Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #6409 next resume »»
CONTACT INFORMATION:
View contact information...

CURRICULUM VITEA

Sex Male
Date of Birth July 17 1964
Civil Status Married
Citizenship Filipino
Language Spoken English, Tagalog

EDUCATIONAL ATTAINMENT

College Bicol University college of Engineering 1988
Department of Architecture
Legaspi City Philippines
Degree: Bachelor of Science in Architecture

Secondary: Bicol University School of Arts and Trades 1982
Drafting Major
Primary: Bicol University Laboratory School 1977
Daraga, Albay

COMPUTER KNOWLEDGE

Microsoft word, Excel, Microsoft project, Auto cad 2002

QUALIFICATION / WORK EXPERIENCE

Has over seventeen (17) years extensive work experience; almost Ten (10) years in Singapore and the rest in the Philippines. Responsibilities handled were Project Management for Architectural Engineering and Construction, Project Supervision, Planning and Coordination, Quantity Surveying, Construction Safety, Construction Inspection, Cost and Quality Control and Assurance in the field of Site Development and Civil Works.
Civil Defense Shelter–MRT, Commercial building, office High Rise Building, Condominium Convention Center, Hotel, Hydro-Electric Plant and Chemical Plant Construction.

SERVICE RECORD: POSITION:

A. SHIMIZU CORPORATION SITE ENGINEER
SMAGII Project –SMM Plant January 2004 to Present
Jurong Island,Sakra,Singapore

B. SHIMIZU –DILLINGHAM KOH Bro.JV ARCHITECTURAL ENGINEER
C710- Outram Park Mass Rapid Train Station Project June 2000 to December 2003
Singapore

C. SSANGYONG ENG'G. AND CONST'N. ARCHITECTURAL ENGINEER
Capital Office Tower Project March 1999 to June 2000
Robinson Road, Singapore

D. KUMAGAI GUMI CO. LTD. ARCHITECTURAL ENGINEER
Duchess Crest Condominium Project November 1997 to March 1999
Singapore

E. HAZAMA CORPORATION ARCHITECTURAL ENGINEER
Anchorage Commercial & Condominium Project June 1995 to July 1997
Singapore

F. HYUNDAI ENGINEERING & CONSTRUCTION ARCHITECTURAL / INTREIOR
Convention Centre, Suntec City Project DESIGN SITE ENGINEER
Katong P.O. Box 0107 March 1994 to May 1995

G. MACTAN SHANGRI-LA HOTEL AND RESORT INC. ARCHITECTURAL / INTERIOR
Kouk Group of Companies. DESIGN INSPECTOR
Cebu, Philippines December 1993 to February 1994

H. MANILA SHANGRI-LA HOTEL AND RESORT INC. ARCHITECTURAL / INTERIOR
Kouk Group of Companies. DESIGN INSPECTOR
Manila, Philippines February 1992 to November 1993

I. MATSUOKA CONSULTANT CO. LTD. ARCHITECTURAL SUPERVISOR
Manila, Philippines June 1991 to February 1992
Head Office: Hongo 4 Chome Bungyo-Ku Japan

J. METAPHIL CONSTRUCTION INC. FIELD ENGINEER / DRAFTSMN
Aboitiz Group of Com. – Hydro Electric Dam Plant December 1990 to June 1991
Makati, Manila Philiipines

K. BF GENERAL CONSTRUCTION ARCHITECTURAL DRAFTSMN
Chemical Plant Project DETAILER
Manila Philippines February 1990 to December 1990

L. CORRAL AND ASSOCIATES ARCHITECTURAL DRAFTSMN
Daraga, Albay, Philippines May 1987 to 1989

EXPERIENCE RECORD:

A. SHIMIZU CORPORATION - SMAGII PROJECT-SMM PLANT:
- A Project for the extension of SMM plant.
- Involved in coordination both Structural and architectural construction Drawing.
- Prepared Method of Statement for Piling, Excavation, Concrete, Finishes.
- Prepared weekly schedule and monthly schedule.
- Review and progress monthly progress claim.
- Assist in preparation for Construction Execution Work Plan (Material take off and Project Schedule).
- Attend Coordination Client meeting.
- Attend inspection for Trial Mix, Load test, piling and Structural work.
B. SHIMIZU DILLINGHAM KOH Bro. JV – C710 Outram Park MRT Station Project:
- Fully involved in preparation of Halfen installation and Touch Voltage Membrane in PSD Platform area. - Fully involved in Preparation of Category room A,B,C and Non public room Architectural works.
- Fully involved in Fired Rated Door,Stainless Steel Railing, Ceiling Works at Station.
- Involved in MTES and Cross passage at tunnel Area.
- Involved in PU grouting at station and Tunnel area.
- Responsible for work Coordination with involved subcontractors.
- Work out miscellaneous construction detail drawing.
- Coordinate Architectural drawings and SWC prior for site implementation.
- Coordinate site discrepancies, Air tight, SWC work sequence on Arch'l works.
- Prepared weekly and Monthly Schedule AND daily meeting.
- Attend Site inspection, Material testing, Final Handovering and Close up defects with NELP, SBST and SMRT.
- Attend NELP meeting, radio, TTP, EPIC course for Maintenance period.
- Overall in Charge for Maintenance, defects and outstanding Works to obtain CSC (certificate).
C. SSANGYONG ENGINEERING AND CONS'TN - CAPITAL OFFICE TOWER project:
- Fully Responsible for the layout of Mock up of offices and Executive toilet.
- Fully in charge for the Quality control dry lay of granite material prior for installation.
- Fully in charge for the External pool finishes and walkway.
- Involved in I.D. Areas site coordination.
- Coordinate with various sub contractors.
- Coordinate with M/E work sequence within Architectural works.
- In charge of defects and final handover to client.
D. KUMAGAI GUMI CO.LTD – DUCHESS CREST CONDOMINIUM Project:
- Duly responsible for implementation approved contract drawings at site with full knowledge of detail.
- Monitor and supervised sequence of work of every contractor.
- Organized and Prepared schedule for work progress.
- Follow up subcontractors and prepared guidelines of manpower to every individual aspect of activities.
- Proposed detail drawing to solve any discrepancies on site.
- Implement coordination meeting and technical correspondence to individual trade.
E. HAZAMA CORPORATION – ANCHORAGE COMMERCIAL AND CONDOMINIUM Project:
- Maintain a through knowledge of the contract specification as applicable to the area of responsibility.
- Coordinate and monitor the competence and qualification of the subcontractor's personnel.
- Provide continuous inspection and supervision of the work in the designated area to ensure that it conform to all relevant drawing, specification.
- Prepared technical reports and documentation.
- Directly responsible over the Architectural works of the commercial and condominium project.
- Guide and Supervised day-to-day operations and performed relative works such as monitoring construction activities, manpower and equipment distribution for optimum utilization.
- Initiate revision drawing prior to the approval of Architect.
F. HYUNDAI ENGINEERING &CONST'N CO. LTD.- CONVENTION & EXHIBITION CENTER:
- Fully involved in Interior Design finishing works to the following area: CITY CAFÉ AREA,
ORGANIZERS OFFICES, PRE – FUNCTION ROOM, MEETING ROOM BALLROOM, AUDITORUIM, PEARL RIVER RESTAURANT AND BUSINESS CENTER.
- Coordinate and countercheck interior design drawing detail prior for implementation.
- Coordinate ID contractors and M&E trade for the sequence of work at site.
- Evaluate and Monitor work progress.
- Prepared technical correspondence for any site coordination and Instruction.
- Attend site inspection with Architect and site coordination to solve any discrepancies on site.
- Evaluate and prepared punchlist prior for handover all ID areas in Convention Center.
G. MACTAN SHANGRI – LA HOTEL AND RESORTS, INC.
- Assist in designing ID area, Presidential suite, Spa and Sauna room and other areas for the Hotel.
- Inspect and Pre- selection of loose furniture.
- Involve in lay outing design Pattern in Restaurant.
H. MAKATI SHANGRI – LA HOTEL AND RESORT INC.
- Fully involved in Interior Design finishing works to the following area: COFFEE SHOP, LOCAL RESTAURANT, DELICATESSEN, MEETING ROOM, ENTERTAINMENT BAR, THAI RESTAURANT AND HEALTH CLUB AREA.
- Coordinate and countercheck interior design drawing detail prior for implementation.
- Coordinate ID contractors and M&E trade for the sequence of work at site.
- Direct involved on ID subcontractor for implementing contract drawings in accordance to specification.
- Prepared progress report and monitor prepared schedule.
- Inspect and coordinate M/E service on coordinated layout in ID design intent.
- Prepared technical correspondence for any site coordination and Instruction.
- Assist and coordinate with Interior Design Consultant.
- Assist in production of working drawing of ID
- In charge for the installation of decorative lightings and lay outing of furniture.
- Evaluate and prepared punch list prior for handovering all ID areas.
I. MATSUOKA PROJECTS CONSULTANT CO. LTD.
- Involved in designing several high rise building in Japan.
- Conduct research for Architectural planning.
- Established setting – out and lay outing of exterior landscaping.
- Review and correct architectural drawings and detail.
- Supervised production of working drawings.
J. METAPHIL INCORORATED – HYDRO ELECTRIC PLANT.
- Assist on plotting topographic survey.
- Monitor dynamite blasting works.
- Supervised road widening and ruble masonry works.
- Supervised the construction of power plan.
- Monitor skyline operation.
- Responsible for as built drawing.
K. BF GENERAL CONSTRUCTION – ELECTRO –MECHANICAL PLANT PROJECT
- Drawing coordinator.
- Monitor work progress and take off material requirement.
- In charge for the architectural works and finishes of Dormitory, Office building and Cafeteria.
- Inspect quality material and finishes for Floor wall and ceiling.
L. CORRAL AND ASSOCIATES
- Involved in construction of School building, Market and Residential.
- Conduct monitoring work activities and supervision.
- Estimate bill of quantities.
- Provide design drawing and detail to the Architect.

CERTIFICATION:
- I, the undersigned certify to the best of my knowledge and belief, that the information in this Curriculum Vitae are true and correctly describe my qualification, my experiences and myself.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 601 to 650 of 4365)Go to Search Parameters...
Brief Description
detailed deisgn of building services,project management and execution
Extensive experience in managing complex construction and service projects with the knowledge to balance the requirements for functionality, quality, timeliness, and safety.
Over twenty years in the engineering and construction industry, having been assigned supervision and management positions on various worldwide projects. In addition to strong technical skills across multiple disciplines, I strive to develop cohesive teams by fostering and maintaining good rapport w
Over 14 years working experience 3 years experience in design office and 11 years experience in the construction and supervision of major prestigious international projects .
An engineering position in the emphasis of tool design, opto-mechanics, manufacturing, liaison, stress analysis, aircraft interiors or structures.
13+ years geological/geotechnical/GIS international hands-on experience in the construction & energy industries. MSc/BSc/PgD in the geosciences. Excellent software skills. Contractual or permanent post sought. Available now.
17 years in the field of construction, Experience Architectural Works and Interior works in the construction of the following building such as: Five Star Hotel, Convention Center<Condominuim, High rise Offices, Commercial and residential ,Civil Defense Mass Rapid Transit and chemical Plant.
•Strong knowledge of engineering design principals and methods necessary to adequately dimension and detail complete design concepts. •A thorough knowledge of mechanical, pneumatic, hydraulic components and electrical systems. •Experience with Classification Society Rules and Regulations.
I am seeking a responsible position that is both challenging and an opportunity to share in the rewards of successful performance in an area where creativity and business experience will be of an immediate value to the organization. I have 25 years of electrical experience
Cost Engineer/Estimator with supervisory experience. Responsible for budgeting, estimating, budget coordination and total cost management. Identified systems and procedure that are necessary to ensure that the engineering, procurement, construction and start-up phases are properly planned.
ENGINEERING MANAGER / CIVIL ENGINEER Specialized in Tunneling utilizing EPBMs and SEM / NATM. Holding a Masters Degree in Civil Engineering with 8 years experience in working overseas for leading Construction Contractors, 6 years in tunnelling.
Civil Engineer / MBA with 14 years of international construction project management experience.
Dear Sir / Madam, I’m interested a job opportunity with your organization which would require my skills & qualifications. I have 24 years experience Oil/gas & Power Industry, Construction Management/Supervision & QA/QC, Domestic & Overseas.
I am 37 Y rold, have 17yrsp.,after pass Dip. in Mech.engg., and 9yrs exp., after pass Dip. in Industrial safety from reputed institute in India, in Intl. standard Companies like CCIC-Qatar& Kuwait, L&T ECC-India, UB Engg ltd-India& Kuwait, Enelpower s.p.a.-Qatar.My Exp.
Project Engineer To be a member of a company that designs and builds large offshore and multi-purpose projects. Interests: Hydraulic Structures and Pipelines – Project Execution and Construction Management.
Analyze, design, develop, implement, and evaluate performance improvement programs using the ADDIE process. Experienced in designing and developing online (Web-based e-Learning) and blended learning as well as video training. Have used/been trained in Microsoft Word, PowerPoint, Excel, and Project,
Over 6 (six) years experience covering all major systems construction project management experience. Experienced in all kind of system and procedure in building construction work. Project control start from mobilization till completion, involved in procument, detailed design, planning, construction
Condition Monitoring Technician
Civil Engineer/Construction Project and Site Engineer/Construction Project Manager/Property Manager
All aspects of preventive maintenance and repair of fast paced industrial machinery and design and building of complex automated resistance welding equipment
Remote Site Expert : Global Experience.
I am skilled in operating many heavy equipment such as Excavator, Wheel Loader, Backhoe Loader, Bulldozer, Vibrator Sheet Pile Excavator, Long Arm Excavator, Back Pusher Tractor, Compactor,Hydraulic Breaker Hammer Excavator,Hydraulic Breaker Hammer Backhoe Loader.
Educational Qualification : Degree in Civil Engineering.
CIVIL/STRUCTURAL ENGINEER W/ 10 YRS EXP
Responsible of all surveying works such as layout, setting out of points, vertical and horizontal grade lines measurement, establishment of vertical and horizontal survey control points, computation of coordinates and elevations, preparations of as- built drawings and any other scope related to surv
Post of monitoring and evaluation Officer
Many years in Construction Administration and project management with responsibility for Pre-Design to Post construction, putting together all consultants, Architect/MEP and design teams, Manage all project elements and interior design scope, environmental permitting, all portions of the contract.
Experience in multistoreyed buildings
Seeking a Challenging Position in the area of IT Support with an on going Opportunity for Professional Growth of CHIYODA CORPORATION in Japan.
Engineering / Construction Management
Looking for job in equipment maintenance and repair
A certified Engineer-in-Training. Possess a Master of Engineering Degree in Civil Engineering from the University of British Columbia, Canada. Worked as an Assistant Project Manager with the California Department of Transportation.
Twenty Three (23) + years hands on Industrial, Commercial and Utility Electrical Field experience including installation and maintenance of low, medium and high voltage switchgear.
I've work in construction most of my life ,I like doing it and I'm very good with grade work.
Architect urban designer with aptitude for designing and detailing large scale building complexes and buildings
Product Support for Hydraulic Drilling Rigs and Screw Compressors
Experience in Warehouse and Purchasing Activities for 5 years
Approved Electrician (BOSIT)
Bachelor of Architectural Engineering 2001 - Ain Shams University, Cairo, Egypt•Internal auditor course on quality systems according to ISO 9001-2000-•Internal auditor course on Occupational Health & Safety Assessment Seriesaccording to ISO 18001-1999 from QUENSH systems co.•Autocad 2007
I have many years experience in Oil & Gas, Power, Chemical, US Embassy, Residential/Commercial and Government work. I have strong Communication, People Skills, Administration and Document Skills.
Mechanical/Piping Engr., Design of Process Plant Layout and Piping, Installation Engr. (Offshore), Pipeline Engr. ( Onshore ), Sofwareused: Autocad, PDMS, PDS, Autoplant, Caesar II for stress analysis.
„X Diversified and proven experience in program management & development of infrastructure projects, including highways, rural roads, jeepable tracks, water supply, sanitation and irrigation schemes with regards to social mobilization, planning, implementation, contract administration
NUCLEAR SAFETY ENGINEER / NEBOSH INTERNATIONAL
12 years work experianc in plumbing supervisor/engineer
Tekla structure developments(by C, C#) ,and structural designer, detailer (concrete and steel)
Building/ Construction technology
Water Resources Hydrologist and Civil Construction speacialist
I am Mechanical Engineering graduate from India and having more than 20 years of experience in the industry. I would like to stick to my last employment of Facility Manager.
I am a 41 year old Civil Engineer with over 20 years of "hands on" construction experience. However, I have only had a Civil Engineering degree for 2 years.
Refinery, tank farms, pipelines, gas plants, flow stations and production units. Engineering, procurement, construction and testing/commissioning.
First   1   2   3   4   5   6   7   8   9   10   11   12   [ 13 ]   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com