Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #66585 next resume »»
CONTACT INFORMATION:
View contact information...

3.0 Date of Birth: 8th August 1959

4.0 Specialisation: Design and project engineering in the areas of Fuel oil handling, material handling, utilities systems and Balance of Plant., Project Development.
5.0 Academic Qualification

NAME OF EXAMINATION YEAR OF PASSING NAME OF INSTITUTION BOARD/
UNIVERSITY DIVISION, %
MARKS, RANK
Higher secondary 1975 Scottish Church Collegiate School West Bengal Board of Secondary Education First Div,71.7%
(secured National Scholarship)
Bachelor of Mechanical Engineering 1980 Jadavpur University, Calcutta Jadavpur University, Calcutta First Class with Honors,83% Rank-Fifth
ME in Project Engineering 1984 BITS in collaboration with DCPL, Calcutta Birla Institute of Technology and Science, Pilani,
India
Master of Business Administration (Marketing Management) 1998 Institute of Business Management Calcutta Jadavpur University, Calcutta 58%

6.0 Professional Experience: : Twenty seven(27) years. +

6.1 Joined DODSAL Engineering & Construction Pte Ltd. Dubai on July 2007 and continuing till date

6.2 Joined Development Consultant Pvt. Ltd. on December 2003 and left end June 2007.

6.3 Since October,1999 appointed by Schemex Corporation Calcutta, design and project engineering / management consultant to Mahindra AshTech Ltd for ash handling project design execution. continued till November 2003

6.4 Joined Birla Technical Services, 11,Dr U N Brahmachari Street, Calcutta 700 017 on 21st July, 1989 and left on 30th September,1999

6.5 Joined Development Consultant Limited, 24B Park Street, Calcutta 700016 on 17 Th July,1980 after graduation and worked there till 19 Th July, 1989

7.0 Nature of work a) Basic and Detail engineering (systems).
b) Preparation of equipment specification, equipment design.
c) Preparation of equipment and piping layout.
d) Securing approval on drawing etc from client/consultant.
e) Tender evaluation, negotiation, and recommendation for order placement.
f) Follow up and expediting supply in schedule time.
g) General inspection.
h) Constant coordination with site for erection of equipment and providing solution as applicable from design point of view.
i) Attending trouble sooting in system operation during commissioning and afterwards at site.
j) Preparation of quotation, prebid engineering, cost estimate against tender inquiry.
k) Preparation of Project Feasibility Report.
l) Project Development.

8.0 Detail of assignments undertaken
Present Assignments at DODSAL Engineering & Construction Pte Ltd. Dubai. (Engineering Manager )(since July, 2007)
a) Overview and management of engineering for material handling packages consisting Ship loader, Stacker Reclaimer, Belt conveyor systems along with other auxiliaries e.g. dust suppression, dust extraction for phase three expansion project of Sulphur handling plant at Takreer Ruwais sulphur terminal.

Assignments at Development Consultants Pvt.Ltd. (Engineering Manager )(since DEC 2003)
a) Project Management of Integrated steel plant at SOHAR Oman in DRI-Melt shop route for Advance Project Development, AlGhaith group, Abu Dhabi as Lead Mechanical engineer ( Since October 2004) ( Deputed to Abu Dhabi from end January 2005 to end April 2005)
b) Execution of WBPDCL Kolaghat Effluent Treatment Plant as Project Manager for contractor Andrew Yule( since December 2004)
c) Execution of total ash handling project and mill reject handling package for WBPDCL 1X 250 MW Sandaldih unit 5 ( since February 2004)
d) Execution of total ash handling project and Mill reject packages for WBPDCL 2X 300 MW Sagardighi Stage I ( since February 2004)
e) Execution of total ash handling project an Mill rejet Hndling package for DPL 1X 300 MW unit 7 ( since February 2004)
f) Execution of total ash handling project and Mill reject hansling package for Jindal 4X 250 MW Raigarh plant ( since July 2004)
g) Execution of Dry ash handling project for WBPDCL 1X 210 MW Bandelunit 5 ( complete Dec 2004)
h) Detail Project Report for DVC Bokaro 3X210MW TPS Dry Ash Handling.(completed Aug 2004)
i) Execution of total ash handling project for Jindal Steel & Power at Angul 4X 250 MW Captive Power Plant. ( since January 2006)
j) Execution of total ash handling project and Mill Reject Handling packages for HPGCL Yamunanagar 2X 300 MW on behalf of Reliance ( since February 2005)
k) Execution of total ash handling project and Mill Reject Handling packages for HPGCL Hisar 2X 600 MW on behalf of Reliance ( since February 2007)
l) Execution of combined slurry system DVC Bokaro 'A' & 'B' TPS ( since January 2007)
m) Execution of total ash handling project and Mill Reject Handling packages for Rosa 4X 300 MW on behalf of Reliance ( since Dec 2006)

Assignments at Schemex Corporation( Manager Engineering)
a) Complete project engineering for hydropnumatic ash handling system for NTPC Shimadri Thermal Power plant(2X500 MW)(since October 1999)
b) Design engineering of handling and bagging plant for Hindustan Lever Ltd,Haldia SSP Plant.
c) Development of Air Drier-proto type for rail locomotive.
d) Preparation of project reports, detail engineering of miscellaneous industrial systems.

Assignments in BTS ( designated as Asst. General Manager)
a) Development of Gouripore Power Project ( 1X 150 MW) WB (Since 1995)
Preparation of project feasibility report alongwith all front-end engineering for balance of plants, estimation, coordinating with Government bodies / Authorities for various clearances etc. Cash flow analysis, power tariff calculation.
b) Preparation of quotation against tender inquiry for a number of EPC jobs for IPPs (Since 1994), As Proposal Manager- prebid engineering, vendor development and selection, estimation, proposal engineering, coordination with client and joint venture partners.
1) Bakreswar Thermal Power Station ( 2 X 210 MW ),alongwith TPE, Russia
2) Indeck Bomlai ( 2 X 250 MW ) Thermal Power Station, alongwith PARSONS, USA
3) Usha Martin Industries Captive Thermal Power Plant ( 1 X 25 MW )
4) ISRO Second Rocket Launching Facility. Storage and distribution facility of liquid Fuels.
5) Other miscellaneous projects.
c) Modernisation of Durgapur Steel Plant, Sinter plant package, (1989-1993) as Project Manager
Complete Mechanical systems e.g. Fire Fighting, Belt Conveyor, Compressed Air, Water, Fuel Gas. Sampling Systems, Fire Alarm System Basic and detail Engineering, Preparation of specification, layout, Bid evaluation, Vendor Drawing review, general inspection, field engineering, commissioning, coordination with TPE, Russia.
d) Development of Sinter Plant for Iron and Steel Complex, Durgapur alongwith DPL. (1993-1994) and Davy Macky, As project engineer--Basic engineering, conceptual layout, estimation of project cost for material handling, utilities and offsite units for the sinter plant.
e) Synthetic aggregate preparation plant at Philippines ( Preparation of synthetic aggregate from garbage and clay by burning the mix in special kiln. (Since 1998). As project Manager preparation of project report including basic engineering, layout, plant specification, estimation.
Foreign assignment:
Having posted at Dubai, UAE presently I am deputed at project home office at Tampa, Florida USA since July 2007 to supervise and coordinate detail engineering along with engineering subcontractor Pegasus USA (formerly Mustang), Takreer (client) and Tebodin ( PMC).

I was deputed by Birla Technical Services to Sherwin Green, UK for absorbing technology in connection with preparation of basic engineering for a Synthetic Aggregate Project..

I was deputed by Development Consultant Pvt Ltd to UAE Abu Dhabi for four months ending April 2005.
Assignment at DCPL ( Designated as Project Engineer )
a) CESC Titagarh (4 X 60 MW) Thermal Power Station: (Part) hydropnumatic ash handling systems.(1980-81). Design engineering of LP Piping, valves and fittings, fly ash and bottom ash piping, equipment specification, bid evaluation, vendor drawing review.
b) RCF Thal 3 X 275 T/Hr Steam Generating Units: hydropnumatic ash handling systems, (1981-1983). Ash handling system design, Design engineering of LP Piping, compressed air system engineering, fly ash and bottom ash piping, equipment layout and specification preparation, bid evaluation, vendor drawing review, preparation of instruction manual.
c) HSEB Panipat Stage I ( 2 X 110 MW ):Thermal Power Plant: -hydropnumatic ash handling systems(1984-1986). As project engineer, Ash handling system design, Design engineering of LP Piping, compressed air system engineering, fly ash and bottom ash piping, equipment layout and specification preparation, bid evaluation, vendor drawing review, preparation of instruction manual.
d) MSEB Bhuswal Extension Thermal Power Station ( 1 X 110 MW ): Analysis of surge in ash disposal piping.(1985).
e) NTPC Farakka Super Thermal Power Station: (Part) hydrosluicing ash handling systems.(1985-86). Design engineering of LP Piping valves and fittings, fly ash and bottom ash piping, equipment specification, bid evaluation, vendor drawing review.
f) Hindustan Lever Limited Haldia DAP Offsite Project: product handling system involving belt conveyor, Hydrant type fire fighting system, Stress analysis of steam piping.(1985-87), Design engineering, equipment specification, bid evaluation, vendor drawing review.
g) TNEB Tuticorin Thermal Power Station: Attending trouble sooting of ash handling system operation at site and assessing remedies.(1987)
h) IOC Haldia water distribution system for refinery and township.: (1988) As project engineer responsible for mechanical facilities, selection of pump parameters, designing pump house arrangement, piping layout Design engineering of LP Piping valves and fittings, equipment specification, bid evaluation, vendor drawing review. Coordination with civil and electrical.
i) ACC Chaibasa Captive power plant: ash handling system(1988) As project engineer, Ash handling system design, equipment layout and specification preparation, j) As proposal engineer preparation of Tender and estimates for a no of Ash Handling Projects.
k) Modernisation of Rajabagan Dockyard: Installation of various offsite facilities e.g. Water, Air, Oxygen, Acetylene, distribution and cranes etc.(1989) As project engineer responsible for mechanical facilities, selection of pump parameters, piping layout Design engineering of LP Piping valves and fittings, equipment specification, Coordination with civil and electrical.
l) Away from Reactor Spent Fuel Storage Facility, Narora Atomic Power Plant: Analysis of liner plate for storage pool.(1987)
m) DMDE Equipment Testing Facility, Vizag: LP Piping,valves,Fire Fighting system (1988)
n) Renovation of Coal Handling System for CPP # 1 of Rourkella Steel Plant: (1989) Design engineering, equipment specification, bid evaluation, vendor drawing review.
o) Taloja Copper Project: Installation of Offsite facilities e.g. water, air, fuel gas, oxyacetylene distribution, material handling crane, weigh platform etc and installation of imported Continuous Casting cum Wire Drawing ( Southwire USA ) plant.(1988-1989) As project engineer responsible for mechanical facilities, Coordination with civil and electrical. Design engineering, equipment specification, bid evaluation, vendor drawing review

9.0 Professional Course: Attended Two days training program on Pneumatic conveying of Bulk solids organized by IIT Delhi by eminent persons like professor David Mill

10.0 Seminar, Presentation of paper: Presented paper and delivered lecture on one day workshop on Present day power plant practice ( with prime concentration on Ash Handling) organized by Kalyani Govt. Engineering College.WB.

11.0 Computer orientation: Fully Conversant with working In PC environment in DOS, Windows, MS-Office, AutoCAD, MS Projects etc.

12.0 Present annual emoluments: AED 3. 3 Lac annually plus one month paid leave, free transportation return fare for self and family to home town etc.

13.0 Salary expected: Negotiable

12.0 Passport No: F2424602 valid upto 31/05/2015

13,0 Referee
Will be provided

View contact information...
«« previous resume next resume »»
Search Results (Resumes 451 to 500 of 4371)Go to Search Parameters...
Brief Description
4+ Years Project Management, 4+ Years in Construction Management/Supervision, 4+ Years in Engineering Design, Costing Budgetory, Primavera Planning, Preparing Commercial & Technical Proposal, High Self Confident, Team Coordinator and Leader, Supportive in Team Work,Strategic Planning,Time Management
I am a post graduate in Personal Management & Industrial Relations
Computer programming knowledge in BASIC, COBOL, C+, DBASE, LOTUS.
Master of Business Administration(Marketing),Master of engineering (Project engineering),Bachelor of Mechanical Engineering. Experienced in project design and engineering (engineering manager for EPC execution) for Balance of plants,material handling,offsites in power plant,steel plant,oil & petro
Expecting a challenging and dynamic career in Civil/Quality Control and Quality Assurance where I can apply my knowledge and development skills.
Experienced Certified Engineering Geologist. Perceptive, creative problem solver. Computer literate. Effective communicator. Undaunted by remote operations. US and Australia resident.
A licensed Civil Engineer, organized individual, goal oriented, committed to responsibilities, affable person, self motivated, determined and a God fearing person.
Experience Senior Project Manager in multi-family, restaurants, hotels, and theme parks
Bitumen Technology (Hot Mix and Cold Mix), Analysis and Design
Construction
I believe that my vast experiences in the various facets of construction organization entitle me as the suitable candidate for this position. My academic qualification, exposures and experience have given me an in depth working knowledge in overall functions of the Construction Project Management.
B.E.(Electrical) , June’96. 11 years, 4 Months Experience,
I have 12 years of experience in different Civil Construction project such as Container Terminal with Jetties, Heavy Industry, Cement Factory, Textile Mill, High Rise Building etc. During my service period I was responsible for Preparation of Tender, Tendering, Supervision, Planning, Estimating etc.
Young Geotechnical Engineer with 9 years exp., well versed with the latest Engineering Softwares being used in the industry.
Structural design and supervision
I have a total of 13 years of full-time work experience. I believe that the skills I have acquired in the course of my professional and educational experiences will be valuable assets for your organization and/or your clients.
Graduate engineer with more than 11 yrs of experience in inspection of fabricated equipments
I have total 10 years of Work experience 5 years in middle east as a procurment officer. I have material knowledge, good negotatiton skills, Good commounication skill. Analytical and commonsense approach to given task, skilled in planning, Co-operation and directing,Self motivated and productive
I did M.tech in Structural Engineering and i have the knowledge of STAAD-Pro2003,AutoCad2004,MSofficeetc.
Objective Seeking to advance my professional career in the international arena of constructionmanagement. Open for relocation to most any international project.
Experienced in surveying, pipeline works and under ground tunnels. Have total 19 years experience.
HSE Manager, specializing in Oil and Gas Plant Construction, adaptable person with extensive travel and international experience. I am ambitious, aggressive, multilingual and entrepreneurial.
Journeyman Carpenter/30+ years experience
Construction management
25 yrs Construction Journeyman Carpenter/ Mechanical Millwright with 12 years supervision. I hope to be an asset to any company and position. Hard worker and I enjoy learning. I am a people person. I do take pride in my work. I have several OSHA Certifications including Safety 10/30.
Piping supervisor , pipeline supervisor, formen piping and pipeline
Having good knowledge in Construction field, having 11 years experience in safety filed. Having B.Sc degree. Good knowledge about scaffolding, equipments. audits. inspections.
Project Manager w/ 11 yrs of horizontal and verical construction experience
I have over 20 years experience working in construction. Certified in many areas. Able to read blueprints, computer knowledge, and have done pay notes.
Able to perform awide variety of crafts
P3, MS Project, MS office Applications, High Rise buildings. 9.8 yrs Exp
Resouceful, Independent Thinking Team Player has legal, business and financial expertise
skilled tradesman.Mobile/Tower crane operator,Heavy duty equipment mechanic,Rigger,Inspector,Apprentice Millwright
Experienced in Pressure vessels, Piping, Pipelines (onshore & offshore), Offshore structures such as jackets & deck, buoys, turrets, PLEMS etc., Storage tanks, etc. for major oil/gas, petrochemical, fertilizer and power sector companies involving materials.
Safety looking for construction employment ready to travel
Gas turbine repair coating blade vane nozzle hot gas path corrosion oxidation
I am having a three year associate engineer diploma in electrical and i have eleven years experience inconstruction of oil refiniry, power plant, gass plat, petrochamical plant, fertilizer plant and cement factory in gulf and my own country. I worked in a epc base good multination company.
Designer / Draftsman
Seasoned Commercial Superintendent
Expert in Planning, Claims analysis and Project controls
I am a Mechanical Engineer and having in depth expertise of over 11 years’ in Technical sales ,Project Management, Design Engineering, and Erection/Commission etc.Demonstrated abilities in implementing strategies for augmenting business, identifying and penetrating new market segments.
Graduate in Civil Engineering (B.E.,) In 1st Division and more than 12 years well experienced in all type of Civil & Steel Structural Construction works, Punctual and organized, self motivated and team player, dynamic, independent working knowledge, sound engineering knowledge, good communication sk
Site manager
Warehouse Supervisor - Skilled
Project Execution of EHVAC and HVDC Electrical Power Transmission as EPC contractor having direct experience of Engineering, Project Management, Procurement, Installation and Commissioning of Indian and Overseas projects.
Welding Technologies, Technical assistance, Workshop, site, AutoCAD, Tekla Structures, XSteel, SolidWorks, MS Project
My experiences and qualifications are enough to introduce me to any large company as an Internationally certificated project manager.
I have spent over 15 years as a dedicated Health, Safety and Environment professional working within Construction, Facilities Management, Manufacturing and Production activities.
I have experience in rigging, TIG (mirror welds), MIG, stick, fitting as well as blueprint reading and measurements, lead man, and safety experience.
Heavy equipment
First   1   2   3   4   5   6   7   8   9   [ 10 ]   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com