Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #72351
next resume »»
CONTACT INFORMATION:
View contact information...
OBJECTIVE
My goal is to obtain a lead design position in a fast-paced engineering and construction environment while incorporating the general practices of structural and civil engineering.
=========================================================================================
***** EMPLOYMENT HISTORY *****
AMEC GLOBAL RESOURCES LTD, Kuwait Engineering Services
Lead Design Engineer – Civil / Structural November 2007 - Present
Lead Civil and Structural Design Engineer supervising the department for a resource engineering group serving clients to include British Petroleum (BP), Saudi Arabian Chevron (SAC), Kuwait Oil Company (KOC), Kuwait National Petroleum Company (KNPC), and Joint Operations (a joint venture between Kuwait and Saudi Arabia). Performing Project Management Consultancy for all aspects of civil and structural design and construction work, to include study phases, development of scope and design services, front-end engineering design (FEED) and detailed design. Responsible for hiring and supervision of all civil / structural engineers within the company, to include the necessary training and development for the department. Currently serving as Contract Representative for client relations and project management in association with Saudi Arabian Chevron, as well as associate manager for the Joint Operations.
---------------------------------------------------------------------------------------
AMEC GLOBAL RESOURCES LTD, PMC for Kuwait Oil Company
Design Engineer – Civil / Structural January 2007 – November 2007
Civil and Structural Design Engineer representing the client (KOC) in Project Management Consultancy of all aspects of civil construction works, including safety and documentation; specifications and design documents for site specific excavations, earthworks, and earthen structures; foundations; reinforced concrete, masonry, and steel structures. Perform verifications of new project scopes via use of GPS and field work. Responsible for the review and technical compliance of the Contractor's plans and construction documents for various projects, including the two main modernization projects and the development and start-up work pertaining to a new gathering centre and pipe lines in north Kuwait. Responsible for close-outs of civil design and construction issues pertaining to the modernization projects. Provide a direct link between Company's field and office personnel to resolve pending issues quickly and efficiently. Management and support of up to six projects simultaneously, one of which I acted as lead engineer until such a time the lead engineer was hired and assigned to the respective project. Assigned and recognized as 'acting' Lead Engineer over the entire civil design group at times when the Lead Engineer is away from the office.
---------------------------------------------------------------------------------------
AMEC GLOBAL RESOURCES LTD, PMC for Kuwait Oil Company
Construction Engineer – Civil September 2006 – December 2006
Civil and Structural Field Engineer representing the client (KOC) in Project Management Consultancy of all aspects of civil construction works, including safety and documentation; excavations, earthworks, and earthen structures; foundations; reinforced concrete, masonry, and steel structures. Tracking progress of Contractor's design and construction activities, raising concerns as they arise, and generating reports. Promoted to Design Engineer after four months, where my experience and expertise could be better utilized by the company.
-----------------------------------------------------------------------------------------
KBR LOGCAP III, Southern Iraq
Director of Engineering November 2005 – September 2006
Lead Design engineer for four separate military base sites, with direct oversight of Civil, Structural, Electrical, Survey, and Design (CAD) departments, a total of ten personnel. Primary functions pertaining to design of, maintaining, and upgrading utility systems such as water, waste water, and prime power; master drainage plans, including generation of contour maps and site topography; design and feasibility studies, cost analyses and design recommendations; provide direct support to all aspects of construction, including planning, phasing, scope and specification generation, design narratives, design calculations and plans, scheduling, estimating, bids, submittal reviews, design-build projects, and construction-based engineering. Also solely responsible for emergency-type retrofits and construction related items as necessary. Responsible for the design functions as well as a design-build function for both in-house projects as well as direct support to the client. Concurrently maintained the previous responsibilities of civil engineer, as described immediately below, up through February 2006.
-----------------------------------------------------------------------------------------
KBR LOGCAP III, Southern Iraq
Civil Engineer – Technical Professional June 2005 – October 2005
Civil and Structural Field and Design Engineer involved in multiple facets of design, construction and rehabilitation of military base infrastructure throughout southern Iraq. Responsible for coordination between client and engineering groups to develop plans for future as well as immediate construction tasks. Conducted field surveys via use of Leica 1200 GPS equipment. This position was equivalent to a Major in the US Army. Promoted to supervisory position within the department after first four months in this position.
-----------------------------------------------------------------------------------------
YOUNGMAN LOCKE ENGINEERS, Oregon (USA)
Design Engineer, Grade II August 2004 – May 2005
Responsible for residential and commercial structural design consisting primarily of steel, heavy timber and masonry structures, and concrete foundations and seismic retrofits to meet Life Safety Levels of service, as prescribed by the local governing codes. Performed daily client relations to discuss scope, design issues, and final recommendations for completion of construction.
-----------------------------------------------------------------------------------------
PDC, INC. CONSULTING ENGINEERS, Alaska (USA)
Structural Design Engineer Feb. 2001 – July 2004
Design duties included post-tensioned (pre-stressed) concrete pedestrian bridge design and construction administration, including immediate engineering support and coordination with State Government Agencies; communication and document control; general project management and construction administration for multiple types of commercial and industrial projects, including design-build projects; specification generation and submittal reviews; seismology studies of existing concrete buildings; structural analyses and design of several residential, commercial and industrial buildings involving timber, steel and concrete; design of industrial supports, including fall protection and echanical unit supports, HVAC platforms and pipe racks for oil refineries; design of foundation systems to support heavy loads in frost-susceptible soils; concrete footings and retaining walls; design and construction administration of retro-fits in power generation facilities, including scheduling and phase analysis to keep primary power on-line; design and planning of many other typical structural framing applications. Use of STAAD, RISA, EnerCalc, ACAD, SAP2000 and ETABS to generate and verify design packages. Field duties included daily inspections of concrete, steel, masonry and timber construction projects; analyses of damage susceptibility due to seismic movement; as-builting existing structures for future retrofits; and identification and evaluation of construction difficulties for building projects in the design phase.
-----------------------------------------------------------------------------------------
ALASKA DEPT. OF TRANSPORTATION & PUBLIC FACILITIES (USA)
Civil Engineering Assistant I Oct. 2000 - Feb. 2001
Prepared airport design and specifications for a remote Alaskan village runway and facilities to be founded on frost-susceptible soils. Project experience included generation of specifications and construction documentation from preliminary design to final construction documents.
-----------------------------------------------------------------------------------------
ALASKA PETROLEUM CONTRACTORS, SUBSIDIARY OF NATCHIQ
Engineering Intern May 2000 - Sept. 2000
Duties included construction administration, inspection, and system turnover for release of a new oil field (gathering center) on the North Slope of Alaska. Duties included tracking construction and completion of mechanical, piping, electrical, civil, structural, and safety systems in accordance with the original scope and design documents.
-----------------------------------------------------------------------------------------
***** WORK HISTORY PRIOR TO MAY 2000 *****
All work below completed prior to or in conjunction with taking university courses.
SELF EMPLOYED, Alaska (USA)
Student Support Services Tutor 1996 - 1998
Provided one-on-one student tutoring for Calculus, Trigonometry, Algebra, Spanish, English, and Elementary Surveying.
-----------------------------------------------------------------------------------------
OFFICE OF JOHN P MONTOYA, LAND SURVEYOR, New Mexico (USA)
Surveyor's Assistant and Rodman 1994 - 1995
Learned the work of a surveyor via use of Total Station, T-16 and T-2 theodolites. Performed as-built surveys with lead surveyor. Learned to use a data collector and how to input data into ACAD. Learned to use ACAD. Checked plats. Learned to use a transit and how to conduct proper checks and back-sights to maintain the required level of accuracy. Learned how to use electronic distance measuring (EDM) in lieu of standard chain and steel tape techniques. Conducted Site Inspection Reports for the County Recorder's office. Manually checked levels and closures with transit and levels. Field work included heavy brush cutting as well as navigation of mountainous terrain and high desert. Danger of snakes and wild animals always a concern.
=========================================================================================
=========================================================================================
***** EDUCATION *****
Oregon State University Winter Quarter 2004-2005
CE 482/582, Masonry design.
University of Alaska, Fairbanks Sept. 1996 - Dec. 2000
Graduated with BSCE and a Cumulative GPA of 3.70 (out of 4.00). Recognized as "Senior of the Year" by UAF Civil Engineering Dept. in May of 2000; served as Chi Epsilon Civil Engineering Honor Society Vice President 1999-2000 and Tau Beta Pi Multi-Disciplined Engineering Honor Society President 1999 - 2000.
Northern New Mexico Community College of Espanola, NM Jan. 1995 - Dec. 1995
Pre-engineering studies, focused in sciences and math.
=========================================================================================
***** LEADERSHIP and MANAGEMENT EXPERIENCE *****
++ 2008: Project Management and Contract Management with Saudi Arabian Chevron in Kuwait. – AMEC KES
++ 2007-2008: Supervised and led the AMEC Kuwait Engineering Services Civil / Structural Engineering Department in all aspects of design, ranging from studies to FEED to detailed design and analysis. – AMEC KES
++ 2005 – 2006: Managed and directed the KBR Engineering Team over four major operating bases in Southern Iraq to provide direct support to the US Army and Department of Defense. Equivalent position of authority to a Lt. Colonel in the US Army. Team consisted of three surveyors, two CAD designers, two civil engineers, two electrical engineers, and a personal administrative assistant. Extended team consisted of two construction managers, one planner, four site managers, four assistant site managers, power generation leader, water plant leader, and director of logistics. Worked closely with the project controls group to deliver estimates for additional work. Additionally, provided assistance to engineering team in Kuwait due to their limited resources for similar projects and issues. Reported to Theatre Engineering Manager for Iraq, Kuwait and Afghanistan. Southern Iraq (US Army, Dept. of Defense) – KBR LOGCAP III
++ 2005 – 2006: Responsible for Base Master planning and logistical support to US Armed Forces and Coalition Forces in all US armed bases and Forward Operating Bases (FOBs) in Southern Iraq (total of 10 separate areas). Prepared briefings to Generals and Commanding Colonels for various support functions, to include status of base facilities and utilities for a combined total of more than 45,000 personnel. Position was based on fast-tracked and accurate solutions to ever-changing conditions of a war environment. Provided satisfactory reports regarding the short-notice increased capabilities for an additional 15,000 personnel. Southern Iraq (US Army, Dept. of Defense) – KBR LOGCAP III
++ 2003 – 2004: Full Project Management duties included construction management for structural, civil, and electrical aspects of construction of a post-tensioned concrete bridge. Acted as prime point of contact and consultant to Alaska Department of Transportation and Public Facilities (ADOT&PF) during the entire construction process and tracked construction documentation and solved construction issues as they occurred. Wood-Ransom (Centennial) Pedestrian Bridge - Fairbanks, AK – PDC, Inc
++ 2001 – 2002: Co-led construction administration of Fairbanks' first post-tensioned concrete structure with another Structural Engineer. Acted as point of contact to City of Fairbanks during construction process and tracked construction documentation and construction issues as they occurred. City of Fairbanks Transportation Center - Fairbanks, AK – PDC, Inc.
=========================================================================================
***** INVOLVEMENT in MAJOR OIL and GAS PROJECTS *****
++ Front end engineering design (FEED) for Kuwait Oil Company upgrade project to build new blast-resistant control rooms on ten (10) separate sites as well as nineteen (19) new substation buildings. Services included civil and structural design and applicable material estimates for all sites. Overall project cost estimated at US 2.2 Billion. – AMEC Global Resources, Kuwait Engineering Services.
++ Construction Administration serving both in the field as a direct representative for the client as well as in the office reviewing Contractor submittals for several KOC Projects, to include relocation of all services from below ground to above ground (modernization) and remodeling of various structures within the live plants, Ahmadi, Kuwait (KOC). Overall project cost estimated at US 16 Billion – AMEC Global Resources PMC for KOC.
++ Design verification, construction, commissioning and release of Alpine Oil Field (Gathering Center with Booster Station), North Slope of Alaska (Phillips) – Alaska Petroleum Contractors
++ Design of various platforms, pipe racks, pipe supports, structural supports, access- ways, tank and structural foundations, North Pole Refinery, Alaska (British Petroleum) – PDC, Inc.
++ Civil planning and preliminary design for 9-million-gallon refueling plant which included a series of supply tanks and dispensing area, living area for the fuel truck personnel, and applicable amenities such as dining facility, laundry, and maintenance garages. Southern Iraq (US Army, Dept. of Defense) – KBR LOGCAP III.
========================================================================================
***** QUALIFICATIONS and SKILLS *****
++ Licensed as a Professional Engineer (PE) as of April of 2007, Oregon, USA. (8-hour exam).
++ Professional work experience and education focused in structural analysis and design for both hot and cold rolled steel, timber, masonry, reinforced concrete, frozen ground, and dynamics.
++ Ability to effectively communicate with persons of various nationalities, generate answers to their questions, and provide innovative and effective solutions to issues as they arise.
++ Enjoy working in a fast-paced environment, entertaining multiple options, finding the most economical and safe solution for a given situation, all while staying within the required criteria.
++ Goal oriented and very strong work ethics.
++ Excellent understanding of design and construction administration and the roles and relations of the administrator, the contractor, and the owner.
++ Competent in various aspects of reinforced concrete and steel design, specifically foundations and structural frames.
++ Familiar with IBC 2000/2003, ASCE 7-98/02, ASD & LRFD for Steel, AISC, MSJC, ACI, NDS, AWS D1.1, ASTM and British Standards and other similar design aides and tools.
++ Proficient with PC's in the areas of ACAD 2000 through ACAD 2005ADT, MS Office, including Access and Project, and many structural design programs, primarily RISA and EnerCalc, but also STAAD, SAP, ETABS, and similar design modeling software.
++ Comfortable with and competent at performing field inspections and addressing contractors questions about both design and construction issues as they arise.
========================================================================================
***** EXTRACURRICULAR ACTIVITIES and POSITIONS of LEADERSHIP *****
Volunteer worker and organizer for a local organized mission of mercy in Kuwait, named Operation Hope, focusing on the need to provide warm clothing for the thousands of third country national workers who are employed in Kuwait on minimal wages.
Volunteer trip taken to Namibia, Africa in October 2005 to assist a foster home that provides assistance to AIDS orphans. Home was in dire need of electrical and plumbing repairs and renovations. Home provides shelter and education for eight children.
Volunteer Tutor for all levels of math. Main focus with High-School students. 2002 – 2004.
PRESIDENT of Tau Beta Pi, a national honor society for upper-level students of engineering. Served term of 9/99 to 5/00.
VICE PRESIDENT of Chi Epsilon, a national upper-classman civil engineering honor society. Served term of 12/99-5/00.
TREASURER of American Society of Civil Engineers, UAF Student Chapter. Served terms of 1/99-12/99.
Steel Bridge Competition Participant, UAF Steel Bridge Team, 1998
Youth Group Leader, 1996 – 1999. Led twelve High-School teens on a short charity-driven trip to Tijuana, Mexico, summer of 1998.
=========================================================================================
***** Hobbies & Leisure *****
## Charity work and organized volunteer support in Kuwait, Africa and Mexico
## Travel, site-seeing, GPS geo-caching, camping, backpacking, safari and other outdoor activities including snow shoeing and canoeing.
## Have endured and survived the natural extreme temperatures of the arctic (-40°C) and the desert (+50°C). Enjoy time outdoors in extreme environments where survivalist tendencies are a must.
## Residential design and remodeling. Have refurbished and remodeled three homes in the US, to include interior design and addition of living space. Enjoy all aspects of residential and light-commercial design utilizing non-traditional materials such as cold- rolled steel, stainless steel, glass and architectural and aesthetic concrete.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 1751 to 1800 of 4352)
Go to Search Parameters...
Brief Description
1- ) Possessing the knowledge of both Construction & Maintenance Planning.2-)Cost Estimation , Analyzing & Controlling ( Cost Tracking , Cost Variance – CV , Cost reports ) ( using different tabular & Graphical forms ) 3-) Resource Planning & Schedulling using Software aid like Prima Vera & M.S.P
Continue acting in pipeline engineering construction and assembly independent of the site job and challenging new experiences.
I have gained knowledge in the areas of construction and project management.I have had considerable experience with the use of spreadsheets and word processing programs.I am a motivated learner and I can work well in in a team.I consider my communication skills,both written and oral of high quality
Around 8.50 years experience in Electrical/Instrumentation Engineering and Maintenance in the Industrial sector, extensive experience in end-to-end execution of EPC Projects including supervision of Installation, Calibration, Testing, Pre-commissioning, Operation and Maintenance of Plant Instrumenta
I'm Tommon Mathew working with mott macdonald as a project engineer in oman for various oil and gas projects.
Mechanical piping supervisor
Diploma In Instrumentation Engineering In Aug 1988 (3 Years Duration) +Amie Eqvt To B.E
DCS Engineer With Yokogawa CS3000 experience
An effective engineer possessing good communication skills, combined with proven technical and organizational abilities. Education, qualifications and experience gained through significant design applications and management positions performed in the US and the Middle East.
Project Leadership: project development, estimation, engineering, installation, field start-up and commissioning.
Mechanical engineer striving for excellence and challenges
Microsoft enterprises systems, Great Plain ERP, SharePoint services SQL Server 7\2K\2k5, Exchange Server 2k\2k4, ISA Server 2k\2k4, IIS 6.0, Manufacturing (Planning ERP, Execution MES, SCADA, Process Controlling) Active Directory, DNS, Windows Servers, Desktop, POS, PDA NT\2K\2k3\XP\Vista VBA\Access
Obtained Greenbelt Certification from DaimlerChrysler and Black Belt Steering Committee for solving a complex rear door window noise issue on Dodge Durango by using Shainin methodology.
Highly organized, self-motivated individual with experience in the Automotive Electronic Equipments maintenance, repair and troubleshooting, Computer and Data/Voice Communication industry.
Civil Engineer for Construction/Excution, Billing, Analysis of Rate, Quantity Survey
Creative and reliable engineering Personal with a strong technical backgrounds including data handling, maintenance and servicing of equipment and machines.
Seeking Construction employment opportunities.
Maintains books of accounts (Journals, Ledgers, Trial Balance and Balance Sheet etc.). Prepares all vouchers (payment, receipts and journal) and ensures proper charging and posting of expenses against appropriate budget lines. Supplier and sub-con (Local, Foreign) bills checking and payment.
can survey construction, road, site development, building, pipeline, airways and can established control.
5 years+ of experience as a Facilities and Administration personnel. Manages On Guard security software (Security). Manages Documents for Access levels (Security)
Designing AutoCAD & Pro-E
B.Tech Engineer with an heavy equipment experience.
B. Sc. in Civil Engineering & MBA in Riyadh, Saudi Arabia
Experience in software is the leading developer of computer-assisted thinking programs for businesses in the field of project planning, problem solving, and negotiating.
Maintenance mechanic
Multi skilled Automotive Mechanic, 24yrs experience with the military often in extreme conditions, work well in a team or individual, some management experience but mainly hands on, good problem solving skills, currently working in Saudi Arabia, contract exp 17th June, i have a migrant visa already
24 years of Machinist experience, with knowledge in heavy and preventative maintenance, experience in the Industrial Mechanic/Millwright trade Supervision of production and quality control mechanical aptitude WHMIS and OHS training
Excellent management skills
TRAINEE ENGINEER
Fabrication/ welder
i have done diploma in metallurgy and working as a quality inspecter in power plant
Senior EPC/EPCM Manager with +30 years experience of successful multi-disciplined project & program management; successfully organizing, managing and directing large mining, heavy civil and infrastructure projects
Certificate in Project Management Course from IIT Delhi B.E (Mechanical) 2000, Diploma: D.M.E. 1997, Mumbai BoardPrimavera, CEASARII (Ver. 4.4)
BE electrical, Micro Station, AutoCAD and MS Office
QA/QC ENGINEER CIVIL
Design and construction supervision of large central HVAC system of comercial,institutional and offfice buildings.Also have experience in Design Management
I have over 16 years of progressive experience encompassing civil engineering and project construction management responsibilities of multi-discipline architectural and engineering projects, value-engineering review, field construction management, project scheduling and contract administration.
I¡¦m holding a Master degree in Industrial Engineering & Management from Europe. I¡¦m currently working at the Consolidated Contractors International Company (CCIC), in Abu Dhabi, as a ¡§Senior Mechanical Engineer¡¨. I have 7 years of work experience in the fields of refinery construction
Assist Lead QC Engineers in reviewing/approval process of contractor’s quality management system documentation. Assist other PMT construction personnel in resolving quality related issues. Surveillance / Witness of Contractor's site inspection and test per approved ITP. Participate in Construction m
Combined experience in Refrigeration and Electrician Technician in the Pharmaceutical Industry, Petrochemistry and Building Management System (BMS).
I am a diploma holder in mechanical engineering and more than 9years experiance inthe field of fabrication
i am a new zealand registered electricain , my apprentiship was in substation construction and maintaince which i completed in 2006 .I currently live in london but will be moving to melbourne in the new year
Job Title : Service, Erection and Maintenance Engineer - Maintenance & Trouble shooting skills - Installation, Repair, commissioning and STart Up of Boilers. Stron Communication Skills. Training Courses
Institute Of Corrosion Certified Painting & Coating QC Inspector - Pipeline Senior Coating QC Inspector - Completed Fireproofing (Chartek -Thermolag) courses in Aberdeen UK
I am working in oil, gas and offshore projects and plants from 14 yrs in india, middle east and europe for multinationals for erection, commissioing and projects.
I have a Masters degree in Civil Engineering. I am seeking a job in the industry to apply skills obtained throughout my training and thereby improve my own abilities and achieve better understanding of the diverse field of Civil Engineering.
Application of specialized softwares for engineering design with opportunities in project leadership
Looks forward to a challenging career as a Engineer in Oil, Gas, Petrochemical, Fertilizer, Power, Nuclear and Chemical related heavy process equipments fabrication, machining and Construction industries. In depth knowledge in Construction industries and process industries.
Civil engineer who is familiar with all aspects of concrete and steel structures, design and analysis , high rise building , finite-elements method and last software packages in structural analysis. Executive sector of the great projects for water distribution and its related pumping stations
Career Objective I am looking forward to develop my academic background and career related experience in Construction field.
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
[ 36 ]
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2008 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com