Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #70589
next resume »»
CONTACT INFORMATION:
View contact information...
EDUCATION
(1991) * Bachelor of Engineering in COMPUTER SYSTEMS from NED University of Engineering & Technology Karachi, Pakistan.
PROFESSIONAL TRAINING
(1992-1993) * Post Graduate Training (one year) in Computer Hardware and Software from CTC, Islamabad, Pakistan.
TECHNICAL SKILSS
CONTROL SYSTEMS:
* Foxboro I/A series DCIS
* Mitsubishi Diasys-UP DCIS
* ABB Symphony and Industrial IT DCIS
* ABB Procontrol P14 and Freelance
TRAINING COURSES * Attended 5 days PMP Certification exam preparation seminar (19 ~ 23 Jan) conducted by PMI-AGC Chapter, Kuwait.
* One week workshop on " Operating Systems – Unix" conducted by ICCC, Islamabad. Aug 09~13, 1994
* ABB. Procontrol P14 DCS System training along with associated products (POS, EDS, PDDS & OPC) conducted by ABB AG, Kuwait (Nov 2006)
CAREER HISTORY
* ABB AG, Kuwait
Lead Control Systems Engineer / Project Manager
October 20, 2004 to date
* Mitsubishi Heavy Industries, Japan ( Ghazlan II Power Project, Saudi Arabia).
Commissioning / Warranty Engineer I&C (DCIS)
October 28, 2001 ~ October 19, 2004
* Nichimen Corporation / MHI Japan (AES Lalpir Power Project), Muzafargarh. Pakistan
Engineer I&C (DCIS) / Site Manager
MAY 05, 1997 ~ JUNE 30, 2001
* Lucky Cement Limited, Pezu, Pakistan
Assistant Manager (I&C).
MAY 02, 1996 ~ APRIL 24, 1997.
* Kundian Chemical Plant. Jauherabad, Pakistan Assistant Engineer (DCIS / Computer).
MAY 05, 1993 ~ MAY 01, 1996
WORKING EXPERIENCE
ABB AG, KUWAIT
* Provided HMI and DCS software implementation and programming together with I/O configuration, start-up, commissioning and technical support of DCS (P14 Procontrol) and PLC (Freelance) based hardware and software systems for the power plants in Kuwait.
* Preparation of Control system configuration diagram, preparation of DCS input / output list and assignment, P&ID, logic and loop diagrams, preparation of graphics, function block diagrams, loop functional testing.
* Evaluation of Technical RFMs, RFQs, BOQs & Tender documents, identified & analyzed Client's requirements including study of existing platforms & infrastructure and developed checklists.
* planned and conducted Site Acceptance Test and got sign-off sheets.
* Managing project execution, installation, commissioning and system validation and preparation of engineering man-hour estimates and schedules.
* Implementation of KKS tagging system for Power Plants.
* Selection of appropriate equipment and materials as per project's requirement and technical specifications.
* Responsible for project documentation (eg Project registry document and project plan).
* Monitoring projects with respect to Cost, Resource Deployment, Time over-runs, Quality Compliance and Manpower Planning to ensure timely execution of projects.
* Conducting project review meetings for evaluating project progress & taking adequate corrective actions if required.
* Negotiates changes to the scope of work with the client and attends technical and interface coordination meetings.
ACHIEVEMENTS AS PROJECT MANAGER
DOHA EAST POWER STATION, KUWAIT (7X150 MW Steam Turbines)
* Refurbishment of Chemical Treatment Room
Cost: US $ 3 million
* Replacement of 415V Turbine and Boiler Switchgear U3 interfaced with P14 procontrol DCS
Cost: US $ 1 million
* Replacement of Sump pit Control
Cost: US $ 0.4 million
* Replacement of 415V Turbine and Boiler Switchgear U4 interfaced with P14 procontrol DCS
Cost: US $ 1.2 million
* Replacement of Traveling Screens Controls
Cost: US $ 0.8 million
* Replacement of 415V Pumping & Chlorination Switchgear with P14 Procontrol DCS
Cost: US $ 1.6 million
* ECR Transducers & Annuciation Systems
Cost: US $ 0.8 million
* ECR Data Logging System
Cost: US $ 0.3 million
GHAZLAN II POWER PROJECT, SAUDI ARABIA (MHI,JAPAN)
(4X632 MW Steam Turbines)
* Involved in installation, configuration and pre-commissioning of ABB Symphony DCIS hardware, BRC100, NIS/NMP, MCP and other modules.
* Complete utilization of "Composer 4.1", an engineering tool for Industrial IT system for the development of logic and operator interface graphics.
* System / Application software installation for conductor VMS and configuration of Alarm management, user access securities, Alarm summary, Tag and Trend database, function key and ADP configurations.
* DECNET and TCPIP configuration for conductor VMS and VMS client.
* Setup, configuration of Conductor NT used for data logging and archiving.
* Commissioning of serial link interface using (Kwick editor and C compiler) to configure and maintain the interface between BRC100 / NTMP01 and 3rd party PLCs using modbus converters (RS 485 or RS 422 to RS 232)
* Testing and commissioning of Asset management System (AMS) by Emerson, providing the online device configuration, diagnostic and calibration of smart transmitters supporting HART protocol.
* Programming and maintenance of the Multi switch 924TXG and Multi switch 900 by Digital.
* Developed and executed the SAT (Site Acceptance Test) procedures to test the equipments.
* Setup and configuration plant performance monitoring system "OPTIMAX" by ABB.
AES LALPIR POWER PLANT (NICHIMEN CORPORATION / MHI JAPAN) (2 X 230 MW Steam Turbines)
Engineer I&C (DCIS) May 05, 1997~Oct 10, 1999
* System Configuration and Commissioning of DIASYS - UP (MITSUBISHI) DCIS using Engineering utilities, including I/O master modifications, OPS modification, 8 loop diagram, System backup (on line + off line).
* System management of UNIX operating system.
* Loop testing ( Analog & Digital signals), Sequence testing at Group & subgroup level of the Plant,
* Development of plant's control logic using (FUNCTION CODE PROGRAMMING) "DIASYS-IDOL"
* Commissioning of Air Compressors (ATLAS CAPCO), Chlorination plant, CEMS Analyzers, canal intake bar/traveling screens, ROTREK motorized actuators.
* Turbine valves adjustment during unit shutdown.
Site Manager Oct 10, 1999 ~ 30 June 2001
* Leading the team of 15 Engineers + 25 Technicians
* Responsible for completion of all punch list items.
* supervise and control all Sub- contractor's activities during annual outage of the units.
* Preparation of progress report on daily/weekly/ monthly and updating the project office in Japan.
* Preparation of monthly cash flow requirement.
* Assisting the customer for spare parts requirement.
* Follow up of all warranty related issues and financial claims.
KUNDIAN CHEMICAL PLANT / LUCKY CEMENT LIMITED
* Installation, System Configuration and commissioning of FOXBORO I/A Series DCIS and other related equipment.
* Hardware/Software maintenance with particular emphasis on Node Bus, Application Processor, Workstation processor. Field Bus Modules etc.
* System Management of Venix 2.1 Operating System
* Development of programs for Historian using informix, Ace report writer and SQL.
PERSONAL DETAILS
* Date Of Birth: April 4th, 1968
* Nationality: Pakistani
* Marital Status: Married
* Dependents: Wife + 03 Kids
* Driving License: Valid Kuwait Driving Licence
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 2351 to 2400 of 4352)
Go to Search Parameters...
Brief Description
Experienced Nine Year Superintendent Commerical / Residential
Free!
20+ years of international projects experience in the study, process design, engineering, procurement & project management. Having led multifunctional teams for EPCM for hydrometallurgical( Leaching, SX-EW), benificaition & pyro( Smelter & Electro refining) for copper, Cobalt, zinc and lead metals.
Approximately 3 years experience in Production Planning, Scheduling & Inventory Control, ERP(BaaN)implementation, Production, Manufacturing, Industrial Engg., Production Management, Process Re-engg., Product Development, Product Costing.
civil engineer having a good knowledge of computers
Engineer’s degree in mechanics Speciality: “Construction and exploitation gas and oil pipelines, gas storages and petroleum storage depots”
Carrying out all Title & Non-Title Topographical, Engineering, Cadastral and Township Planning Surveys.
Well versed in P3e, P3 and MS Projects with very good knowledge of spread sheets and MS Access database. Have experience of Petrochemical, Oil & Gas and Chemical Projects. Have also seccessfully executed few projects as Project Manager.
• Preparing Material Approval Form.
Power generation, substations, transmission and distribution, circuit breakers, machines, service, plants, computer.
To acquire a technical/management position where engineering experience and managerial skills will significantly contribute to use the skills obtained through my experience and qualifications to benefit my employer and grow my self with organization.
MASTERS - Mechanical Engineering – [GPA: 3.6 / 4]
Preparation of Environmental Impact Statements (EIS) Report and of Resettlement Action Plan (RAP) Report for Mining Companies in Ghana
Structural Engineer with broad knowledge on design and analysis of Buildings (concrete and steel structures). Full knowledge in using Computer aided design Software such as Etabs, Staad pro, Prokon, Sap2000, CSI Safe, Xsteel, AutoCAD, Microstation, and other Computer programs (MS Office Word, Excel,
Project Management, Cost Control, Estimating
10 years Systems Administration experience, wide verity of systems.
Operational Specialist
Hands on experience in plant maintenance instrumentation as well as commissioning and precommissioning activities of the various chemical and petrochemical plants. Have experience in control valve overhauling, maintenance of transmitters,DCS,PLC etc.
Highly qualified Project Management Professional offering more than 20 years of project and construction management experience in managing and administering complex engineering and construction projects. Results focused and effectual leader with proven ability to set up project management systems
QUALIFICATION:B-TECH in CIVIL ENGINEERING. PROFESSION: STRUCTURAL /GEO-TECHNICAL ENGINEER.
Application for the post of Excavator Operator
Highest qualification Diploma
I had been work in this line for past 6 yrs, i have a valid lience for mobile crane & crawler crane
Logistics and Procurement Specialist
Employed as Sales Applications Engineer, I have supplied industrial, marine, mobile construction, process plant and aerospace markets pumps, valves, hydraulic & pneumatic components and systems since 1986.
maintenance millwright-28yrs. from trainee to maint. superintendent
Over twenty years experience covering all aspects of Document Control and Information Management responsible for the supervision of junior staff and the management of Document Control. I have worked in a variety of locations in the UK and overseas (Libya and Qatar)
Skilled with Leica total stations, RMR logging, structural geology
Lead Control Systems Engineer / Project Manager having more than 16 years of experience with multinationals
Mechanical Draughtsman in Solidworks and AutoCAD
H.S.E. Part 1 Air Diver
Civil Engineer, board topnotcher and full Academic/University scholar. Expert and hands-on experience in Primavera P3.
Experienced EPC Project Executive with proven results through leadership and technical aptitude.
To obtain a challenging job where I can utilize my experience and skills to add value to the company. •Electrical engineer with over 18 years of hands-on experience.
My sckills cover a broad range of heavy equipment. Along with this I have made sure I have the safety skills needed to work in the Extreem Alaska enviroment.
Mechanical Engineer with over 10 yrs experience
C.A.W.I. PRESENTLY SEEKING C.W.I./BOILERMAKER FOREMAN
Mechanical Engineer having expereince in Hydraulic & Pnumatic - Static machinery
My skills involve the use of auto cad, micro station, architectural desk top, gis system over a span of 12 years of working experience
Planning, Scheduling and Cost Control Engineer
Detailed structural design and engineering, feasibility studies, project / contracts management, plant and building trouble stooting, QA / QC, contracts, project estimation, preparation and review of specifications,
Proficiency in using Primavera (P3), Primavera Enterprise, Expedition, Suretrak, Microsoft Project, Access, Excel And Other Related Software.
Over thirteen years track record for success in all phases of Landscaping Design, Project Management, and Nursery Operations
As a civil engineer with 7 years of experience, I have done design, estimation and site work on various projects.
A+ Technician Certified, Instaling and upgrading systems, Manage Printers and connect to networks, Implement security measures, diagnosing and prevententive maintenance, Hardware and software troubleshooting skills, Great customer services skills.
I have more than 10 years of good functional experience in engineering organization in Project management & ExecutionI poses strong presentation, communication, process and quality oriented analytical skills with abilities of a leader as well as an efficient team member. I can sustain high pressure.
Industrial Construction Project Management
12 years experience in designing of electrical system for medium to large projects in EPC consulting firm;Designing and drafting construction drawings for substations, distribution, electrical control, FAS, and etc.
Welding Inspector, Piping Inspector, ASNT RT Lev II, Quality Control, examination and testing including WPS and Welder Performance Qualification Test, inspection for Bar Pipe, Duplex Pipe inspection, Responsible for technical review of engineering design, construction, and review documents/procedure
Diploma holder in electrical engineering with 6 years exp.in execution and maintenance of steel plant.
Electrical Engineering Graduate, 8 years of experience in the execution of High Voltage Substation & Airport projects
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
[ 48 ]
49
50
Next
Last
Seach Parameters
Change search parameters...
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2008 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com