•11 years Managing Director and Senior Design Engineer for an ASME code fabrication job shop that specialized in manufacturing large pressure vessels, piping systems and automated process equipment.
•14 years International project management experience in design, construction, automation, start up commissioning, problem resolutions, operations training, security and HSE and for new Petrol Chemical, Semiconductor Fab, Pharmaceutical, coal fired, combined cycle and nuclear power plants.
•10 years China/Asia Project experience as Owner’s representative, Project or Construction manager, Commissioning or Start-up problem resolution engineer, also Supply Chain management.
•20 years of accomplished Automation and Lead I&C skills, including design, programming, and problem resolution for PLC, DCS, and SCADA systems.
•25 years experienced in many conventional and modern state of the art Water & Waste treatment technologies for the removal, exchange, and quality control of organics, inorganic and radionuclides
•25 years managing large project teams and or working single-handed for many types of project disciplines and situations associated with design, welding and fabrication, heavy and technical lifting, HSE, Hazop, Hazmat, construction, automation, start-up commissioning and client turn over.
•25 years working on Domestic and International, multi million & billion US dollar project contracts for many of the worlds largest onshore/offshore Oil & Gas, Petrol Chemical, Power Generation, Semiconductor, Pharmaceutical and Food & Beverage industries.

Education: •1977 Naval Schools: 1986 BSME University of Southern California
Hull Maintenance Technician phase1 & 2, normal maintenance and battle damage emergency repairs, Basic Electricity & Electronics, Welding & Fabrication, including Underwater: Welding, Fabrication, Repairs, Demolitions, Tactics and Communications.
Ship board Boiler and power generation operations, repairs and maintenance.
Ship board Water & Waste Treatment and Purification Systems
Nuclear, biological and chemical weapons, effects and counter measures. (NBC Warfare)

Native English speaker, also conversational in Mandarin Chinese, and Spanish.Using computer I can read, write and translate to produce documentation in all above languages.

Engineering and Fabrication:
Design engineer and QA/QC in accordance with ASME code sections 1, Parts A, B, C, and D of 2, 4, 5, 8 Division 1 and 2, 9, 10, B311- 3, and WCR.. NBIC, Repairs and alterations Use many types of country standards ANSI (American), GB (Chinese), JIS (Japanese), DIN (Germany), EUS (European), and ISO standards. High technology materials, alloys, plastics, and linings. Safety and QA/QC inspection procedures for welding, fabrication, machining, and surface protection. Tool, die and mold making for NC and CNC machining and injection molding processes. Process piping for corrosive, toxic, radioactive, non toxic, chemical, industrial, water, waste, sanitary, high purity, and ultra pure service. High temperature and pressure, jacketed and double containment process piping, monitoring and sampling systems. Continuous and batch, reactors, columns, and tanks. Single and multi phase, vacuum, heat, pressure, vibrating, rotating, equipment, and controls. Special hazard isolation areas and clean rooms. Separation, ion exchange, filtration, membrane, Electrodeionization (EDI), catalyzed and noncatalyzed reduction and oxidation process systems.
Employment Experience
Bayer Technology and Engineering Services / Bayer, Shanghai Integrated Sciences Site
5/2006 – Present Construction Manager SPC2 / LOG2
This is a expansion project for a new optical electronics grade polycarbonate production and logistics facility. 80 % of detailed engineering was performed in Germany and the reminder finalized on site. I am in charge of CSA , Mechanical Equipment Installation, Heavy & Technical lifting, Piping, E&I, Tracing and insulation contracts. This includes writing bid tender technical scopes of work, execution strategies, work flows, test specifications and system turn over requirements along with China Government Authority requirements, and inspections. I am in charge of contractor evaluations and selection, construction schedules, onshore / offshore procurement, site temporary facilities and warehouse.Materials management system, along with the many project, equipment and piping problem resolutions required to finalize the remainder of engineering and PDS model during construction.I was also responsible for establishing and approving the site security, work permit, and HSE plans and procedures.

BSF/ CSPC Nanhai and Shell Petrochemical Plant/ Guangdong, China
8/2005-3/2006 Project Engineer/Commissioning Engineer
Commissioning of the low olefins plant (LOP) east section, this consisted of Ethylene, Propylene and LPG spheres, the transfer piping systems, pumps, fire and safety protection systems, and vent gas piping system to the site flair. After completion of the LOP section, I was moved to the Slops system and assigned as the system commissioning lead for the Slops plant area. The Slops area handled all waste water and waste oil form the site. The Slops had several problems that required design, and construction changes and modifications prior to commissioning. My duties included working with engineering and system suppliers to recommend, finalize and execute design changes and repair deviations. I worked with the Chinese subcontractors to commission the drain systems, CPI separator system, Slop tanks including N2 blanket system, Waste water transfer to the effluent treatment system, Slop Oil transfer system, Truck loading and unloading systems, Hydrocarbon transfer to the Solid Waste Incinerator system and Vent Gas compressors systems. I was also responsible for the installation, and functional DCS test of the toxic, combustible gas and fire safety systems. Both plant locations required the installation and commissioning of utilities from battery limits to the individual systems. Utilities consisted of Cooling Water, Nitrogen, High and Low pressure Steam, Plant and Instrument air, Plant and DI water, Fire steam snuff, and Fire water and foam systems. I inherited from engineers that left the project; the continuous contaminated drain system (CCD), the Rain water and Sanitary lift station systems. We use the WinPCS software project control system to schedule, track, document and complete work for the entire project. This included Punch lists, inspection hold points and completion check sheets, walk downs and final system turnover to the client. As the lead commission engineer in charge of my systems, I was responsible for scheduling all subcontractor work and equipment, vendor site work, overseeing and approving all works, verifying punch list items were cleared and signing check sheets of completed works and final ready for service system turn over to the client.

Zenon Environmental Corporation/ Global Hub Material & Supply Sourcing
8/2004 – 8/2005 (China/Asia Supply Chain Director)
Contract position was established to help the Zenon corporation decrees costs but maintain or increase profits by qualifying China / Asia material suppliers and fabricators. Also to secure offers from different economic zone locations for a new Zenon facility in China.

CEEDI a Government owned Chinese Design Instituted (CDI)
2/2004 – 8/2004 I was a consultant for the formation of a new Environmental Division to I acted as project director for a new environmental division. I and helped the CDI form and employ new technologies and modern methods of project organization and management.

From 4-2001 – 2/2004 I was employed by GE Power Systems on a contract basis.
GE/ Pfizer Pharmaceuticals / FDA Plant / Singapore
(Senior Project and Commissioning Engineer / Client Consultant)
I was the project manager and on site technical advisor to Pfizer for all GE supplied Generation and Purification equipment. This was a new Pharmaceutical Utility, OSP-1 and Dispensary water process equipment and distribution piping system.
GE/MSD Pharmaceuticals/ FDA Plant / Singapore
(Senior Project and Commissioning Engineer / Client Consultant)
I was the project manager and on site technical advisor to Merck for all GE supplied Generation, Purification and DI equipment. This also was a new Pharmaceutical Utility, OSP-1 and Dispensary water process equipment and distribution piping system. This also included a DI water system with electro deionization (EDI) and DI storage.
Both above Pharmaceutical projects were located in Singapore across the street form each other. The construction of equipment in the US and Canada took place at the same time. The commissioning schedule was staggered with Merck taking place 6 months before Pfizer. I was on site in Singapore for both projects for almost 2 years and managed and oversaw site construction sites for both plants at the same time. I attended weekly design reviews and fabrication progress meetings. I was present with the client at factory acceptance tests prior to equipment being shipped to the site. I instructed local contractors and oversaw equipment installation. I performed mechanical and automated start up commissioning, assisted in process problem resolutions, performed operator training and stayed on site as technical advisor through all procedural ( DQ, IQ, AIQ, OQ, Shake down rehearsals, and PQ) the Performance Quality is the final FDA review qualification.

GE/ABB Lumus Global / Oil Refinery / Sines, Portugal
(Project Problem and Financial Resolution Engineer) Inspected local contractor installed equipment for compliance with GE specifications. Generated a punch list of corrections, missing parts and suggestions to solve scope gapes. I helped to resolve PLC and DCS automation scope gape. Met with Client and Customer to have change orders approved, resolve back charges and retained payment issues. Met with ABB in the Netherlands office to assure release of the agreed to project funds.

GE Hsin Tao / Combined Cycle Power Plant / Taiwan             
(Senior Commissioning Engineer) Oversaw the site construction and installation, performed all installation inspections and start up commissioning of a 2 train Demineralizer and waste neutralization system. I also assembled, debugged and commissioned the PLC, and PLC back up systems, 2 graphical operator interfaces, Ethernet workstations and DCS interface. After the system was in full Auto and making spec water I spent the last 2 weeks on site training the plant chemist and local operators.

GE/CANDU Qinshan Nuclear Power Plant / Haiyan , China     
(Senior Commissioning Engineer)
Inspected local contractor installed equipment for compliance with GE specifications and generated a punch list of corrections. Reviewed with operations the sequences for the process instrumentation controlling the UF, RO membrane, Demin, chemical feed and waste treatment installations. Retuned to site 3 months later and commissioned the PLC and HMI work station and trained local operators.

Motorola / MOS-17, BAT-3 Semiconductor Fab / Tianjin, China
9/1999 – 3/2001 Water and Waste Project Director/Client Contact
As site project director I was the single point of client contact on site for all contracts and change order business. I hired and managed all expats, Malaysian and local Chinese subcontractors for the installation and start up a semiconductor fab. Work included design, and fabrication of all water and waste systems, site construction, installation and automated commissioning. Scope of contract work was a site filtration building, Industrial and fluoride waste treatment building, UPW pretreated, make up, primary and polish equipment installed in the fab building. Also included the high purity distribution loops and laterals for all the tools and rooms in the fab. Our original 2 contracts were 22 million USD however with expansion that Motorola designed and based on our performance of existing contract work I was able to help obtain 2 more contract scopes of work for a total of 49.3 million USD. Motorola MOS-17/ BAT3 was a 3 billion US dollar world-class fab, the first of its kind built in China.

Bechtel / Power Plant / Meizhouwan, China                 
3/1999 - 9/1999 Commissioning Engineer / Problem Solver
Start up commissioning of raw water, Demin make up water plant.
This project site had a typhoon cause a landslide in to the make up water reservoir and changed the water quality. As they civil works for the clarifier and gravity filter had just been completed my first site responsibility was to test the new reservoir water quality and turbidity, then determine a fix or on site retrofit of the clarification and gravity filter system to achieve the desired water quality and flow demand. I also established new chemical feed dosing parameters to correspond to the retrofit. Debugged and commissioned the control system including created new HMI screens and interfaced pretreatment, Demin, and waste treatment control systems to the Bailey DCS.

Graver , Hua Yang Power / Zhangzhou Houshi Power Plant /Xiamen, China
1/1999 - 3/1999 Senior Commissioning Engineer
Oversaw the final installation, performed the start up commissioning and control hardware and software debugging for a 3 train Demineralizer unit and waste neutralization system.

Raytheon UEI / Power Plant / Zhuhai, China                 
6/1998 - 1/1999 Senior Site Construction and Commissioning Engineer
Oversaw the construction and installation of an automated make up water system, and a 3 unit 4000 gpm mix bed ion exchange sphere condensate polisher and regeneration system, the chimerical injection feed system and site water quality laboratory. I performed the start up commissioning and control hardware and software debugging for all systems after installation. Note some of the 16 PLC control panels and 2 HMI workstations were damaged during overseas shipment.
I had to buy local replacement parts, rebuild the control panels and work stations, then rewire, test and reprogram them at the site. After the systems were commissioned I trained local operators on the plant operation and maintenance.

Black & Veach / Power Plant / Nantong, China                
8/1997 - 6/1998 Senior Site Construction & Commissioning Engineer
Long term project 10 months on site overseeing site location construction, installation of equipment and controls, performing start up commissioning of a automated powdered ion exchange condensate polisher and regeneration system, chimerical injection feed system and the site water quality laboratory. I also performed the automation commissioning and software debugging for all systems after installation. Trained local operators on the plant operation and maintenance for 2 phases of a 4 unit 350 mega watt power plant in the Jiangsu providence of China.
Mektron / Ion -Exchange Waste System / Kashima, Japan         
5/1997 - 8/1997Commissioning Engineer
I performed the automated start up commissioning for a zero discharge ion exchange based plating bath, rinse water recycling system. I also at site designed and installed a remote modem connection on a DH485 network so that system PLC / HMI could have program changes made from anywhere in the world via phone.

Wrigleys Gum / Automated Gum Base filter/ Edison, New Jersey
7/1996 – 4/1997 Turnkey EPCC Project Manager/Engineer)
Turnkey project: I designed engineered and subcontracted fabrication at my Bakersfield USA location. Tested and then shipped and commissioned the equipment at the customer’s New Jersey location. The system was a automated batch heat controlled gum base filter. I also wrote the system PLC program, operation and maintenance manuals.

Chevron USA / Waste Treatment Plant /Lost Hills, CA             
1/1996 – 7/1996 Turnkey EPCC Project Manager
Turnkey project: I designed, engineered and oversaw fabrication and installation of an automated solid waste de-watering plant. I also wrote the system PLC program, operation and maintenance manuals.

Samsung / Semiconductor Fab / Austin, Texas                
7/1995 - 1/1996Senior Commissioning Engineer
Start up commissioning and operator training of 30 million in ultra pure water, process equipment for a new Semiconductor Fab. Equipment scope of work included site filtration, waste treatment, UPW pretreat, make up, primary and polishing process equipment. Note: Samsung was a 1.3 billion USD dollar installation.

Glegg Water/ Bechtel / Calama, Chile
12/1994 - 5/1995 Commissioning Engineer
Oversaw construction and installation of equipment and controls. Performed the start up commissioning and control program debugging, for an automated reverse osmosis water plant at a copper mine in the Chilean mountains. Stayed on site after commissioning to train local operators.

1/95 - Present Consulting & Engineering Services
Self Employed Owner/General Manager
P.O. BOX 3262 Bakersfield, CA (also registered company in China)
Duties: USA and international, (Canada, Europe, ASIA and South America) projects.
See above project descriptions

Self Employed: Owner/General Manager
2000 Mineral Court Bakersfield, CA
5/83 - 6/90 Hedrick Portable Welding and Structural Design.
2/85 - 6/90 Formed Hedrick Chemical
6/90 - 6/94 Merged both companies into one, Water Treatment Equipment. Same address. Duties: Sell, design, engineer, quote, fabricate, and install automated process equipment, including new industrial water and waste treatment systems. New construction, repairs, retrofits, rentals and maintenance of process equipment. ASME code engineering, fabrication and inspections. Pilot tests, laboratory analysis and studies. Sales and service of media, membranes, ion-exchange resins and custom blended chemicals. We were a ASME code job shop with U, S, PP, and R stamp authority;
My business was located in the heard of California’s largest oil production fields so our primary clients were the major Oil & Gas Corporations. Every day I sent welding and maintenance crews to various oil leases, refineries, cogeneration and petrol chemical plants. From this work we were able to obtain many shop contracts to retrofit or supply new equipment packages. After selling the business in 1994, I have been traveling the world as a project manager, commissioning engineer, , technical or project problem resolution consultant. I have tried to maintain the same common sense values I leaned as a business owner for all my international project work

4/81 - 2/83 Futura Metal Technologies 1709 Junipero Ave Ventura, California.
Company shut down. Duties: Lead welder/fitter class A ASME code shop fabrication of offshore platforms, jack ups, semi submersibles and offshore structures such as living quarters, galley, rotorcraft delivery platform, pipe racks, supports and special mooring. MOPU, FPSO, and FSO. Offshore emergency repairs and underwater welding.

Please consider my qualifications with regards to any of the following carrier positions or contract project opportunities you may have for: Project Director / Manager, Construction, Engineering, or Commissioning Manager. Automation Manager or Lead I&C Engineer Start Up, Process or Lead Problem Resolution Engineer.
I am problem solver that gets things done! I specialize in problems solving strategies, contract negotiations, keeping work on schedule, accomplishing work as per project specifications and obtaining final client sign offs. I also have a talent for identifying special project needs, and opportunities.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 3001 to 3050 of 4331)Go to Search Parameters...
Brief Description
Summary An enthusiastic, Postgraduate Civil engineer with 2 years and 2 months of experience in the design, Engineering and Construction of Industrial, infrastructure and Multi storied Buildings, Eager to learn new technologies
Free! Advanced level Paramedic; 26 years experience: Emergency/Remote/Occupational/Tactical experience; Instructor/Supervisor/Training Manager
20+ years in administrative field, ie. human resources, managerial, recruiting, exec. assist, proficient in Microsoft Office 2007
Mining Engineer with 35 years experience as a manager and superintendent in open pit, open pit casting, and underground mining in operations, engineering, maintenance and construction. Extensive oversease experience in North America, South America, and Indonesia.
He has more than 25 years of experience; from his current work in hydrogeological and hydrochemical assessment, environmental monitoring, and capacity building. He has managed many projects as well as acted as team leader on various project components.
Construction HSE Manager with 18 years of experience encompassing the areas of Safety Adviser through to Corporate HSE Manager. Formerly a Senior ranking Fire Officer (nine years experience). Five year apprenticeship served as a mech. engineer. Degreed engineer with both off-shore and on-shore exp.
A Mechanical Engineer and an MBA with years of progressive experience in in commissioning, procurement and project engineering of power plant renovation & modernization contracts
Mechanical Engineer with over 7 years experience in QA/QC of mechanical construction activities, Welding, Painting, NDT, Insulation, Implementing QA/QC procedures, Auditing
Maintenance Manager Engineer Middle East Experience, Looking for work in UAE
Tim Sweeting has been working in environmental and HSE management since 1994, mostly in oil & gas developments. His broad expertise design, construction and operations, auditing, waste management, pollution prevention and managing client/contractor relationships. MSc and professional memberships.
Crane operator and Driver
Project Management, Oil & Gas Industry, Civil Costing, Planing and Estimation
Utilize management and organization skills acquired through previous positions in
Safety Officer QualifiedUK HSE & HSE Trainer
Experience driving loading shovels, Excavators, Dumpers. Managing quarrys and concrete plants
My experience includes the Superintendent level managing maintenance crews for a nickle smelter. I have a trades background of 25 years which includes millwright; welding and machinist. I am currently working for a large Nickel Project overseas and have extensive experience with RCM.
I am a highly motivated Operations Manager and am always ready for a challenge. I have extensive experience in management and I am actively seeking a position that fits my skills and experience. Please review my resume to see further details of my experience. I am self moti
I have an overall experience of 17 years out of which 11 years in Oil & Gas Development Projects. Presently I am working as Group Project Engineer in a Major British Exploration & Production Company in Edinburgh UK. Following are my current responsibilities:
Handling key customers like Saudi Aramco, Sabic Affiliates, Saudi Electricity Company, Saline Water Conversion Corporation, etc in the western region of Saudi Arabia related to Sealing Solutions.
MECHANIC/WELDER/GENERAL MAINTENANCE & REPAIRS
I have 25 years of multi disciplined, design, engineering, and project management experience with very strong automation skills. I am highly experienced with specialize, automated process equipment systems for Oil & Gas, Petrol Chemical, Power Generation, Semiconductor,Pharmaceutical,Water & Waste
BS in Mechanical Engineering from India, 36 years of Petrochemical industrial Experience in NDT & Vibration analyses field.
Looking for career enrichment opportunities in Sales & Marketing, Business Development, Technical Services, Operational Manager, or Telecom commercial consultant with a frontline organization
• Extensive experience managing Document Control deparments within Engineering, Construction and Petrochemical Industries.
Technical
Site Construction Manager Oil and gas Industry. Over 20 years experience. Process plants, facilities and pipelines.
Project control engineer with experience in planning and cost engineerig fields.
A self-directed, high organized individual who is able to easily identify and achieve priorities. Significant broad based experience in the areas of facilities planning, production, engineering, maintenance, environmental, staffing, and safety. Excellent communication and technical report writing
I have worked in the Petrochem/Oil and Gas industry for 20 years. Vast knowledge of all support qualifications, document control, purchasing, expediting and subcontracts work.
Expertise in Project Engineering, Cadd Management & related fields.
Fully experienced HSE Coordinator,Supervisor,Advisor comfortable in Oil&Gas,Construction and Military environments
I am college educated in business and looking to make a change in my career. I am tired of the business environment that I am in and am seeking something more physical demanding. I played 4 years of college baseball where I was exposed to loads of teamwork.
ELECTRICAL ENGINEER
Marine Engineering, Risk Assessment, Lloyds Surveyor, Project Management FPSO Projects worldwide
Lead construction engineer (structural, methods, lifting, marine)
Currently employed as the primary Electrical Engineer. Engaged with improving safety, training, documentation, and implemeting preventive maintenance goals.
HR/Recruiter/Trainer
Monitoring POR’s (Purchase Order Request) for payment with the vendors and double check it if the documents needed are properly attached before payment is made.
MBA & Licensed to Practice Attorney seeking Government Affairs Position
Previous warehouse work..good hard worker ,fast learner
•Nebosh International certificate in Occupational Health and Safety , Membership Examaination of The Institution of Fire Engineers UK., Fire Officer course from National Fire Service College Nagpur India
i have complited a MSc degree from pune univeristy,worked as a geologist in geotechnical field,wel known to GPS ( Trimble Geoexplorer 3 )
A proactive leader with extensive reliability centered maintenance management and hands-on experience in the repair, overhaul and troubleshooting of mobile equipment, initiate change and reengineering of quality improvement processes while maintaining a positive, safe and productive environment.
Telecom Transmission Engineering, Computer and Electronics
With more than ten (10) years of extensive experience and knowledge in Pipe stress calculation and support design of oil & gas, petrochemical, refinery, chemical, LNG, LPG, onshore, nuclear power plant and subsea piping projects.
M.Sc. Environmental Engineering and B.Sc. Civil Engineering holder seeking more experience. Although I do not have long working experience, I assure you that I am a keen learner and will work hard for the department if I am selected.
In-service / shutdown inspection of most of the static equipments in a plant, such as pipe works, pressure vessels, hydrogen crackers, reactor vessels, storage tanks, reformer tubes, risers, topside structures, well head parts, valves, etc. , Inspection of all plant construction related activities
Supervision, planning, scheduling, coordination, maintenance (prevantive & breakdown), budgeting/forecasting, optimum inventory management, resource development & deployment, utilities etc.
Electrical Engineer, Six Sigma, Lean, Manufacturing
33 years Mechanical & Civil Exp in QA/QC & Construction Management form$65.Million to $3.2 Million Projects. EXP. All Codes , ASME, B31.1 B31.3 AWS, , NBIC, ASME Sec.V, ASME Sec.VIII API-650 &653. Develope & writing QA/QC Programs, Site procedures Manuals, Project exection plans & Welding plans
First   Prev   51   52   53   54   55   56   57   58   59   60   [ 61 ]   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80   81   82   83   84   85   86   87   Last
Seach Parameters

Change search parameters...
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com