Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #79759
next resume »»
CONTACT INFORMATION:
View contact information...
Position Applied: LAND SURVEYOR
Work Experience: 12 years
Place of Birth: Minalin, Pampanga, Philippines.
Age: 37 yrs old
Sex: Male
Civil Status: Married
Nationality: Filipino
Height: 5'9"
Weight: 175 lbs.
EDUCATIONAL ATTAINMENT
Intermediate Education: San Pedro, Elementary School,
Minalin, Pampanga.
March 1985
Secondary Education: Sto.Rosario High School,
Minalin, Pampanga.
College Education: D.H.V.C.A.T.
Don Honorio Ventura College of Arts & Trades,
Bacolor, Pampanga.
Graduated with a Degree of Bachelor of Science in
Civil Engineering.March 1994
SPECIAL SKILLS
Basic computer knowledge in autocad,Microsoft word & excel.
PRESENT EMPLOYMENT
Company: ARABTEC CONSTRUCTION LLC.
Project: HIGH RISE BURJ DUBAI SITE 29 & 30
Address: Burj Dubai Site 29& 30 Dubai, UAE.
Date: June 05 2007 up to present
Position: LAND SURVEYOR
Consultant: RICE PERRY ELLIS
Duties and Responsibilities
1. Established main control station..
2. Setting out all gridlines, alignment, and level including as-built plan.
3. Setting-out column, wall, and alignment of the building structure.
4. Performed joint survey with consultant to check alignment, gridlines and level of building structure.
5. Submit daily report.
EMPLOYMENT HISTORY
Company: Peremba Construction Sdn Bhd-Dubai Br.
Project: 52 storey's Al-FATTAN TOWER
Address: Near DIFC bldg.,Shaked Zayed Rd. P. O. Box 26348,Dubai UAE.
Date: July 20 2006 up to June 05 2007
Position: Land Surveyor
Consultant: LC Consulting Engineer.
Duties and Responsibilities
1. Established main control station of the building.
2. Setting out all gridlines, alignment, piling and level including as-built plan.
3. Setting-out columns, walls, and staircase etc.. @ every floor slab.
4. Performed joint survey with consultant to check alignment, gridlines and level of building structure.
5. Submit daily report.
Instrument used
Nikon Total Station (DTM 522)
Nikon Auto Level (AS-2C) and Laser Level(LL 500)
Laser Optical Plummet
Company: Hyundai Engineering & Construction Company Ltd.
Project: 220kv/132kv/33kv Substations
Address: Eastern Region of Abudhabi
Date: March 08, 2003 to July 19 2006
Position: Land Surveyor
Consultant: Lahmeyer International
Duties and Responsibilities
1. Performed to established control station and setting-out all alignment, gridline and elevation.
2. Assisting site Engr. To supervised the civil works construction i.e., structural works, finishing works, and shuttering works including piling works and external works of the building.
3. Performed joint survey with consultant to checked all alignment, and level of structure.
4. Submit daily report.
Instrument used
Sokkia Total Station and Theodolite
Sokkia Auto Level
Company: Piedras Negras Const.,Dev't.Corp.(PNCDC)
Project: San Lazaro Leisure Park
Address: Brgy.Lantic,Carmona Cavite.
Date: July 01 to Dec 31 2002
Position: Land Surveyor
Consultant: Jose Aliling Associates
Duties and Responsibilities
1. Performed setting-out all alignment @ every station of line canals, drainage, manhole and roads.
2. Monitoring all vertical and horizontal elevation using auto level.
3. Established control station by performing close traverse.
4. Performed topo-survey and monitoring of race track level as per given design.
5. Submit daily report.
Instrument Used
Total Station(Geodometer 600)
Auto Level(Nikon)
Company: Daewoo Corporation
Project: Construction of Breakwater for the New Port and Fishery Harbour at
Wilayat Sohar
Address: P.O.Box 277 Postal Code 325 Liwa,District,Sultanate of Oman
Date: May 16,2000 to March 19 2001
Position: Land Surveyor and Hydrographic Surveyor
Consultant: Ibn Khaldun in Association with HALCROW
Duties and Responsibilities a) As a Land Surveyor
1. Performed setting-out alignment @ every chainage offset.
2. Performed leveling and topo-survey.
3. Established control station by closed traverse.
4. Performed to compute actual and design slope elevation @ every chainage offset.
5. Submit daily report.
b)As a Hydrographic Surveyor
1. Locating planned lines and sounding run-lines.
2. Performed echo sounding with run lines to check current seabed elevation.
3. Setting-out target buoy for reference line of dumping area by GPS.
4. Editing and processing of all sounding result.
Instrument used
Total Station(Topcon GTS-711)
Auto Level AT-G2
Digital Theodolite DT 102
HYPACK Software Ver.8.9
D.G.P.S.(Sokkia GSR2300),E-Sea Sound Marimatech206c
Company: Hyundai Eng'g and Const. Co.Ltd.
Project: Reclamation area @ Changi East Phase 1c
Address: Smeg3 Project, Changi Airport P. O. Box 0310Singapore.
Date: October 19 1996 to December 22 1999
Position: Land Surveyor and Hydrographic Surveyor
Consultant: SPECS Consultant Pte.,Ltd
Duties and Responsibilities a) As a Land Surveyor
1 Performed Topo -survey and monitoring of soil instrument for settlement plates.
2. Computation of all survey result in monitoring by leveling works.
3. Established control station by performing closed traverse.
4. Setting-out location of boundaries and mainline for preparation of topo-survey.
5. Submit daily report.
b) As a Hydrographic Surveyor
1. Locating scenery files and sounding runlines.
2. Performed echo sounding with runlines to check current seabed elevation.
3. Data processing of hydro-survey result.
4. Performed plotting and contour of hydro-survey result.
Instrument used
Total Station (Sokkia set 2c)
Auto Level (Leica TC 1610)
SDR 33 Electronic field book
Mininav software ver.2.0
Echo-Sounder Odom Digitrace.01
D.G.P.S. Manavox 9212 and Trimble Navtrack 300D
Company: AA Aluminum Supply Inc.
Address: Boni Serrrano, Cubao, Q.C.
Position: Sales Estimator Engineer
Date: February 1995 to August 1996
Duties ad Responsibilities
1. Estimating the cost of labor and materials of aluminum sections and glasses, i.e.,doors,windows and architectural section.
2. Checked all materials for incoming and outgoing deliveries.
References available upon request.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 351 to 400 of 4757)
Go to Search Parameters...
Brief Description
Seeking assignments in Civil Engineering with an organisation of high repute Developer/Project Management / Consultant / Contracts Professional in the Senior Positions of Projects Control Engineering / Commercial & Contracts Engineering / Cost Engineering / Quantity Surveying sections.
Buying, Procurement, Purhase, Logistics, Supply Chain, Material Control and Management, Stock and Inventory Control, Vendor-Supplier Relations, Client Relations
12 years expirience in my career as a Engineering CADD Draughtsman
Autocad, microstation,
Engineer civil site
SENIOR ELECTRICAL DESIGN ENGINEER - BUILDING SERVICES
Diploma in Mechanical Engg. Having 19/20 years of experience in FABRICATION AND PLANNING of structural steel, Pressure vessels, Boiler, as per ASME code and storage tanks etc. Last 15 years Iam working in Dubai in various organisation in verious responsible positions.
I am Bachelor of mechanical engineer having extensive oversease experience in the field of Oil and Gas Costruction.
15 years experience in the construction industry.Professional Engineer from Ghana and MBA from the University of Houston. Plan to be certified in the US as soon as possible.
Actively seeking a position in „o PROJECT ENGINEER „o With an organization needing a professional demonstrating ability in providing consistent, cost effective methods improving quality of products while meeting best engineering practices
I have been in the excavation industry for over 30 years having owned my own Excavation company for 16 of those years. I can operate a variety of equipment as seen on my resume
i can manage site maintanace,fabrication and erraction
scaffolding supervisor / co-ordinator /instructor
PCS Manager - Cost and Planner Engineer
I am civil engineer having 12 years experience.i have passed post graduate diploma in this field.
Experience in General Administration / Human Resource Management •Document Management / EDMS on Construction Project Management and Integrated Facility Management. •Experience in Contract and Cost Administration / Property Management •Includes diverse supervisory skills in planning and organiz
Facilities management, HR Management, Administration,- Mechanical Engineer, NEBOSH
Safety Professional for Construction, Railroad or Mining
Computer literate and exposed in construction scope of work ranging from medium to large-scale project for 13 years experience as a Quantity Surveyor dealing with all general QS duties both pre-contract and post-contract major in civil engineering, infrastructure and building works.
I am a BE(Electrical) Engineer having more than 12½ years of comprehensive experience (6+ years in Gulf) in Consultancy (Design) and Project Implementation involving Designing of Electrical Services, Tendering, BOQ , Estimates, Technical Specifications and in Installation, Testing and Commissioni
Welding Supervisor
Over 25 years experience in automotive, heavy equipment, and tractor / trailer repair, maintenance, and rebuilds. Repair, maintenance, and diagnostics on all types of heavy equipment / tractor trailer in shop and field service. Rebuild on all types of engines to include Caterpillar, Cummins / Detro
I am a multi skilled and highly proactive manager, with strong people management skills which have been developed in highly competitive and constantly changing environments, I have worked in the industry for some 17 years, both in house and also in the service providers roles.
Professional Surveyor & Mapper, Thirty years experience. Construction Layout, Quanity Surveys, As-built Surveys.
Asphalt foreman and paver operator
Over 20 years as an industrial electrician
Project Management Lead Zinc Copper Nickel Gold Silver Base Metals
Experienced CSA Designer
Project Management in HVAC Mechanical or Building Construction Management. Excellent mechanical aptitude, problem solving, customer relations, contract administration , field experienced hands on Manager
Unlimmited able seaman.,qmed oiler,SD(FH)LBMAN-NON LB EQUIP'D,Master 200 ton GT
Project planner / scheduler / cost / shutdown / turnaround /Primavera P6.2, P6.1, P6,/Oil, Gas, power, EPCM Project Control
I have experienced for road/bridge construction project as Site Enginer
Warehouse Inventory; Civil Engineering Technician;
Looking for an engineering position with the responsibility of structure research and analysis.
Career objective: seeking a challenging managerial position with an established regional or national organization.
Multi-Million Dollar General Construction Project Manager
Experienced Construction Superintendent
12 years experienced of AutoCAD 2D & 3D in Building Services (HVAC,Fire Protection, Water & Drainage)
I have worked many years in the construction field and I have knowledge of all aspects from ground breaking to completion.
Ninteen years of diverse, multi-disciplinary experience in contract management, project planning, project budgeting and cost control related to industrial, construction and manufacturing.
My job objective is to obtain a career in Civil Engineering that could effectively utilize my skills in the field of construction management/supervision of civil construction projects with the following Synopsis
commercial, contracts and procuremnent management
Computer literate on microsoftword/excel, auto cadd,sincrere to work,honest,hardworking.
Inspector Coatings QA/QC, NACE Level II Certified, SSPC Bridge Inspection Certified.
Experienced in deep excavations for 20 years, specializing in sewer and water and installation of large diameter pipe, as well as Mass excavation and Heavy Highway work.
Civil Engineering, planning engineer, project management, GIS, software, modelling
Working field superintendent
I'm Civil Engineering Degree applying for Land Surveyor can operate total station,level,all survey purpose and have skill in autocad.
As a residential developer and general contractor I am committed to the principles of construction. I am prepared to advise and assist in making decisions with regards to land development, commercial & residential building and construction project management with cost effectiveness and proficiency
24 years experience in the Quality Control, inspection, supervision of pressure vessel, piping, pipeline and structural steel work. Certificated NDT level II in the UT/RT/MT/PT. Performed WPS/WQT and inclusive of Mechanical Testing witness. I have knowledge of ASME, ANSI, AWS and API code.
First
1
2
3
4
5
6
7
[ 8 ]
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com