Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #63608
next resume »»
CONTACT INFORMATION:
View contact information...
Qualifications
RAB/IQA ISO 9000 Assessor/Lead Assessor - Certificate No. Q05671 (1996-1998)
Certified CWB 178.2 Level III Welding Inspector - Reg. No. 1344
Welding Examiner - Alberta Boiler Safety Association - Reg # TBA (Incomplete)
Welding Supervisor per CSA W47.1 and W59
Radiographic Film Interpreter, Level II - NDT Training & Placement Center
Certified Alberta "A" Pressure Welder - Reg # 215
Alberta "B" Pressure Welder - Certificate W-10437
Journeyman Welder - Interprovincial Certificate No. 10430
Education
American Society for Quality (ASQ) - Certified Quality Engineer - Pending
Application to write exam in Jan 2008
Quality Management International (UK) ISO 9000 Lead Assessor Training
ASQC - ISO 9000 Quality Systems Auditor
(WIC) Welding Institute of Canada - Welding Inspection and Non Destructive Examination
NAIT - Welding Metallurgy, Processes, NDE, ASME Codes and Quality Control
Safety
H2S Alive - Current January 07, 2005
CSTS Safety Training including WHMIS - Current February 17, 2006
OSSA Fall Protection - Current April 27, 2007
OSSA Confined Space Entry - Current May 18, 2007
First Aid/CPR Training - Current June 02, 2007
Automatic Defibrillator Training - Current June 02, 2007
BP HSE Safety Training - Completed 17 October 2001
NAARS (Northern Alberta Aquatic Rescue Society) - Public Safety Diver - Feb 2006
Experience
August 13 2007 - Current Pipeline Quality Advisor
Colt Engineering Corporation
Calgary, Alberta
Responsibilities include the development and review of new Engineering Specifications and the coordination of squad review during the approval process. I am additionally responsible for liaising with the Engineering Department Leads and Client Representatives, as well as performing site pipeline quality audits.
April 30 2007 – August 10 2007 Quality Assurance Lead
Capital Engineering
Ft. McMurray, Alberta
Pre Startup Safety Review Coordinator on the Opti Canada Long Lake Upgrader Facility. Responsibilities included support liaison for the CSU Team involving coordination of plant startup activities and documentation verification, the coordination of PSV and pressure vessel inspections, the performance of quality auditing functions, as well as liaising with the Engineering Department and the Regulatory Authority Representative. (ABSA). I was responsible for the coordination and internal effectiveness review of system walkdown inspections, critical safety and near readiness checks and pre startup safety reviews in the Gasification, Orcrude, Hydrocracker, Sulphur Recovery and the Utilities and Offsites areas.
September 25 2006 – April 27 2007 Corporate Quality Assurance Advisor
Flint Energy Services Ltd.
Sherwood Park, Alberta
QA
Responsible for Regional Operations support in project quality planning, selection and training of quality representatives, and ensuring Corporate Quality System compliance. Responsibilities included auditing company-wide compliance of the Quality Manual, monitoring continuous improvement initiatives and key production indicators. Duties included QA support for field offices, the development and implementation of quality systems manuals and turnaround management procedures for use in Alberta, Ontario and Colorado on a new joint venture project.
September 06 2005 – September 22 2006 Quality Assurance Manager
Midwest Constructors Ltd.
Edmonton, Alberta
QA
Responsible for administration and maintenance of the (ASME and CSA W59) QA and QC programs, completion of internal QA auditing requirements, the selection and supervision of Site Inspection personnel, liaison with Customer QA and Regulatory Authorities. Duties included contract review responsibilities, maintaining the Codes Library, generating work procedures, quality plans, inspection and test plans. Responsible for monitoring the major project work in Fort McMurray for the Opti Nexen Long Lake Project.
May 09 – August 21 2005 Senior QA Coordinator
National Oilwell
Houston, Texas
Quality Assurance Manager on the AGIP D-Island Project. Responsible for coordination of all QA/QC activities for a team of eight staff, including the assignment and monitoring of internal audit functions, supplier audit and inspection activities and the coordination of Factory Acceptance Testing, Rig Commissioning and associated QA/QC Regulatory Documentation and Reporting. Primary liaison between Customer and Engineering facilities. Responsible for development/review of QA/QC Feed documents required by contract.
April 04 – May 08 2005 QA Consultant
National Oilwell Varco
Edmonton, Alberta
Responsible for performing internal audits ensuring compliance to ISO 9000 Standards. Activities included liaison with QC personnel, review of audit results and realignment of quality program manual, procedures and work instructions. Involved in personnel training, revision and development of procedures, work instructions and the maintenance of the preventive/corrective action system, monitoring key performance indicators.
February 07 – March 23 2005 Senior QC Inspector 2005 Turnaround
Melloy Industrial Services Inc.
Ft. McMurray, Alberta
Turnaround Inspector - Plants 16-1 / 16-2. Responsible for scheduling and tracking of NDE requirements and the completion of welding inspection and plant system turnover activities during the Syncrude 2005 Turnaround.
January 03 – February 04 2005 Lead QA Inspector
Central Alberta Midstream
Fox Creek, Alberta
Responsible for the coordination of pre-shutdown QA/QC activities during CAM 2005 Shutdown, preparation of ITP's, Quality Plans, NDE requirements and completed maintenance work order documentation packages. Responsible for auditing the (ASME) quality program, the coordination of daily QA/QC activities including welder qualifications, material verification and the maintenance of owner/user program equipment maintenance databases. Primary liaison with ABSA and Customer inspectors.
October 2004 – December 2004 Quality Assurance Representative
Farr Canada Ltd.
Edmonton, Alberta
Quality assurance representative for a hydraulic power tong manufacturing facility/machine shop. Responsible for the maintenance of the Corporate QHS&E ISO 9001:2000/ISO 14000 Quality Program, and the development of new statistical analysis and control methods. Duties included the performance of internal audit requirements and the realignment of the corporate quality and HSE manual and procedures.
March 2004 – September 2004 Quality Assurance Manager
Vanoil Equipment Inc.
Leduc, Alberta
Quality assurance manager for an oilfield product manufacturing facility/machine shop and subsidiary sales/service center. Responsible for the maintenance of the ISO 9001:2000 and API Q1 Quality Programs, development of statistical analysis methods, resolution of quality concerns. Responsible for performing contract reviews, internal and vendor audits to ISO 9000 and API Q1, personnel training, NDE procedure development and materials and product verification activities. I was also the Customer QA liaison responsible for input during certification audits and management review meetings.
April 05 – 28, 2004 (on leave from above) Senior Shutdown Inspector
Husky Energy
Lloydminster, Alberta
Contract inspection position for Husky Oil 2004 Turnaround. Performed in-progress visual inspections on pressure vessels and piping systems making recommendations regarding the corrosion control program information obtained as a result of inspection. Responsible for identifying and scheduling completion of NDE services and documenting, formulation and distribution of inspection results within relevant departments. Involved in the major in-service repair/retrofit of a 3-1/2" thick Coker vessel support skirt.
January 2003 – February 2004 QA/QC Supervisor
Lockerbie & Hole Industrial Inc.
Sherwood Park, Alberta
Supervision of ten QA/QC personnel at a 450 employee module fabrication yard for the Syncrude UE-1 Plant Expansion Contract. Coordination of daily QA/QC activities including material procurement activities, welder qualification testing, visual inspection of structural steel and piping systems, equipment installation and electrical systems. Responsible for the management of project related statistics, NDE procedures and reporting, QA contract reviews, verification of procedural, code and standards compliance, NDE procedure and internal policy reviews. Responsible for the development, implementation and maintenance of a ground level QA Program, monitoring the activities of multidiscipline trades, auditing subcontractor functions, liaison with Customer representatives, as well as being responsible for final project turnover documentation.
November 1990 – January 2003 Senior Quality Surveyor
Purnell Industrial Quality
Edmonton, Alberta
Completion of quality surveys on behalf of international verification agencies such as American Bureau of Shipping (ABS), Bureau Veritas (BV), British Inspecting Engineers (BIE) Det Norske Veritas (DNV), Germanischer Lloyd (GL), Lloyds Register (LR) and SGS Canada. Representation of these agencies and their clients at the corporate level during prefabrication meetings. Performance of quality audits of vendor QC systems throughout pre-award contract assessment reviews and during the completion of quality verification contracts.
Management of procurement inspection activities on numerous EPC Contracts for certification compliance to ISO 9001:2000, QS9000, API Q1 and ASME Sec VIII/IX, B31.1 and B31.3. Functions including project planning, development of Inspection Test Plans and Quality Plans and the coordination of multi-discipline Inspections of witnessing functional, hydrostatic, gas and factory acceptance testing, performance verification and validation of API 6A/17D PR2 and Appendix F test results, and procedural verification of the disassembly and failure analysis of components.
Review of vendor documentation packages and independent design certificates, and the endorsement and issuance of agency verification reports. A sample of companies represented were Amoco, British Petroleum, Esso, Exxon, Husky, Nova and Shell.
May 1990 – November 1990 Quality Control Inspector
Melloy and Associates Ltd.
Edmonton, Alberta
Quality assurance of fabrication processes and inspection to ASME Sec. VIII Div. 1, ASME B31.3 and ABSA Code requirements. Liaison with Syncrude Senior QA Inspector, responsible for materials traceability, welder qualifications, overall spool dimensions, NDE and inspection test plans, and third party NDE scheduling, development of inspection and test plans for gamma ray radiography, magnetic particle, liquid penetrant, and ultrasonic testing. Quality Assurance activities including qualification testing of welders, review of NDT procedures and personnel qualifications.
June 1985 – May 1990 Quality Control Manager
Nortech Oilfield Services
Edmonton, Alberta
Quality control functions for an ABSA (ABB) / CWB approved welding contractor doing vessel repairs and alterations, the replacement of heat exchanger bundles, piping fabrication and structural steel assembly during plant shutdowns and turnarounds. Responsible for all QA/QC requirements including WPS development, ensuring compliance to ASME Section VIII Div. 1, ASME B31.1/B31.3, CSA W47.1 / W59.
1983 – 1985 Local 488 Pipefitters / Local 182 Boilermakers Unions
Welding in petrochemical plants, coal powered HRSG plants, and pulp mills during new construction and shutdowns on ASME Section VIII Div. 1 and 2 pressure vessels and ASME B31.1/B31.3 pressure piping.
Auditing Experience
Accreditation through the RAB/IQA (UK) as a Lead Assessor in 1996 through 1998. Continuing with internal audit functions on a regular basis since this time without formal recognized certification.
Performance of audits in accordance with Dutch Council for Accreditation (RvA), ANSI/ASQC and Standards Council of Canada (SCC) requirements during registration and compliance audits.
Quality System Consultant with experience in program development and auditing processes. Standards I am familiar with are ASME (Sec. VIII/IX, B31.1/B31.3) and API Product Monogram (API 5D, 6A, 7K, 16A, 17D) Certification programs.
QS9000/PPAP Development on a Caterpillar Engine Component contract for Barber Industries Ltd.
Career Highlights
Client QA Representation on numerous EPC Contracts related to the fabrication of structural steel, piping systems and pressure vessels intended for use in Oilfield Refineries, Petrochemical Plants and Pulp and Paper Mills.
Extensive experience with land and offshore platform drilling rigs and associated equipment, top drive conversions, offshore cranes and hydraulic pipe handling equipment, surface and sub-sea oilfield chokes, valves, actuators and manifold systems, oilfield production, pipeline, and wellhead equipment, down-hole tools and pumps, cathodic protection systems, rotating and gas compression equipment.
Department of National Defense Contract (SRRS Zones 4/5) - DEW line modernization project.
Subcontract welding contractor/quality control in charge of a structural steel erection contract on the Resolution Island, NWT and Jenny Lind Island, NWT sites from May - December 1989.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 1401 to 1450 of 4365)
Go to Search Parameters...
Brief Description
Electronics security engineer
In-depth knowledge of related course work and work experience in Civil Engineering Firm. Worked as Design Engineer in private consultancy firm from May’03 to June’04. Working as an Associate Design Officer with Patni Computer Systems since Feb’06 till date.
Having Eight Years Experience in the field of Civil Construction of Tank Farms, Roads, Control Buildings, Valve Stations, Pipe Racks, Pipe-way Sleepers, Paving, Sulphur Silos, Furnaces, Boilers, Conveyors, Flare Tower, Heavy Vessel Foundations in Power and Desalination Plant, Chemical Plant, Public
BE. MECH + CWI+BGAS PAINT. INSP. GR.2+ ISO 2000 lead auditor+ 10 const. & maint. in the field of oil & gas
Dear Sir: My experienced assignments cover a variety of projects including project management, translation and negotiating.
EXPERIENCE IN INTERNATIONAL TENDERING OF POWER TRANSMISSION PROJECTS
Summary of Relevant Experience: Management career is based on sixteen (16) years experience developed while in long term service with world class engineering and construction organizations.
OBJECTIVE To obtain a position with a progressive construction / development firm in which I will utilize my construction management and business skills
Prepared weekly and monthly schedules and cost reports preparation and submission to Client and in house management• Monitored of the cost & Progress on weekly basis. Invoiced to Client on monthly basis for the project.
10 years working experience in the field of QA/QC Inspection, Project Management, Field Engineering, Construction, Fabrication, Maintenance and Preservation of High-rise Buildings, Paper Recycling Plant, Oil & Gas Petrochemical Plant to Semiconductor/Wafer Technology Plant.
Control and instrumentation engineer with good experience in project management ,construction, commissioning in power plants and chemical industries.
Sajeer T S, Btech mechanical Graduate, 2 year experiance in HVAC design,
A qualified Chartered Accountant and Company Secretary with 25 years experience in accounts, finance, banking, treasury, costing and budgeting, procurement, insurance, materials management, import clearing logistics, contract management / negotiation and general administration. Indus
Planning, Scheduling, Computerized Maintenance Management System - CMMS,
Working in the erection & commissioning field from 2 yrs,having degree in mechanical,
B.Tech in Wleding, Welding Inspector
A self motivated, creative and organised engineering graduate with good communication skills and an eye for detail, possessing a good sense of humour and the ability to motivate others, coupled with the ability to work under pressure and good management skills, seeking a career in construction field
cv
To gain a responsible position with the company, which will utilize my skills and experience in the field of Mechanical design/sales Engineer.
Geological Work - Prospecting, Exploratory mining pit, Estimation of Reserve, Sampling
A challenging position in a growth oriented firm which can provide me a ground to boost me up my skills, experience and my carrier level.
JOURNEYMEN ELECTRICIAN
ELECTRICAL DESIGN ENGINEER
Autocad Draughtman
Diploma
Professional Architect with 3 years of experience
2D and 3D CAD proffecient
As a safety officer i conduct safety tool box everyday make a insfection to all equipment to ensure that they are in good condition and make the people aware at the safety regulation of the company.
Hi, i had completed my B.E.Civil in May - 2006, with 62% and my elective Subject was C.A.S.E. (Computer Added Structural Engineering). joined for M.E.Structural in June - 2006, 1st year was completed and now my dissertation is going on and the topic is "Load and Resistance Factor Design"
Information Technology Vicepresident / Manager / Director / Project Manager
Civil engineering experience. Highly qualified in troubleshooting and problem solving skills in the field of construction and management
17 years experienced engineer
More than 22 years (16 years in India and 6 years in Saudi Arabia) in Electrical Power/Substation/ Managerial/ Electro-Mechanical /Petrochemical/ Geographical Information System (GIS), fields.
Havin total 30 yrs experience out of which 20 yrs in all types of cranes-and 6 yrs in Bulk material handling field like stackers/Reclaimers etc.
Detail-focused and culturally-sensitive professional offering more than 20 years of increasingly-responsible experience. Track record of completing complex projects on time and under strict budgetary guidelines without sacrifice to overall project quality
Civil Structural Design Engineer with over 6 years of experience in the field of Design, Finite Element Analysis, Stress Analysis. Currently working on fast track multimillion dollar, complicate & intricate International construction projects in a contracting company in Dubai, U.A.E.
Licensed geodetic engineer in the Philipiines, familiar with various surveying equipment and softwares. Knowledgeable in flight planning procedure and aerial photo rectification.experienced in isolated surveys.
Senior Marine Facilities Engineer, Highest qualification: B.Sc (Eng) Civil, University of Cape Town, 1989, Overall working experience 16years, specializing in Marine Terminals, Harbor and Coastal Structures, Oil & Gas Development and Port Infrastructure Projects.
Quality Manager with 20+ years diverse experience
Interior designer-Architectural presentation artist
Highway Design, Pavement Design, Economic and Financial Analysis
Business oriented leader with a strong commitment to results and service. Significant experience in operations, logistics and supply chain management of complex, evolving organizations.
Construction Engineer
10 years in executive management and marketing and sales in numerous engineering and construction environments.
Extensive experience in finance and accounting, project cost and business office administration in start up companies in the petroleum, construction and heavy lift industries.
I am well qualified engineer, have strong administrative abilities, and also possess sound background as Quality Control Consultant. I would like to work with a company that provides strong career building opportunities as well as helps to enhance my engineering/administrative abilities.
Having Gulf experience and 10 years long employment in contract preparation & negotiation, tendering & award procedures. Conversant with FIDIC and INCOTERMS.An certified ISO Internal Auditor.
Electrical Engineer with 2 years experience i Transmmision line Commissioning, SCADA, Volumetric Batching(Foundation work), RTU/PLC in SCADA
Strong ability to work both independently and as part of a team. Possess effective time management and organizational skills. Familiar with S-Frame, AutoCAD, MS Word, Office, and Excel. Experience interacting with field crews and subcontractors.
HSE Manger
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
[ 29 ]
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2008 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com