Objective To pursue a fulfilling and dynamic career in fields of civil works.
Experience
Date
Employer
October 18, 2007 to Present
Consortium Japonais pour l'Autoroute Algérienne ("COJAAL") - under HAZAMA CORPORATION
Project: Constantine Algeria Autoroute Project - Section 5 Construction de l'Autoroute Est/Quest du lot Unique Est,
Project Description: The project covers the construction of a 13.14 km. of expressway. It also includes 200 linear meter of tunnel, viaduct, 3 bridges, underpasses, overpasses. RCBC's and RCPC's.
Position: Senior Civil Engineer (Roads and drainage)
(km 187+003.312 to km 200+143.284)
Responsibilities:
 Overall in charge in the construction of all roads, gabion works, stone masonry works, slope protection works and drainage structures.
 Check drawings for proper implementation
 Plans construction program
 Monitors and supervise site engineers with regards to construction activities in order to assure that interim goals are understood and met
 Monitors materials requirement and work done.
 Prepares take-off/measurement of quantities, costing and scheduling
 Checks billing reports and necessary attachments and evaluation of sub-contractors billing report
 Evaluates, selects and applies standard construction engineering techniques, procedures and criterias using judgement based on all applicable codes, specifications and engineering information in making decisions
 Coordinates with the consultant and client.
April 10, 2007 to October 12, 2007
HAZAMA-TAISEI-NIPPON STEEl Joint Venture
Project: SUBIC-CLARK-TARLAC Expressway Project
(Package 2), Clark-Tarlac Section
Project Description: The project covers the construction of a 40.20 km. of expressway that starts at Clark Angeles and ends at Tarlac. It also includes major interchanges, underpasses, minor bridges, major bridges, RCBC's and RCPC's.
Position: CONSTRUCTION MANAGER
(Zone 2- km12+800 to km 25+486)
Responsibilities:
 Overall in charge in the construction of all concrete structures, gabion works, stone masonry works, slope protection works and drainage structures.
 Checked drawings for proper implementation
 Planned construction program
 Monitored and supervised site engineers with regards to construction activities in order to assure that interim goals are understood and met
 Monitored materials requirement and work done.
 Prepared take-off/measurement of quantities, costing and scheduling
 Checked billing reports and necessary attachments and evaluation of sub-contractors billing report
 Evaluated, selected and applied standard construction engineering techniques, procedures and criterias using judgement based on all applicable codes, specifications and engineering information in making decisions
 Prepared accomplishment reports and innovated monitoring procedures for the benefit of the project
 Coordinated with the consultant and sub-contractors
March 30, 2005 to April 04, 2007
TAISEI-SHIMIZU Joint Venture
Project: New Iloilo Airport Development Project
Sta. Barbara-Cabatuan
ILOILO, Philippines
Project Description: The project covers the construction of Iloilo Airport that includes;
1. Runway = 2.5 km x 45 m
2. Apron = 48,000 sq.m.
3. Access road = 3.0 km x 30 m
4. Passenger Terminal Building = 12,000 sq.m.
5. Cargo Terminal Building = 1,281 sq.m.
6. Administration Building = 960 sq.m.
7. Control Tower = 35 meter high
8. Central Plant Building = 2,600 sq.m.
9. Maintenance bldg. and Equipment = 657 sq.m.
10. Crash Fire Rescue Station and Equipment
11. Air Navigation System
12. Airport Utilities
13. Underground Structures
Position: Senior Site Engineer/ Asphalt Plant Engineer
Responsibilities:
 Overall in charge in the construction of underground concrete structures such as Underground Service Link (960 meters), Six (6) units of reinforced concrete box culverts with a total length of 300 meters, Ductlines, Trapezoidal Grouted Riprap. U-ditch, Fuel Tank Separator, Slotted Drain, Regulating Pond with an area of more than 6 hectares and Sewage Treatment Plant that includes seven (7) major structures such as Pump Station, Sludge Drying Bed, Disinfection Tank, Sludge Thickener, Regulation Tank, Final Clarifier and Oxidation Ditch.
 Supervised Asphalt Plant Operation and Maintenance
 Supervised Embankment and Pavement Works
 Checked drawings for proper implementation
 Planned construction schedule
 Supervised construction activities in order to assure that interim goals are understood and met
 Monitored materials requirement and work done
 Made drawings for some proposals/ modification of drawings
 Prepared take-off/measurement of quantities, costing and scheduling
 Prepared billing reports and necessary attachments and evaluation of sub-contractors billing report
 Evaluated, selected and applied standard construction engineering techniques, procedures and criterias using judgement based on all applicable codes, specifications and engineering information in making decisions
 Prepared accomplishment reports and innovated monitoring procedures for the benefit of the project
 Coordinated with the consultant and sub-contractors regarding problems that may occur on site.
August 2004 TO February 2005
Position: Civil Engineer (Private Practice)
Limay, Bataan
 Construction of three (3) Bedroom Residence owned by Engineer Eric S. Cortez located at Barangay Townsite, Limay. Bataan
May 20, 2003 to February 6, 2004
V.P. Roque Construction Corporation
Project: Hermosa Ecozone Industrial Park (HEIP)
Phase 1A, Partial Development Project
Barangay Palihan, Hermosa Bataan
Project Description: The project covers site grading of 10.60 hectares land (part of 550 hectare land) and construction of access road, reinforced concrete retaining wall, stone masonry retaining wall, fencing, slope protection, storm drainage protection (RC pipes) with catch inlet manholes and drainage manholes.
Position: Project Engineer
Responsibilities:
 Overall in charge in the construction
 Checked drawings for proper implementation
 Planned construction program
 Supervised construction activities in order to assure that interim goals are understood and met
 Monitored materials requirement and work done.
 Prepared take-off/measurement of quantities, costing and scheduling
 Prepared billing reports and necessary attachments and evaluation of sub-contractors billing report
 Evaluated, selected and applied standard construction engineering techniques, procedures and criterias using judgement based on all applicable codes, specifications and engineering information in making decisions
 Prepared accomplishment reports and innovated monitoring procedures for the benefit of the project
April 01, 2002 to May 19,2003
Position: Civil Engineer (Private Practice)
Limay, Bataan
List of projects handled:
 Construction of Four(4) Bedroom Residence owned by Mr, Mario T. Cruz located at Tucop, Dinalupihan, Bataan
 Construction of Aloha Highway Resthouse owned by Mr. Mario T. Cruz located at Roman Superhighway, Limay, Bataan
 Construction of 2-storey apartment owned by Mr. Mario T. Cruz located at Barangay Reformista, Limay, Bataan
 Construction of 2-storey residential building owned by Mr. and Mrs. Rancy Calma located at Emerald Village, Limay Bataan
 Construction of Three(3) Bedroom Residence owned by Mr. Rolando G. Cortez
Responsibilities:
 Overall in charge in the construction
 Monitored material requirements
 Supervised construction activities in order to assure that interim goals are understood and met
 Checked drawings for proper implementation
 Checked proper workmanship
 Checked drawings for change order
 Made drawings for some proposals/ modification of drawings
 Planned construction program
September 18,1995 to March 31, 2002
Municipal Engineer's Office
Municipality of Limay
Province of Bataan
Position: Planning/ Civil Engineer
Responsibilities:
 Prepared quantity take-off costing and scheduling including direct supervision to various works in field construction
 Planned construction program
 Prepared and updated master construction schedule
 Monitored and reported weekly/ monthly progress and ensured work progress meet planned schedule
 Prepared accomplishment reports and evaluated contractors billing documents
 Coordinated with the contractor regarding alteration, addition, omission in the plans and made that materials meet the required strength, quality and brand through testing and material specification
 Responsible for providing construction engineering and technical support to field construction..
December 12, 1994 to September 15, 1995
ERE Construction
Project: Periodic Maintenance of Gapan-San Fernando-Olongapo Road, Dinalupihan Section Region III
Position: Road/ Quantity Engineer
Responsibilities:
 Prepared take-off/measurement of quantities, costing and scheduling including direct supervision to various works in field construction
 Monitored materials requirement and work done
 Prepared billing reports and necessary attachments and evaluation of sub-contractors billing report
 Evaluated, selected and applied standard construction engineering techniques, procedure and criteria using judgement based on all applicable codes, specifications and engineering information in making decisions
 Prepared accomplishment reports and innovated monitoring procedures for the benefit of the project
 Performed tender drawings and as-built drawings for final billing
 Conducted field survey works in determining quantities and layout of the road, canals, culverts and others.
Jan. 31, 1994 to Nov 30, 1994
DCCD Engineering Corporation Project: Small Island Project, Siargao Island, Dapa Surigao Del Norte
Position: Civil Engineer
Project Description: The project covers the construction of 200 km. Feeder road and 53 units RC Pipe Culverts within the island and 8 timber bridges.
Responsibilities:
 Prepared take-off/measurement of quantities, costing and scheduling including direct supervision to various works in field construction
 Monitored materials requirement and work done
 Evaluated, selected and applied standard construction engineering techniques, procedure and criteria using judgement based on all applicable codes, specifications and engineering information in making decisions
 Prepared accomplishment reports and innovated monitoring procedures for the benefit of the project
 Performed tender drawings and as-built drawings for final billing
 Conducted field inspection to ascertain status and progress of the project
 Performed other technical assignments assigned by the Resident Engineer
 Attended weekly coordination meeting with the client with regards to variation
April 01, 1992 to January 30, 1994
DCCD Engineering Corporation in association with Nippon Engineering Consultants Co., Ltd.; De Leuw Cather International Ltd., DEMCOR Inc. and Katahira & Engineers International.
Project: South Luzon Expressway Extension Km 59+950 – Km. 64-540, Package 1A, Province of Batangas.
Position: Civil Engineer
Project Description: The project covers the construction of a 4.59 kilometers of expressway that starts at Sto. Tomas and ends at Sambat, Tanauan, Batangas. It also includes a major interchange, 2 overpasses and 1 steel bridge. The project amounting to P258M was funded by OECF.
Responsibilities:
 Prepared take-off/measurement of quantities, costing and scheduling including direct supervision to various works in field construction
 Monitored materials requirement and work done
 Evaluated, selected and applied standard construction engineering techniques, procedure and criteria using judgement based on all applicable codes, specifications and engineering information in making decisions
 Prepared accomplishment reports and innovated monitoring procedures for the benefit of the project
 Performed tender drawings and as-built drawings for final billing
 Conducted field inspection to ascertain status and progress of the project
 Prepared progress accomplishment report and billings
 Attended weekly coordination meeting with the client with regards to variation
 Performed other technical assignments assigned by the Resident Engineer.
 Responsible for keeping Resident Engineer informed as to progress of the work and the manner it is being done.
January 20, 1992 to March 31, 1992
DCCD Engineering Corporation in association with Nippon Engineering Consultants Co., Ltd.; De Leuw Cather International Ltd.; DEMCOR Inc. and Katahira & Engineers International
Project: Engineer's Facilities for South Luzon Expressway Extension, Package 1A, Province of Batangas
Position: Civil Engineer
Project Description: The project covers the construction of Field Office, Laboratory Office, Staff Quarters and Site Development that includes construction of water tank, fencing, construction of Basketball Court and Landscaping.
Responsibilities:
 Prepared take-off/measurement of quantities, costing and scheduling including direct supervision to various works in field construction
 Monitored materials requirement and work done
 Prepared billing reports and necessary attachments and evaluation of sub-contractors billing report
 Evaluated, selected and applied standard construction engineering techniques, procedure and criteria using judgement based on all applicable codes, specifications and engineering information in making decisions
 Prepared accomplishment reports and innovated monitoring procedures for the benefit of the project
 Performed tender drawings and as-built drawings for final billing
 Conducted field inspection to ascertain status and progress of the project
 Supervised and checked works of the contractor and its operation as per plan and specifications
 Performed other technical assignments assigned by the Resident Engineer.
September 16, 1991 to January 19, 1992
DCCD Engineering Corporation in association with Nippon Engineering Consultants Co.Ltd.
Project: Northern Part of Circumferential Road 5 (C-5) Development Project (Pasig to McArthur Highway)
Position: Civil/ Highway Engineer
Project Description: The project covers the Detailed Engineering Design of 24 kilometer multilane divided urban highway. The project was funded by OECF.
Responsibilities:
 Participated in plans checking, drafting of contract documents and project specifications
 Prepared Unit Price Analysis (UPA) of various items of work that included researching and canvassing of labor and materials
 Responsible in the design of all Traffic Guide signs.
 Prepared Traffic Layout
 Participated in field works from gathering of pertinent data up to verification of proposed alternative alignment
 Supervised the survey activities to ensure proper execution
 Checked field stakeouts, computations, plotting of plan and profiles, and other topographic plans
 Assisted in the preparation of vertical and horizontal design
 Assisted in the preparation of monthly progress report
 Prepared quantity take off with regards to roadway excavation, embankment, clearing and grubbing, sub-grade preparation, earth berm, sub-base materials, base course, pavement and take off for the Staff Quarters, Laboratory and Office Building.
January 16, 1991 to September 15, 1991
DCCD Engineering Corporation
Project: Construction supervision of the Rehabilitation of roads, bridges, Flood Control Structures and Buildings damaged by the July 16, 1990 Earthquake
Position: Civil Engineer
August 9, 1990 to January 15, 1991
DCCD Engineering Corporation in association with PHILNOR Consultants and Planners and PERTCONSULT Inc. Consultants Co., Ltd.
Project: Detailed Engineering Design of South Luzon Expressway Extension Project (Province of Batangas)
Position: Civil/ Highway Engineer
Project Description: The project covers the Detailed Engineering Design of 42 kilometers of expressway that starts from Sto. Tomas and ends at Batangas City. It also includes three (3) major interchanges, bridges and overpasses.
NCD Construction and Trucking
Position: Project Engineer
Project Description:
- Construction of (ABB) Asea Brown Boveri Housing and facilities that includes roads, drainage system, swimming pool, tennis court, basketball court and multi-purpose building located at Alangan Heights, Limay, Bataan
Education
 Limay Elementary School
Limay, Bataan
(1974-1980) Graduate
 Limay Municipal High School
Limay, Bataan
(1980-1984) Graduate
 Mapua Institute of Technology
Intramuros, Manila
Bachelor of Science in Civil Engineering
(1984-1989) Graduate
 Bachelor of Science in Environmental & Sanitary Engineering
1st Semester 1989-1990 (13 Units)
Skills/ Interests Computer literate, Drafting, Surveying, playing basketball, billiard and bowling
Professional Affiliation:
Philippine Institute of Civil Engineers
Registered Civil Engineer
Personal Data
Birthday: March 18, 1968
Birthplace: Limay, Bataan
Nationality: Filipino
Sex: Male
Civil Status: Married
Height: 1.76 m
Weight: 80 kgs.
Religion: Roman Catholic
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 1 to 50 of 4772)
Go to Search Parameters...
Brief Description
Free!
20+ years in Civil/Structural design with a variety of Cadware both 2D and 3D
Free!
Twenty five years of mining and construction experience in both surface and underground. Lead Quality Engineer for MTA East Side Access NYC. Chief Inspector for Construction Management on The Heartland Corridor Project in West Virginia. Chief Inspector for the city of Atlanta on the West Area CSO.
Free!
Electrical Supervisor/Technician. Construction and Commissioning, Explosion Protection Certification
Free!
Experienced hard working Geologist, Underground and open pit experience, Resource development modelling and drill program design and implementation, Very experienced mapping and strong structural background.
Licensed attorney with 25 years international experience in procurement and administration of contracts for engineering and construction of infrastructure, public works and power generation for petrochemical industries, facilities and contracts for engineering design services and consulting studies.
Health and safety project manager with extensive knowledge of construction techniques specializing in developing and implementing health and safety procedures for global construction companies. Expertise includes design of behavioral based safety, cultural assessments, and audit protocols aligned wi
Free!
Analysis/Design/Construction Heavy Concrete and Steel Industrial Structures/Foundations
Free!
Quality Management Specialist
Surveying Engineer/Survey Project Manager
Cesar has over twenty four years experience as Electrical Engineer and seven years experience as a Control Engineer, having positions such as Regional Sales Manager, Field Engineer, Engineer Project Manager, Electrical Supervisor, System Integrator and Senior Controls Engineer.
Free!
Project Management Specialist
Geotechnical Engineer, design, consulting
35 years of experience in the petro-chemical business.
I am a very independent thinker. I enjoy challenges, actually, I thrive on them. I consider myself a very 'hands on' type of problem solver. Thinking 'Outside the Box' has always been my approach to difficult problems.
Long experience Civil Engineer who would like to apply for a challenging position in construction management
Global Project & Engineering Management Executive, Senior Project Manager, Project Director
Quality Assurance Management ▪ Team Building and leadership ▪ Project Life Cycle Management ▪ Corporate Mission/Vision Fulfilment ▪ Safety Management ▪ Layout design & development ▪ Task Scheduling & Workflow management ▪
Project,Resident,Engineer,Coordinator,Administrator
Chemical engineer with MBA and over 20 years of process engineering experience.
Involved in planning, designing & construction of different building. Electrical, water & sanitary lines. Acquired experience in administration & accounts.Implemented & executed several projects successfully.Eperienced in purchases,entering into contracts,quality control, payment to contractors etc
20 Years experienced in Materials Mgt. specially in Procurement mgt.
Electrical and Power System Engineer with over thirty–one years of experience in the field of MV and LV power system related equipment.
To secure a challenging Senior Management position within a progressive reputed organization, which facilitates professional growth and utilization of my architectural qualification and experience, while embracing new methodologies & strategies to remain competitive in the market.
Civil Engineer with 22 + years experience
Architect, architectural CAD drafter/designer historic preservation specialist
Civil engineer with 25 years of diverse expeience with 16 years in L&T ECC.Have also worked with leading companies like ITCand RELIANCE
More then 20 years exp in Manager operation & maintance
Im a civil engineer working for more than 19 years in all fields of civil works. All I can say is I love my job very much and Im sure tha I will be an asset of your company.
I AM BIO MEDICAL ENGINEER WORKING WITH NEWLY CONTRUCTED HOSPITAL IN RIYADH I HAVE 20 YEARS EXPERIENCE
SMALL CONSTRUCTION COMPANY PRESIDENT LOOKING FOR NEW CHALLENGE, GENERAL CONTRACTOR SINCE 1981, ESTIMATING, ACCOUNTING, HANDS ON MANAGEMENT OF PROJECTS AND SUPERVISION OF ARCHITECTS AND ENGINEERS.
I have over 15 years experience in heavy industry and construction and strong skills in managing time and controlling cost on projects from design to start up and operation.
Professional Experience Government Procurement
Over 20 years as an experienced accountant responsible for financial statements and all aspects of the general ledger. I have worked with in house accounting systems and Quickbooks.
Engineer / Consultant for Civil, Water Resources, Irrigation, Dam, Canal, Dam safety, Storm water Drainage, Flood Management, Lake & river revitalization, Procurement, Training Specialist
My techanical abilities in the use of Primavera and my leadership skills may be of significant interest to you. Upon review of my qualifications I think you will find that I would be a very valuable member to your company.
A highly experienced & qualified, possessing extensive experience in handling any size of organization in various aspects of Finance & Administration seeking a managerial position.
20 years experience in design, installation, commissioning, performance testing, client personnel training to final handover of the DCS control system for epc power station projects. Excellent working relation with design, process, control, instrument, operation and vendor system personnel.
High educated Creative leader with 18 years of experience in business and human development and multi languages speaker seeking new challenges, quality experiences and more traces
Bachelor Degree in Electrical Engineering,Masters in Management,Having Good technical knowledge about Engg.standards such as IEC, SEC-standards, IEEE, BIS.
looking for a new experience abroad
Chartered Civil Engineer with 30 plus years' experience in project control, construction, & design of major infrastructures, including reclamation, highways, water, drainage, sewage treatment works, underground and above-ground railways. Specialised in Geotechnical Engineering.
Manager of milling department woodworking division, wood lamination, sawmill manager, lumber quality checker, logs scaler.
Process Industries, Oil & GasOffshore & Onshore Construction, Completion, Fabrication & Installation.
Over 31 years of extensive professional experience in various Highway/Road Construction projects in Bangladesh, Ethiopia, U.A.E., Yemen and Laos. Experienced in Geometric and Structural Design of road pavements. Experienced in Execution, Supervision Consultancy and Design of roads including bridges,
Seasoned Sr Construction Project Executive
Key Skills: Exposure to several clients and consultants in the core sector industry including the Cement industry has helped me to hone my negotiation and relationship building skills.
heavylifts engineer
Project Controls Manager with widely diversified experience worked with some of the top five engineering and construction companies on international and domestic projects.
Electrical Engineer Transmission Distribution Of Power Supply, DEsigns, Layouts., Operation & Maintenence of Grid substations upto 400 KV
7 years shipyard work experienced Senior Project Manager
First
[ 1 ]
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com