratt&Whitnry FT8 Turbines operated on Citech software in conjunction with Woodward Controls. Responsibilities also included operator training, procedure writing, CEMS training and Demin Water training.
LEAD START-UP ENGINEER 3/00-5/00
Contracted through PIC to:
G.E. Lee Station CP & L
Goldsboro, NC
Supervised completion of construction and initial start-up and commissioning of all equipment associated with this Carolina Power & Light energy producing facility. Major equipment including but not limited to: 4 (four) 7FA G.E. gas turbines with hydrogen-cooled generators, totaling 720 MW. G.E. gas turbines operated on the Mark VI software & controls. Ancillary equipment includes but not limited to: The flushing of closed-loop cooling systems, fuel oil systems, & water injection skids. Responsibilities also included: CP&L operator equipment, walkdowns, and training.
LEAD START-UP ENGINEER / CONROL ROOM SUPERVISOR 8/99-2/00
Contracted through PIC to:
Central Wayne Energy Recovery Facility
Dearborn Heights, MI
Supervised completion of construction and initial start-up and commissioning of all equipment associated with this Municipal Solid Waste (MSW) to energy facility. Major equipment included 3 (three) D.B. Riley Municipal Solid Waste combustors with a total steam flow of 245 KPPH. Each boiler was fitted with 1-Ignition Burner, 1-Auxiliary Burner, and Detroit Stoker Reciprocating Grates. Power was generated by a 25 MW Ansaldo and Bentley Nevada Turbine Supervisory Instrumentation. Emissions Control System included an Altec CEMS, Fueltec Urea Injection, Chemco Lime Slurry, Wheelabrator SDA and Fabric Filter and PAC Carbon Injection. The Plant Control System consisted of the Bailey INFI 90 with Bailey Symphony Conductor VMS-Series 43 CRTS. Other areas of responsibility included Bailey INFI 90 DCS – On the Job Training of control room operators.
START-UP ENGINEER 5/99-8/99
Contracted through PIC to:
Enron / Eco Electrica
Penuelas Power Plant
Penuelas, Puerto Rico
Responsible for the completion of construction, initial start-up and performance testing of 2 (two) Westinghouse 501-F combustion turbines and 1 (one) Toshiba steam turbine, using Westinghouse DCS controls. This is a Co-Gen facility combined 507 MW.
PROJECT SUPERVISOR 12/98-5/99
Site Management Services International Inc.
Houston, Texas / Penuelas, Puerto Rico / Ghana, Africa
Responsible for Pre-Commission cleaning of Petro-Chemical and Power Generation facilities worldwide. Projects include Steam-Blows, HRSG De-Greasing, HRSG Chemical Cleaning, Turbo-Flushes and Oil Flushes of Steam as well as Combustion Gas Turbines. Overseas assignments include Ghana, Africa and Puerto Rico.
PLANT OPERATOR / OPERATIONS SUPERVISOR 6/84-12/98
Rohm and Haas Texas Inc.
Deer Park, Texas
Responsible for the safe, efficient daily operation and maintenance of various Chemical Processes. Prepared daily and monthly production reports, safety (lock-out, tag-out) clearances, hot-work permits, confined-space entry permits and coordinated maintenance activities to insure maximum unit production. Mr. Barnett also oversaw several pipe-line additions for this facility. Developed extensive computer skills. I entered and completed the Rohm and Haas Course for Millwrights and graduated and worked as a 1st Class Millwright and Millwright Foreman on rotating equipment of all sorts. I was a member of the Rohm and Haas Fire Brigade my entire tenure and as such am very familiar with Haz-Mat situations and procedures.
SHIFT SUPERVISOR AND START-UP ENGINEER 1/84-6/84
Houston Light and Power
Houston, Texas
Responsible for shift personnel in starting up and operation of a 650 MW coal-fired boiler and water treatment.
PLANT OPERATOR / OPERATIONS SUPERVISOR 11/77-1/84
Charter International Oil Company
Houston, Texas
Operated several processes within the Charter Refinery Organization such as the Crude Oil, Cat-Cracker, Platformer, Udex, etc. The Crude Oil Unit utilized Sour Crude and as such was processed through a De-Salter. Worked my way up to Operations Supervisor where my duties included but not limited to: Total shutdown and refurbishment of Heat Exchangers, Process Vessels, Heaters, Fin Fans, Underground Piping, Pipe-Lines, Headers and Piping, Boilers and associated equipment. Scheduled all work to be accomplished and managed the manpower to complete the turnaround as well as securing all documentation required. Supervised and commissioned the addition of the Solvent De-Asphalting Unit for Charter Oil. Worked with and issued Engineering changes to facilitate the existing Processes for Charter Oil. I was a member of the Charter Oil Fire Brigade my entire tenure and as such am very familiar with Haz-Mat situations and procedures.
U S AIR FORCE 10/75-10/85
Worldwide
Completed the Basic Training Course at Lackland Air Force Base in San Antonio, Texas. Additional training in Air Police, Combat and Advanced Combat Training, Air Base Combat Defense Training as well as Search and Rescue Training. Graduated as one of two Honor Graduates from my Basic Training Platoon. I was assigned to a Strategic Air Command Base (SAC) in Abilene, Texas where I held a Top Secret Military Security Clearance. After separation from Active Service, I joined the Air National Guard and served at Ellington Air Force Base in Houston, Texas from 1977 to 1985. During my tenure in the Air Guard I completed the training for Marksmanship Instructor for the Air Force and was the NCOIC or Non-Commissioned Officer in Charge of the Marksmanship Unit on the Ellington Air Force Base. I received extensive First-Aid training as well as completing the Non-commissioned Officers Course for the Air Force.
HOUSTON FIRE DEPARTMENT 10/69-10/75
Houston, Texas
Completed the Houston Fire Department Training Course and graduated as a Pipe and Ladderman. I served as a Pipe and Ladderman in Fire Suppression for 2 years and then completed the training involved to serve as an Emergency Medical Technician (EMT). My tenure with the Houston Fire Department taught me to deal with stressful and life threatening situations in a calm and thorough manner while maintaining control over the situation.
------------
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 2201 to 2250 of 4806)
Go to Search Parameters...
Brief Description
International Project Manager
Nuclear Operations Supervisor. Supervised operations ensuring safety of personnel and equipment. Supervised maintenance operations on I&C equipment.
Experience includes Cost Engineering, Electrical/Instrumentation Estimating, Construction Electrical Engineering and proprietary software support. Duties include reporting of various kinds, forecasting, change management, staffing plans, cash flows and more.
Project Management/Engineering/Construction, with over 25 years of professional experience in EPC projects, in Management, Engineering and Construction in oil and gas field, infrastructures, site development, roads, airstrips and buildings, Proven Project Management skills with post responsibility
qa/qc engineer (E&I),6years experienced
Please consider this letter as an application for employment within your company. I wish to apply for the position as HVAC ENGINEER /Design Drafter/Quantity surveyor that will give me an opportunity for growth and career challenges particularly in the areas of design engineering and technical drafti
Land Surveying, Setting Out, GIS, Cadastral, Photogrammetry, Remote Sensing, CAD
I'm 36 years old Mongolian man. looking for mining operations job. Such as mine foreman, mine planner, translator
Proficient use of Microsoft Office Applications, Operating Systems, SAP R3/R4, Graphical Applications, IE Browser, E-mails, EDMS System such as Livelink, E-Cabinet and MS Access, Equipment Communications, Programming Languages, and Computer Troubleshooting ,Typing speed of 50 W.P.M.
Estimation, Quantity survey, planning, design
Level II certificate in PT,RT,MT and UT..Confident to take up any job in oil field industry.Good knowledge in drawings,construction materials,welding standard,piping,test pack completion etc..
AT 44, I AM CERTAINLY NOT A NEWCOMER TO THE FIELD OF CONSTRUCTION, HAVING OWNED MY OWN FIRMS FOR OVER 15 YEARS.
Ability to learn new Languages, Technologies quickly Strong Knowledge in Civil Engineering Subjects Proficiency in Software Packages like Auto Cad, Auto Lisp, Staad-III Good Practical Knowledge in Civil Constructions „h Ability to learn new Languages, Technologies quickly
I am interested in a position within your company’s electrical installation or electrical service Departments.
7 years of experience in the field of design, development, analysis. Design and modeling of Special Purpose Machine, Machine tools & accessories, Dies, Cams, jigs and fixtures etc.
Safety and Health Manager with international experience seeks a challenging and fulfilling position with a company that encourages and rewards ideas, initiative, perseverance, and accomplishment.
I am looking for a position of Field Engineer, Office Engineer or Quantity Surveyor. I worked with the JBC for a little over a year. I am a very hard worker. I am very proficient at reading spec books and engineering drawings.
Civil Construction Engineer, Construction Superintendent Lead Civil Engineer
proficient in using MS-Office ,Word Excel & Expedition,and i did my B.tech in Computres science and engg
I am Civil Engineer having 9 years experiance in marine works. construction of breakwater, Quawalls installation, boat ramps, shore protection, reclamation and dredging with multinational construction company and consultants. presently working with reputed consutlant in maritime field.
Over 20 years of Electronic, Electrical and Mechanical experience. 10 years of Field Service in both domestic and international travel.
I am lead piping engineer ,supervised 6 engineer ,6 autocad drafter and 7 PDMS staff.I am familiar with all international stds related to oil&gas ,petroleum and power plant.
17 years of legal work experience as DA, Chief Judge, Legal Advisor and part time professor
HSE Manager in major energy, power generation, oil and gas sectors covering technical and commercial requirements. With professional experience in directing and mananing health, safety and the environment protection & sustainability development aspects as per OSHA framwork and guidelines. Strong abi
NCCO/NAHETS Certified operator. Northern California College of Construction Grad
Document Controllre with 3 years work experience in Qatar
18 Years including 10 years in oil & Gas - Construction experienced Safety Specialist , having Mechanical engineering Degree from Bangalore University and Diploma in Industrial Safety From RLI Chennai, India & OSHA 30 Hours Trained - Key skills : Construction Safety Mangement, Auditing, Trainer
Educational Qualifications: Master of Engineering in Mechanical Engineering specializing in Welding Engineering from Indian Institute of Technology, Roorkee, Uttar Pradesh, India in April 1996 with 74.40%, American Welding Society (AWS) Certified Welding Inspector (CWI) -AWS-CWI Certificate
3 yrs diploma in mechanical engineering with 1st class from bset, bhubaneswer (india) in April-2002 professional qualification: -• cswip 3.1 (twi) certification for welding inspector, cert. no- 36291 •surface preparations & paint application techniques (certification from jotun paint school)
Senior Primavera 6.2 Planner / Scheduler or Management Skills
Experience as Piping Designer, in performing Pipe Modeling, Piping Arrangement Drawings, Checking & Extraction of Isometrics from 3D Model. ƒá Hands on Experience in Piping Software¡¦s ¡V Bentley¡¦s PlantSpace Design series, Microstation, PDMS & TRIBON M3. Knowledge of Piping Stress Analysis.
I have done degree in mechanical engineering. I am having AWS-CWI certification. And I am also having approval of Saudi Aramco as a Welding Inspector. I have also done ASNT level-II in UT, MT, RT, and PT. I am having more than 5 years and 8 months experience in oil and gas field.
Materials Coordinator on oil/gas, and construction industry. 12yrs experience onshore and offshore.
Highly skilled graduate Project Manager/Civil Engineer and Project Controls Lead with more than 25 years related domestic and international experience in project and construction management.
Result oriented Geotechnical/ Engineering Geologist with 2-3 years onshore experience in ground engineering with keen interest to develope further expertise in the field. Strong analytical and personal ability to problem solving solutions with Civil Engineering Geology knowledge of Construction
I have 15 years experience in the electrical field, with journeyman and interprovincial qualifications, also a Class A ticket. I have training in iIndustrial, commercial and residential electrical installations, also, telephone and data networks, with Nordex certification.
With twelve years of varied experience and proven competence in the electrical field and two years experience as a Process operator, I'm looking for an employment setting offering challenging employment with a supportive team environment.
Experience in control Automation system ,contruction and oil and gas
PLANNING/SCHEDULING ENGINEER & BACHELOR OF ENGINEERING (CIVIL)
I have 30+years in the heavy equipment field service. I work on all parts of any machine diesel or gas that is construction or mining related. Don't let the years fool you. I can work circles around the younger guys and teach them more than they have ever learned.
Qualified diesel mechanic with 12 years experience in a commercial and mining environment and 3 years Maintenance supervisor experience.
Autocad & Inventor Draftsman
Survey Technician/Instrument Man
I have 12 years work experience in Civil Engineering Constructions and 4 years experience in Environmental Remediation project for Brunei Shell Petroleum. My Supervisor experience includes execution of structures as per drawings and specifications with skilled group of trade persons and subcontracto
A multi-skilled mechanical/piping, Construction Superintendent/manager, QA/QC Engineer, with over 20 years international experience in the oil, gas, petro-chemical and power generation industries
It is with great interest that I am forwarding my resume for your consideration. My record of academic achievements and professional career history, demonstrates attributes that make me a valuable employee.
Industrial Electrical, Instrumentation, Power Generation Systems, PLC and Scada design and programming, Construction and Maint.
•Over 9 years experience preparing detailed estimates for Capital Projects involving all engineering disciplines including process design, civil, structural, mechanical, piping, electrical, instrumentation, and process control for Mining and Heavy industrial Projects.
Sr. Piping Design, Lead Des, ACAD 3D, Microstation 3D
Estimating
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
[ 45 ]
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com