Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #66669
next resume »»
CONTACT INFORMATION:
View contact information...
Summary
A senior electrical engineer and project engineer with over 30 years experience largely gained within the Petro-Chemical, Liquid Natural Gas (LNG) and Power industries. Experienced in UK and overseas operations both on and offshore, Start-up, resident and project based engineering roles. A good motivator, natural communicator and excellent at man-manager with the ability to make people perform to the very best of their capabilities.
Career Experience
Tengizchevroil (TCO) Oil & Gas Project Tengiz Kazakhstan
September 2006 until September 2007.
HV Electrical Substation Project Engineer
As the HV Electrical Substation Project Engineer it was my responsibility to ensure that the Substations were constructed and commissioned to TCO policy. We had 9 HV Substations on site all construction finished with just a little commissioning to do and we actually have a few on line which are supporting the existing plant at the moment. The Substations that are on line were also my responsibility to ensure that they run efficiently and support the operations teams to optimize the plant daily output. I had the responsibility of the budgets for all the Substations and the management of the resources for the Substations. I carried out annual assessments on my engineering team to monitor their efficiency and commitment and award salary increases as appropriate. My engineering team consisted of 18 expat engineers and about 40 national engineers.
Atlantic LNG. Train 4 LNG Expansion Project, Trinidad, West Indies
January 2005 until September 2006
Lead Electrical Engineer Construction & Commissioning
As the client's Lead Electrical Engineer on this project I am responsible for monitoring and review of Contractor and sub-supplier's detailed design drawings and documents and to ensure Contractor's procedures and schedules are adhered to.
Accountabilities and Responsibilities
Responsible:-
* For engineering quality and adherence to standards, including being the Senior Authorised Person on site.
Accountable:-
* For all electrical aspects of the work scope and schedule.
* Engineering interface with other departments within the Project, including support to the interface and change management procedures.
* For all Electrical Management Of Change(MOC) documents
* Review and respond to Technical Queries from Contractor.
* Review and accept all test procedures and results from 3rd party testing group.
* Assist in technical preparation of responses to variation proposal by Contractor.
* Ensuring implementation of the project Health, Safety and the Environment policies and procedures is carried out on site.
* The compiling of the Final Handover Electrical Dossiers( content and electrical accuracy)
Staff:-
* There are 2 Electrical Engineers and 2 Electrical Inspectors answering directly to me.
Saipem S.p.A. Milan (Italy) & Ulsan (South Korea) On the Sabratha Gas Platform Project May 2004- December 2004
Electrical Commissioning Engineer
I was the Lead Electrical Commissioning Engineer in Milan on the Sabratha project, which is to construct and commission an offshore gas platform in the Mediterranean Sea off the Libyan coast, this project comprised of an integrated deck structure.
* This consists of 3 Siemens 10Mw Gas Turbo Generators generating at 6.6kV.
* A distribution system of step down transformers and switchboards to the main operating level of 440v
* Black Start System (2Mw Diesel Generator) this is all controlled by an ECS (Electrical Control System) supplied by ABB
* There are also the usual AC voltage & DC voltage UPS systems required by the generating and distribution equipment.
* I revised the specifications and drawings for the electrical system for the deck structure.
* I am also compiling the manuals for the offshore commissioning phase of the project.
* I was transferred to the construction yard in Ulsan South Korea to supervise the electrical construction and pre-commissioning phases of the integrated deck structure until sail out.
Linde AG Munich (Germany) Project office for the Hammerfest LNG project
October 2003-May 2004
Electrical Project Engineer (Technical Author)
I was employed as an Electrical Project Engineer in Munich on the Hammerfest LNG project, which was to construct and commission an LNG plant on a floating barge and sail it out after construction in Spain to a position on the northern coast of Norway
* Power Generation System consisted of 5 GE (LM6000) gas turbines total capacity of 225Mw distributed at 132kV.
* It also had an Electrical Control Supervisory System (ECSS) by ABB.
* I reviewed drawings and specifications.
* I was also the Technical Author compiling the Electrical Commissioning/Start-Up and operating manuals for the project.
Bechtel International, Atlantic LNG Extension Project, Trinidad, West Indies
August 2001 - August 2003
Lead Electrical Field Engineer
I was the Lead Electrical Engineer on this project, which was the extension of the existing LNG plant. I was involved in the construction through to commissioning and start-up. The project was to construct 2 additional LNG trains each containing 6 gas turbine driven compressors and 2 new solar power gas turbines (10Mw each) also a diesel driven black-start generator (1Mw) for an upgrade in the plant power system.
I had overall responsibility for:
Any design changes and 'red-lining' of drawings on site
Being the Senior Authorised Person on site
Ordering of materials making sure the procurement department is keeping up with the construction and that there is no shortage of materials
Making sure that vendors are on site when and where they are required
The plant itself contained all the usual HV/LV switchgear, transformers UPS systems, pumps and all types of ancillary equipment.
I had 6 field engineers in my team liasing with about 500 electrical craft people.
General Electric Power Systems for G.R.E. Minnesota, Lakefield Junction Generating Station
January 2001 - August 2001
Lead Electrical Engineer - 500Mw Power Station (the station consists of 6-7EA Dual Fuel 85Mw Units)
As the GE Electrical Engineer I was responsible for the installation and commissioning of all GE electrical equipment on the 6 - 7EA dual fuel gas turbines on site. This included all turbine ancillary equipment such as 13.8 kV generators and 13.8 kV switchgear, 5 kV switchgear and motors for the starting system, 480v motors, switchgear, battery systems and chargers, DC pumps and switchgear.
* Checking and accepting all 3rd party testers work on all associated generator and switchgear protection
* Assisting in the commissioning of EX2000 excitation system and liasing with the MkV controls engineer for commissioning of instrumentation and control systems and eradicating any problems on start-up
* General acceptance duties on all GE equipment on site
I was also involved in the commissioning of the 345 kV SF6 Siemens line breakers and 13.8 kV -345 kV step-up system transformers.
GE Power Systems for Esso Production, (Malaysia)
August 2000 - December 2000
Electrical Project Engineer - Construction and commissioning of a HV & LV switchboard system
My duties on this project were to monitor that the construction, internal wiring, and installation of all switchboard equipment was carried out to GE standards. I was also available to answer any technical queries that the client might have.
* The HV switchboards contained 8 GE Power/Vac circuit breakers for feeders and bus-ties and 9 GE Limitamp vacuum controllers for large motor drives including soft start systems, all protected by various types of GE Multilin relays.
* The LV switchboard has 5 GE AKD 10 ACB`s for feeders and bus-ties and a Mcc distribution system of over 250 various starters with Multilin protection.
I was overseeing the factory functional and commissioning tests of the switchboards and their protection systems, and also setting up and controlling the factory acceptance test for the client and the national electrical inspectorate.
G E Power Systems for Enron Energy, Illinois, Lincoln Energy Centre
January 2000 - July 2000
Lead Electrical Engineer - 680Mw Power Station (the station consisted 8-7EA 85Mw Units)
My duties on this project were identical to those of my more recent project for G.R.E. in Minnesota (above) except these machines were single fuel simple cycle units.
Duke/Fluor Daniel for InnCOGEN, Trinidad, West Indies
May 1999 - November 1999
Electrical Start-Up Engineer - 250 Mw Power Station (The station consists of 3-7EA 85Mw Units)
As Electrical Start-Up Engineer, I was the senior electrical person on site in charge of collating all construction activities and commissioning activities into a turnkey project for the client.
* I was responsible for writing of all electrical commissioning and operational procedures and for HV and LV testing on all electrical equipment on site
* I was responsible for all protection relays testing which consists mainly of GE Multilin relays.
* I was also responsible for the commissioning of the Black Start Detroit Diesel Generating set operating at 4.16 kV.
* I was also responsible for O.J.T. for the InnCOGEN Electrical Operators on High Voltage Switching and safety and general electrical maintenance
* I was involved with the installation and commissioning of the site control systems
* I drafted and controlled the site permit system
The project consisted of
* 3 GE MS 7001AE Turbines generating at 13.8 kV controlled by the Mark V Speedtronic system.
* 132 kV via 3 GE Prolec step up transformers,
* Siemens SF6 filled breakers
* Siemens vacuum breakers
* 4.16 kV for operational utility switchboard.
Petrobras, Brazil, South America
January 1999 - May 1999
Electrical Installation/Commissioning Engineer
Offshore Installation – I was engaged in the installation and commissioning of offshore telemetry systems for the mooring of tankers to Single Point Mooring Buoys and the monitoring of the pumping and loading procedure during the transfer to the product to the tankers. This involved the installation and commissioned of several pressure and temperature devices, current and voltage checking units and the computer controlled telemetry unit to link back to the offshore platform and the main computerized control unit. I also installed and commissioned the GPS system for the positioning of the tankers onto the mooring buoys, and also all the solar power units required to power-up the systems on the mooring buoys.
BPX\Ocensa, Colombia, South America
August 1997 – November 1999
Electrical Construction/Commissioning Engineer - Pipeline Pumping Stations
I was engaged in the construction & commissioning of all the electrical equipment in several pumping stations. This included HV and LV motors and associated switch gear and protection systems for up to and including 34.5 kV, stand-by diesel generator sets, lighting systems, cathodic protection systems etc. I also carried out on the job training of Colombian nationals, and was BP's authorised electrical person on site for HV switching and isolation and the synchronisation of the diesel generator sets when required. I was also the client's authorised signatory for all electrical certification carried out on site.
Qatar Liquefied Gas Company, Middle East
March 1996 – August 1997
Senior Electrical Supervisor - North Field Bravo Platform
As the platform senior authorised electrical person, it was my responsibility to perform all the synchronisation and changeover of the generators and HV switching duties. I was in direct control of all the platform electrical equipment that consisted of 3 EGT Typhoon dual fuel gas turbines delivering 4.5Mw at 6.6 kV, which was then distributed through various transformers to the different voltage level switchboards.
There were also 2-1Mw diesel driven generator sets, several UPS systems for 230v, 48v, 28v plus the usual offshore platform equipment such as HV/LV motors with associated protection relay, and all other electrical equipment. The HV/LV switchgear was all Merlin Gerin and the complete electrical system is controlled by Merlin Gerin computerised power distribution system.
My main duties were the day to day running of the electrical section this covers all aspect of preparing permits to work setting up and running the computerized maintenance and stores system SAP. I was responsible for setting up the training matrix for the electrical technician and assessing them on a yearly basis both in the construction and commissioning phases in the yards and during the offshore book-up.
I was the company electrical representative preparing for and participating in the certifying authorities commissioning authorisation checks, reviewing and then participating in the operational test procedures on platform electrical equipment which were carried out to Total Opercomm and Mobile Oil specifications. Through my close working relationship with the Instrument & Control department on OTPs I have gained invaluable experience and a good working knowledge of this discipline.
BHP Petroleum, Liverpool Bay, U.K.
January 1995 - March 1996
Electrical Construction/Commissioning Engineer
I undertook construction duties onshore in the construction yards and then commissioning duties offshore during the hook-up phase.
This involved carrying out tests on a wide range of equipment for Lloyds authorisation, commissioning duties on the GELM 6000 gas turbines and their Speedtronic MkV controls systems and the 13.8 kV switchboards including ABB relay commissioning tests. Also involved with GEC on their ISIS and Gemstart MCC controls systems and Cegelec on their variable speed drive system controlling the 18 Mw gas compressors, brush controls on their power management system (Prismic System), Siemens HV control systems and Gutor UPS equipment The complete distribution network had the facility to be controlled remotely from the main switch room via an ABB SCS90 system.
I had the authorisation for witnessing tests and signing for systems on behalf of BHP and also supervising teams of electrical & instruments commissioning technicians and distributing their commissioning duties.
BP Exploration, Aberdeen, UK.
August 1986-October 1994
Electrical Supervisor - Clyde Platform
I was responsible for the co-ordination and execution of the platform maintenance programme carried out by a multi-disciplined work force. I was 'asset owner' for all electrical modules on the platform, including power generation, distribution (transformers & switchgear).
The platform had generating capacity of 30 Mw from 7 dual fuel EGT TB 5000 gas turbine and 2 – 1Mw diesel driven emergency generators, with voltage levels up to and including 11Kv.It was my duty to organise manning levels, leave schedules and all training requirements. I was the platform senior authorised electrical person responsible for the entire platform HV switching and generation changeovers and for preparing and authorising electrical permits to work and participating in certifying authorities' annual visitations.
I implemented the planned maintenance system, and was responsible for the electrical yearly budgets. I in the absence of the Instrument Supervisor, I was in control of the instrument/control technicians. I am comfortable with computer controlled stores systems such as ENGRADE, RAPIER, TERAMIN AND MESC.
Earlier career is omitted here but can be provided on request.
Education HNC Electrical & Electronic Engineering
ONC Electrical & Electronic Engineering
City & Guilds Full Technicians Certificate Electrical Engineering
Training
External Cegelec Variable Speed Drive Systems
ABB Lassale Downhole Pump Drives
ABB Protection Relay Systems
Scotech HV Distribution
Scotech HV Protection
Scotech Electrical Protection In Hazardous Areas
Scottish Power HV Safety
EGT (Ruston) Gas Turbine Control and Maintenance Course
Brush Prismic Power Management Systems
Siemens HV Controls Systems
Gutor UPS Systems
Internal Digital Electronics and PLC Systems
Production Hazops Course
Supervisory Training and Leadership Skills
Area Authority and Permit to Work Course
ISRS Loss Control Management
Multi – Skilling Pro – Scan Assessor
Membership
Institute of Electrical and Electronic Incorporated Engineers (Associate Member)
Personal Details
Marital status: Married
Children 1 (Son)
Date of birth: 21/7/49
Health: Excellent
Passport: Full British (with 10 year B1/B2 Business Visa for USA)
Hobbies and interests: Football, Golf, and D.I.Y.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 1951 to 2000 of 4363)
Go to Search Parameters...
Brief Description
Action oriented, contracts-project manager
Senior Electrical Engineer
I have over 5years and 8 months of combined experience in computer programming and design of electronic appliance controls mainly for HVAC products. Presently I am working as an Electronics Engineer (HVAC Electronic Controls Design, Testing & Approval) in the R & D dept. of Awal Gulf Mft. Co.
This is a resume which will illustrate briefly what I have achieved both with educational and industrial environments.
laser alignment, 0-8t crane operator,shift millwright for 10yrs accident free, root cause analysis, pm generation, equipment reliability, job plan creation, yearly budget, capitol projects, equipment installation
Mechanical Engineer, 2 yrs of experience in design and development, cad packages- CATIA V5, solidworks 2006
An ambitious, highly motivated and energetic civil engineer with extensive commercial experience in construction business. Superb managerial, communication skills combined with analytic and practical personality. Looking for project coordinator, contract administrative or similar position.
as below
To obtain full time employment with a Prominent company in the Construction Industry that offers stability, growth, and advancement opportunities where I can utilize my skills as a Heavy Equipment Operator.
For the post of Design and draughting
Six years of experience in Project Management, Contract Management, Quality Control and site supervision of high-rise residential and commercial project. About four year of experience in Project Management of an industrial projects.
Objective: To contribute my technical skills and to be part of professionally managed Organization that provides excellent opportunities for learning and scope for Individual development.
Vast Experience in Business Development, Administration and Management, Business correspondence.
Architect and Environmental Planner Total Job Experience-2.5 yrs as an Architect 2 Months as a Planner
Bilingual engineer with experience in engineering and teaching. Experience in administration, group management. Dynamic and outgoing by nature.
Ability to think rationally and solve problems analytically
Site Acquisition
A strongly skilled professional with technical abilities in supporting computer networks and systems. Knowledgeable in the selections of telecommunication equipment, the installation of networks, cabling, hubs, bridges, routers, and interconnecting multiplatform networks. Career minded self motivate
KG Dunaway NCCCO
Emergency Response Technican / Fire Fighter
MSc in Environmental Engineering from University of Nottingham, UK
I am piping engineer with diploma in mechanical engineering to Poli- Technic institute "GH.Asachi" Iasi, Romania
Document Controller, with two years experience in an "A Grade" construction company (ISO 9001:2000 certified). Have an excellent knowledge in Document management. Able to handle big volume of documents both in hard copy & electronic file in accordance with QMS-ISO system.
Hardworking, a good team work, able to work with minimum supervision, responsible; have a positive thinking, open to critics and willing to learn more.
ALL EXECUTE CIVIL WORK AS PER DESIGN AND SOME CORECTION ON CAD WE PREPPER AND CLEAR IT .
I am a senior electrical engineer and project engineer with over 30 years experience in the Oil& Gas industry including LNG, I have a national diploma in Electrical Engineering
I have a variety hands on work experience in electrical field troubleshooting and installation of electrical/instrumentation circuit,PLC programmable logic controller and power plant generating units gas/steam and diesel generators.
Piping Designer with Over 20 years experience within the Oil and Gas, Petro Chemical, Refinery, Textile, Pharmaceutical and Nuclear Waste Industries
EXPERIENCED PIPING ENGINEER WITH PDS ADVANCED EXPERTISE / TECHNICAL DATA SPECIALIST
Make, Review and implement Engineering design, construction work,inter-diciplinary interfaces, Construction Specifications, Progress reports, Quality Plans and all the commssioning and Maintenance Procedures.
Site Manager; Site Supervisor; Checker
Construction Project Manager Restaurant (Swiss, 39, Trilingual E/F/G) is looking for a new international career opportunity. 10 years experience in construction project management (McDonald's restaurants and General Contractor). Willing to re-locate in the US/Australia/NZ/Canada.
I have over twenty years pipefitting experience. Most of this experience has been in industrial chemical and paper processing. Five years of this experience has been as an foreman. I have used computers for report writing, maintaining records and numerous other tasks, have worked internationally.
10 years experience of geotechnical investigation and environmental remediation
I have a master degree from the American University in Cairo, excellent computer skills, English & French languages, Excellent communication skills, and presentable. I prefer workin in construction management field
More than 11 years experienced Claims Consulant from Quantity Surveying Background with Civil Engineering Professional qualification and FIDIC based training and pursuing CIOB, CIArb membership and PGDip in Construction Law & Arbitration.
25 plus years of heavy trucking and construction experience.compotent with hand,pneumatic tools, cutting torches, welding in flat position ,current ga. cdl with tank end. hard worker, healthy.
BSc(Hons) Quantity Surveying
I am a proactive, adaptable and conscientious graduate Quantity Surveyor with 9 years experience of responsibility and Management in Quantity Surveying Practice working with, Building & Civil Engineering Contractors and Property Development &Valuation Companies (Real Estate). My involvement stretche
Develop & implement Contractor’s Quality Control Plan in accordance with contract & technical specifications including writing the Inspection & Test Plan, Quality Audits, Record Keeping, Prepatory Phase Meetings, Resolve NCR's, Process Control, Sub-Contractor Control, every aspect of Quality Control
I/E Designer, 25 years experience in the petrochemical industry along the Gulf Coast. Worked onsite at client facilities and in-house. Extensive use of Autocad and MS Office (Word, Excel). Experienced in working with other engineering disciplines, clients, vendors and construction. Willing to travel
Experienced Autocad drafter with 5 yrs. structural steel detailing experience seeking employment.
Highly experienced Project Mgr in construction and environmental projects. Extensive experience in Federal & State projects, contaminated soils & groundwater, demolition. Hands on and takes ownership. Extensive experience in massive soil relocation and placement. Available for overseas projects.
Construction verification, Cost estimation for mechanical systems involving process piping, heavy civil structures, Plumbing, and fire protection. Project management with Profit-Loss responsibility, Project cost control, Project execution, project control & close out.
I am Danish construction engineer. I have worked as a construction manager for about 3 years. The projects have been large infrastructure projects, commercial, and industrial projects. I have experience in site management and project management,
6+ years of software design and development experience with specialization in Client/Server programming, Object Oriented Analysis and Design. Proficient in, C/C++, MFC, Visual C++, Win32 API, COM/DCOM, multithreading.
I'm looking for a job as machinist. My field of interest is to repair, rebuilding, fabrication and/ or finishing of replacement parts for large and small mechanical equipment including pumps, valves, shafts , sleeves, bushings, rollers and other special items.
Curtain Wall Civil Structural Engineer Manager
11 years of experience in Erection & Installation, Engineering, Design, Commissioning, Inspection and other Management activities in the field of Terminal Automation, Gas Metering, Refinery, Gathering Centers and others.
Skilled IronWorker, general labor, maintenance and delivery
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
[ 40 ]
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2008 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com