Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #62818
next resume »»
CONTACT INFORMATION:
View contact information...
Industrial Automation Electrical Engineer
OBJECTIVE: Enthusiastic, responsible, and results-oriented engineer. Quality directed team player with a vision of company and customer. Ability to ensure that all phases of assigned technical field are in compliance with and onform to local, State, and Federal requirements, Ul508 codes and regulations; read, interpret, and develop construction drawings, plans and contractual ocuments. Fully disciplined in principles, techniques, and practices of engineering, construction and electrical systems; requirements and applications of modern commercial construction, materials and methods; direct application of State, Federal regulations; construction estimating, costs and financial planning. (NVIC-89) Over 24 years of oilfield, refinery and petrochemical automation experience with project delivery lifecycle expertise from front-end engineering, conceptual and detailed design, feasibility studies, project planning, procurement, construction, commissioning, performance monitoring and handover to end customer
TARGET JOB: Senior Electrical, I&E Controls Engineer/Manager
Desired Job Type: Employee Full, Temporary/Contract/Project
Desired Status: Full-Time
Site Location: No Preference
Description of my perfect job: Challenging, direct, progressive, conceptual, and trend setting in the industry
Career Level Management (Manager/Director of Staff)
Date of Availability: Immediately
TARGET COMPANY: Engineering
TARGET LOCATIONS: Relocate: Yes US - Would consider going back overseas.
WORK STATUS - US Citizen: I am authorized to work in this country for any employer.
EXPERIENCE
Brinderson Engineering, Inc. - March 2007 - Present Costa Mesa, CA
Senior Controls Supervisor - Chevron, El Segundo
Services for electrical/controls design engineering, procurement to turnkey system and construction management. I possess a strong controls engineering background. I have an in-depth working knowledge in project management techniques, from design to construction, and hands on experience in labor estimates and scheduling, and liaison between various construction groups. Over twenty five years in the engineering field, I have obtained skills and experiences from detail design to programming, database structure design, to testing, commissioning and startup, project engineering and management expertise with the ability to successfully devise, design and program an unusually diverse variety of processes utilizing an integrated array of electromechanical processes, software systems and program-control devices.
Areas of particular knowledge and capability includes: controls engineering with an emphasis on: Distributed Controls (DCS), PLC¡¦s, and HMI, SQL and databases. Server/client computer network topologies design has been a personal interest of mine. From full redundant token ring networks design to stand alone PC controls system with a single nodes or remote i/o¡¦s, utilizing serial RS485 interface communicating over various industrial communication standard protocols¡¦ i.e., Hart, SP-50, Field Bus, Modbus TCP, Ethernet TCP/IP, 10-Base-T, and fiber optic and wireless spread spectrum routers, Ethernet switches and modem, over the years I¡¦ve been involved in implementing these systems, with complete commissioning and startup in some cases DCS systems as large as 60 thousand i/o's points Completed knowledge of measurement and instrumentation design requirements, as it relates to it's process. PID development, instrumentation calculations and sizing, instrumentation installation design standards, and valves and close loop PID adaptive control tuning. Electrical experience consist of high voltage 3 ph, 4160KV switch gear and motor control centers design, one-line diagram development, transformer calculation and sizing, heat rate calculations, transmission metering to low voltage DC UPS and emergency backed up battery power systems power distribution, includes procurement specification development, ISA data sheets generation, instrumentation index, and process and instrumentation diagrams, SAMA logic diagrams, ladder logic, and loop diagrams for process connections and instrument loop check. Responsibilities include managing all phases of design, construction and final acceptance from the client.
2/2003 - 3/2007 Venom Consulting Spokane, Washington / Pusan, Korea
Engineer / Electrical Controls - Capital Projects
My main responsibilities include Gathering technical specifications & requirements of client, system design, selection & design of equipment. Submitting engineering packages for the client / consultant, making necessary modifications and releasing the same for execution of the project. Instrumentation and Control Systems Engineering and assembly of engineering work order packages for system wide processes, develop P&ID's, PLC cabinet drawings, loop sheets, schematics, panel drawings, including DCS and PLC interface drawings, perform quality checks and verification of compliance to standards for instrumentation drawings issued for construction and field checkout, construction support, startup assistance and as-built construction. Lighting and grounding arrestment design and means developed One Line Diagrams, Electrical Instrument Plans, Sections and Details, Schematic Diagrams and Wiring Diagrams. Eliminating redundant / obsolete processes involved in the design, development processes and working towards value-addition. Conducting trials & tests, identifying any changes and making final modifications in components for routine production. Preparing cable schedule, hook up diagrams, JB schedule, interconnection diagrams, PLCI/O list, DCSI/O list control room layout and flow charts. Process measurement & control instrumentation & services to monitor, & optimize manufacturing processes. Review design and documents prepared by the respective design engineers and conducting verification of drawings and documents done by the design engineers. Managing erection/ commissioning of process control equipments for smooth operations.
Also in this position, I lead the technical aspects of ownership representation of the facility including implemented electrical, control and instrumentation systems in chemical processing, food processing, power Generation and metal fabrication manufacturing environments. Specify, configure, test and commission DCS and PLC/PC-based systems TDC-3000,Delta V, Modicon, GUS, FSC, Honeywell FSC (R420, R501, R531.1, R535.1, R602.2) system with SOE(R130,R120), IPC 620-60 PLC], Honeywell Experion PKS R101.1 with C200 Controller, Honeywell PlantScape Process (R200, R300.1, R320, R400, R500.1) & SCADA (R200, R300.1, R320, R400) system including C200 Controller,Honeywell SCAN 3000 SCADA system, Honeywell TDC-3000 DCS, Triconex TMR (V4.0) PLC with Tristation (V3.1) Allen Bradley, Mitsubishi and Wonderware. Design of and Implementation of electrical, low, medium and high voltage power distribution, motor Control and instrumentation systems. System terminology experience in Industries: Petroleum Refinery, Power Plant with Boiler Management Systems, Gas Pipe Line Transmission, LPG Storage Facility and Production, Petrochemical, Chemical, Off Shore Terminal Unloading Facilities and Automation in Oil Production.
Managed all aspects of projects assigned from concept through Construction, testing, training and startup. Managing overall activities pertaining to installation and commissioning of a wide range of machinery, systems and equipments. Supervising commissioning activities. Extended communications Skills and the ability to work in a team environment. Implemented project Designs using applicable industry standards including ISA, IEEE, NEMA and NFPA, and UL508, CSA.
Assurance contractor and company compliance with design construction, Simulation and Loop Checking of various instruments; in adherence to the company standards and specifications. Conducting inspection, Factory & Site Acceptance Tests to ensure the performance capacity of various Control Systems and equipments.
Hardware and controls installation and calibration, maintenance, operating
Agreements and permits, including enforcement of equipment guarantee
Provisions therein, Assure work at facility's is performed in a
Safety-conscious manner, Facilitate periodic reporting as required.
Monitor, inspect and analyze generating equipment incorporating VFD and servo control devices for proper operation, safety interlock and service report deficiencies, Utilized SCADA, Ethernet communications, Analyzing individual device and overall plant performance for trends, Anomalies and improvement, Work closely with equipment suppliers and Service providers as required.
Engaged appropriate internal and external resources as issues were required, Provided periodic status reports as required from time to time, Assured reliable electronic communication was maintained to and within the facility, Monitored equipment maintenance and repairs; performed periodic inspections, Interfaced with engineering, accounting, development staff And other individuals both inside and outside the company as required. Analyzed spares consumption and quantities for adequacy, Performed other Tasks with additional site contractors as was required to expedite cost and construction means.
This position requires successful interpersonal relationships, Strong verbal, written and electronic communication skills, High attention to detail and inherent inquisitiveness. I have to be Self-motivated and able to perform duties independently and remotely.
1/2000 - 2/2003 EcoBlasti International Los Angeles, Ca / Koper, Slovenia
Director Engineering/ Owner Client Services WTO Contractor
Project management, project monitoring, and project delivery life cycle for FPSO and MOPU.
Developed on shore - off shore-automated power loading systems for oil, natural gas exploration automation and service capability's, automation and control of Storage loading platforms. Designed oil drilling platform lighting, power Distribution, switchgear, fire control systems, black flame detection and Annunciation evacuation systems. Managed the Engineering & Design and commissioning of two Major oil and gas projects on Honeywell Platform EPKS C200 controller and Fail-safe Controller with Experion R210 software. Designed power generation systems and Conversion for foreign markets. Design and incorporation of automation & access control systems for
Drilling platform facilities. Integration of electronic sub systems, and Communication suites. Liaison with contractor engineering staff in the Interpretation of contract specifications and drawings.
Generated technical reports, program interpolation monitoring, and advised Sub contractor performance. Pre-bid support of estimation of scope. Level one planning at bid stage for Project Execution Methodology and Project Scheduling. Deliverable quantity and Cost estimations leveraging Low Cost Country (LCC) sourcing opportunities. Project Initiation, Planning, Execution, Monitoring & Control and successful close out. Aggregation of LOB financials and planning Annual Operating Budgets for Project Operations on project operations, MIS and performance planning and review. Resource Management
Installation and commissioning of Ast Make Flow Computer On Hbj Pipeline. 92 Flow computers were interfaced to central processing for data monitoring through Ast Make Remos software communication to cpu on open line Rs 232 standard with fibre modems. ƒnGujarat Gas - Design, Engineering, installation & commissioning of 20 Nos. St Make Flow computers with orifice plates as primary sensing element, Rosemount transmitter, temperature elements. The calculations were performed using Aga 3.
Gas Authority Of Nova Gorrica Limited-Part Of The Team Responsible For A Turnkey Instrumentation job Including Designing, Installation & Commissioning of Das ( Data Acquisition System ) for Gujarat Gas Limited, Kranj. System Commissioned Using Ast Make Flow Computer, Rosemount transmitter, Fouress control valve & Yokogawa single loop controller & bell I/P convertors.
Oil And Natural Gas Commission Izola, Slovenia - Commissioning Of 167 Nos. Flow Computers with remote software. Terminal Automation of Karnal Marketing Depot - Was involved right from the technical evaluation of the bid to the execution of the order. system Has 162 metering points with liquid control Pd meters as primary sensing elements & Ast Make 8695 S, 869 M Batch Controllers & Dec Machine as supervisory computer In control rooms.
7/1997 - 1/2000 Lisnave Estalerios, Lisbon, Portugal / Gdansk, Poland
Electrical Design and Contractor Controls
Retrofit engineer for Blue Water Transportation re-build yards located in Portugal & Gdansk created Build outs and automation control system schematics for revisions and as-builds. Directly involved with four - 700 passenger, 33 unit ferries for local operator Zeluga Swinoujska and a 199 passenger, 50-unit ferry for Torghhatten Trafikkselskap AS. Was Responsible for power distribution, communications suite electronics, Radar and navigational aide's calibration and control. Oversaw the installation and control of automated turbocharger controls and design systems. Engineered and designed control systems for bilge water cleaning, treatment, de-watering of sludge systems. Design and installation of Customized Bridge Consoles, and re work of existing consoles. Design and installation of Engine Room Control Room consoles. (Triple Sea Consoles - Main) Industrial Automation project for Honeywell, Singapore; Client - BASF Nanging, China Aromatic DCS Interfacing ICS TRIPLEX TMR with existing Honeywell TPS, Design of PLC Hardware, PLC I/O Schedule & Layout, and PLC Software; coding of PLC software to the existing Honeywell Experion PKS, Commissioning of PLC, SCADA, Data Acquisition Systems, DCS and PLC-based Telemetry systems and control panels which includes addition of points, graphic generation and report building. Preparation of technical/project documents in FDS generation, software design specifications, and configuration documents, Systems support activities including integration of new systems with existing setup and site acceptance tests.
3/1996 - 9/1997 Cordova Electric/ State of Ak Kodiak, Alaska
Electrical Engineer Projects
Cordova Electric co-op 1996 -1997 Kodiak, AK
Engineer and designer for the Alaska Aerospace Polar Launch Facility
Located on the island of Kodiak, Alaska. Performed the Power requirement study, Construction Work Plan, Facilities power design, systems layout and Specifications, Automated countdown, Irig control processes, Black Flame Detection control loops schema, internal communications systems.
Power transmission circuits, substation facilities, provided engineering Support to construction personnel during construction phase, prepared cost Estimates for original proposals, assisted in project clarification for Primary approved bidding contractors, and was end customer liaison for Site turn over. Developed engineering package, PID design specs, project Scheduling, project technical drawings and clarifications.
9/1991 - 3/1996 Francis Engineering Vancouver, Wa / Montreal, Canada
Systems Engineer
Designer for the Nasa Ames research faculties. Implemented upgrades of
Advanced security hardware, software, and remote video motion control
Processes. Redesign of power distribution and redundant 750kw generator
Backup power sourcing. Integration of Co-generation facility and transfer Buckets. Design of Irig timing control, video surveillance and fire Control systems lighting. 480-volt distribution, Ozone reactor power Design, Satuable inductor transformer design and systems control Process Controls call out and design for access control. Control system development Centrifuge test facilities. Design and specification of spent launch Container, recovery vessel guidance and control.
5/1987 - 9/1991 Promedigas San Francisco, Ca / Hazira, India
Senior Engineer
Systems Electrical Engineer and lead designer, extensive conceptual design
And project management of resources and personnel. Design and integration of facilities power distribution, lighting and media control systems. Design of teleconferencing studios and communications for DOD contracts. Design and installation of access control for encryption suite facilities, and facility environmental controls for Naval and Marine vessels. Incorporation of technical manual upgrades and incorporation into current Operation and usage. Project Manager, Onshore facilities, GSPC-NIKO Ltd, Hazira, India Implemented a remotely controlled Honeywell C-200 system with a radio link with an unmanned offshore platform, Commissioned field instruments gas chromatographs and metering subsystems. Project Manager, Onshore facilities, Cairns Energy, Hazira, India
.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 1351 to 1400 of 4496)
Go to Search Parameters...
Brief Description
10 years experience in engineering & design of material handling equipments like coal handling, MSW handling etc.
• 16years of work experience in India/Indonesia in Welding, QC and Site/Construction management in EPC turn key projects (Polymer, CTA, PTA, and Steel). • CSWIP 3.2 Senior Welding Inspector •ASNT NDT Level III in RT, PT & MT •Computer literate in Project Management tools.
Experienced health and Safety professional, excellent Computer Skill, knowledge of H&S MS (OHSAS 18001); EMS (ISO 14001) and QMS (ISO 9000:2000; Qualified Auditor, Training Instructor.
Successfully completed the Final Bill of Saudi Riyal 120 million Steel Plant project (Civil Works) with the Main Contractor Awabeded Ssang Yang- Korea and successfully completed the Internal Audit before the External Audit to obtain ISO 9002 Certification for Company's Quality System.
Global experiance in the construction field from horizontal to vertical projects and from start to finish level.
I am a CWI, Level II in MT, UT, PT and RT film interpretation. I have US and overseas QA/QC project and manufacturing supervisory experience in the construction, petroleum, mining and aerospace industries. References and copies of certs. will be provided upon request.
- Bilingual English/Spanish.Microsoft Word, Excel and Project Strong verbal and writteFirst Aid, CPR AED, Blood borne Pathogens certification communication skills.MS Office Suite, Lotus Notes, Equity Management Software, COMPASS, and Smart Convergence model
Comprehensive practical and commercial experience since 1997 in every aspect of cathodic protection systems on all types of structures, comprising detailed design preparation / engineering calculations and Preparation of proposals with design etc.
Graduate in Bachelor of Science in Civil Engineering and Bachelor of Science in Sanitary Engineering. Presently Employed at the University of Northern Philippines, Vigan City, Ilocos Sur. Im working as a ( project supervisor/project in charge, estimator and Part-Time Instructor)
Five years of progressive working experience within the civil engineering sector in the Middle East. I have worked mainly in consulting discipline of engineering, specialising in Document Controlling and general office administration. I have been involved with the preparation of Monthly Reports, Cor
Professional Civil Engineer with 3 years experience in QUANTITY SURVEYING
Condition Monitoring Management Consultant
Consultancy, design, detailed engineering, configuration, implementation and maintenance of commercial and industrial automation and control systems.
Residential apartment, multi story buildings, pile foundation, diaphrgm wall etc
I'd like to join a multinational firm as automation engineer where I can apply things I learned and get more experience
I am a very skilled and qualified mechanic, service technician. I have experience as a welder, among other qualifications.
Seeking a challenging career position where my technical skills, talents can be effectively utilized by a company offering long-term opportunities for professional growth in recognition of dedication, drive and superior performance.
CAE, Structural stress Engineer possess work experience in design & analysis, Seismic Analysis, thermal analysis, fatigue analysis
Mechanical discipline. Construction LNG / Power / Oil and Gas. Middle Management .
Manager with 14 years experience in Project control Management , Project Management & Contract Management
Career Professional in the Ready Mix Concrete,Aggregates,Equiptment Industries,
My most recent experience was repair and maintenance on board a Tanker vessel, Livestock and Reefer Ship. I was responsible for all the hot work and repair, including the use of Manual lathe machine
Civil Engineering,Construction Manag., Geotechnical, structure, Design of steel towers
I am currently working in a Water Utility Company as a Project Development Manager with exposure in designing pipe network, supervision of pipelaying works, and pipe maintenance, handles customer service operation, and Customer and Billing computerization project.
Looking to join a company that has the need for civil engineer and offers opportunities for advancement.
detail drawings to be prepared from design drawings or from the data available as per site or workshop or offshore, civil steel structural, fabrication, electrical and drainage piping design works experience in India and Saudi Arabia for bldgs, strl towers, elect control panels, factories, furnaces
I possess Poly Technic (3 years) Diploma of Associate Engineer in Electrical Technology and also have completed Graduation in general subjects. My total professional experience is about 8 years out of which 7 years are passed in Oil and Gas industry. Presently, I am working with Saudi Aramco as Engr
Mechanical Fitter
Over 16 years of total experience in the industry of which 8 year’s industrial experience as Chemical Engineer. This is backed by 8 years of experience of implementation of Intergraph’s Plant Design System (PDS) software. The domain of PDS expertise comprises of piping and structural modeling, extra
Autocad drafter
B.E. civil engineering with gulf experience
Cement plant operation,optimization,trouble shooting,refractory management.
A commercially minded quantity surveyor and manager with 17 years experience of managing the financial and contractual matters of projects from pre to post contract in both client and contracting environments. Conversant with many forms of contracts and working within the constraints of deadlines.
Design engineer electrician, english-russian interpreter
Duties and Responsibilities:
Electronics, embedded, RTOS, C
Comprehensive problem solving abilities, excellent verbal and written communication skills in English. Ability to deal with people diplomatically,
Enthusiastic, responsible, and results-oriented engineer
Profound knowledge of GPS (Leica SR 530), Total Stations, AutoCAD 2008, Leica SKI-Pro, Leica Survey Office, Surfer 8, Excel, Word
Construction Manager with 22-years experience in Mechanical Construction discipline for Industrial Projects (Oil & Gas, Refineries, Petrochemical Project and Power Plant Projects).
CAD, CAM systems-Textile, MS Office including Word, Excel, PowerPoint, Internet operations.
Good commander of Microsoft office & operating system & web applications
Autocad programming(VB, Visual Lisp, AutoLisp), Database, Report Generation (Crystal Reports, Active Reports)
I am a construction engineer having experience of more than 3 years in multi storey building construction
Electricial field 18 years, licensed journeyman since 1992, residential, commercial and industrial
Ñivil (irrigation engineer), dam design and construction engineer
Hardworking, passionate to learn more . Diploma in Electrical with 33 years of experience in construction and oil and gas industry.
Licensed Civil Engr with more than Ten (10) yrs of work experience mostly in railway projects, commercial and residential buildings in the Philippines. Includes Construction Supervision, Design, Estimates and Monitoring. Computer literate with knowledge in different Engg Softwares.
Ten years Experience @ various construction sites like LNG Terminal, Infrastructures, Marine/Offshore, Jetties, Break water, Port Commercial & Residential Building projects with skill in Site Management, Execution & QA/QC. Work experience with Saipem S.A, Ballast Nedam / Foster Wheeler, Besix-Kier
Estimator / Quantity Surveyor
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
[ 28 ]
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2008 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com