CONTACT INFORMATION:
View contact information...
DATE OF BIRTH: May 18th 1981
MARITAL STATUS: Unmarried
LANGUAGES KNOWN: English, Hindi
OBJECTIVE: To be a good employee and achieve professional excellence through constant learning.
KEY QUALIFICATION: Experience in all theoretical and practical aspects of construction surveying, exposed to international safety standards experience in segment lining tunnel (TBM and EPBMs) and NATM Tunneling, Topographical Survey, wriggle survey, Siffa Gantry and Slip Form Gantry, Laser Fixing in tunnels,Rockbolting,fibrecrete,shortcrete etc.
ACDEMIC & PROFESSIONAL QUALIFICATION
* Matric exam passed in 1995 from P.S.E.B. (Punjab) with 75%.
* Intermediate (Science) exam. Passed in 1997 from P.S.E.B. with 50%.
* 3 yrs. Diploma in Civil Engineering exam. Passed in 2000 from P.S.B.T.E. & I.T (India) with 72.5% (with Honors).
* 1 year Diploma in Railway Engineering exam. Passed in 2001 from I.P.W.E. (India).
SURVEY INSTRUMENT: GPS Topcon with RTK System
Electronic Total Station: Topcon, Leica TCRA 1101 plus, TCA 1103 plus, TCA 1800, Power Set 1102 Sokkia, Set-2C Sokkia,Nikon DTM 522, Distangular Pentaks DA-020F.
: Electronic Theodalite & Laser
(DT2E Sokia, Hilti Laser, Tunnel Fixed Laser)
: Digital and Dumpy Level
Digital Leica DNA 10, 2002, 2003, All the Dumpy levels of leica and Sokkia.
COMPUTER LITERACY: AutoCAD 2000,2005,LT, M.S. Office, Internet, Nikon Transit (Instrument Down Loading Programme) Ultra Edit 32 (Survey Editing Programme), Leica Levels pack (Instrument downloading programme, Plomag Viewer, SLS-T TBM Software.
CAREER ACCOMPLISHMENTS: (7.5 YEARS)
From May 2007: Till date
1) Employer: Bombela Civil Ltd
(A Jv of BOUYGES, Murrary&Robert, SPG & Bombardier)
Project: GAUTRAIN RAPID RAIL LINK (South Africa)
Position Held: Civil Engineer/land Surveyor
Description of Work: All the activities related to the survey for the construction of 12kmViaduct
, Cut& Cover Section at Airport Link.
From Feb 2006: March 2007
2) Employer: Consolidated Contractor International Company
Project: QATAR GAS ONSHORE LNG Expansion Project
(DOHA –QATAR)
Position Held: Land Surveyor
Description of Work: All the activities related to the survey for the construction of LNG
Plant such as establishing control points, marking for excavation for foundations,setting out works for columns,walls,and anchor bolts making the asbuilt reports for the structures and anchor bolts in the following areas(Process Area, Utility Area, Effluent Treatment area,Flare area
Fresh water and sea water cooling area).alignment checking of vessels,
Turbines, compressors, and steel structures etc
3)From July 2005: Feb 2006
Employee: SOUTH ASIA LPG PVT LTD.
A JV of HPCL (India) &Total Fina (France)
Project: Visakahapatnam Underground LPG Storage Project(India)
Position Held: Asst.Manager (Cavern)
Description of Work: All the activity related to mined Cavern Construction, Shaft construction
4.0 Dia &6.5m dia) 200m Deep from the Sea level including supervision,
Quality Edit&Quality checking, Quantity analysis, rockbolting, fibrecrete
, shortcrete, blast paterns&controlled blasting, supports for underground
Opening as per Q-classification &other rock mass drilling of boreholes of different diameter etc.
From April 2004: July 2005
4)Employee: INTERNATIONAL METRO CIVIL CONTRACTOR
(Dywidag-L&T-Samsung-Ircon-Shimizu JV).
Project: Metro Corridor Contract MC1B (Delhi).
(D.M.R.C.)
Position Held: Surveyor
Description of Work * Tunnel Survey -
NATM Construction & surveying (traversing, check of profile, setting out of tunnel centerline and spring line, track centerline, walkway, setting out of concrete form work wriggle survey, manual survey of TBM, Optical 3D-Deformation monitoring (3D Monitoring) and settlement markers on Surface (Surface Monitoring), as built of Structures etc.
* Station Survey
All the job related to station work including(survey &construction), layout of Base slab, concourse slab, ECS slab, platform slab, block work, O.T. duct point Marking, Dome marking etc.
From Dec. 2003: To April 2004
5) Employer: JAI PRAKASH ENTERPRISES LTD.
(Jai Parkash Voitch Siemn Consortium).
Project: 520MW, Omkareshwar H.E. Project.
Dist- Khandwa (M.P.) (N.H.P.C. & N.H.D.C.)
Position Held: J.E. (Civil/ Survey)
Description of Work: Topographical & Cross Section Survey.
: Const. Of Steel Bridge on River Narmada & Kavery.
: Layout marking for excavation of powerhouse, TRC, HRC and 200
TPH (Crusher Plant).
: Marking for line drilling, jet grounting etc.
From Feb. 2002: To Dec. 2003
Employer: JAI PARKASH ENTERPRISES LTD.
(Jai Parkash SNC Lavlin Indo Canadian Hydro Consortium).
Project: 300MW, Chamera-II, H.E. Project
Chamba (H.P.) – (N.H.P.C.)
Position Held: J.E. (Civil/Survey).
Description of Work * Dam & Stilling Basin
Drilling, loading, blasting, Rock Bolting, ShortCrete, Mass Concreting by using tower crane and concrete pumps, Const. Of Spillway, Piers, Retaining wall, Rail Line Fixing for Tower Crane & Gantry etc.
* Power House (Excavation Profile Checking to Final Finishing).
* Survey&const. work related to GIS Building, Power House Building, 411KV Switchyard, Control Building, Ventilation Building, Pump House, and Transformer Hall etc.
Survey&const.work related to cable tunnel, upper chamber, lower chamber, draft tube gate shafts etc.
From Dec 2000: To Dec. 2001
6) Employer: Executive Engineer
PWD (B&R) Div.
Pathankot, Punjab-145001(India).
Position Held: J.E. (Apprentice)
Description of work: Const. & survey of Roads, leveling, calculation of earth work, making
L-Section and X-section of Road and Curves, and other work related to road, culvert and bridge etc.
From May 2000: To Dec. 2000
7)Employer: 'S' CLASS MES GOVT. CONTRACTOR
K.K. Sud, Pathankot
Position Held: Site Engineer
Description of work: Construction& survey work for Building, Estimating and Costing, Site
Supervision ofO.T.M. (Other than married Accommodation) of MES
Project.
TRAINING EXPERIENCE: 1) Auto Cad 2008 intermediate course from Autodesk in SA.
2) Two days training of GPS & Robotic Total Station by Trimble Co. at South Africa.
3) Course in Introduction to Occupational Safety & health on construction
Project at Qatar from National Occupational Safety&Health Centre(OSHO).
4) One month training at Public Health Dept. (P.H.E.) Pathankot (India) in 1999.
5) One: month training at Public Work Dept. Kathua, J&K (India) in 2000.
6) One week training of Total Station by SOKKIA at 520 m.w. Omkareshwar H.E. Project at Indor (India) in 2003.
7) Two days training of GPS & Robotic Total Station by Trimble Co. at South Africa.
Expected Salary: Negotiable
Joining time required: 1 Month After confirmation.
Reference:
Will be provided
View contact information... |