Electrical Technician
Industrial Electrician
Electrical Engineering Aide
Electrician Construction-Maintenance (Inter-provincial), with Electronics Endorsement ( Ontario, Canada )
Heavy Equipment Operator
October 2007 to Present
- Hired as Journeyman Electrician ( Tech ) by Pyramid Corp to work on
Ranger Cross Natural Gas Compression Station. Terminating, troubleshooting, start up and commissioning of all electrical equipment systems related to plant operations.
February 2007 to September 2007
- Hired as Journeyman Electrician by Lauren Engineering to assist with
Construction of Nevada Solar One, a 70 Mw Solar Power Plant south of
Boulder City Nevada.
- Working in Solar field troubleshooting various electronic and
Electrical problems related to the rotation of mirror array.
- Moved to Power Block to assist with vendor skid integration to
Ovation DCS. Troubleshoot and correct electrical problems to enable
On time start up of steam turbine.
- Promoted to Instrument Technician position, re-wiring 850Kw Cat
Generator to co- ordinate dead buss activation for critical loads and live buss Synchronization for generator exercise routine.
- Performing inventory of Siemens cabinet terminations to create status completion report. Also doing field jbox and device survey for completion status.
- Working with third party calibration team to conduct point to point
Cable termination of cts, pts on the generator 15 kv circuit, checking for correct phase sequencing coming to the protective relay panel related to the generator monitoring and synchronization with
Nevada Power.
November 2006 to February 2007
- Working in Sumterville, Florida on construction phase of
Eagle Roofing Tile Plant.
Running conduit, organizing the wire pulls for raw materials,
Kiln wet and dry doors on line 19, trouble shooting kiln propane burners. Troubleshoot and repair production problems.
November 2005 to November 2006
- I worked for F & H Contracting of Crystal River, Florida.
A union contractor that was performing several jobs at
Progress Energy's Nuclear Power Plant CR-3. I worked on the
Control Rod Drive Power supply which involved the replacement of the 2- 500 KVA, 3000 pound 3 ph.480 Pri-
6 phase 120, secondary transformers. We also replaced the 2
input regulators which weighed 1900 Ibs each. I did all the control wiring which monitored the output of the
Transformers and functionality of the regulators. Completed ahead of schedule, commissioned with Roy Lane the project engineer.
During the past year I have worked on several short term
Projects.
- New Orleans - FEMA trailer sites and Murphy Oil Refinery.
- Port St. Lucie Nuke re-fuel work.
- Progress Energy Nuke CR-3 Helper Cooling Tower added capacity.
6 weeks project (White Electric)
- America West 790 MW Power house. Omaha Nebraska.
- Kellogg's Food, Omaha Nebraska. Equipment mods. (National)
- Yahoo Data Center, Wenatchee Washington. Cupertino Electric
- Homestead Hospital, exhaust fan roof service racks. Dynalectric.
May 2002 to October 2005
- Working as an Industrial Electrician for Cemex (formerly
Southdown) in Brooksville, Florida.
- Troubleshoot and wire all types of equipment related to the production of cement. Modify SLC100 cooler dump gate sequencers to allow for less frequent dumping.
- work on fire alarm system installation.
- Troubleshoot and repair all electrical equipment related to the production of cement in a plant producing over 1 million tons annually.
- Effectively trouble shoot 5000 Hp Synchronous motor with ground
Fault intermittent trips.
February 2001 to May 2002
- worked as a foreman for F & H Contracting of Crystal River, doing
A Beck damper upgrade on Unit 4 Progress Energy Coal Plant in Crystal
River. We pulled in new signal and power for all dampers for control of the boiler on this unit including ID FD and Primary air fans.
Completed on time. Also did some MOV and burner control rewire.
- traveled the country working short term on many different construction projects. Many large projects around the
Cont'd 3
country were canceled after 9-11-01 so I
returned home.
- Disney Animal Kingdom Lodge in Orlando Florida, worked in the
Boiler room on electrical, then some room trim out then onto troubleshooting standard emergency lighting circuits.Consolidated
Electric.( 6 weeks end of project)
- I then worked for Williams Power at the Plant Vogtle Nuclear Power
Plant in Augusta, Georgia for a refueling outage. Pulling wire for
Control room modification. In containment last day running conduit.
Laid off at the end of the refuel.
- The next job was at Tosco Shell in Alton Illinois where a fire had
Caused considerable damage. Worked 7-12's night for 3 ½ weeks to conclusion of project. Running conduit, pulling wire, control work.
- Sach's Electric St. Louis Illinois, Chrysler Plant Quad upgrade.
Worked in area of line conveyor, control wiring, troubleshooting
Prior to start up. Also some conduit work in paint line area.
- Working for Sach's Electric at the Kennedy Space Center, Launch
Complex 41, Hensel Phelps overall contractor.

November 1997 to February 2001 Southern Power & Controls,Tampa
- Doing a automation upgrade at Southdown's large cement plant in Brooksville, Florida. Converting from relay to PLC
control.
- Working as a leadman on the Sea-3 LPG project in Tampa on
Pendola Pt. I was the primary troubleshooting and commissioning electrician on this project.
- Working with Project Manager Tom Klemm at Florida Crushed
Stone Rock Mine in Brooksville ( presently Rinker) on a
Production and Automation upgrade.
June 1996 to November 1997 Flair Pneumatic Products Ocala
- Started in electronic assembly where I built up electrical control cabinets for different equipment and environments.
- Accepted for a position in the Electrical Controls Group at
Flair as an Electrical Engineering Aide under Mike
Scwhambach Computer Programming Engineer and head of the
Electrical Controls Group.
- working on design of special non-standard product with the creation of drawings, electrical schematic and panel layout as well as the bills of materials. Experience with programming and trouble-shooting of PLCs.
- drawing creation
- Product types Hydrogen Coolant Purfiers, Oxygen Generators, -40 deg.
Dew point dessicant dryers, also zero air or - 100 degree F dryers
For chip plants.


- attended Allen-Bradley RSLOGICS 500 training in Tampa in
August.
Sept. 26, 1995 to June, 1996 Clairson International,Ocala FL
ClosetMaid Electrical-Specialist
- troubleshooting various assembly line equipment, H-100 Auto
Bagger,Precision Quincy Vinyl Coater, Environmental
Scrubber,Resistance Welders of different types, Natural Gas burner PMs.
- assist with change out of electro-mechanical relay control on a roller welder to PLC control.
- some work on forklift repair, pallet jacks etc.
- completed STOP safety training.
- trouble-shooting with laptop, Allen-Bradley SLC
501-502-503.
May 1994 to March 24 1995 Skeena Cellulose Ltd.
Prince Rupert British Columbia, Canada (MILL SHUTDOWN,BANKRUPT)
- Brush replacement on D.C. motors on wet and dry ends of #2
machine room.
- Repair of burnt out control wiring of #2 MG set, B Machine room.
- Installation and setup of Iris Flame detector unit on #4
Power Boiler. Trouble shooting of C.E. digital control panels on # 4 Power Boiler. Also repairs during a maintenance shutdown on #5 Recovery Boiler burners, check outs of igniters, burner controls and other field devices.
- changing brushes on #3 (24 MW) and #2 (12MW)
Turbo-Generators. Some lock out and maintenance checks ie., meggering and connections.
- Trouble shoot and repair of Relcon L1000 and AFR7000
variable speed A.C. drives on #2 Kiln in Recaust and the
Salt Cake Filter unit in Chemical Preparation and Induced
Draft Fan unit on #6 Recovery boiler.
- Limited work experience on sootblowers, site elevators and pollution control precipitators. Mostly screw conveyor drive motor change out.
- Worked shift relief and getting familiar with G.E.
Series Six PLC system.
- Trouble shooting Unityer Auto Baling System.
July 17, 1978 - to January 7, 1994,Thunder Bay Terminals
Thunder Bay, Ontario,Canada
- completed IB508 Industrial Electronics Control -April,1992
(Basic Industrial Electronics at Confederation College ).
- Obtained Electrician (Construction-Maintenance License
Cont'd 5
Inter Provincial) November 15, 1988 license #618127 Red Seal classification 309D with the electronics endorsement.
( 9000 hour apprenticeship completed.)
Electrical Work Experience
- Installation and maintenance of various types of motors, induction, wound rotor, DC etc.Fractional to 1000hp.
- Testing and repair of digital logic control systems related to the Southwell Control yard coal pile spray system.
- Installation and maintenance of fluorescent, high pressure sodium and metal halide light fixtures and overhead roadway lighting.
- Monitoring of the power factor correction capacitor bank and repair as required.
- Repair of various types of unit heaters, duct heaters and heat tracing on dust suppression water piping.
- Assisted with installation of Allen-Bradley 5-10 and 5-15
Series PLC's to replace obsolete electro-mechanical relay control.
- Testing and repair of emergency lighting equipment.
- Maintenance and repair of high voltage switchgear 4160,
25kv yard in main sub area.
- Some welding and fabricating experience.
- Underground cable installation.
- Trouble shooting of relay logic PLC's and various D.C.
Variable Speed Drives. Asea-Brown Boveri, G.E. Silpac.
- work experience on new construction jobs at Thunder Bay
Terminals Ltd. ( hydraulic power packs, PLC, etc.)
- repair of Flyte sump pumps of different sizes used to control the site water flow and levels. Installation of lift station.
- trouble shooting of Edward Fire Alarm systems.
- worked on both wet and dry valve fire systems by Vipond.
- cleaning of electrical shop, truck and electrical unit subs as required.
- at Thunder Bay Terminals, we were trained as a composite crew to make the running of the plant more efficient.
- certified in CPR and Basic Rescuer certificate from St.
John's Ambulance.
- worked on the thaw shed propane burners that were used to thaw the coal cars during the winter months, with the gas fitter.(preventative maintenance).
1984 - 1988 Electrical Apprentice

July 1978 - 1984 - Heavy Equipment Operator Same Site
Cont'd 6
Work Experience
Ability to Operate:
- D9H Cat Bulldozer
- Hough 560 Front End Loader
- Bomag Compactor
- Mac 5000 gallon water truck (dust suppression and clean-up)
- railroad locomotive for movement of trains on TBTL site.
- Stephens Adamson and Dominion Bridge track bound bulk hand-
ling equipment
- Fork-lift and Case Skidsteer loader.
1982-1983
- completed 2 credits to attain my grade 12 diploma from
Westgate High School. ( night school )
June 1974 - July 1978
Valley Camp Coal Ltd
- started as a labourer and was soon trained as an oiler for all equipment at Valley Camp Ltd. in Thunder Bay. This was a busy bulk cargo loading dock, handling commodities such as iron ore,salt, sulphur, limestone, coal and different metal concentrates.
- as I mentioned 2 weeks after I started I was trained to be the relief oiler ( which I did for 3 months ) and over the next two years I was trained on all the machinery,such as the stacker, shiploader and front end loader cross conveyor and feeder. During this time I continued with relief oiler duties.
- most of the final two years I operated the Hyel overhead crane loading and unloading various bulk commodities.

Career Goals
To keep up with the on going advances in the electronics used in
Today's industry.

Hobbies
Hiking, video and still photography, volleyball, baseball, and billiards. I also enjoy learning new skills on my PC.
Specifics: Age 51
Married 27 years wife Heather, daughter Amanda 18.

References
Will be provided

View contact information...
«« previous resume next resume »»
Search Results (Resumes 301 to 350 of 4364)Go to Search Parameters...
Brief Description
Senior material controller with great experience in western companies.Have a technical education and professional expertise in various computer softeware and hardware.Known as a good communication person with leadership skill.
HEAVY CIVIL STRUCTURES/ LUXURY HOUSING /BRIDGES/ DAMS SCHOOL / FACTORIES/WATERPIPE LINES&PUMP HOUSESSITE COSTINGSURVEY AND SETTING OUTCONCRETE TECHNOLOGYORGANISATION OF LABOUR AND PLANTJOINERYRENOVATIONS
Senior Electrical Engineer (Construction)
Safety is my Passion
Safety man
I am currently employed as a contracts manager involved in all aspects of the mechanical piping industry. My back ground is Pipe Fitting and Welding.
Challenging position in Project Management in commercial, residential and government projects with career advancement.
More than 16 years in the field of Secretarial job, 4 years in the field of Accounting and Credit & Collection & 2 years in Office Clerical jobs. Expert in computer program applications like MS Word, Excel, Access, Outlook, PowerPoint, Mind Manager, CRM. Also, PC assembly and trouble shooting.
Efficient planning for execution of project
13+ Years of Experience in Overhead Power Transmission Line Projects/Construction
I am senior electrical engineer working in kharafi national as engineering and procurement team leaders
I have 10 yers of Chemical process experience design also.
7 years expierience in gulf area out of which five years as site engineer ininteriors
As an Architect Inspector and Sr.QA/QC Engineer my primary responsibility is to control the quality of construction, so that I can best serve the project by preventing mistakes before they happen rather than finding them after the fact. And I am responsible to ensure that the quality control of the
Construction Inspector, Infrastructure
Looking for Rig Welding work offshore
Procurement Assistant
Electrical Technician, Canadian Interprovincial Electrical License, Plc, vfd programming, Extensive start-up commissioning throughout U.S and Canda.
15 years spent in the design and engineering of instrumentation for petrochemical plants.
Geotechnical Engineer
Planning, Scheduling, Cost Control
HSE engineer
Cement Production Supervisor // Senior Cement Process Engineer //
Mechanical engineer having a vast experience in general management for the vehicles fleet management, construction equipments, ground equipments with the most succesful profit and loss bases.
Materials, Warehouse, Asset, Logistics Management
(Mechanical & HSE Supervisor)
Power Plant Erection/Maintenance /Warranty Engineer
I'm having good knoweldge of Land Survey work and having sound knowelge of Microsoft Excel which is very much useful in estimation works
Geotechnical Engineer & Ph. D in Civil Engineering with 15 years experience work as University Researcher and Mainly as Freelance Expert-Consultant.
Surface Sciences, Polymer Chemistry and Physics, UHV Techniques, Materials Sciences, Thin Film, Single Crystal.
Results orientated, hands on multitasked, multifunctional, dedicated manager. experienced in materials. Systems, logistics, & operations management. I am the go to guy to save you from losses in time or money. Please e- mail or call me so we can get together on filling your current opening.
Sales /Marketing / New Business Development / Project /Product Manger .
Civil Engineer
Over 12 years of experience in the area of ERP& CRM applications life cycle management in South East Asia, Middle East, India and Africa region. Managed complete SDLC from inception, design, construction & testing through to final delivery & support; IT auditing implementation in TRANE group of comp
Experienced mechanical engineer, with 2 years of design and project / construction management of oil & gas and petrochemical industry.Extensively travelled and executed projects in Middle East, Caspion region and in East Africa.Excellent leadership, self-starter, intensively motivated competent.
Lead offshore structural engineer
OBJECTIVE :- To strive and achieve excellence in functional areas , constantly strive and create value, and attain higher benchmarks. EMPLOYMENT EXPERIENCE: Over two decades of experience in the field of various Civil Engineering Projects.
More than nineteen years in the field of construction,some engineering & design works for oil& gas, petrochemical, power plant, expansion, revamp projects.
Over 20 years of experience in diesel engines ,marine propulsion system and generator set working in the middle east and gulf region for more than 15 years U.A.E and Saudi driving license a valid resident in U.A.E read ,write ,speak English , Arabic ,German
Senior Project Architect with extensive construction supervision and design experience willing to relocate to overseas/Middle East
-Mechanical Engineering, member of ASME, PMI, -computer skills include Primavera Project Planner & MS Project. -Sr. Maintenance/Project Planning/Scheduling Engineer -long experience in Oil & Gas Industry -Project Controls Engineer/Manager. -Fluent in English & Arabic. Canadian Citizen.
I'm presently working as Planning/Scheduler and at the same time Quantity Surveyor here in Yanbu, Saudi Arabia. Our on going project is the Royal Commission Field Office and 4 bridges.
Hard dollar Mechanical Estimator/Project Manager experienced with Estimation and Quick Pen seeks West Coast Position.
21 year professional with experience in safety/operations turn arounds, business development, strategic planning, government regulations, P&L, Construction Equipment Operations/Maintenance and Construction Management.
Represent corporation at the regional / local level. Administer local contracts, interface with clients, assist with field issues, transportation, housing, energy. Fluent in ARABIC, ITALIAN, GREEK, SPANISH, ENGLISH. Knowledge on Libyan culture, customs, religion, geography, and geopolitics.
Am immediately available. I have 23-years Safety and Health experience, including: * 12-years in Production * 20-years Consulting/Training * 6-years in Construction Other experience: * 7.5-years Criminal Justice/Anti-Terrorism. * 26-years Emergency Medical Technician (EMT).
Performed conceptual design, design devel, work drawings, specs. Recent emphasis has been more on managing teams of architects and engineers, coordinating documents and specifications. Major strength is producing quality documents and teaching others to produce high quality work.
Experience and skills: 1) Electrical Engineering, HT & LT systems, power systems, instrumentation and control. 2) Projects' management. 3) Service and customer support. 4) Sales and marketing. Worked for 3 years in Nigeria in various construction projects.
20+ years Civil Engineering experience on Public Works, Utilities, Industrial, Commercial and Residential projects. Experienced in streets, highways, water systems, sanitary & industrial sewers, airports, site development, grading, drainage, underground piping and specifications
Professionally qualified Civil Engineer with a PG degree in Construction Management with over 20 years experience in Asian Development Bank, World Bank and Other Internationally funded road projects in South East Asia and Pacific region.
First   1   2   3   4   5   6   [ 7 ]   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com