Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #71618 next resume »»
CONTACT INFORMATION:
View contact information...

CONTROL & INSTRUMENT COMMISSIONING / MAINTENANCE ENGINEER 16.05.2008

Romanian, born 16.09.1954
Married: two children
Romanian Passport, expires October 2008
Romania/International driving license

PROFILE:
Construction/Commissioning Instrumentation & Control Superintendent, or Project Management (PMC-role), or I & C Field Engineer/Supervisor, or I & C Maintenance Engineer with extensive (>25 years) experience: in Romania & overseas (>12 years) – in the:
Power Generation, Power & Desalination, Wastewater Treatment, Petrochemical, Gas Processing Projects with experience in:
* Turn key & customized data acquisition systems, calibration, measurement & interpretation, design & research, mounting, erection, field installation, pre-commissioning, commissioning, inspections, witness, operation, maintenance for: control loops of flow, temperature, level, pressure, vibration, alarm & interlocks, function groups, photometers, analytical analyzers, control valves, DCS, DDC, PLC, MCC, ESD,LMS/DMS, power & gas plants, fire fighting & gas systems, oil production, steam, oil & gas turbines, combined cycles, water treatment, desalination, chlorination, boiler, water & oil storage, distribution & transfer, instrument & service air compressors, EDG systems, H2, O2, CO2 plants, TCA coolers, stack flue gas, Hart Communicator.
* Supervisory skills of multi-national workforces for the duration of construction &commissioning phases.
* Specialized in the "Plant handover system", coordinating the activity of Mechanical Completion and Pre &Commissioning works.
* Reviewing /inspection of Test-Packages compliance against the: Project specifications, Quality & Test/Procedure.
* Experience in "Project Management"-PMC role, practiced in reporting processes.
* Familiar on reading/using P&ID's, logic diagrams, catalogs, tuning.
* A sound knowledge of international standards and codes (BS EN 60801,ISO 900X, IEEE,NFPA, IEC, API RP551, ANSI)
* Administrative aptitude and computer literacy (Microsoft Office Project, Lotus, TinnyCad, Orcad, AutoCAD, Internet)
* Safety awareness (Courses as: Safety Leadership Workshop, HSES Supervision & Leadership Program, Permit to Work).

ISTRUMENTATION/SYSTEMS/PLANTS:
Honeywell, Yokogawa, W.D.P.F.Foxboro, ITT Barton, Fisher Rosemount, Masoneillan, Auma, EMG, Rotork valves, Daniel box, Siemens-Sipart, Fisher-Porter, Endress-Hauser, Sor, Magnetrol, Varec, Petrol, Aschroft, Sakura Enders, Duragauge, Sespi, Zellweger Analytics, Parametrics, Maihak Multor, Land, Hartmann & Braun, Raychem, Allen-Bradley, Rockwell Automation Software Logix 500/Linx5/ActiveX – 6200 Series SLC 500 PLC's, Mark 5, Cuttler Hammer, Omron CXP Programmer, Siemens Simatic PCS 5/7, Diasys 4, Contronic3, ABB Advant 160/450 & Siemens-Teleperm XP DCS, Ingersoll Rand, Compair, Sullair, Deltech-Flair, Donaldson, Bently Nevada 7200, Homar-Notifier 5000, Minimax FMZ-4100,Fizia-Italimpianti, Technos, Termomecanica, Tormene, Aquatech, Fantuzzi Regiane, Eurosistemi, De Nora Impianti, Raimondi, Texas Instruments Systems.

QUALIFICATION:
* "M.Sc". Engineer in Electronics(Components and Devices),1974-1979, Politechnica University Bucharest Romania

LANGUAGES:
* Romanian (mother tongue), English (speaking, reading and writing), French (basic)

EMPLOYER (Country)-PROJECT PERIOD/LOCATION/VALUE-POSITION HELD:
* Mott MacDonald –October 07- Present, Independent Water Steam & Power Project, KSA, 960 Million $ - Sr.Owners I&C Engineer
* ABB SP&P (Italy) –January 07- April 07, Power Generation EPF Block D, Malta, 200 Million $ - I&C Commissioning Engineer
* HANSWORTH Ltd (UK/UAE) -June.05-Aug.06 - 6X25MW Power Plant Project – Nigeria- 550 Million $ - I&C Superintendent
* LLOYD's REGISTER IS (UK) – July 04-Oct 04 - ENI WLGP-Mellitah Coastal Plants-Libya- 3,0 Billion $ - Lloyd's Site Representative
* ZUEITINA Oil ( Libya) - June. 03-June. 04 - Concession 103 D – Gas Plant & Oil Production –LIBYA- Instrument Maintenance Engineer
* ALSTOM Power ( Italy)- August. 02-May. 03 Jebel Ali Power & Desalination Plant –UAE-0.8 Billion $ - Senior I & C Commissioning Engineer
* ALSTOM Power ( Italy)- Dec. 00-Dec. 01- Shoaiba Power Plant Stage 1 -SAUDI ARABIA- 2 Billion $ - Senior I & C Commissioning Engineer
* MITSUBISHI HEAVY IND (JP)- Oct. 98-June. 99- Bursa Combined Cycle-1400MW Power Plant- Turkey-1.8 Billion $ – I&C Sys Engineer
* MITSUBISHI CONSORTIUM (JP) -Jan.97-July. 98 -Al Aweer Gas Turbine PP "H" Project--U.A.E-2.2 Billion $ - I&C Systems Coordinator
* ABB SAE SADELMI ( It) - March 95-Dec. 96- Al Taweelah Power&Desalination Plant "B", -U.A.E-1.8 Billion $- I & C Commissioning Engineer
* NATIONAL INSTITUTE FOR THERMAL ENGINES (RO)-Sept 79-March. 95 Bucharest- Romania- Electronic Laboratory – Deputy Manager
OVERSEAS POSTING (Chronological): KSA, Malta, Nigeria, Libya, Libya, UAE, Saudi Arabia, Turkey, UAE, UAE
CAREER HISTORY on the next Pages

October.07- Present (x month), Independent Water Steam & Power Project (IWSPP) 5x 120MW Steam Turbines + 9x Boilers+ 2x8 Reverse Osmosis banks - Rabigh Arabian Water and Electricity Company(RAWEC) - KSA
Owners(RAWEC)Engineer, Senior Instrumentation & Control Engineer, Mott MacDonald - consultancy
* Provided oversight of installation, commissioning, and start-up processes for the IWSPP and auxiliaries.
* Performed system walkdown and inspections during all phases.
* Assist initial startup, checkout, and calibration including control and process instrumentation, MHI's Protection and Control systems.
* Pre-identified all potential expansion issues.
* Provide extensive interface with Engineering corrections and field implement design deficiencies.
* Monitored STG performance during steam blows and full load operation
* Monitored STG performance during no load, load and full load operation, established final system setpoints.
* Interfaced with overseas vendors for problem resolution of I&C systems
January.07- April 07 (4 month) Power Generation EPF Block D, 4x35MW, Barge 8 Offshore Facilities, Malta Shipyards, for Kashagan Field Development Experimental Programme Project - Kazakhstan,
Instrumentation & Control Commissioning Engineer, ABB SP & S,- PMC & EPC contractor
* LMS/DMS ( Load Management Sys/ Distribution Management Sys) - commissioning and set up Involved in the functional tests, loop tests, calibration of the field instruments, interfaces Server / RTU s – Allen Bradley to Switchgears, interlocks according to the process requirements
* review/ preparation of instrumentation and control design documents, conceptual and detailed electrical and/or instrument designs and layouts, control schematics, instrumentation wiring diagram, PLC Control Panels Design, instrumentation and control, instrument loop diagrams.
* maintain close liaison with other teams to support and monitor the instrumentation activities in order to ensure effective sharing of information,
* in final coordinate the plant preservation and barge preparation for the travel to the final location – Caspic Sea.
June.05-Aug.06 (14 months) - 6X25MW Independent Power Plant Project-Omoku - Nigeria
Instrument & Control Construction/Commissioning Superintendent- Hansworth Ltd - Rockson Eng Ltd - PMC & EPC
* performed managerial duties at the division level including preparation and the verification (at site) of the existing drawings, including the interface with various engineering disciplines during design/construction/commissioning development,
* review/ preparation of instrumentation and control design documents, P&IDs, conceptual and detailed electrical and/or instrument designs and layouts, equipment designs and packages (process control system and emergency shutdown systems, control panels-Mark V-frame 5 and. instrument tubing, electrical and instrument material selections, control schematics, instrumentation wiring diagram, PLC Control Panels Design, instrumentation and control, cable lists, instrument loop diagrams).Provide appropriate settings for major instrument and control parameters to allow safe operation of plant and equipment.
* ensure equipment erection & commissioning for safety critical items meets acceptable standards. Undertake installation and commissioning of pneumatic /electronic instrumentation on-BOP, power generation equipment, ESDV systems, gas/oil metering kit, temperature/flow/level/pressure controllers.
* resolved unusual problems, made decisions under emergency commissioning conditions to solve problems and protect the teams and the plant, conduct meetings and makes frequent inspections to assure operations confirms to plans and are being carried out safely, efficiently and economically.
* directed preparation of and reviews/approves forecasts for manpower, materials and supplies required, order tools, supplies and supporting service and initiates action to assure stocks are maintained at minimum adequate levels. Prepared work schedules; directs the work of subcontractors involved in various activities and monitors the commissioning costs to enhance the overall efficiency within budgeting constraints.
* reviewed and approved the comments report when appropriate and maintains accurate records of all activities carried out..
July.04-Sep.04 (4 months) - ENI Gas BV – WLGP-Wafa Plants-Coastal Oil & Gas Processing Plant Mellitah)-LIBYA
Lloyd's Register Site Representative( E&I )– Third party representative - Lloyd's Register Inspection Services
* provide independent verification on the onshore plants forming the Western Libya Gas Project (WLGP), the physical progress of work, the quality required level, safety condition and witness in accordance with the Site Work Instructions, the commissioning of a certain equipment. (by the means of Verification Work Instructions (VWIs), following the corresponding Verification Matrix as an index, in order to show the relationship between Safety Critical Elements (SCE) and the appropriate performance standard (PS).
* attend and act as a third party representative to all relevant Company's-ENI /Technip- meetings, monitor the EPC Contractor (Tecnimont)
* review/verify theTest-Packages compliance against the Project specifications, the Quality Plans, the Procedures and Inspection &Test Plans.
* reviewed at sample level the documentation provided to ensure that the Inspection and Test Plan Intervention points have been implemented by the main manufacturers QA/QC team and that Change Control, Site Query and Non Compliance Systems have operated to a satisfactory level.
June. 03-June. 04 (13 months))- Zueitina Oil Company -Concession 103 D – Gas Plant & Oil Production -LIBYA
Instrument Maintenance Engineer - Craddock Engineering UK – Zueitina Oil Company Libya
*. involved in the functional tests, loop tests, calibration of the field instruments including water analysers, interfaces with PLCs – Allen Bradley Logix 500 / Switchgear, interlocks, controller tuning according to the process requirements, Foxboro, Fisher & ITT Barton, instruments overhauls, vibration system- Bently Nevada 7200, air intake filters for gas turbines, water & gas injection systems
* contribution to P&I development, Instrument Summary, production, maintenance and the specification /purchase of Process Control equipment such as: Fisher/Masoneillan Control Valves, Relief Valves, Flow Measuring Systems, Emergency Shutdown Systems, PLC control systems.
* duties also include proposal estimating, planning of project Process Control activities and reporting / forecasting performance
August. 02-May. 03 (10 months))- Jebel Ali Power & Desalination Plant Station " K" Phase II –DUBAI-UAE
Senior I & C Commissioning Engineer –- ALSTOM POWER Italia / ENEL POWER Italia –main contractor
*. involved in the witness, to the consultant-Fichtner/client-DEWA of the functional tests, loop tests, calibration of the field instruments including analyser systems, interfaces with DCS-Teleperm-XP / Switchgear, communication PLC – DCS, interlocks, controller tuning according to the process requirements of the combined cycle power plant, as wel as for TOP-Turn Over Package.
* witness of the various systems i.e. Aux. Boilers & Recovery Boilers (Alstom Power Boilers), GPRS-(Tormene).
* Coordinate subcontractors –Minimax, for the Fire fighting FMZ 4100 System and hand over it to the consultant
Dec. 00-Dec. 01 (13 months))- Shoaiba Power Plant Stage 1 phase 1&2 -SAUDI ARABIA
Senior I & C Commissioning Engineer - ALSTOM POWER Italia / ABB SAE SADELMI Italia –BOP main contractor
* working in the BOP Commissioning Instrumentation & Control Department, for Shoaiba (3+2)x390MW Steam Power
* involved in functional group tests, loop tests, calibration of the field instruments including all gas and water analyzer systems (i.e. analytical, dust, photometers, TOC, pH, concentration, conductivity), interface with DCS / Switchgear, communication PLC (Advant 160)-DCS (Advant450), interlocks, controller tuning according to the process requirements, witness and hand over of the various systems i.e.Water Island-Fantuzzi Regiane (Desalination), De Nora (Chlorination) and Eurosystemi (Demineralisation), Aux. Boiler (Combustion Engineering), H2 (Sespi), to the consultant/client, as well as for TOP's
* assigned as I & C Commissioning Manager, my duties include planning individual works, schedule jobs i.e. time to complete activities, technical support during commissioning, inspections, witness for consultant engineers and client, review Project Schedule and develop Project Execution Method for Instrument and Control Scope of work. Maintain overall schedule and communication to client, technical department, subcontractors and vendors, keeping in touch with the planning department for progress, shortfalls and with the QA/QC Department for standards and site procedures..
* involved in organising the maintenance team, schedule, activities, involved in Factory Performance Test
* attended daily progress/commissioning meetings, reporting on current situations, monitoring changes in forward planning and restrictions to progress.
* collected and recorded the data for use in Performance Measurement, as build drawing and set point and alarm list.
July. 99-Nov. 00 (17 months))- Electronic Laboratory—Bucharest- Romania
Technical Consultant- Electronic Products - TRADIEL srl.-Bucharest
* assigned as Technical Consultant, I was involved in the design, commissioning and service for various computer - controlled systems, turn key systems and customised projects as system integrator
Oct. 98-June. 99 (9 months))- Bursa Combined Cycle-1400MW Power Plant- Turkey
Control System Engineer / Instrument & Control Engineer- MITSUBISHI HEAVY INDUSTRIES – main contractor
* involved in Factory Acceptance Test for Diasys 4 DDC and the integration FAT with other systems.
* provided technical support as a I & C Commissioning Engineer for commissioning of Fire Fighting System - Notifier 5000, TCA Coolers, Air Intake Filters- Donaldson, Gas Station- Homar.
* in charge for the coordination of the instrument technicians, instrument laboratory setup and also responsible for the new technicians training.
* involved in the Water Treatment Plant –Aquatech commissioning and the interface with DDC-Diasys 4
* involved in the daily technical commissioning meetings and in monitoring the relation contractor -client.
Jan.97-July. 98 (19 months))- Al Aweer 600 MW Gas Turbine Power Plant "H" Project phase 1 - Dubai, -U.A.E
I&C System Coordinator Engineer - MITSUBISHI CONSORTIUM - main contractor
* involved since the beginning in construction supervision, calibration, preparation of the as built drawings and revision of construction loop packages for the final inspection and witness
* review the vendors instrument criteria to suit plant scope and conditions and procedures for various systems like Instrument and Service Air Compressors-Ingersoll Rand (Cuttler Hammer –PLC), Air Intake Filters - Donaldson, EDG.
* commissioned the above systems and also Fire Fighting MiniMax FMZ 4100.as I & C Commissioning Engineer.
* provided the technical connection between designer, vendor, client/consultant – DEWA/Kenedy & Donkin, subcontractor / main contractor.
March 95-Dec. 96 (21 months))- Al Taweelah Power and Desalination Plant "B" Project-Abu Dhabi, -U.A.E.
I&C Commissioning Engineer - ABB SAE SADELMI Italia – main contractor
* involved in instrument commissioning for Control System Hartmann & Braun- Contronic 3, including the switchgear interface to the Information System
* worked at Desalination-6 units and Remineralisation Plants, O2, CO2 and Town Water Plants.
* performed open and closed loops, motorised valve MOV-Auma actuator control valves, function groups.
Sept 79-March. 95 (> 15 years)- Methods and Specific Ways for Measurement Laboratory Bucharest- Romania
Electronic Laboratory- Deputy Manager/ Scientific Research Engineer / Electronic Engineer - MASTER S.A./ THE
NATIONAL INSTITUTE FOR THERMAL ENGINES - Bucharest, Romania
* involved in the design of computer - controlled systems, turn key systems and customised projects as system integrator
* performed special measurements like noise- Bruel & Kjaer, tensometry and spectral analysis - Nicolette.
* in charge for the delivery terms, quality and improvement of the results.
* designed differential amplifiers, multiplexes (MMC 4067}, high resolution A/D converters, precision voltage references and interfaces PLC's-process.
* involved in the installation / commissioning of the electronic equipment for the heat engines test stands-Froude, Schenck, Hoffman, coordinate the lab research and design activity using all my technical knowledge, experience and interpersonal skills for getting the best results and relations with ours partners.

PROFESIONAL BODIES
* published "Microprocessor based supervision control and measure system for test stands of the heat engines".
* author of the an invention "Electronic device for force measurement" -brevet no: RO-94898/14.03.1988, and innovations certificates: Pressure capacitor transducer -1986, Cycles programmed device for heat engines tests -1988, Multi channel system for high-speed transient response recording –1986

COURSES ATTENDED
* Thensometric Measurement in Industry, DBase 4, Microprocessors: Architecture and Microprogramming Language

View contact information...
«« previous resume next resume »»
Search Results (Resumes 501 to 550 of 4805)Go to Search Parameters...
Brief Description
Business Plan Modeling, Project Management, Motivational Team Leader
ESTIMATING, PROJECT MANAGEMENT,HEAVY EQUIPMENT OPERATOR, UNDERGROUND UTILITIES
Over 20 years managing equipment. Large tunnel, heavy civil jobs and managed jobs across state and states. I have been involved in training and presentations to improve and maintain safety and service. I enjoy a challenge and enjoy reaching goals and working with a team or teams to reach a common go
Management
I am 46 years old, hardworking and trsupervision. Seeking permanent employment overseas. ie: Dubai.ustworthy. My attendance is 100%, never having had any sick time from my work in 25 years of full time employment. I can use my own initiative, and am able to work without supervision.
pressure welder
I am a fully qualified Cost Engineer and Estimator and have contract claims experience. Please see resume for details.
Senior Executive with verifiable performance in the fields of Project / Operations Management and Techno-Commercial management in Shipyards and Oil & Gas industry.
Experienced General Manager with Emphasis on Sales and Operations
Quality Specialist experienced in Quality Management System, being aware of specific Inspection Techniques, including NDT Techniques and offering over 25 years experience in QA/QC environment acquired in Mettallurgy and Construction (Prestressed Concrete Cylinder Pipes and Oil&Gas Inst.)
I am a grduate in Civil Engineering and an Exprerience of 34 years as Civil Engineer (5years work experience at El Kufrah, Govt. ofLibya). I have acquired Diploma in Computers in Office management in the year 1991 & utilised M.S. Word & Excel while sending formats to the World Bank, New Delhi.
Over 28 years in the engineering construction industry including more than ten years on international assignments
Seeking a job of Resident Engineer in Middle East (hoghways,infrastructure,buildings)holding more than 20 years experience in international companies.
Structural designer and progect engineer experienced in designing , supervising and progect management on large residental and industrial projects in Libya and Bulgaria,elegible to be member of Professional Engineers Association of Ontario, Exelent skill in desigh and inspection of steel and RCS
BS Business Administration Major in Accounting graduate and presently a Materials Management Manager
Estimating project managing scheduling coordination with general owner to make sure schedule can be met purchasing preparing submittals laying out preparing ASI's RFI's RFP's completing project from start to punch list.
I have more than 15 years experience in safety and environmental policy implementation for construction sites , drilling , workovers and explorations, refineries, pipelines, shipyard and offshore/onshore oilfields installations.I worked with clients Bechtel, Technip, Chiyoda, Brown and Root, Flour D
I'm a civil engineer andhad worked in different countries. I've been in this field for about 20 years.
Skilled building Quantity Surveyor with a degree and over twenty years of experience both as a PQS or Contractors Qs. Fields of performance include preparation of bills of quantities, bid documents , valuations, final accounts, claims, cost estimates, pricing, material schedules.
20 years of progressive EPC project contracts experience. Recent refinery up-grade construction contracts work in the arena of contracts administration are detailed on a comprehensive resume available upon request.
Thorough knowledge of all aspects involving residential,commercial and Industrial HVAC and Electrical systems. Extensive sxperience working and leading project teams worldwide in challenging technical environments and different cultures. Understanding and ability to work with other disciplines.
PMI and CMAA Certified Project Manager with a BSME avilibile for large scale Mechanical/HVAC Projects as a Senior Project Manager or Owners Rep. Willing to work Agency, Contract, Direct Hire and International Projects.
VP Sales used strategic planning to increase annual profit by $13 mm and sales by 17% in a declining market. Proficient in marketing and sales management (direct, business-to-business, consultative, & value added). Negotiated contracts in excess of $1 mm. Record sales in 5 of the past 9 years.
heighted , office oriented, global person
CNC Service Manager and Technician / Building Project Manager
Preparing Concrete profiles. „« Preparing P.T. Design Drawing and Shop Drawing as per the Engineers Design (ADAPT or RAM Programs).
Seeking for a position of Store Keeper where I can leverage my valuable experience of management skills with potential of growth and challenging environment. Confident and have potential to directs the work or other communications.
SAP Procurement
Welding Inspector 3.1, Welding Engineer
Postgraduate in Civil Engineering with specialization in Infrastructure, Highways & Bridges, Soil & Materials engineering & Project Management Systems with about 17 years of professional experience in construction supervision, design of Highways & Infrastructure projects
Construction/Commissioning Instrumentation & Control Superintendent, or Project Management (PMC-role), or I & C Field Engineer/Supervisor, or I & C Maintenance Engineer
I am civil engineer, working as consruction planning engineer at Mott MacDonald India from India And seeking job at Austrilia with visa support from employer.
heavy equipment mechanic
CAD Drafter with 14 years of experience in most commonly used software for Architectural and Civil Engineering Firms.
run different types of cranes. friction, tower, experience in pile driveing. 30 yrs.e xperience
The maintenance of comprehensive accident and dangerous occurrence statistics for the Project
22+ years of professional knowledge and experience in QA/QC Engineering and Field Civil Construction on EDPC onshore oil/gas/petrochemical plants, defense, infrastructure projects in the Middle East, UAE, Iran and North Africa.
Engineering/Management professional offering expertise in domestic and international construction management and engineering support. Demonstrated proficiency in managing schedules, budgets and personnel for multiple projects with an emphasis on profitability in a variety of environments.
Entrepreneur; international construction materials trader; international business developer; real estate projects developer; building materials exporter; purchasing and sales of construction materials; manufacturer's representative; international contracts negotiator.
Licensed Civil Engineer with BS degree in Civil Engineering; over 20 years experience in Land Surveying and Civil Engineering in government projects (irrigation, dam, reservoir, roads), construction and surveying firms in the Philippines and abroad.
• Perspective gained through advancement from field operations, through front-line supervision to senior staff management and administrative positions.
HNC Qualified Engineer with an extensive experience in a broad cross-section of engineering, predominantly structural/mechanical civil/building services, familiar with all aspects of project management. I.e. planning, cost control, tender evaluations, contract law, health and safety.
I have over 35 year's experience in the Cement Industry, Machinery Manufacture, Refractory Technology, Large Projects Execution and Commissioning,
Over 25 years of experience of which have more than 15 years of experience in Developed Countries.
ELECTRICAL-MECHANICAL TECHNICIAN CONSTRUCTION – INDUSTRIAL & MANUFACTURING OPERATION & MAINTENANCE – COMMISSIONING – CONTROLS – LO-MED-HI VOLTAGE ELECTRICAL INSTALLATION & MAINTENANCE – HVACR – WATER AND WASTEWATER TREATMENT PLANT.
Responsible for all accounting activities from trial balance to financial statement and balance sheets and financial report from time to time, supervision & control of financial, cost & management accounts of the company up to finalization
Project Superintendent, Instrumentation, Piping, Civil, Electrical
Procurement & Supply Chain Management
Has twenty one (21) years of experience in the Field of Engineering, Design and Construction. Experienced in Front End Eng’g, Preliminary Eng’g & Detail Eng’g / Design Phase Work-share Execution, and Construction / Final Design / Eng’g Support for Construction / As-built Phase & Quantity Surveying.
I can run just about any kind of equitment you have To do a job in construction, I ran a crew of 20 men for 6 year's and built forms, poured concrete,built house's and metal buildings I can read blue print's I do have about 2 year's of oil field exp. Motorman and Floorhand, Some Driller asst. exp.
First   1   2   3   4   5   6   7   8   9   10   [ 11 ]   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com