Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #68576 next resume »»
CONTACT INFORMATION:
View contact information...

EDUCATION B.S.M.E University of Saskatchewan., 1988 (Canada)

ENGINEERING POSITIONS HELD
Nov 2006 - Dec 2007 Senior Process Control Eng. & Controls Lead Eng
(13 Month Contract) AMEC Engineering (Saskatoon)

May 2006 - Oct 2006 Senior Instrumentation Engineer - Lead Area Engineer
(6 Month Contract) WPMEG Engineering (Calgary)

Sept. 2005 - April 2006 Safety Instrumented System (SIS) Lead Engineer
(8 month Contract) Jacobs Engineering Canada (Calgary)

April 2005 - July 2005 Instrumentation & Control Systems Engineer
(4 Month Contract) Upside Engineering Ltd. (Calgary)

Sept. 2004 - March 2005 Intermediate Engineer
(6 Month Contract) Fluor Daniel Canada (Calgary)

June - July 2004 Senior Instrumentation Engineer
(2 Month Contract) DPH Engineering (Calgary)

April - May 2004 Senior Instrumentation Engineer
(2 Month Contract) Concise Design Engineering (Calgary)

Feb 2003 - March 2004 Instrumentation & Controls Engineer
(14 Month Salary Position) Associated Engineering (Calgary)

Jan 2001- Dec 2002 Self Employed in Real Estate
(24 Months) Owned and Managed Multi-Residential Units

July 1999- October, 2000 Project Engineer
(16 Month Salary Position) Bartlett & West Engineers (Topeka, Kansas, USA)

March 1998- Jan. 1999 Instrumentaion & Controls Specialist
(10 Month Contract) Bantrel Inc. (Calgary)

Nov. 1997- March 1998 Senior Controls Specialist
(4 Month Contract) Colt Engineering (Calgary)

1996-1997 Control Systems Eng. & Chief Commissioning Eng.
(13 Month Contract) Kilborn - SNC Lavalin (Saskatchewan)

1994-1996 Intermediate Applications Engineer
(2.5 Year Salary Position) J.E.J. Industria e Comercio de Metais e Plastico (Brazil)

1993 Start-up Engineer
(1 Year Contract) Bailey Brazil & Samarco Minerals (Barzil)

1988-1991 District Engineer
(3 Year Salary Position) Elsag Bailey Process Automation (Alberta & Sask.)

RECENT COURSES AND TRAINING
EMERSON DeltaV DCS PROGRAMMING COURSE
SAFETY INSTRUMENTED SYSTEMS COURSE (ISA 84 & IEC-61511 STANDARD)
ARC FLASH TRAINING, WHMIS TRAINING, H2S ALIVE
INDUSTRIAL CONTROL VALVE SIZING

INTRODUCTION
Professional Engineer with 18 years experience in industrial automation, process controls and instrumentation design. I am familiar with the following processes: Mining, Petro-Chemical, Water Treatment, Power Generation and Oil Applications. Familiar with the entire scope of duties and activities of the Consulting Engineering Practice from initial design to final equipment procurement and system check-out. Effective communicator during internal company meetings and client meetings. Demonsttated ability in setting-up and implementing project standards. Experienced in mentoring and managing less experienced personnel.

SPECIFIC PROJECT EXPERIENCE
Nov 2006 - Dec 2007
AMEC ENGINEERING SASKATON (350 MILLION DOLLAR MINE PROJECT)
In charge of all control system detailed engineering implementation for the PCS (Potash Corporation of Sask.) Phase 1 Mill Expansion Project ($ 350 Million Expansion). Also in charge of all detailed electrical design interfaces as it pertained directly to the control system. Planned, designed and tested advanced networks. Worked closely with Senior Process and Electrical Engineers. Responsible for assigning tasks to lower level personnel as required and as dictated by upper management. Attended in-house and client meetings.

Prepared Engineering drawings and issued to draftsmen. Actually did Autocad drafting work when drafting manpower was not available so as to maintain the project's tight schedule.

Prepared plant wide Control System Package for IFT (Issued for Tender), IFC (Issued for Construction) and Re-issued for Construction stages.

In charge of all details of preparing the following engineering deliverables: Control System Network Drawings, Control Panel and Communication Panel Drawings, Electrical PLC I/O Drawings for 5 kV and 600 V Electrical Starters, DeviceNet and ControlNet schematics. Electrical starter interface design for MCC (Motor Control Centers) and VFDs (Variable Frequency Drives) including hardwired process interlocks. Maintained and updated the project's detailed control system cable schedule.

Checked Process PLC I/O Drawings and DCS I/O Drawings prepared by others and suggested improvements in the design. Reviewed Vendor Data for approximately 400 Electrical Starters.

Maintained and updated the project's detailed motor control database (i.e) for purposes of importing motor control data into the DCS database for motor control programming during the final stage of project.

Designed the plant's detailed Fiber Optic Control System Communication Networks. The plant's network included advanced Ethernet Networks using Cisco Switches, VLANs (Virtual LANs) and advanced Servers. Programmed and tested the VLANs to the Emerson DeltaV DCS and to Allen-Bradley ControlLogix PLCs.

Designed, maintained and updated the Instrumentation Power Panel Distribution drawings in coordination with Senior Electrical Engineers so as to tie-in properly to the plant's Electrical Power Distribution system (transformers, MCCs, etc.).
Designed Electrical substation interface to DCS and PLC control systems including serial and OPC communication devices and connections.

Nov 2006 - Dec 2007
AMEC ENGINEERING SASKATON (continued)
(350 MILLION DOLLAR MINE PROJECT)
Designed the plant's new main Fire Alarm Panel. Developed the Allen-Bradley ControlLogix PLC Program for interface to Det-Tronics Fire Alarm System. Developed special fault handling routine for detecting loss of communications between ControlNet and Det-Tronics Fire Alarm System. Tested the entire Fire Alarm System at Spartan Controls staging facility in Calgary

Performed detailed FAT (Factory Acceptance Tests) for 18 control panels at Spartan Controls facility in Calgary. Resolved all control panel deficiencies.

Resolved site requests for information and clarifications via telephone and e-mail.

May 2006 - Oct 2006
WPMEG ENGINEERING CALGARY
(400 MILLION DOLLAR SAGD OIL PROJECT)
Detailed Instrumentation design for the CNRL Wolf Lake 4 Project. This was a SAGD Oil Project. Acted as the Water Treatment Plant Lead Engineer in charge of all issues related to the detailed instrumentation for the new Wolf Lake 4 Water Treatment Plant. Coordinated on a daily basis with the Oil Treatment Plant Lead Engineer for all tie-ins between the water & oil treatment plants and to standardize all design aspects for these two areas.

Worked closely with Senior Process, Mechanical, Piping and Electrical Engineers. Work included mostly detailed Vendor Package input for the Water Treatment Plant, P&ID development for both Water & Oil Treatment, InTools Database work, modularization of equipment skids, instrument sizing/selection, preparation of RFQs, evaluation of Vendor Bids and mentoring less experienced personnel.

Sept. 2005 - April 2006 JACOBS ENGINEERING CANADA
MULTI-BILLION DOLLAR SAGD OIL PROJECT)
Worked as the Lead SIS (Safety Instrumented System) Engineer for Suncor Energy's Firebag SAGD Oil Project (Stage 2). Worked on both the EDS (Engineering Design Specification) Phase and the DBM (Design Base Memorandum) Phase for Stage 2 of the Project.

Detailed hardware design and hardware estimates for Triconex Safety System. Detailed hardware and software design of SIS communication block diagrams, SIS architecture diagrams and SIS interfaces to external devices. Designed interfaces to Emerson DeltaV DCS to PLCs and Triconex System.

April 2005 - July 2005 UPSIDE ENGINEERING LTD.
(SMALL TO MEDIUM SIZED OIL PIPELINE & OIL TERMINAL PROJECTS)
Worked on a new Crude Oil Terminal facility for Rangeland Pipeline Partnership. This project includes various detail engineering design of Electrical equipment, Instruments and Control System programming for the new Edmonton based oil terminal. Also included tie-ins to the Esso Strathcona Refinery, Pembina Pipelines and the existing Sundre Oil Pump Station which transfers this oil to the United States.

Resume of ROGERIO SOUZA, P. Eng. (APEGGA) 01.FEB.2008 Page 6/12

Sept. 2004 - March 2005 FLUOR DANIEL CANADA
(MULTI-BILLION DOLLAR OIL & REFINERY PROJECTS)
Worked on two major Alberta projects: The Petro-Canada Refinery Conversion Project (RCP 1.1) and the CNRL Horizon Oil Sands Project. Developed the P&ID Drawings in conjuction with the Process Engineering group, obtained vendor data and operations requirements for refinery equipment such as Cokers, fired heaters, flare stacks and lube oil skids..

On the CNRL Horizon Oil Sands Project, wrote the detailed control philosophy for one of the large plant areas: the Storm Water Pump House. Also wrote Control Narratives for the Heating and Cooling Plant.

June - July 2004
DPH ENGINEERING (MEDIUM SIZED HYDROCARBON LIQUIDS PROJECT)
Detailed engineering design, selection and sizing of instruments for Encana's Empress Debutanizer Project. Selected and sized relief valves, control valves, inline flow instruments, rupture discs, rotameters and densitometers. Prepared Instrument Datasheets for the RFQ (Request for Quotation) package, updated P&ID Drawings and the Instrument Index.

April - May 2004
CONCISE DESIGN ENGINEERING
(SMALL TO MEDIUM SIZED OIL & GAS PROJECTS)
Worked on small to medium sized Oil & Gas Projects. Designed instrumentation and controls for three clients: Tarasen Pipelines, Starpoint Energy and Viking U.K. Company.

Feb. 2003 - April 2004
ASSOCIATED ENGINEERING LTD.
(WATER & WASTE WATER PROJECTS - UP TO $80 Million)
Work included detailed design of all instrumentation and control systems, including selection of all instruments, price estimates, installation details, writing specifications for the tendering process, and final evaluation of contractor bids. Work also included instrument datasheets, control valve selection and control valve piping/tubing diagrams, control panel design, I/O drawings, detailed electrical control wiring diagrams, PLC and HMI programming, site start-up and commissioning.

Jan 2001 - Dec 2002
SELF-EMPLOYED IN REAL ESTATE
Owner, operator and manager of multi-family residential rental income properties.

Resume of ROGERIO SOUZA, P. Eng. (APEGGA) 01.FEB.2008 Page 8/12

July 1999 - October 2000 BARTLETT & WEST ENGINEERS INC.
(WATER & WASTE WATER PROJECTS - UP TO $12 Million)
City of Holton, KANSAS, USA (New Water Treatment Facility)
Designed the I/C System for a new potable water plant. Platform used was the Allen-Bradley SLC-5/04 with 3 PanelViews, DeviceNet and Flex I/O Communications. Also included radio telemetry communications to two remote sites.

City of Lee's Summit, MO & Kansas City, MO (New South Terminal Pump Station)
Wrote the Instrumentation & Control System Specification (144 pages). Included all instrument selection, sizing and placement. Included interface to two existing & operating systems Valmet Oasys SCADA, Transdyn SCADA and Aries Power Plant. Radio and telephone telemetry via modems.

BNSF Railway Company (New Telemetry Monitoring System)
Designed a Telemetry Monitoring System for the Argentine Yard in Kansas City, KS. The system is intended to monitor all railway yard critical operating parameters such as: Diesel Fuel Oil Transfer System, various tank levels (locomotive lube oils, compressor oil, etc.), lift stations, pump stations, waste water treatment plant, boilers, yard air compressors, yard flooding and equipment failures.

BNSF Railway Company (New Diesel Fuel Oil Storage Tanks)
Design of new instrumentation to measure Diesel Fuel Oil level and volume and also entrained water level and volume for two 2.2 MG storage tanks. System also included high tank alarms and hi-hi tank level ESD (Emergency Shutdown).

City of Lee's Summit, Missouri (Scherer Road Elevated Water Storage Tank, 3.0 MG)
Designed the control system architecture for a new elevated water storage tank. The system used was the Allen-Bradley SLC-500 Platform with leased telephone line modem communication to an existing SCADA Host.

March 1998 - Jan. 1999 BANTREL INC.
UNION CARBIDE CORP - LP7 POLYETHELENE PLANT - $650 Million)
One of the crucial tasks was to come up with an accurate I/O count for the three control systems (ESD, PLC, DCS). This was accomplished by reviewing the existing P&ID's and the Boolean Control Logic Diagrams. The I/O counts were entered manually in the project database. This database was then used as a basis for all preliminary design work such as the initial layout of the Marshalling Panels and issuance to other internal departments such as electrical engineering. The ESD System for this plant is a Fault Tolerant Triple Redundant System. Systems evaluated were Triconex, Honeywell's FSC & Moore ESD.

NOVA CHEMICALS OSBL PROJECT ($2.5 Billion Expansion)
Prepared detailed front-end studies and estimates for various applications. These studies included both technical and cost comparisons. One of these highly specialized applications was the high pressure steam flow for the NOVA Chemicals site. The steam flow lines studied were the main headers for the future Cogeneration facility. These were large 18" and 20" headers with bi-directional flow capability, flow computers and also custody transfer metering requirements. This was a unique, difficult and challenging application. Reviewed the acceptable industry standards for the various methods of metering steam flow.

In addition to the steam flow application mentioned above, also investigated the measurement of nitrogen gas, water and caustic liquids. Summarized the currently acceptable industry standards and researched any new technologies.

March 1998 - Jan. 1999 BANTREL INC. (Continued)
NOVA CHEMICALS OSBL PROJECT (Continued)
Developed the Instrument Index for the 3 future Electrical Substations. This required knowledge of high voltage switchgear, transformers and substation intertrips and lock-outs. Prepared a detailed front-end study for interfacing PLC's to the plants' existing Honeywell DCS System. Reviewed 2 major PLC vendors (Allen-Bradley and Modicon) for both technical merit and costs.

Nov. 1997 - March 1998
COLT ENGINEERING
UPSTREAM PROJECTS ALLIANCE with ESSO (IMPERIAL OIL RESOURCES) (PROJECTS RANGING FROM $100,000 - $2 Million)
Senior Controls Specialist in charge of designing controls and instrumentation systems for the Bonnie Glen Crude Oil Pipeline system within Alberta. Designed and tested Modicon PLC hardware and Ladder Logic Programs for a vapour incinerator at the Rimbey Pump Station. This involved knowledge of combustion and burner management controls, pumping station field operations, crude oil piping and valving. The vapour incinerator system was interfaced to the existing and operational Rimbey Pump Station. The design also included an ESD shutdown system which was relay based.

Aug. 1996 - Oct. 1997
COGEMA RESOURCES INC.
McClean Lake Uranium Mill, Northern Sask. ($400 Million)
The McClean Lake Uranium Mill in Northern Saskatchewan consisted of the following major plants:
Ore Receiving and Grinding, Atmospheric Leaching Plant, Counter Current Decantation Plant, Clarification Plant, Solvent Extraction Plant, Acid Plant, Calciner Plant, Strip Purification Plant, Ammonium Sulfate Plant, Utilities Plant, Chemical Reagents Plant, Product Discharge/Packaging/Shipping Plant. In addition this mill contained plant-wide Dust Collection Systems and HVAC Equipment, some of which were stand-alone while others were PLC/DCS controlled.

Chief Commissioning Engineer responsible for: coordinating, directing and supervising mill-wide activities related to electrical, mechanical, instrumentation, controls and chemical processing equipment.

NYCO MINERALS, A DIVISION OF FORDING COAL - Pilares Project, Mexico ($120 Million)
Control System Design Engineer responsible for the instrumentation and control development for a mining application in Mexico. This included the implementation of mill wide control philosophies: start-up and shutdown sequences, recipe handling sequences and definition of motor control interlocks. The systems were Elsag Bailey field instruments, Elsag Bailey Infi90 DCS and Allen-Bradley PLC's.

Jan. 1994 - June 1996
J.E.J INDUSTRIA E COMERCIO de METAIS E PLASTICO LTDA. - Sao Paulo, Brazil
This company specialized in injection molded plastic parts for mountain bikes, suppling parts to Brazil's largest bicycle manufacturer. Intermediate Applications Engineer responsible for the research and assessment of technical data needed for the design and development of new plastic products. This involved designing prototype injection molds using AutoCad for the injection molding machines.

April 1993 - December 1993
BAILEY BRAZIL - SAMARCO MINERALS (Brazil)
Samarco Minerals is an iron ore pelletizing plant situated on the Atlantic Coast. As of 1993 Samarco had the world's largest iron ore furnace (it contains 72 oil burners). The original field instruments in place were by Foxboro, Honeywell and Moore. The original control system was pneumatic. The system was retrofitted to the Bailey Infi90 system. New electrical components were added during the retrofit (mainly new motor control centres and completely new field wiring for all motors and instruments). Start-Up Engineer responsible for: supervising the upgrade from pneumatic controls to Bailey Infi90 controls and modifying DCS logic.

June 1988 - June 1991
ELSAG BAILEY PROCESS AUTOMATION - District Engineer (Saskatchewan)
Involved in Sales, Design and Service as District Engineer.
Worked on small to extremely large scale projects. Samples below:

ALBERTA POWER LIMITED & SASKPOWER CORPORATION
- Existing Coal & Gas Fired Power Plants
- Various Maintenance and Controls Automation Projects.

MILLAR WESTERN PULP & PAPER
- New $400 Million Plant. CTMP Mill Commissioning

WESTCOAST ENERGY GAS PLANT
- Plant upgrade projects and system maintenance.

SHELL CANADA GAS PLANTS
- Automated Sour Gas Metering System Design (AGA-7 Standards)
- Site System Training and Tech Support.

IMC KALIUM POTASH MINES
Among the world's largest and lowest cost producers of potash.
Plant upgrade projects, system maintenance, training, sales calls.

HUDSON BAY MINING & SMELTING
- Plant Modernization and Upgrade Projects. - Sales and marketing, and ongoing tech support.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 1451 to 1500 of 4371)Go to Search Parameters...
Brief Description
Project planning with MSP & preparing 2D/3D sketch, ISOs, GADs, Plot plans.
Post Graduate Naval Architecture from IIT Kharagpur , sound knowledge of naval architecute and structural designing
Design of Distribution and power transformers upto 66kV class and 20MVA. Have knowledge of singlephase, amorphous, dry type and pad mounted transformers
I am presently working as Manager - Operations (Process) with IndianOil Petronas for their 6.0 lakh TPA LPG Import/Export Terminal at Haldia, India. I have over 20 years of experience in the construction, commissioning & operations of LPG Filling Plants & Cryogenic LPG Terminals.
I am presently working as Manager (Mechanical) with Engineers India Limited an ISO 9001 CONSULTANCY ENTERPRISE of Govenment of India & supervising on behalf of owner all piping and equipments installations in PTA - project of Indian Oil Corporation at Panipat Haryana India.
CA licensed geologist (CEG&RG). More than 24 years of professional experience in engineering geology and environmental consulting in CA & HI, including 16 years as supervisor/owner. Currently self-employed with own environmental consulting firm in HI since 1992. Relocating to AZ (Tucson or Phoenix)
Five years field as well as laboratory experience (as JRF/SRF) in Collection, Collation, Computation and Synthesis of Land Resource Data of Himalayan terrain, particularly in the Nanda Devi Biosphere Reserve.
Accounting in IAS & GAAP, Controlling, Budgeting, Financial Reporting, Compliance
MSc of Engineering Science, East Ukrainian University – Ukraine (1998),  BSc Instrument & Control Engineering, East Ukrainian University – Ukraine (1997)
Geologist with extensive experience in earthmoving, civil construction, dredging, site management and quality control
MA(ECONOMICS), PGDCA, HEALTH & SAFETY MANAGEMENT DIPLOMA, FIRE AND SAFETY MANAGEMENT DIPLOMA, FIRST AID DIPLOMA, CONSTRUCTION SAFETY CERTIFICATE, COSHH CERTIFICATE, SAFETY MANAGEMENT CERTIFICATE, OHSAS-18001-1999 HEALTH AND SAFETY INTERNAL AUDIT, ENVIRONMENT AWARENESS CERTIFICATE, MANUAL HANDLING CE
Chemical Engineer with 6 years experience in Drilling, Pipeline Operation, Construction, Economic Modelling, Health, Safety and Environment, together with Sustainable Development and Issues Management. 6 languages and American Citizenship, would like to work in Houston, Texas.
Search for job in car or food industry.
same as resume one
15 years experience in implementation & maintenance of ISO 9000 QMS, Internal Audits, preparing QA/QC procedures, Quality control in construction of Tunnel, sewer/storm water pumping & lift stations, drain & sewer pipelines, Cross regulators/falls, siphons, bridges.
Searching for a position within the Construction & Civil/Structural Engineering profession, in a progressive employer that provides career growth and excellent advancement opportunities.
I’m a Computer Aided Drafter/Designer with 15 yrs experience in various fields. I use AutoCAD up to version 2002, IDEAs SDRC v. 7-9. I’ve worked some with MicroStation and AutoDesk Inventor. I am looking to relocate to Virginia or Pennsylvania Reading area.
I want to relocate to USA/UK/CAnada,hence need an employer who can hire me and sponsor me for visa.
I have been working in the industry for approximately 10 years, as a rigger, milwright, field mechanic, valve technician, and welders assistant
10+ years of project management experience in the areas of accounting and financial reporting in various industries, including Management Consulting, Retail and Wholesale, Manufacturing and Distribution, Mining and Construction
Heavy equiptment operator
Fresh Graduate Civil / Project/ Site Engineer
I believe that my vast experiences in the various facets of construction organization entitle me as the suitable candidate for this position. My academic qualification, exposures and experience have given me an in depth working knowledge in overall functions of the Construction Project Management.
An enthusiastic self-starter with strong leadership and communications skills. proven academic and curricular achievements, and possess the right technical and soft skills required to propel the organization achieving its goals and objectives.
Project Manager
BHS Engineer
Mechanical engineer having 2 + years of experience in machine manufacturing , Solidworks being the design tool
I am looking for a project controls/EVMS position internationally.
I am an HVAC ENGINEER from India having good knowledge of Textile Air Conditioning, Pharmaceutical air conditioning , Clean Rooms, and Normal comfort air conditioning till date i have executed around 8000 TR of Jobs. presently working in United Arab Emirates as a Project Engineer.
Project Planning and Control
Project Controller with extensive experience of implementation and operation of project management systems. Detailed knowledge of C/SCSC & EVM systems. Experience in Petro-Chem, Oil & Gas downstream distribution, Rail, Defence and Civil Engineering sectors. Extensive procurement experience.
LSIT, total 12 years of surveying
Ready Mix Concrete - Operations - Production - Plant Construction Manager
A senior manager with over 25 years experience in engineering management including sales and project engineering in the Middle East, North Africa & UK within the oil, gas, construction, power, petrochemical sectors with blue chip companies including Saudi Aramco, Shell UK and British Gas.
Thirteen years experience of Project Execution, Quality Assurance & Quality Control at OIL & GAS Industries at Saudi Aramco, QatarPetroleum,Parco Refineries, National Oil Refineries, PSO Plants, in Saudi Arabia ,Qatar & Pakistan involved with the FAT’s, Installation ,Testing and Commissioning of
Senior QA/QC Engineer (Welding, Inspection & NDT) / Construction Superintendent, with more than 12 years of experience in the field of Oil and Gas performed with multinational engineering companies
Chief Engineer (Manager) in Technical Office for a large construction progect :High Rise building, Under ground Metro line, Industrial projects, Preparing and checking structural shop drawings with B.B.S., Coordination, Methods for constructions, using ISO 9000 - 2000 Prep. of Claims and V.O etc.
Senior Planning Engineer well versed with Primavera, Suretrack, MS Project
Technical office Manager.
Urban Roads and Highway design, Traffic and Transportation planning
Contract Negotiations, Quantity Surveying, Project Handling & Project Implementation, Project Co-ordination
Civil Engineer from REC Kurukshetra, India. Working as Assistant Manager (Civil) with Larsen & Toubro Limited - ECC Division
AutoCAD, Revit, 3D Animation
PLC programming,control design,piping,branch circuits.
safety officer (offshore project)
Senior Instrumentation & Control Systems Engineer
Responsible for business development of company & for recruitment of professionals like Project Managers, Engineers, &Technicians for Engineering, & Construction industry in India, Middle East, ,etc.To develop and manage our own portfolio of clients and source the most suitable candidates .
International Weldig Engineer (IWE) , CSWIP 3.1 and Level II(two) Pt,Mt,Ut and RT
Degreed in occupational safety and health, 18 years experience in construction safety, sveral yrs. Overseas exp. Working with multi-national staff. Excellent medical background
Erection & commissioning
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   [ 30 ]   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com