CONTACT INFORMATION:
View contact information...
Profile Summary
Mid-career Estimation, Planning &Fabrication Engineer with 20 years of solid experience in the field and posses'
Good communication & interpersonal skills.
Specialized in project Planning, Shop floor Fabrication & Site-Co-ordination.
Date of Birth
January 22nd, 1960 (Male, Indian & Hindu)
Academic Qualifications
Diploma In Mechanical Engineer
From State Council Of Technical Education And Training, Orissa, India
Specialized In Production (Fabrication), Estimation, Project Planning & Co-Ordination.
Present Job
Al Hirah Engineering LLC. Sharjah, UAE. - With effect from March 2007.
Development Manager - Working as a Head of the Production, Planning & Estimation. I am responsible for Estimation, Fabrication with planning & coordination between production and Site work. Al Hirah is one of the biggest diversified groups in UAE, has interest in Contracting (Steel Structures, Pressure Vessels, Boilers (ASME Stamp, U,S,PP,R & A (Under Process), Off-shore & On-shore Piping Spools, Skids, Trestles, Tripods etc. & oil field related Items), Power Plant related structures like shed, HRSG, docting, Refinary structures.
Previous Job History
Al Suwaidi Industrial Services Ltd, Jubail, KSA. - With effect August 2006 ¡V March 2007
Production Manager, (Fabrication) - Working as a Head of the Production. I was responsible for Fabrication with planning & coordination between production and Site work. Al Suwadi Industrial Services Ltd. as being a part of SIS Group of Companies is one of the biggest diversified groups in Kingdom of Saudi Arabia has interest in EPC contract. (Steel Structures, Storage Tanks, Pressure Vessels, Boilers (ASME Stamp holder, U,S,PP,R & A), Off-shore & On-shore Piping Spools, Skids & oil field related Items), Power Plant related structures like shed, HRSG, docting, Refinary structures & Manufacturing & Export of Formwork & Scaffolding with a powerful 7650 workers, out of 455 skill workers in Fabrication Division which is an Indipendent SBU. Our main contractor was SABIC, ARAMCO, Etc. Our Standard is compiled to Aramco, KSA.
Excel Industrial Co., Ltd. ¡V UAE - With effect May 1996 ¡V July 2006
Working as a Head of the Production, Planning & Estimation Department. I was responsible for Production, Job costing, Planning & coordination between production and Site work. Excel Industrial Co., Ltd. as being a part of Excel Group of Companies is one of the biggest diversified groups in UAE has interest in Contracting (Steel Structures, Pressure Vessels, Boilers (ASME Stamp holder, U,S,PP,R), Off-shore & On-shore Piping Products & oil field related Items), Steel Bridges, Power Plant related structures like shed, HRSG, docting, Airline Engineering Docking System, Refinary structures & Manufacturing & Export of Formwork & Scaffolding to Europe and Far-Eastern Countries with a powerful 650 workers, out of 155 skill workers.Job Profile Responsible for the Production, Estimation, Planning & coordination on Multinational Projects for United Arab Emirates, and other Abroad, Contracting & Aviation Division and Nabroos drilling, National Oil, Enoc & Emarat fuel facilities within UAE.
* Structural Engineering (Contracting):
ĬSteel Bridges/Power Plant Structures/Petrochemical Plants/Offshore & Onshore Structures & pipe line projects/ Warehouses / Fuel Station/ Truck Body Building, etc. doing an average turnover of AED350/-Million annually.
* Airline Engineering (Airport Jobs):
Design; Manufacture the following Ground Support Equipments for Emirates & DNATA:
ĬBaggage Handling Trailers ĬAircraft Wheel Change Trolleys
ĬLD3 Container Transport Trailers ĬLanding Gear Trolleys
ĬLD3 Container Dollies ĬNitrogen Cylinder Trolleys
ĬLD3 Container Heavy Duty Racking System ĬTow Bar
ĬLD3 Racks ĬBall Mats
ĬIdler Roller Conveyors ĬAll Types of Access Platforms
* Hangers & Docking system (Number one In the Middle East):
ĬAccess Equipment & Work Stands ĬMain Dock, Wing Docks, Tail Docks, Nose Docks & Scissor Lifts
ĬMaintenance & Overhaul Docks ĬMulti Aircraft Combined Docking Systems, Main Dock.
Bartawi Group of Companies, Dubai, UAE - September 1992 ¡V October 1995
Direct reporting to the Production Manager. I was completely responsible for Production with a team of 210 skilled & semi-skilled personel from different categories like supervisors, chargehands, fabricators, fitters, welders, etc. for fabrications, Erection & project coordination.
AmaCorp., Bhubaneswar, India - 1991 to 1992
Acted as Production-In-Charge, responsible for the supervison of the whole production team. AmaCorp was a major Supplier and Manufacturer of Industrial spairs to NALCO, INDALCO, HPCL, BP, L&T & NTPC.
Manorama Chemicals, Ltd., India - 1987 - 1991
Groomed as a Plant Supevisor with M/s. Manorama Chemicals Limited, a leading manufacturer of Chemicals & Fertilizers.
Additional Education & Computer Skill
B.A. Degree from Utkal University, India
MS Office, MS Project, AutoCAD Rel.14/2000,
Primavera Project management "P3" and Internet.
Contact Information
Present Address
E'Mail: rathbiranchi@yahoo.com biranchi@emirates.net.ae
Tel. No.: +97150 4541855,
+9716 5752600
Permanent Address
C/o Dr. Binayak Rath
Plot #9, Unit 6, Ekamra Marga, Bhubaneswar ¡V 1 Orissa, India, Phone-+916742595430, 6757230266
Nationality: Indian
Religion: Hindu
Marital Status: Married
Passport No.: E-0383966 Valid until Year 2012
Visa Status: UAE Employment visa Valid -May 2010
DL - Valid UAE Driving Licence until 2009.
RESPONSIBILITY HANDLED
Production Manager,
(Production Manager, Since Aug. 2006 ¡V Dec 2006. Al Suwaidi Industrial Services, Jubail, KSA)
* From Aug. 2006 ¡V Dec. 2006. (Production & Planning)
1. Preparation of plant facility.
2. Day to day production, planning and project over view.
3. Due to a short period I was not involved any type of major jobs.
Works Manager,
(Estimation, Planning, Production & Coordination Engineer, Since Jan. 2000. Excel Industrial Co. LLC)
* From Jan. 2000-Jul 2006. (Estimation, Production & Planning)
4. Preparation of tender.
5. Day to day production, planning and project over view.
6. Design (only connection details), Estimation & Job Costing for the incoming tenders.
7. Source of rawmaterials from the local as well as International market by corresponding through fax, mail & phone.
8. Selection of sub contractor.
9. Co-ordination between Sub contractor & Main contractor.
10. All other correspondences regarding the project are the part of the responsibility.
11. Assignment of resources for in-coming project.
12. After all a complete project report preparation through the software M.S.Project or P3 Project planner for the production and site Project Engineers.
While leaving the company the following projects were through. Nose Dock, Presure vessels & Boilers for Iran Petrochem refinery, Pressure Vessels for US.Army, & Wasit Power Plant at Hamriya Sharjah, a 1650MW Power Plant with Dissalination unit.
Production Engineer, Since May 1996 to Dec. 1999. (Excel Industrial Co. LLC)
* May.1996-Dec. 1999 Production Engineer (Contracting)
1. Work Shop management with 210 workers of various categories,
2. Distribution of the job among charge hands and supervisors,
3. Direct coordination between main contractor and the consultant regarding the progress of the works, approval of design, shop drawing approval etc.
4. Verification of shop drawings for consultants approval,
5. Preparation of Bill of materials from the shop drawings to prepared the purchase order for material procurements.
6. Submission of purchase order for the management's approval.
7. Submission of quality documents from the QC Department to the consultant.
8. Preparation of production programme.
9. Preparation of errection programme
10. Planning for the site mobilization and coordination.
11. Allocation of the workforce to the site engineer.
12. Project coordination between site and workshop.
13. Above all, conducting the weekly and monthly meeting between management and production regarding progress &development.
Fabrication Foreman, Since Sept 1992 to October 1995. (Bartawi Group of Company, Dubai)
* September1992 to November 1995 (Fabrication Foreman)
1. Preparation of bill of quantity
2. Preparation of production programme for management's approval to Consultants & production.
3. Direct control over day-to-day production.
4. Control over workforce in the shop floor.
5. Dimension & quality control.
6. Preparation of method statement.
7. Distribution of works among the charge hands and floor personals.
8. Drawing clarification & direction to shop floor.
9. Day to day production report to the Manager for their review.
10. Preparation of emergency report to meet the client's requirement.
11. Coordination between sites Engineer for the site requirements.
Production In Charge, Since 1991 to 1992. (Amacorp Enterprises, India)
* 1991 to August 1992 (Production in charge)
1. As a small scale company responsibility was not limited. I was looking for the incoming tenders, tender preparation to award of contract. All correspondence and technical clarification was also part of the responsibility.
2. I was also looking towards the day-to-day production and supply the finished product to the client in time to avoid any late penalty.
3. I was also responsible for the breakdown work of the customer as per the site condition to complete by the full fabrication team at site without any problem.
Plant Supervisor, Since 1987 to 1991. (Manorama Chemicals LTD, India)
* 1987 to 1991 (Plant Supervisor)
1. A Manorama chemical was a chemical plant producing Liquefied Chlorine Gas for industrial purpose. My responsibility was to look after the maintenance of the plant and machinery to avoid the breakdown.