Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #70915 next resume »»
CONTACT INFORMATION:
View contact information...

Australian Visa: Class BN Subclass 136 Skilled - Independent

Certificate of Competency #: 0513160338389
Issued: November 10, 2005

Driver's Licensed: N04-93-272560
SSS No: 33-6084913-1

Objective: To give superior service to the company and serve willingly for any job task assigned

License Attained

Title: BUILDING WIRING ELECTRICIAN
Certificate of Competency #: 0513160338389
Issued: November 10, 2005
License Authority: TECHNICAL EDUCATION and SKILLS DEVELOPMENT AUTHORITY [TESDA]
Location: TESDA Complex, East Service Road South Super Highway, Taguig, Metro Manila

Work Experience

AAC [Arabian Air-conditioning Contracting]
HVAC, Plumbing, Fire Fighting, Electrical & Maintenance Services
GRADE A Electro – Mechanical Contractors
P.O. Box 40688, Doha, State of Qatar
Tel. #: 4317488/ 4317489 / 4316345
Fax: (0974) 4317487
Email: arabianyork@qatar.net.qa or contracting@aac.com.qa
Web Site: aac.com.qa
October 14, 2006 – July 03, 2007
July 04, 2007 – October 16, 2007

Position: Electrical Foreman
Jobsite: Tower F, Parcel 2A Pearl Qatar Tower
Date: July 04, 2007 – October 16, 2007

DUTIES and RESPONSIBILITIES:

1. Supervise rough installation of RSC, IMC, EMT & PVC Pipes for power, lighting, telephone and auxiliary system (Fire Alarm, BGM/pa, Intruder Alarm, Clock, CATV & CCTV System) and installation of various types of devices such as power outlets/sockets, lighting fixtures, telephone outlet, wiring and auxiliary devices. (Smoke Detectors, F.A Bell F.A. manual station, Speakers, Door Detectors, motion detectors) from Level 4 - Level 15 Parcel 2A Tower
2. Plan, prepare daily task schedule, call meetings for distributions of responsibilities to each staff under my supervisory
3. Prepare materials take off prior to slab concreting
4. Coordinate through meetings with the Project Mgr, Project Engineer, Civil Engineer, Safety Engineer. and Project Consultants with regard to project development
5. Make daily, weekly and monthly written reports and submit to the Proj. Engr. with regard work status per floor bldg level basis
6. Coordinate via meetings with other trades: Steal Fixer Foreman, Post Tensioning Foreman, Carpenter Foreman and Project Consultants to avoid conflict and delays at work

Position: Electrical Foreman
Jobsite: Karh-amaa Substation [PSS2 and PSS5]
Date: October 14, 2006 – July 03, 2007

DUTIES and RESPONSIBILITIES:

1. Roughing – in layout of RSC, IMC, EMT & PVC Pipes for power, lighting, telephone and auxiliary system (Fire Alarm, BGM/pa, Intruder Alarm, Clock, CATV & CCTV System)
2. Wiring & termination works for power, lighting, telephone and auxiliary system
3. Installation of power outlets/sockets, lighting fixtures, telephone outlet, wiring and auxiliary devices. (Smoke Detectors, F.A Bell F.A. manual station, Speakers, Door Detectors, motion detectors)
4. Testing and commissioning of all system. (Installation test, continuity test)
5. Installation of low voltage Switch gears, Panel Boards, Distribution Board, Motor Control Center and low voltage distribution Transformer including its cabling, raceway and termination.
6. Installation of Cable trays including fabrication of its support system
7. Laying of High Voltage and Low Voltage feeder Raceway. (Laying of 2"0 PVC to 6"0 PVC)
8. Meeting and planning with the Project Engineer with regards the project status and activities
9. Supervise electricians and helpers in the jobsite
10. Make daily activity reports and accomplishment

United Neon Ever Corporation
4F HPL Bldg. 60 Sen. Gil Puyat Ave. Makati City
April 03, 2006 – September 23, 2006

Position: General Building Electrician/ Building Maintenance

DUTIES and RESPONSIBILITIES:

1. Develop as-built plans of the electrical system of the building
2. On call 24/7 on emergency electrical problem that may arise anytime
3. Determine proper balancing of load on 3-phase supply
4. Maintain all electrical apparatus of the building
5. Installation of Electrical Devices such as, convenience outlet switches and circuit breakers
6. Installation and repair of Lighting fixtures
7. Maintain and repair various types of electrical equipments such as fan blowers, A/C Motors and transformers air conditioning
8. Label all circuit breakers / panel boards
9. Lay out of cables and electrical conduits
10. Regular Monitoring of elevator controls
11. Replacement of busted light bulbs of the building's hallway
12. Rehabilitate existing electrical system that have been worn out due to wear and tear
13. Supervise other contractors that will perform repair
14. Monitoring of PABX
15. Termination of wires inside the panel boards
16. Regular check up of loading of electrical system
17. Daily check up and inspection of electrical rooms of the whole five floor building

RERA Material Handling Corp.
RERA Material Handling Corp. Molino –1, Bacoor, Cavite, Philippines
16th August 1999 up to March 24, 2006

Position: Senior Electrician

DUTIES and RESPONSIBILITIES:

1. Makes an ocular inspection of the Job Site
2. Consults and meets with the Project Engineer with regards to the Project Planning
3. Lists of Materials needed to be purchased for the said Project
4. Installs of Panel Board, safety fuse box, cut-out box and circuit breakers
5. Installs/Replaces/Repairs light bulb sockets, wall outlets and switches
6. Supervises in pulling of wires inside the Electrical Conduit
7. Rewires of grounded circuits
8. Measures the current, using clamp meter, make sure that each circuit is not overloaded
9. Replaces and repairs existing fuse box and circuit breaker
10. Make a final inspection before putting the main switch on
11. Rewinds of A/C motors/Replace capacitor and bearings
12. Installs Electrical appliances such as fans (all types), water pumps and A/C units
13. Conduit layout and wiring termination
14. Cable layout
15. Power Panel board wiring and termination
16. Cabling and conduit layout for Service Entrance
17. Cable splicing for Service Entrance
18. Wiring and perimeter lighting installation
19. Connects annunciator, telephone and intercom system

DM HERNANDEZ ENGINEERING
19th of June 1995 – 31st of July 1999
129 Lourdes dr. corner N. Domingo St. San Juan Manila

Position: Electrician

DUTIES and RESPONSIBILITIES:

1. For INSTALLATIONS

* Installs, replaces/ repairs of lighting fixtures
* Replacement of busted starter, ballast, fluorescent holder and light bulb
* Install, replace and repairs of lights switch and electrical sockets
* Mounting of panel boards, from 30-600 amperes
* Layouts of cables from #14 to #200 mcm
* Layouts of pipes from half inch (1/2 inch) to 4 inches

2. For HOUSE WIRING

* Layouts of electrical wiring
* Installs/Replaces/Repairs of safety switch and circuit breaker
* Installs/Replaces/Repairs fuse box, cutout box, circuit breakers
* Replaces/Repairs defective wall socket, switch, light bulb sockets and lights

3. For REPAIRS

* Repair of Electrical appliances
* Washing machine and Dryers – rewind of motors. Replacement of capacitor, repairs of switches, re-shafting and re-bushing. Change of belts and other spare parts.
* Electric Oven, Flat iron, Microwave – Trouble shooting and replacement of defective parts
* Water pump – Rewinding of motors. Replacement of capacitor, bearing, shaft seal
* Electric Fan and exhaust fan – rewinding of motor, re-shafting and re-bushing, replacement of capacitor, fan blades, repairs of switches, Change of gears and other spare parts.
* Pulling of cables inside electrical pipes
* Rewinds/Repairs/Installations of A/C motor from ½ horse power to 5 HP (horse power)

4. Makes a final inspection before turning the main switch on.

PSALMS 23 ELECTRICAL SERVICES
1st of April 1987 - 31st of May 1995
8th of September 1986 - 31st of March 1987
111 N. Domingo St. San Juan, Metro Manila, Philippines

Position: Electrician
Inclusive dates: 1st of April 1987 - 31st of May 1995

DUTIES and RESPONSIBILITIES:

1. Survey of location and planning
2. Install Panel board, safety fuse box, cutout box, and circuit breaker
3. Connection of wirings in Panel Board
4. Layout of wires and electrical pipes such as Conduit and PVC Pipes
5. Determine the route, number and connection of wires as per plans or drawing specification
6. Tightening, splicing copper conductors, weather proof switches, receptacles and plugs
7. Maintaining of meter base and services
8. Check all Electrical fixtures like lights, switch, wall outlet, circuit breakers and fuse box if properly installed and functioning
9. Install and repair fans (all types), A/C Unit, water pumps and other electrical appliances
10. Test ad correct circuit if it is grounded or not functioning
11. Replace defective fuses and circuit when discovered to be in malfunctioning status
12. Rewinding of A/C Motors and coils
13. Make a final inspection before turning the main switch on

Position: Apprentice Electrician
Inclusive dates: 8th of September 1986 - 31st of March 1987

DUTIES and RESPONSIBILITIES:

1. Prepare tools and material needed in the project.
2. Assisting in assembly of scaffoldings and ladders
3. Assist in layout of wires and electrical pipes such as Conduit and PVC pipes
4. Chisel walls in preparation for utility box, junction box and electrical pipes
5. Putting guide wires inside the electrical pipes
6. Assist in pulling of wires and cables (electrical)
7. Install lighting fixtures, switches and wall outlets
8. Disassemble appliances needed for repair and maintenance
9. Provide assistance like holding, lifting, pulling whenever needed by Senior Electrician
10. Make sure that all tools are kept, secured and cleaning the workplace before leaving the Job Site

Trainings/Seminars:

Title: OCCUPATIONAL SAFETY Date Taken: November 10, 2005
Institute: MERALCO Foundation, Inc. No of Hours: 3
Location: Meralco Foundation Inc. Building Ortigas Avenue, Pasig City, Philippines

Title: ELECTRICAL SAFETY Date Taken: July 19, 2004
Institute: RERA Material Handling Corp. No of Hours: 8
Location: RERA Material Handling Corp. Molino –1, Bacoor, Cavite, Philippines

Title: BLUE PRINT READING Date Taken: January 6, 2003
[A basic hands-on program for Electrical Plan Layouts & Schematic Diagram Familiarization]
Institute: RERA Material Handling Corp.
Location: RERA Material Handling Corp., Unit 302, Reans Bldg., #93C Jose St., Malibay, Pasay City, Philippines

Title: BUILDING WIRING INSTALLATION Date Taken: October 2, 2002
Institute: RERA Material Handling Corp. No of Hours: 96 [on the job training]
Location: Mornese Center of Spirituality, Mamon Road, Pansol, Calamba City, Laguna, Philippines

Tools Managed:

* PLIERS
* LONG NOSE PIPES
* SIDE CUTTER
* SCREW DRIVER
* PHILIPS SCREW DRIVER
* HAMMER
* HACK SAW
* ALLEN KEY
* OPEN WRENCH
* BOX WRENCH
* COMBINATION WRENCH
* VICE GRIP
* CHANNEL LOCK
* MULTI TESTER
* ADJUSTABLE WRENCH
* SOLDERING GUN
* SOCKET WRENCH

Skills:

Basic typing (MS WORD)
Basic Internet

Educational Background

Highest Education

Vocational Course Taken: BUILDING WIRING INSTALLATIONS and MAINTENANCE
Name of School: MERALCO FOUNDATION, INCORPORATED (MFI)
Year Taken: September 11, 2005
Year Graduated: October 30, 2005
Location: Meralco Foundation Inc. Building Ortigas Avenue, Pasig City
Philippines

Short Course Taken: CALL CENTER PROFESSIONAL TRAINING in
COMMUNICATIONS SKILLS and AMERICAN ACCENT
Name of School: Informatics Computer Institute
Date Taken: June 2006
Date Graduated: July 2006
Location: 2/F Security Land Bldg., 6797 Rufino St., corner Ayala Ave., Makati City
Philippines

Character Reference:
Will be provided

View contact information...
«« previous resume next resume »»
Search Results (Resumes 251 to 300 of 4371)Go to Search Parameters...
Brief Description
Joinery & Interior ESTIMATOR
Project Management Lead Zinc Copper Nickel Gold Silver Base Metals
Project Manager, Automation & Controls, Instrumentation, IT Systems, PLC, SCADA,
Looking for an engineering position with the responsibility of structure research and analysis.
Career objective: seeking a challenging managerial position with an established regional or national organization.
Multi-Million Dollar General Construction Project Manager
Heavy equipment operator
17 years experience in EE
Graduate Mechanical Engineer skilled in Projects & Contracts Management.
A Land Surveyor with more than 10 years of experience. Can handle and operate total station and GPS receiver( for a minimal training), with knowledge in AutoCad and knows how to drive.
I have a complete knowledge of construction from footers to a complete building I also can run a successful business and handle all the employees with minimal interuptions
Executive Administrative Assistant/Office Manager
Structural/Pipewelder 20+ yrs.
Upper management position with a company that encourages and empowers its employees, by
I have worked many years in the construction field and I have knowledge of all aspects from ground breaking to completion.
Ninteen years of diverse, multi-disciplinary experience in contract management, project planning, project budgeting and cost control related to industrial, construction and manufacturing.
Video Production Engineer/Video Engineer/Television Systems Broadcasting Engineer
Workshop manager/supervisor plant,transport,cars,mining machines,also field works
For my fifteen years experienced in construction, as a site/ project engineer, I have more on experience in horizontal project like earthmoving works, site and land development works and road works. Some of my experienced are attached on my resume for your guidance and evaluation.
Hospitality Development - Project Manager
Experienced Project Manager with proven success meeting the demands of her clients, providing professional construction and project management services on tenant and capital improvement projects.
I am Ayrin B. Rioflorido, 37 yrs old, a civil engineer with more than 14 yrs experience in quantity surveying works.
Aside from education and work experience gained from previous and current employment, I have skills in operating gas turbine, substations, testing and commissioning of power protection relays and handling DCS and SCADA system.
I have worked in the management role for over twenty years in mechanical integrity by performing root-cause analysis to ensure consistent and cost effective approach to reliability improvement and preventive maintenance in fixed and rotating equipment in the Petrol-Chemical/Refinery and the Power In
My experience in the Piping and Mechanical fields is both diverse and extensive. I have stayed in the Heavy Industrial sector all of my working life.
Qualifications include over 25 years experience in management/supervision positions on various domestic projects and various international projects in countries such as Iraq, China, United Arab Emirates, India, Saudi Arabia, Bahrain and in other locations such as Puerto Rico, US Virgin Islands etc
I've been a team leader to the most experienced members for seven years and I think most of my sub ordinates would describe me as being a tough but fair leader who is easy to approach, open to suggestions, and driven to achieving success.
24 years experience in the Quality Control, inspection, supervision of pressure vessel, piping, pipeline and structural steel work. Certificated NDT level II in the UT/RT/MT/PT. Performed WPS/WQT and inclusive of Mechanical Testing witness. I have knowledge of ASME, ANSI, AWS and API code.
Construction Manager Construction Project Manager Project Manager Civil Engineer Construction Engineer Structural Engineer Estimator
With an impressive diversity of significant experiences, I have developed a familiarity with several field of work such as petrochemical refinement, water treatment, environmental protection and various power generation systems
Worked in the field of civil construction including real estate sector, rail-road construction etc. and also in the field of financial institution
Electrical Superintendent with 20 years of very diverse background
with Australia Visa Class BN Subclass 136 Skilled-Independent
computer
Award Winning and Experienced Dispatcher/Customer Relations/Service Coordinator
I have about 22 years Expereince in Land Surveying field at diffrent projects, Such as Power and Desalination Plants, Oil Refineries,High rise Buildings,Canal and Dams, Tunnels and Roads,Topographical Projects.I have also good knowledge of Computer software related to Surveyings.
Civil engineer with 14 year work experience in construction.
Hydrographic & Geophysical Surveying , including Topographic Surveys Industrial Offshore, Near Shore and Port Surveys , Drill Rig/Platform site & Positioning Surveys, Marine Constructions Surveys, ROV Positioning, Pipeline & Cable Route Surveys
Plant Maint Engg
Factory Manager, Technical Manager
Looking to join a progressive construction organization that needs an expert in planning & Cost control follow up engineer for senior position. my experience incorporates all types of construction projects - high-rise multi-dicipline buildings, touristic villages, etc.
experienced with service equipment, panelboards, breakers, fuses, disconnects,devices, conduit installation, branch circuits, lighting, motors, motor controls
hvac/electromechanical technician
Maintenance Supervisor/Maintenance Planner with 10 years experience. Proficiant in preventive maintenance and scheduling. Seeking employement on contract or time in & and out basis.
A seasoned, highly organized construction professional with over 38 years of heavy industry experience which includes both industrial construction sites and field/shop fabrication locations in the Pulp & Paper, Petro-Chemical, Government, Hydro Electric, Institutional, Mining, Nuclear and Wind Power
Solid skills in heavy equipment maintenance, pneumatic and hydraulics operations
MBA with 11 years of experience
B.Tech in Electrical & Electronics eng and having 13 years of expe in constrution field in india and Abroad
Automitive Design
Senior material controller with great experience in western companies.Have a technical education and professional expertise in various computer softeware and hardware.Known as a good communication person with leadership skill.
First   1   2   3   4   5   [ 6 ]   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com