Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #59407
next resume »»
CONTACT INFORMATION:
View contact information...
Objective:
To pursue a career in my field of expertise (i.e. Piping Installations) that will continue to interest and challenge me. Your company could provide a perfect opportunity to achieve my goals. In order with my experience, I consider that a position not less than
Piping Section Engineer it is a fit position for me.
Personal assessment:
Date of birth: May 02, 1976
Place of birth: Medgidia, County of Constanta, Romania
Marital status: Married (one child)
Nationality: Romanian
Informational background:
Jan 2005 - May 2005 - Technical English Course, ¡* Ovidius¡¨ University Constanta
Sept 2004 - Dec 2004 - Initialization in Nuclear Power Plant Operation Courses
October 2000 - April 2001 probation military stagy in Navy Academy
¡* Mircea cel Batran¡¨ Constanta, Patent act of officer with distinction ¡* Aspirant¡¨
1995 - 2000 Technical University ¡* G. Asachi¡¨ - Iasi
1991 - 1995 Nicolae Balcescu High School, Medgidia
Qualification: mechanical engineer - 5 years
Foreign languages:
English - speaking, reading and writing - high level
French - low level
Computer skills:
Word, Excel
Experience:
1. August 2006- up to now: construction experience as an employee of Interconstruct `98
LTD working in Qatar as subcontractor to Consolidated
Contractors International Company(CCIC) in Qatar Gas
Expansion II Project.
Mechanical engineer employed as Piping Site Engineer in Utility Area especially for erection of six boilers fabricated by MACCHI TM a division of ¡* SOFINTER¡¨ S.p.A. Italy.
Also during this period I am involve in supervision of piping erection for Air
Compressors ¡* KOBELCO KOBE STEEL. LTD¡¨ (suction pipe and cooling lines), Boiler
Feed Water Pumps ¡* NUOVO PIGNONE BARI¡¨ (oil system; control oil, oil supply, oil return oil discharge, oil suction), Carbon Filter Package Train ¡* UNIDRO S.p.A >
Tecnologie per l¡¦ecologia¡¨,Steam Turbine Generator ¡* MITUBISHI HEAVY INDUSTRIES
< LTD¡¨(lube oil system).
Since September till now, under supervision of VENDOR, I am involve in follow activities:
* Graduating different courses; safety rules, materials control and traceability, quality control, quality assurance, Confined Space Entry Permit, Permit to Work sustained by CCIC Training Department, CTJV and Qatar Gas
* Coordination of piping, Air Duct and Stack items transportation between General Warehouse to the position of each one in site(using trailers, wheels cranes, boom trucks, fork lift)following planning indications
* Arranging a quarantine area located in site and specialization of a small team for segregation of different types of materials (received from Italy), used for erection of six boilers, with the purpose to control all materials coming from Italy with Packing Lists and to avoid any possibility of mixture with outher materials.
* Initialization of different types of permits (Confined Space Entry Permit, Man Basket Permit, Hot Work Permit, Gratings Removal Permit, Gas Cylinders Transportation) in order to respect the requirements of safety rules.
* Overall Supervision of including such as:
HSE, House Keeping, Piping Prefabrication including Pipe Supports, Piping
Installation including Pipe Supports, Spool Piece Control, Check and Monitor
Tools, Equipment, and Welding Consumables, Check and Monitor
* Performing daily tool-box with topics including technical and safety procedures complete approved by CTJV and Qatar Gas.
* Preservation, Pipe Internal Cleaning
* Schedule Monitoring for: Man-power Mobilization, Construction Equipment,
Welding Dia-inch, No of Spools, and Pipe Supports.
* Pipe Internal Inspection Witness for Large bore Piping
* Check if the latest Construction Drawings are Used
* Consult Engineering problem with Engineering Departement
* Check and Consult Spool Delivery at Site
* Check Work Front and Coordinate with Other Disciplines (Civil,Painting,Electrical grounding)
* Request Scaffolding Installation
* Aproval request for different Work Permit
* Erection of steel structures ( small platforms, leaders and steel structure supports), ASME piping and Non-ASME piping (large bore), segments of Air Duct necessary for piping erection, Silencers, Burners(under and with help of KOCH CHEMICAL TECHNOLOGY GROUP supervision),steam tracing pipe and Stack assembly.
* Inspections of the spools, dimensional, parallelism and flange alignment in accordance with piping isometrics.
* Fabrication preassembly of pipe using isometric drawings following material prescriptions punched or tagged on each spool (no. of drawing, no of sheet and quality of material ;Lalloy, Carbon Steel, NICE Carbon Steel, LTCS, Stainless Steel, Cooper, Galvanize).
* Erection pipe assembly fabricated using cranes, chain-blocks and lever-blocks and finalizes boiler lines with field weldings.
* Under VENDOR supervision, elaborating solutions for different modifications required by the steps of pipe and structure erection.
* Installation of specials devices: rupture disc; restricted orifice; water level indicators; sight glasses; gauges used in exploitation of boilers.
* Installation of different types of valves (ball valves, safety valves, check valves, globe valves, diaphragm valves (pressure relief valve), gate valves).
* Fabrication, solutions for different modifications and directly erection of different piping supports
* Check Flange Alignment of Rotating Equipment
* Check internal grinding of welding route of flanges for Restricted Orifices
* Using general plans, line list,bills of material, valve list and under Vendor supervision finalize complete erection of small-bore piping lines with field routed supports.
* Togheter with Engineering Departement and Q.C. Departement elaborating As-built small-bore piping drawings with welding map and field routed supports location using general plans provided by Macchi
* Perform Piping Line Check and initialization of preliminary punch list
* Follow Up of Punch Work following to kill A1 punch items for lines included in hidro testing and A1 and A2 punch items for lines under visual test
* Prepare Daily and weekly Report regarding of piping erection evolution and hidro test preparation
* Consult Punch work with CTJV Supervisor
* Perform Official Line Check
* Perform Back Check of Punch Work
* Check and Ensure Piping Test Preparation is Properly Made(test limits are box-up with temporary gasckets,original stud bolts and nuts are properly tighted,check valve or any outher manual vave connected by flange and included in test it is fixed with original gasckets color code already marked)
* Check and Review of Test Packs initial prepared following to have include all documents required by procedures(Internal grinding of welding route for restricted orifice's flange report,Stud bolts tightening report,Isometric Control Sheet,last revision of Hidro Test Flow Chart,Cleaning Report for Piping Spools)
* Coordinate and Consult with Other Discipline (Calibration Team, Pre-Comission Team,Civil Team) concerning in Testing
* Witness of Piping Pressure Test
* Check and Ensure Piping Flushing and Blowing Preparation is Properly Made
* Coordinate and Consult with Other Discipline concerning Piping Flushing and Blowing
* Perform Piping Reinstatement Work and Checking following last revision drawings and color cod for permanent gasckets, bolt and nuts
* Attend Daily and Regular Meeting about LNG general progress
2.September 2004 -August 2006: exploitation experience as an employee of CNE-PROD
Nuclear Power Plant Unit 1 Cernavoda
Mechanical engineer in Piping and Metallic Structures Design Department. In this period I was implicated in follow activities:
* Graduating different courses; safety, materials, quality control, technology of welding, nuclear power plant systems, initialization in operation of a nuclear power plant, piping technical design, initialization in ASME Code.
* Working in an engineering team who recorded date directly from field (sketches and measurements) for situations who become non conformance with good functions of Cernavoda Unit 1 Nuclear Power Plant especially for nuclear piping system.
* Giving some possible engineering solutions( based on these sketches and measurements, consulting experience of our partners(other nuclear power plants)and general codes: ASME,ASTM,DIN )for these situations who become non conformance with good functions of Cernavoda Unit 1 Nuclear Power Plant,
* Initialization of different engineering documents (DCN, MPA, DRP) with purpose to transmit these solutions to the team of calculation for stress analyses for final evaluation in order to optimized piping systems
* Supporting a good implementation of modifications by Maintenance Piping and Supports Department.
* Sustain in creation of documents revised after implementation.
* Recording in Unit 1 Nuclear Power Plant History Docket all modifications already implemented
3. May 2001 - September 2004: field experience as an employee of Nuclear Montaj SA
Nuclear Power Plant Unit 2 Cernavoda.
As new graduated mechanical engineer in this period I was implicated in follow activities:
a) September 2002 - September 2004: Piping Engineer Supervisor in Reactor
Building
* Leading worker teams in a professional manner following to respect quality and schedule requirement and a good safety level (weekly technical commissions followings indicated procedures complete approved by Management Team - SNN -AECL - ANSALDO)
* Full materials Traceability on.
* Fabrication and installing for spools using isometric drawings
* Inspections of the spools, dimensional, parallelism and flange alignment in accordance with piping isometrics. Pipe diameters (36¡¨-1/2¡¨ different materials: SS,CS)
* Installation of specials devices (rupture disc; restricted orifice; sight glass; gauges used in exploitation) in piping systems
* Installation of different types of valves (ball valves, butterfly valves, check valves, globe valves, diaphragm valves, gate valves)
* Also inspection the spools for Stainless Steel and impact tested Carbon Steel.
* Fabrication, stress analyses modification and directly installing of different piping supports.
* Pressure test
* Implementation quarterly Quality Assurance Program impress by Management Team.
* During of project implementation suggesting first possible solutions to non conformance situations under Engineering AECL coordination
* Working with employees of AECL (Canada), Babcock&Wilcox (Canada) and Ansaldo (Italy);
b)April 2002 - September 2002: Planning supervisor
* Preparing CWP (Construction Work Packages) as per due normative ¡* Instructions in calculation of required men-hours for each activity in gas line erection¡¨ by John S. Page for piping systems especially for non-nuclear systems.
c)November 2001- April 2002: Rigging Supervisor
* Leading rigging teams in a professional manner following to respect quality and schedule requirement and a good safety level
* Supporting erections of different piping and equipment items in Turbine Building and Pump House
* Initialization of a maintenance program for lifting equipments (hoists, monorails, cranes, etc.)
* Selecting a specially team for maintenance program of lifting equipments
Implementation d)May 2001 - November 2001: First assistant of Electrical Mechanical Chief
* Initialization of a maintenance program for all electrical tools (together and with consulting of safety department) based on a color code who asked for each month one specially color applied on each tool and changed monthly just if the tools are in good function condition
Other notes:
* driving license since 1999
* passport number: 06869996( available one year)
* single accommodation
* date of availability: after 30 days from your request
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 2301 to 2350 of 4805)
Go to Search Parameters...
Brief Description
Profile: Activities Involved Designing, Coordination with Shop supervisors, Using Auto Cad for designing 2D Drafting, Using NX4 for designing 3D modeling.
Ability: proficient in window application
Action oriented, contracts-project manager
Senior Electrical Engineer
I have over 5years and 8 months of combined experience in computer programming and design of electronic appliance controls mainly for HVAC products. Presently I am working as an Electronics Engineer (HVAC Electronic Controls Design, Testing & Approval) in the R & D dept. of Awal Gulf Mft. Co.
This is a resume which will illustrate briefly what I have achieved both with educational and industrial environments.
Sr Structural Designer / PDS FrameWorks Coordinator and project set up.
Estimator, Project Manager, Project Engineer, Construction Administrator, Architectural Designer, CAD
Free!
Oil & Gas Finance, Commercial Manager. 30+ years industry and 20+ years international experience.
Class 6 Underground Coal Miner. Certified Welder. Certified structural steel welder. Skilled in rebuilding all types of machinery. Skilled in running all types of equipment.
instrument engineer with 6 yrs of experiencer in construction management,projects and commisioning in instrumentation field.
Primavera Scheduler
Has 15 years of top, diversified logistics/operations management experience.
Facilities supervisor for utilities, electrical disturbution, ammonia refrigeration, power boilers and heat exchangers,production equipment, infrastructure, mechanical contractor for twenty years,
Over thirty years engineering, construction, remediation, operations, start-up, and manufacturing experience includes: project management; project planning, sched¬uling and analysis; cost engineering; cost, schedule, and earned value analysis and reporting; WBS, OBS development; EAC, SPSPI and CPI
Radiation Safety Officer, Certified Health Physicist, Environmental Manager
Mechanical Engineer, 2 yrs of experience in design and development, cad packages- CATIA V5, solidworks 2006
An ambitious, highly motivated and energetic civil engineer with extensive commercial experience in construction business. Superb managerial, communication skills combined with analytic and practical personality. Looking for project coordinator, contract administrative or similar position.
as below
To obtain full time employment with a Prominent company in the Construction Industry that offers stability, growth, and advancement opportunities where I can utilize my skills as a Heavy Equipment Operator.
For the post of Design and draughting
Six years of experience in Project Management, Contract Management, Quality Control and site supervision of high-rise residential and commercial project. About four year of experience in Project Management of an industrial projects.
Objective: To contribute my technical skills and to be part of professionally managed Organization that provides excellent opportunities for learning and scope for Individual development.
Vast Experience in Business Development, Administration and Management, Business correspondence.
Architect and Environmental Planner Total Job Experience-2.5 yrs as an Architect 2 Months as a Planner
Bilingual engineer with experience in engineering and teaching. Experience in administration, group management. Dynamic and outgoing by nature.
MSc in Environmental Engineering from University of Nottingham, UK
Well rounded journeyman electrician looking for industrial, commercial or residential position. Experienced with supervising apprentices and other jw's.
I am piping engineer with diploma in mechanical engineering to Poli- Technic institute "GH.Asachi" Iasi, Romania
Piping Designer with Over 20 years experience within the Oil and Gas, Petro Chemical, Refinery, Textile, Pharmaceutical and Nuclear Waste Industries
hardworker STORE KEEPER
NDT technician RT MPT LPT UT
Young academically accomplished geotechnical engineer, practical experience in the mining industry both domestic and overseas.
Application for the post of Safety officer
EXPERIENCED PIPING ENGINEER WITH PDS ADVANCED EXPERTISE / TECHNICAL DATA SPECIALIST
Make, Review and implement Engineering design, construction work,inter-diciplinary interfaces, Construction Specifications, Progress reports, Quality Plans and all the commssioning and Maintenance Procedures.
Construction Project Manager Restaurant (Swiss, 39, Trilingual E/F/G) is looking for a new international career opportunity. 10 years experience in construction project management (McDonald's restaurants and General Contractor). Willing to re-locate in the US/Australia/NZ/Canada.
Knowledge of Hydrotreating & Hydrocracking, Catalytic Cracking, Distillation and Amine plants. Knowledge of Process simulation (HYSYS, ASPEN Plus, PRO II and HTRI), PFD, P&ID, Flare and Relief systems, LDT, Hydraulic calculation, HAZOP review, Equipment sizing, TBE, DPDT and process data sheet
Electrician
I'm a proficient, reliable and a technical sound welder.
QA/QC, CERTIFICATION, TURNOVER
Work on a farm all my life, I went to school last year for heavy equipment
Experienced Buyer/Purchaser, very versatile background from different countries and industries.
I have over twenty years pipefitting experience. Most of this experience has been in industrial chemical and paper processing. Five years of this experience has been as an foreman. I have used computers for report writing, maintaining records and numerous other tasks, have worked internationally.
Interior fitouts Project Manager - expertise in Site execution, Management, Planning , Procurement, Coordination between Services. A Go-Getter and Self-Motivated Engineering Professional.
19 years of experience as a Camp / Accommodation-Facilities Management (Staff Welfare Operation and Maintenance) in Oil & Gas, EPCC, Company (Road & Bridge, Electro-Mechanical Contractor.
I have a master degree from the American University in Cairo, excellent computer skills, English & French languages, Excellent communication skills, and presentable. I prefer workin in construction management field
Develop & implement Contractor’s Quality Control Plan in accordance with contract & technical specifications including writing the Inspection & Test Plan, Quality Audits, Record Keeping, Prepatory Phase Meetings, Resolve NCR's, Process Control, Sub-Contractor Control, every aspect of Quality Control
Im certified coating inspector B-GAS grade2&SSPC-PCI
Senior Electrical, Energy Model, LEED, sustainable, Head, Manager, renewable, coordinator, building commercial, residential, healthcare, Education, industrial, parks, Hotels
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
[ 47 ]
48
49
50
Next
Last
Seach Parameters
Change search parameters...
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com