Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #68854 next resume »»
CONTACT INFORMATION:
View contact information...

DATE OF BIRTH: 01 May 1966

CIVIL STATUS: Married

NATIONALITY: Filipino

RELIGION: Roman Catholic

LANGUAGES SPOKEN: English, Tagalog

EDUCATIONAL ATTAINMENT
(HIGHEST LEVEL): Bachelor of Science in Mechanical Engineering
Pablo Borbon Memorial Institute of Technology - 1988
Batangas City, Philippines

PROFESSIONAL LICENSE: Registered Mechanical Engineer (RME # 0038983)
Professional Regulation Commission
Manila, Philippines

B. EDUCATIONAL BACKGROUND

1973 - 1979: Elementary
Batangas City East Elementary School
Batangas City, Philippines
1979 - 1983: Secondary
Pablo Borbon Memorial Institute of Technology - 1988
Batangas City, Philippines
1983 - 1988: College
Pablo Borbon Memorial Institute of Technology - 1988
Batangas City, Philippines
DEGREE: Bachelor of Science in Mechanical Engineering

C. KNOWLEDGE IN COMPUTER
Microsoft Excel, Microsoft Word, Microsoft PowerPoint, Microsoft Access, AutoCAD R14/2002, Iris Vessel R 3.81, Primavera Project Planner P3, E-SPIR 2000 Software Program

D. EMPLOYMENT HISTORY

I. YEAR COVERED: Jan2007 to Present
EMPLOYER: CHIYODA CORPORATION
ADDRESS: 2-12-1 Tsurumichuo TSurumi-ku Yokohama Japan
DESIGNATION: PROCUREMENT COORDINATOR – SPARE PARTS
Project Team Procurement Dept
(Pearl GTL Project, Feed Gas Preparation (FGP) Works,
Ras Laffan, Qatar)
JOB DESCRIPTION:

* Establish the evaluation / recommendation system for E-SPIR Program.
* Implement over-all schedule for spare parts management project schedule.
* Coordinate with client and establish spare parts procedure for implementation and purchasing of initial spare parts.
* Attend and jot down minutes of discussions, meetings and teleconferences with client and other disciplines.
* Reply to queries/comments/correspondents to clients and vendors.
* Attend kick-off meetings for the purchase order in the main list and confirm with vendors the required data necessary and to be specified in the E-SPIR. This then has to be submitted in connection to spare parts requirements to vendor.
* Expedite vendor's submission of E-SPIR.
* Monitor and report to management overall status for spare parts management – from obtaining E-SPIR until delivery.
* Analyze any delay in vendor's activities and recommend counter measure to procurement manager.
* Execute evaluation including the review of E-SPIR, MESC CODING, Interchangeability check and determine the quantities to recommend for initial spare parts and spare parts for normal operation in consultation with discipline engineers.
* Submit E-SPIR forms to company for review and consent/decision of quantities for initial spare parts.
* After determination and selection of spare parts to be purchased by client, inquiry to vendor should be made for obtaining final cost proposal including other ancillary cost charges like packing, FOB, Inspection charges and any other charges required to deliver the materials to site.
* Negotiate with vendor the final cost and send to client the final agreed price including all ancillary cost for approval.
* Send request for authorization to client for purchase approval of spare parts and issue purchase order to vendor.
* Expedite the delivery of initial operation spares.
* Make comprehensive evaluation of contract terms and conditions on the issues relating to the late delivery of materials and negotiate the cost impact of this late delivery.
* Check the acceptance requirements of materials by obtaining inspection certifications, certificate of conformity, tag list check according to quality control and quality assurance requirements.
* Provide assistance to the logistics dept for shipment of equipment and materials. This includes follow-up of the delivery of materials that are not yet completed due to cases such as overage, shortage and damage.
* Provide support to site warehouse for the hand-over of initial operational spares to company. Since supply of initial spare parts is a reimbursable contract between CHIYODA and client, preparation of invoice to client is made and make sure all cost relating to the supply of initial spare parts are covered and reimbursed.

YEAR COVERED: May 2002 to Dec 2006
EMPLOYER: CHIYODA CORPORATION
ADDRESS: 2-12-1 TSURUMICHUO TSURUMI-KU YOKOHAMA JAPAN
DESIGNATION: EXPEDITOR / PROCUREMENT COORDINATOR
PROJECT TEAM PROCUREMENT DEPT
(OLG PROJECT, TRAIN 5/6, SUR, SULATANATE OF OMAN)
JOB DESCRIPTION:

* Attend kick off meeting and confirm with vendors the required documents for progress monitoring such as organization/communication channel, vendor print schedule, suborder list, fabrication schedule, individual production schedule, monthly progress status report and supply list.
* Attend and jot down minutes of discussions, meetings and teleconferences.
* Reply to queries/comments/correspondence to client and vendors.
* Monitor and expedite through desk expediting or shop visits the vendor print submission (drawing and document), suborder status of equipment and material, fabrication progress, inspection and delivery forecast.
* Analyze any delay in vendor's activities and recommend counter measure to procurement manager.
* Provide support to site construction on-going activities such as information on material delivery, outstanding issues at jobsites that are related to procurement.
* Coordinate directly to the vendor regarding the technical and commercial issues which were conveyed by different disciplines (Mechanical, Electrical, Instrument, Process and Civil) for earliest resolution of current issues.
* Send recommendation to client for purchase order of spare parts and issue purchase order to vendor.
* Check the acceptance requirements of materials by obtaining inspection certifications, certificate of conformity, tag list check according to quality control and quality assurance requirements.
* Provide assistance to the logistics dept for shipment of equipment and materials. This includes follow-up of the delivery of materials that are not yet completed due to cases such as overage, shortage and damage.
* Make comprehensive evaluation of contract terms and conditions on the issues relating to the late delivery of materials and negotiate the cost impact of this late delivery.

II. YEAR COVERED: March 1998 to April 2002
EMPLOYER: KELLOGG OVERSEAS CORPORATION - CHIYODA CORPORATION JOINT VENTURE
ADDRESS: SINGAPORE OLEFINS PROJECT, JURONG ISLAND FIELD OFFICE, JURONG
WEST P.O BOX 1087
SINGAPORE, 916433
DESIGNATION: SENIOR QUANTITY SURVEYOR / ESTIMATOR
PROJECT INVOLVED: SINGAPORE OLEFINS PROJECT

JOB DESCRIPTION:

* Preparation of various inquiry packages for piping, equipment erection works, insulation works, equipment package piping works and various dayworks contract for miscellaneous mechanical, electrical, insulation and civil works.
* Assess and evaluates including preparation in table form comparison of various subcontractors bid and price submission.
* Familiarizes with the definition of terms and conditions of project contracts and agreements of different subcontractors – piping, insulation, painting, mechanical erection/ heavy lift works, civil works and daywork contracts.
* Evaluates and assess thoroughly all subcontractors' claims for extra works due to various field changes, modification works or site instructions and ensures that it shall conform to the agreed method of measurement and applicable pay items of the contract.
* Defines and interprets thoroughly pay items of the agreed project contract and agreement.
* Prepares detailed quantity take-off and cost estimates for cost comparison purposes to all change order proposals claimed by sub-contractors due to field change orders/modification works or site instructions.
* Conducts actual site measurements and evaluations.
* Prepares detailed quantity take-off for the final quantity measurement and reconciliations – contract closeout.
* Checks and evaluates subcontractors' monthly progress claims and invoices. Ensures that payments of any items of worked performed and claimed including extra/revision works shall conform to and in accordance with the agreed or applicable method and unit of measurements and terms of payments as defined in the contract.
* Updates and monitors subcontractors weekly and monthly progress and accomplishments.
* Prepares relevant work instructions for every extra/revision works evaluated, processing of cost proposals and payments shall then follow.

III.YEAR COVERED: August 1996 to February 1998
EMPLOYER: CHIYODA CORPORATION
ADDRESS: FIELD CONTROL DEPARTMENT
SERAYA ISLAND PROJECTS
SINGAPORE
DESIGNATION: QUANTITY SURVEYOR / ESTIMATOR
PROJECT INVOLVED: SERAYA CHEMICAL SINGAPORE LTD. (SCSL)
SERAYA ISLAND PROJECTS
SINGAPORE
JOB DESCRIPTION:

* Reports directly to the field control manager.
* Preparation of worksheets summary reports etc. in conjunction with the control in progress claiming.
* Make and conduct actual quantity take-off. Check the progress report submitted by the subcontractors, making sure that everything is understood and correct and discuss any issues which need further clarification and confirmation.
* Verify to subcontractors the progress of work every time and monitor the accomplished progress every month.
* Evaluate, analyse and make technical evaluation on the additional works to be done by the subcontractors which are not part of the original scope of work.
* Meet and discuss with the subcontractors regarding this change orders and negotiate the costs.
* Performs other works directed or requested by the contract engineer pertaining to field changes, subcontracting, cases of conflicts and legal requirements of each subcontract packages.
* Verifies/checks in consultation with line supervisors/engineers the quantities estimated by the subcontractors for a given change in the work.

IV.YEAR COVERED: June 1995 to July 1996
EMPLOYER: FLUOR DANIEL PHILIPPINES INC.
PIPING & MECHANICAL DEPT.
ADDRESS: 9TH FLR PACIFIC STAR BLDG.
MAKATI AVE. MAKATI CITY
PHILIPPINES
DESIGNATION: ASSOCIATE DESIGN ENGINEER
PROJECT INVOLVED: SYNDET BAR PLANT PROJECT
PROCTER & GAMBLE PHIL., INC.
CABUYAO, LAGUNA, PHILIPPINES

JOB DESCRIPTION:

* Responsible in the detailed design of equipments such as surge bins, storage tanks, pressure vessels, belt conveyors, screw feeders, pumps, fans & other mechanical equipments in the soap plant.
* Prepare engineering drawing using AutoCAD. This includes nozzle positioning, elevation details, sections and detail of internals.
* Preparations of strength calculations using IRIS VESSEL RELEASE 3.81 design software.
* Make inquiries and clarifications to the client, sub-contractors and other disciplines concerning the latest development and status of equipment.
* Check all incoming and outgoing documents making sure that they are updated and revised according to the latest information of each equipment.
* Preparation of data sheets, bid packages, specifications and other documents needed for the requisition of quotation packages.
* Evaluate the technical portion of the bid packages submitted by the vendors. A recommendation is made to whoever (VENDORS) complies with the requirements to our procurement dept.
* Provide engineering support and recommendations to local equipment fabricators and erectors so as to acquire a very good design and quality of equipment.
* Make inquiries and clarifications to the vendor, sub-contractors and other disciplines concerning the latest development and status of equipment.
* Check all incoming and outgoing documents making sure that they are updated and revised according to the latest information of each equipment.

V. YEAR COVERED: January 1993 to April 1995
EMPLOYER: CHIYODA CORPORATION
LOSS PREVENTION AND ENGINEERING GROUP
FACILITY ENGINEERING DEPT.
ADDRESS: YOKOHAMA, JAPAN
DESIGNATION: MECHANICAL ENGINEER
PROJECT INVOLVED: BANDAR ABBAS REFINERY PLANT, IRAN
- SERAYA ISLAND PROJECT
SCSL CHEMICAL PLANT, SINGAPORE
- KARNAPULI FERTILIZER CO. PROJECT
BANGLADESH
- CHINA-AMERICAN PETROLEUM CO. PROJECT
TAIWAN, REP. OF CHINA
QATARGAS LNG PLANT PROJECT, DOHA, QATAR

JOB DESCRIPTION:

* Responsible in the basic designs of fire fighting facilities and equipments. These involve fire water line sizing and selection of appropriate fire fighting equipment for a specified area.
* Engage in the design of water spray system, sprinkler system in accordance with project specifications and National Fire Protection Association (NFPA).
* Perform hydraulic calculation of water spray & sprinkler system according to NFPA.
* Preparation of P & I D's, Layout drawings, etc. of fire fighting system and equipments using an autocad.
* Preparation of data sheets, bid packages, specifications and other documents needed for the requisition of quotation packages.
* Evaluate the technical portion of the bid packages submitted by the vendors. A recommendation is made to whoever (VENDOR) complies with the requirements to our procurement dept.
* Check the drawings, calculations and details of the successful vendor in accordance with the design codes, standard drawings and standard engineering practices.

VI. YEAR COVERED: April 1992 - December 1992
EMPLOYER: FUJI KOSAN ENGINEERING CENTER
MECHANICAL DESIGN SECTION
ADDRESS: OSAKA, JAPAN
DESIGNATION: MECHANICAL ENGINEER
PROJECT INVOLVED: SHELL BERHAD REFINERY PROJECT
SINGAPORE
BANDAR ABBAS REFINERY PROJECT, IRAN
JOB DESCRIPTION:

* Responsible in the design of pressure vessels, heat exchangers, towers and equipments in accordance with the code and other engineering standards. This involves selection of materials and sizing of equipment and in the detailed design of various equipments.
* Preparation of data sheets, bid packages, specifications and other documents needed for the requisition of quotation packages.
* Evaluate the technical portion of the bid packages submitted by the vendors. A recommendation is made to whoever (VENDOR) complies with the requirements to our procurement dept.
* Check the drawings, calculations and details of the successful vendor in accordance with the design codes, standard drawings and standard engineering practices. Checking includes dimensional checking (equipment and other appurtenances), welding (WPS) and other requirements necessary to meet a quality of finished product.
* Coordinate with other discipline regarding the design revisions and modifications.
* Provide engineering support and recommendations to local equipment fabricators and erectors so as to acquire a very good design and quality of equipment.
* Make inquiries and clarifications to the vendor, sub-contractors and other disciplines concerning the latest development and status of equipment.
* Check all incoming and outgoing documents making sure that they are updated and revised according to the latest information of each equipment.

VII.YEAR COVERED: JANUARY 1989 - MARCH 1992
EMPLOYER: A G & P ENGINEERING CENTER
GLOBAL ENGINEERING & CONST'N GROUP
ADDRESS: 351 SEN. GIL PUYAT AVE., MAKATI CITY METRO MANILA, PHILIPPINES
DESIGNATION: ENGINEER I - ESTIMATOR
PROJECT INVOLVED: DOW CHEMICAL HEAT EXCHANGERS & PRESSURE VESSELS PROJECT, CHINA
- MITSUI POWER BARGE, PHILIPPINES
- PRESSURE VESSELS, TOWERS & HEAT EXCHANGERS FOR SHELL TABANGAO REFINERY PROJ.BATANGAS CITY, PHIL.
- BOILERS FOR BABCOCK HITACHI PHILS.
- ERAWAN COMPRESSION PLATFORM
- PRESSURE VESSELS, STORAGE TANKS FOR UNITED COCONUT CHEMICAL INC., BAUAN BATANGAS PHILIPPINES
- STORAGE TANKS FOR SUMITOMO HEAVY IND.
JOB DESCRIPTION:

* Prepares material take-off for bidding purposes of equipments and piping works, technical evaluation on various bid packages and price schedule and any other necessary documents needed for bid qualifications.
* Develop estimate cost based on direct labor, consumables, steel materials, power, oil and lubricant equipment cost and other data necessary for the completion of the work.
* Responsible in the detailed checking of vendor drawings, design calculations according to the design codes, standard drawings and standard engineering practices.
* Send inquiries to manufacturers, both domestic and international, for material pricing.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 751 to 800 of 4349)Go to Search Parameters...
Brief Description
mapping
Working in different areas.
Mechanical Engineer, Engineering Management, Project Engineer, Reengineering, TQM, Activity Based Accounting System, Production Planning & Scheduling, Budget Controlling, ARIS Toolset, Access
12 years experience in controls design and project management of complex automated systems.
Civil Engineer / Master's in Construction Co. Administration. Interested in Project/Construction Management positions that require all type of resource control and administration to meet contractual dates. Mexican citizenship. 100% English.
Rich experience in financial reporting and analysis function, more than 4 years practice in SAP, high skill level in operating in FI/CO/COPA modules, such as PS/CS/CATS.
PERSONAL EXPERIENCE(9 YEARS )
I would like to apply for a senior /executive position of highway /infrastructure projects
Forteen years of diversified corporate experience. Dedicated Accounting & Finance professional with extensive experience with: personnel management of large groups, development, project management, implementation and compliance monitoring of internal control standards, international logistics.
i am working as a TPI inspector in welding,piping,tankages,structural,vessels ect. and my basic qualification is DME and additional qualifications are AWS CWI, ASNT Level II in RT,UT,MP and DPT
As a Principal Process Engineer, supervised and executed over 20 basic engineering designs (grassroots and revamps) of ethylbenzene and styrene monomer units. Participated in 6 startups, 5 of which overseas. Also supervised or participated in numerous technical proposals and feasibility studies.
I am an Irish national wishing to gain work experience in the USA through the Non-Immigrant Work Visa program. I am educated to Masters Degree level, am a member of the Chartered Institute of Building (MCIOB) and have 10 years site-based management experience on a range of projects.
I have vast experience in site works and have a good knowledge of soil and rock anchors, drilling and grouting works, cast in place concrete piles, vibropiles, drilling drainage holes and weep holes, thin-wall works, slurry-trench, dewatering, sheet piles, deep excavation, pipeline construction.
I am presently working as a procurement coordinator since may 2002. projects include OLG PROJECT in oman and Pearl GTL Project in qatar. Prior to that, i was a quantity surveyor from august 1996 to april 2002
A strong technical background is complemented by practical financial, managerial, commercial, and communications experience developed in worldwide assignments.
A. CIVIL STATUS DATAS
Heavy Equipment mechanic
CNC PROGRAMMER WITH CARVING DESIGNER USING DELCAM SOFTWARE
Engineer for Power System Analysis, SCADA/EMS chief engineer
ARC HITECT PLANNER (5 YEARS EXP )
Civil/cad engineer, structural steel detailer
EXPERIENCED METASWITCH tECH. wORKED WITH 3510 AND 2510'S CALL AGENTS, EMS SERVERS, WEB SERVERS AND OTHER UC9000 TYPE VOICE MAIL SYSTEMS.
Design and construction in bridge and road
Experienced in drafting commercial buildings, residential for permit processing and for shop drawing.
I am a mechanical engineer with 10 years experience in Material handling, Steel structurals, PEB, Steel buildings industries
Senior Executive with Board Experience
Extensive experience in the construction industry in the field of architectural and civil/structural works of residenses, townhouses, condominiums and commercial buildings including interior and exterior finishing details. A highly motivated project supervisor, proven ability to solve site problems.
Sixteen years experiance as a Journeyman Diesel Mechanic. Please see resume.
Occupational Health And Safety Professional, Post Graduate Cert. In OHS&E Management
Looking for growth
More than 6 years of cost control and budget analysis experience, plus 1½ years of progressive accounting practice.
Civil Design and Engineering specialist Highways, including design standards, Geometric design, Horizontal & Vertical alignments, Detailed Estimations, Bid Evaluation, Design Drawings, Coordination with client, Preparation of PDR and Feasibility Reports, Pavement Design, Traffic Surveys, Data Analys
QUANTITY SURVEYOR
Diploma Mechanical engineering Pipe fabrication, erection Supervison manpower
I believe that my key qualities are my excellent interpersonal skills and strong communicative ability, combined with my talent for effective organisation and prioritisation.
Senior manager maintenance of Drilling water well & Mining drills and Screw compressors, man power Management, Guiding and training the service engineers, maintaining records and monitor the performance
Willing and able to perform ones job with less supervision
Senior Chemical Integrity Engineer
B. Tech (Electrical) with more than 15 years experience in project management, design, engineering, installation and commissioning of electrical & control system in combined cycle power plants and substations
I hold a B.Sc. degree in Civil Engineering, 15 years experience in construction project supervision and project management. Overall I'm capable of supervision/management of most types of construction projects.
A highly accomplished gas turbine field engineer and power generation equipment service director. Experienced in turbo-electric machinery installation and maintenance, asset and contract management, profit and loss finance, electro-mechanical troubleshooting, quality control, and staff management.
Enclosed please find my detailed resume for Structural Engineer job openings you may have. As my resume will attest, I appear to have excellent qualifications for this position
Mechanical engineer (naval welding) with 15 years experience seeking a job as supervisor(superintendent engineer).
My background is in the offshore fabrication industry. I am interested in Project Management and Fabrication Management, but will certainly entertain any offers, especially for positions in Australia.
Over 7 years experience of mechanical works in offshore and onshore in various project such as oil and gas plant / LNG gas plant / cement plant (industrial and commercial facilities).
Well experienced Project Architect / Coordinator /Auto Cad Designer / Quantity Surveyor
Experiences on civil construction works and i hope it'd be tasteful and challenging.
Qualified welder 10 years experience ( QC, NB, AB) pipe welder , willing to travel
I am skilled in all types of welding.
Feasibility studies, Process Design & Consultation, process Development , Project Management, Electro-mechanical installation, Pre-Commissioning & Commissioning, Start – up & Operation of Industrial Projects
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   [ 16 ]   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com