Project Manager. Civil-Structural Engineer. Lead Planning Engineer

Professional Construction management, supervision and design of Industrial Complex
Experience and Facilities such as Oil Refineries, Floating Platform Storage & Offloading (FPSO), Offshore Oil Platform, Power Plants, LPG Treating Plants, Manufacturing Facilities and Factories, Commercial and Condo Buildings (Reinforced Concrete and Structural Steel Buildings), Land Development, Roads & Drainage, Piers and Harbors, Dams & Spillways, Bridges and Piles Driving Works, Structural Steelworks and Survey Works.

Other experiences - Contract Review and Evaluation, Planning and Scheduling (using Primavera Project Planner Version-3.1 & 6), Cost Engineering & Estimates, Quantity Surveying, Bid evaluations, Structural Engineering (using computer software such as STAAD3/PRO, SAP 2000, & ETABS), Detailed Engineering Design and Front End Engineering Design, Geo-technical Engineering, etc.

Professional Philippines Institute of Civil Engineers (PICE): Member – 1985 to Present
Memberships Geodetic Engineers of the Philippines (GEP): Member – 1995 to Present
Association of Structural Engineers of the Philippines (ASEP):
Member – 1985 to Present

Education Bicol University College of Engineering, Legaspi City, Philippines Graduated with the degree of Bachelor of Science in Civil Engineering 1981-82

Completed with the course of Civil Engineering Technology (Building) 1992
The ILO – Association of Japan Inc. / International Skill Cooperation Center
Ohsaki Institute of Construction Technology, Tokyo, Japan

Professional Passed the Licensure Exams for Civil Engineer – 10th Placer
Qualifications Passed the Licensure Exams for Jr. Geodetic Engineer

Computer Literacy STAAD-PRO 2005/2007,SAP 2000, ETABS Ver. 8,
Primavera Proj Planner P3 & P5.0/P6.0, Pertmaster Risk Analysis,
Primavera Expedition/P3e Enterprise / Sure Trak Project Manager
Microsoft Project Prof./ Excels / Word / Microsoft Point

Professional Experience
(As Project Manager, Design Manager, Civil - Structural Engineer, Lead Planning Engineer)

COMPANY: CHIYODA –HYUNDAI CONSORTIUM
Project: Qatar Pearl GTL-FGP Project
QPG Site Office, P.O. Box 12051
Ras Laffan, State of Qatar
Dates - From June 11, 2008 to Present
Position - Lead Scheduler /Assistant Planning Manager
Duties - Work as Area-C Lead Scheduler / Asst. Planning Manager; planning and scheduling on the procurement, construction, pre-commissioning and commissioning of Feed
Gas Preparation Unit(FGP) that will support and feed gas to main GTL /LNG Processing Plant.
- Planning and scheduling the interfacing works within the areas of the GTL / LNG
Processing Plant (Total of 9-Contract Package Areas in the Plant)
- Monitor project progress using the computer softwares, i.e.,CPMS (Construction Progress Monitoring System), and Primavera Project Planner(P3.1 & P6 version)

COMPANY: CONSOLIDATED CONSTRACTORS COMPANY W.L.L
Project: Rabigh Independent Water Steam Power Plant Project (Rabigh WSPP)
Rabigh Olefins Plant Project (Ownwer: PetroRabigh)
Rabigh, Saudi Arabia
Dates - From October 20, 2006 to February 15, 2008
Position - Lead Planning Engineer
Duties - Work as Planning Head - Mechanical Section, supervising and managing group of planners/schedulers for the planning and scheduling on the procurement, construction, pre-commissioning and commissioning of Steam Power Plant (9-
Boilers/9 x 390 MW Steam Turbine) and Desalination Plant that will generate power and water supply for Rabigh Olefins Petrochemical Plant.

COMPANY: SAMSUNG HEAVY INDUSTRIES
Project: PM2 / Production Div. 2 / Fabrication Shipyard Dock 3
Jangpyeong, Geoje City, South Korea
MODEC STYBARROW FPSO LNG Project (from Jan.'06 to Aug. "06)
LUNKOYE(LUN-A) Topside Sakhalin II,
Phase 2 Development Offshore Project (from October 2005 to December 2005)
Dates - From October 7, 2005 to August 24, 2006
Position - Planning Engineer
Duties - Planning and scheduling of FPSO and Topside Construction i.e., from Basic
Engineering Design, Construction Drawings, Procurement, Production /Fabrication
(Cutting, Outfitting & Hull Assembly), Construction(Blocks Assembly and Intergration),
Test/Commissioning, and Delivery.
- Planning and scheduling for the mechanical completion works (MC Packages) & Commissioning of the fabrication and installation of LUNKOYE (LUN-A) Topside for Sakhalin II Phase 2 Dev. Project.

COMPANY: RANHILL PETRONEEDS JOINT VENTURE
RANHILL ENGINEERS & CONSTRUCTORS SDN BHD
21th flr Empire Tower, No. 182 Jalan Tun Razak 50400
Kuala Lumpur, Malaysia
Project: Melut Basin Oil Development Project (Upstream)
Four(4) Pacakge Projects are: Palogue Field Production Facility / Al Jabalayn Central Production Facility / Operation Base Camp /Produced Water Pipelines -250 Kms & Raw Water Pipeline Project (45 Kms) & 8MW Combined Cycle Power Plant, located in Palogue & Al Jabalayn, Khartoum, Republic of Sudan
Dates - From August 1, 2004 to September 15, 2005
Position - Project Control Engineer / Planning Engineer
Duties - Work as Lead Project Control / Planning Engineer for the Four(4) Package
Projects which includes planning and scheduling, contract management, coordination, monitoring, setting up controls for the engineering, procurement, construction and commissioning (EPCC) of upstream crude oil production (dewatering/pre-heating/chemical treatment) facilities for Al Jabalayn Central Processing Facility(CPF) and Palogue Field Production Facility(FPF), and other utilities such as the Power Plant (8MW Combined Cycle), Water Treatment Facility, Raw Water Pipelines & Produced Water Pipelines, and Operation Base Camp.

COMPANY: YANBU STEELCOMPANY (Formerly PDM - SAUDI ARABIA)
P.O. BOX 30075
Madinat Yanbu Al Sinaiyah
Kingdom of Saudi Arabia
Projects Involved: Different Saudi Aramco Projects such as Medina Bulk Plant Project,
And many Other Tanks Constructions for Bulk Plants & Tank Farm
Projects; Jubail United Petrochemical Plant(JUPC) Projects; Saudi
Arabian Fertilizer Company (SAFCO) Projects, Arabtank Terminal Ltd,
Saudi Arabia Mobile Refinery (SAMREF), Saudi Yanbu Petrochemical
Plant (YANPET), Gulf Farabi Petrochemical Company,etc
Dates - From May 14, 2003 to May 14, 2004
Position - Scheduler / Estimator
Duties - Planning, scheduling and setting up cost control on the fabrication (pre-engineered)
and construction of different storage tanks and its appurtenances, pressurize vessels, drums & internals, piping lines and structural works for petrochemical plants, oil refinery, desalination plants, etc.
- Estimates, quantity take-off and cost estimates, cash flows, schedules, manhour cost estimates, equipments utilizations, prepare vendor documents, and other sublet documents, etc. of different storage tanks (plate / structural materials & other tank appurtenances) such as Naptha Storage tanks, Kero Tanks, Diesel Tanks,etc.

COMPANY: ICC-IMPSA CONSTRUCTION CO. / CBK POWER LTD.
Caliraya-Botocan-Kalayaan Hyrdroelectric Power Plants Project, NPC Compound,
Kalayaan, Laguna, Philippines
Project: The Build, Rehabilitate, Operate, Transfer (BROT) & EPC Project
Caliraya-Botocan-Kalayaan Power Plants Complex
National Power Corporation
Dates - From April 3, 1999 to July 31, 2002
Position - Design Manager (Civil-Structural) / Sr.Civil-Structural Engineer
Duties - In-Charge of all the detailed engineering design for the rehabilitation of different facilities of the Caliraya-Botocan-Kalayaan Hydroelectric Power Plants(HEPP), which includes the rehabilitation of Steel Penstocks and accessories from intake to surge tank, then to bifurcator, then to power house; additional steel structures, equipments and transformer foundations, dams and spillways, roads and drainages, bridges, etc.

COMPANY: TECHNOSERVE INT'L CO. /JGC PHILIPPINES
TIC Bldg, 1606 Trade St. cor. Investment Drive,
Madrigal Park, Ayala-Alabang, Muntinlupa City, Philippines
Project: Caltex-Owned - LPG Treating Facilities Upgrade Project,
Caltex Oil Wharf & Pipelines Project,
White Oil Pipelines Project
Shell-Owned - TCCU Fuel Efficiency & Mixed Xylene Project,
HCS Rundown Manifold Project
KERO Hydro Sweetener Modification Project,
NAIA JOCASP Aviation Fuel Storage Project
British Petroleum- Bataan Polyethylene Plant Project
Dates - February 2, 1997 to March 15, 1999
Position - Project Control Manager / Sr. Project Engineer
Duties - In-Charge of the project control engineering on the front end engineering design and detailed engineering design, procurement of the lead equipments & instruments, and management for the above-mentioned projects.
- Review and technical auditing of different designs for civil, mechanical, process, instrumentation, electrical plans and design output based on the internationally accepted standard codes and specifications such as ASME, API STD 650/12F, ACI, AWS, AISC, ASCE, JIS, British Standard (BS) Code / BS 5500, etc.
- In-charge for the preparation of the engineering and construction proposals which includes planning and organizing the proposal team, review of the bid documents, contracts and other bid conditions; cost estimates and preparation of all items included in the Technical Proposal and Commercial Proposal for the proposed EPCC Projects

COMPANY: JGC CORPORATION - SONATRACH
Project: LPG Recovery Project
Hassi Messauod, Algeria
Dates - July 11, 1995 to November 28, 1996
Position – Planning Engineer
Duties - Planning and scheduling on the construction of Administration building, control house, and switch gear building, equipment foundations/pump foundation, gas turbine foundation, tanks & vessels foundations, cable trenches, slab works, and other accessory offsite works
- Planning and scheduling for the construction and erection of equipments such as cryogenics storage tanks, drums, vessels, heat exchangers, coolers, and its stairs and platforms, booster pumps and surge pumps, etc.

COMPANY: CONSOLIDATED CONTRACTORS INT'L CO. (S.A.L.)
Project: Adgas Third LNG Train Project
Das Island, Abu Dhabi, U.A.E.
Dates - February 21, 1994 to January 19, 1995
Position - Project Engineer / Planning Engineer
Duties - Supervision, planning and scheduling on the construction of civil structures and mechanical equipments erection and installations included in the LNG Process Facilities-Train 3, i.e. structural foundations for cryogenics storage tanks, vessels and drums, pumps, heat exchanges, air coolers, air compressors, boilers, gas turbine generators, etc.

COMPANY: OVERSEAS OHSAKI CONSTRUCTION CORP.
Ermita, Manila, Philippines
Project: Ohtsuka Manufacturing and Polytechnic of the Philippines Project, Cabuyao, Phils.
Ciudad Del Sol Townhomes Project, Taytay, Rizal, Philippines
10-Storey Ferguzon Bldg. Project, Ermita, Manila
Dates - September 28, 1992 to October 31, 1993
Position - Project Manager
Duties - Management, supervision, design and construction of the manufacturing facilities such as the production bldg, administration bldg, canteen bldg, generator house, and warehouse bldg for the Ohtsuka Manufacturing & Polytechnic of the Philippines
- Management, supervision, design and construction of the subdivision, i.e. land development and earthworks, housing units, roads and drainage, bridges and river rip rapping, elevated water tank, deep well drilling, water distribution system, and electrical distribution system for the Ciudad Del Sol Townhomes
- Management and supervision in the construction of the ten (10) storey building from bored pile works, foundation works, concreting and rebars works, plumbing and architectural works

COMPANY: OHSAKI CONSTRUCTION CO. LTD / TAIYO CONST.
Yoyogi, Tokyo, Japan
Project: Fourteen (14) Storey Lions Mansion Condominium Project
Higashi, Chiba-ku, Japan
Dates - September 6, 1991 to August 27, 1992
Position- Asst Project Manager / Trainee
Duties - Site management and supervision and assist the Japanese Project Manager on the management for the construction of the fourteen (14) storeys Lion Mansion Condo-
Building.

COMPANY: TRESTECH DEVELOPMENT CORP.
No. 51 Gil Puyat Avenue Cor.Dian Street,
Makati City, Philippines
Project: Nabua Public Market Project, Narvacan Public Market Project
Narvacan Storm Drainage, Roads & Bridge Construction Project
Dates - February 7, 1990 to August 30, 1991
Position - Project Engineer /Structural Engineer
Duties - Overall supervision and management, inspection and monitoring on the construction of public markets facilities which includes buildings, bridges and main storm drainage roads and drainage, mechanical and electrical system, water tanks and water distribution system, water treatment, oil & water separator
- Structural design of different vertical and horizontal structures based on ASME, (mechanical designs), API STD 650/12F (tankages), ACI (concrete structures), AWS /

COMPANY: PEOPLES RUBBER MFNG & STEELWORKS
No. 40 Asian Road, Canumay East, Valenzuela,
Metromanila, Philippines
Project: Paracale Mines Vents Shafts and Winder House Project
ASTRA Pharmaceutical-Steel Building Project
People Rubber Fabrication Shop
Dates - February 2, 1988 to February 5, 1990
Position - Civil Engineer / Estimator
Duties - Supervision on the erection of structural steel members of ventilation shafts and winder house for the gold mine pits, construction of water distribution pipelines, water treatment facilities and its pipelines, pumps and motors.
- Quality inspection of different shop fabricated steel structures, Steel Oil Well Rigs, Pipe spools & manifold, and fittings, pressurized tanks and vessel, storage tanks, etc. based on ASME CODE Sec. VIII Div. 1 & 2, American Welding Society (AWS), American Institute of Steel Construction (AISC) Code, American Petroleum Institute (API 650/12F) Code, British Codes for Steel Structures & Pressurized Vessels

COMPANY: ENGINEERING EQUIPMENT INC.(EEI) / KUWAIT NATIONAL
PETROLEUM CO.(KNPC)
Project: Mina Al-Abdullah Oil Refinery Project (KNPC-BTC PROJECT )
Fahaheel, State of Kuwait
Dates - December 8, 1985 to December 15, 1987
Position - Field Engineer
Duties - Supervision, planning and scheduling on the construction of civil structures and erection of mechanical / process equipments for the oil refinery / crude desalting and crude distillation unit, i.e., pre-heaters, furnace, feed pumps, reactors, pressurized vessels, drums, fractionators, heat and air exchangers, air fan blowers, booster pumps and surge pumps, and other equipments included in the oil refinery.

COMPANY: ATLANTIC GULF & PACIFIC CO. OF MANILA (AG&P) -KUWAIT NATIONAL PETROLUEM CO. (KNPC)
Project: Refinery Modernization Project / Further Upgrading Project
Mina Al-Ahmadi, State of Kuwait
Dates - November 19, 1983 to August 29, 1984
Position - Field Engineer / Rigger Chargehand
Duties - Assigned in the Erection Section of JGC Corporation- estimates and take-off materials and internal parts for vessel, reactors, heat exchangers, fractionators, drums, tanks, pipe racks, elevated pipelines and pipe spools, etc.
- Prepare materials and accessories needed for the erection of vessels and tanks, reactors and towers, fractionators, air-fan blowers, heat exchangers, condensers, and other equipments included in the oil refinery.
- Inspection, monitor, and supervision on the installation of vessels and drum internal parts, prepare punch list for final inspection and for pre-commissioning.

COMPANY: AG & P – MARINDUQUE MINING & INDUSTRIAL CORP/
NATIONAL POWER CORP/ BATANGAS MARINE FABRICATION YARD(BMFY)
Project: MMIC Coal Conversion/Nickel Mining Project, Nonoc Island, Surigao City
Calaca-Batangas Coal –Powered 300MW Thermal Plants Project
Calaca, Batangas, AG&P Batangas Marine Fabrication Yard
Dates - November 9, 1982 to November 11, 1983
Position - Field Engineer / Draftsman
Duties - Assigned in NPC 300mw Thermal Plants -supervision, planning, scheduling, and inspection for the construction of coal unloading piers and harbor, sea wall abutments, sea wharf and jetty, mooring dolphins and conveyor foundations.
- Assigned in Batangas Marine Fabrication Yard – Supervision, planning of fabrication of floating vessel such as barges, tug boats, ship steel hull assembly and accessories, floating oil rigs, top sides and jackets and other accessories. Supervision on the construction of the desalination pond and water separator, chlorinator house, water treatment pond, and reinforced concrete water tanks.
- Assigned in MMIC-Nickel Mining Project-Supervision, drafting, planning, scheduling of the construction of FOSTER WHEELER boiler and structural steel house, burner piping, and soot blower piping/ boiler parts.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 2501 to 2550 of 4806)Go to Search Parameters...
Brief Description
I am a recent college graduate who majored in Civil Engineering Technology and is seeking the opportunity to gain experience, as an Entry Level Civil Engineer.
Engineer looking for job in construction industry in Los Angeles area.
The purpose of this resume is to define and highlights the skills and ability to work as a Planning Engineer. I secures 5 year of working exp. as Maint. Planning Engineer and Proj. Plan Engr. in Petroleum Refinery and for the const. of Pet.chem. & Steel Plant respectively.
Objective: My main objective has always been to construct any job in a timely manner, excellent quality, and safety conscience. I like to work about 20 hours a week overtime, and I feel like I have gone as far with this company as possible.
Experienced Project Manager/Engineer
Stakeholders Mgt, Social Impact assesmment, Negotiation skill, Participatory devt Planning, Monitoring/Evaluation, Team Player (B.Sc. M.Sc, Ph.D)
Diploma in Mining Engg, AMIE Sec A&B in Mining Engg from IEI.
Urban Planner with GIS and AutoCAD skills
-Planning and scheduling using Primavera Project Planeer P3.1 &P6, Microsoft Project Professional / Structural Engineering Design Using Computer Softwares such as STAAD-PRO 2007, ETABS, SAP2000
Over ten-years of progressive experience and responsibility in the areas of Heavy Equipment Operation & Landscaping at various organizational levels
Passed in diploma in civil engg in 2009 with 84.9%.
Moniitoring and implementation of all related painting/coating/lining works involved in the construction packages managed under co project department.this also includes the major painting works associated with the major overhauling of crude oil storage tanks in oil and gas co under control environm
I am an experienced professional with excellent communication and interpersonal skills, persuasive ability and sound understanding of business conceptsand issues related to Business Administration, Sales, Marketing and General Administration;
Electrical Technician/Cell Phone Technician
Experience, professionalism, skills, physically fit, able to work long hours in tough environment and stressful conditions, availability for traveling abroad.
Project Management
Mining engineer and experienced manager with over 20 years of successful executive management, project development, engineering, construction and operations experience in the mining, tunneling, fossil power, rail and heavy construction sectors.
Procurement, Supply Chain and Contracts Professional
Seeking position as HSE/Training/Emergency Management for Petrochemicals or Refinery Operations
Construction Management professional with Heavy Industry ,Power, Energy, Mining sector experience
To repair and service
Inspection of Oil & Gas, Refinery, Petrochemical plant and offshore field Static equipments, Welding, piping, pipelines, painting& coating and NDT.
Transformational Human Resources Manager with strong business orientation and multi-site experience in a broad range of HR Generalist functions including recruiting, staffing, talent development, HRIS, organizational development, staff management, and many others.
10 years of professional experience in commissioning trouble shooting and servicing heavy-duty diesel engines. Presently working as Senior Service Engineer, responsible for field service of Cummins Diesel Engines. I possess strong academic credentials and good communication skills.
An Entry level position within a growing industry that takes advantage of my electrical engineering education and skills.
A highly motivated, ambitious and systematic individual with exceptional interpersonal skills •Presently doing Masters in Mechanical Engineering with one year of full time experience as Design Engineer working on PRO-E.Proficient in Pro/Engineer 2000, Wildfire, Pro/Mechanica.
Strong structural engineering knowledge, Energitic, Good analitycal thinking, Self motivated, Hardworking, Dedicated person, Able to work under pressure.
LARGE AND STRATEGIC PROJECTS MANAGEMENT - BUSINESS AND OPERATIONS MANAGEMENT
Senior mining professional with global risk management experience identifying and managing risk in mining operations and related construction projects
Mechanical Engineer,masters in Engineering Design,CATIA V5,SOLIDWORKS
Qualification: Diploma In Civil Engineering(3Years), Over 11 years experience in Land surveying, the majority of which has been spent gaining experience of Surveying works using modern surveying equipments and Surveying software.
B-GAS LEVEL II PAINTING INSPECTOR.MORE THEN 15 YEAR EXPERIENCE IN INSPECTION FIELD.
5 yrs experience in crushing & asphalt operation,maintenance,motor control centre,inventory control,switchgear.
2D and 3D cad applications - upstream and downstream experience
12 Years experience in civil engineering, design, procurement, construction & supervising of particular relevance to the project are as follows :
10 Year Experience, 5 years Implementing SAP FI/CO and BW / BI / Netweaver Solutions for Banking, Manufacturing, Sea port industry, Maintaining SAP BW Solution for Oil and Gas Industry
Heavy Equipment Operator to include Mobil Cranes, Crawler Cranes, Overhead Cranes, Forklifts, and Tractor/Trailer
Quality control, Inspection, Installation/erection of pipes and piping components, HVAc, HSE, Computer literate
I am a geologist with multidisciplinary experience, including experience in geotechnical engineering, mining, exploration, tunneling, groundwater, drilling, environmental and construction monitoring. I am a licensed monitor well driller in Nevada and OSHA Hazwoper, MSHA, SWPPP and nuclear gauge cert
DCS and instruments el.engineer.International experience.Experience in Chemical,mainly in Pulp and Paper (equipment-similar to used in Oil&Gas,Cement,Fertilizers,etc)Industry
I have extensive experience in coal analysis, material distribution systems, combustion systems, power generation and all associated chemical processes
Mechanical Engineer with expereince in AutoCAD 2000, Piping, Welding, Installation and Erection Works, Production Plainning, Supervision
Graduate Mining Engineer with MBA & First Class Mine Manager's Certificate having 22+ yrs. Hard Rock Large Highly mechanised hands on experience in Mine Operation, Drilling & Blasting, Mine Planning, Contracts Management, Waste Dump & Haul Road, Mine Dewatering
Junior project manager
Scheduler, Primavera P3E & Expedition
Land surveying relating to boundaries, design, construction, and mapping.
Jouryneyman Millwright - Alignment Specialist - Lazer, Reverse and Rim& Face. I have installed and rebuilt steam and gas turbines, crushers,conveyors, ball and sag mills, tower mills, pumps, compressors, blowers.
12 years experience in all aspects of telecommunications. Excellent written and communication skills. Highly organized. Ability to work on multiple assignments. Excellent problem solving skills. Able to meet deadlines and schedules. Start of to completion of projects to include ordering, insta
Motivated, proven performer with a 17 year record of demonstrated success in Operations Management, Project Management, Distribution/Logistics Management, and Mechanical Engineering across multiple fields from Military Operations, Municipal Management, Telecommunications, Software Development, Call
I am a BS Mechanical Engineer who had served primarily as a Senior Fire Protection-Applications and Design Engineer for around 17 years plus and 5 years as an Occupational, Health and Safety practitioner in a petrochemical industry with a primary function as Fire Safety Engineer. My specialty profe
First   Prev   [ 51 ]   52   53   54   55   56   57   58   59   60   61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80   81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   Last
Seach Parameters

Change search parameters...
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com