Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #80086 next resume »»
CONTACT INFORMATION:
View contact information...

Birth date/mnth/year/place: 22.04.1970 Ýraq

Address: Kagýthane basak konutlari B104 D39 – Istanbul – Turkey

Nationality: Turkish

Maritul Status: Married

Graduation: Bachelor of electrical engineering from Baghdad Technology University 1992

Foreign Languages: Arabic – English ( talking & writing - fluent )

Driving License Type: B due to Turkish traffic law

Computer Knowledge: Microsoft Office

OBJECTÝVE: To have position suitable to my career experiences

Skills
* Responsible for all Electrical work including Medium Voltage (13.8kV) Distribution, Low Voltage Distribution, Lighting, Power, Extra Low Voltage Systems (Fire Alarm, BMS, CCTV/Access Control, Telephone/Data, Audiovisual etc), Lightning Protection and Grounding, External Lighting, etc.
* Review shop drawings and vendor drawings for compliance with Contract Documents.
* Review Electrical Calculations for compliance with Contract Documents.
* Review material submittals for compliance with Contract Documents.
* Review Technical Specifications for conformance with Contract Documents.
* Implement, manage and control the Project Electrical Quality Assurance Plan.
* Plan, monitor and control the inspection of all Electrical equipment at the manufacturing plants and the installation of the Electrical equipment and systems at site by the Contractors.
* Review As-built drawings for the Electrical work.
* Review Operation and Maintenance Manuals for the Electrical work
* Review Project acceptance procedures and participate in contract close out
* Witness Testing and Commissioning of all Electrical systems
* Coordinate Electrical work with Architectural, Civil, Structural, Mechanical and Specialist Disciplines.
* Attend weekly Project review meetings and report on Electrical work.
* Review, monitor and report on the Project construction schedule.
* Review, design and implement Client change requests
* Manage and control the site Junior Engineers and site Inspectors.
* Ensure senior staff are kept informed of important and relevant service/design decisions and the objectives of the client are achieved.
* Continually ensuring that practices, policies, strategy and services represent the client's best interests and that BH policy is in keeping with current legislation, Standards and Codes of Practice etc.

CERTÝFÝCATES:
CCC – HSE –RPP ARAMCO PROJECT
SÝEMENS – BERLÝN ( 380 KV CÝRCUÝTE BREAKER ERECTÝON )
VATECH – AVUSTRÝA ( TRANSFORMER SUPERVÝSOR ).
ARAMCO SAFETY CERTÝFÝCATE – KSA

Experiences:

1- Consolidated contractors company – KSA ( 05September 2006 – 30Novamber 2008 )

A- Aramco – Mitsubishi power plant: Ýn this project i was responsible of whole E& I department and responsible of more than 1250 person including ( 10 ) engineers as well as this project activities was containing installation of:

1- 24 Electrical room
2- GIS substation
3- 5 turbine and GCB
4- 110 KV cable pulling
5- All MV, LV,control, power plant lighting, cable trays, conduiting, street lighting cables pulling and all megar test and termination
6- Lightning system & grounding system
7- Hole Ýnstrumentation activities
8- 15 Main transformer and auxilary transformer
9- 110KV Busduct
10- HVAC, ESP, 3 x 92m gaz and cooling tower systems
11- Water desalination plant including items ( 1,4,5,6,7,8,10 )
12- Material control
13- All fire, security, lighting fixtures and cctv systems

We finished our scope before the target date

B- Aramco – Bechtel petrole refinery: This project was second mega petrol refinery project in the world becaue it was producting 500 barrels / day and 83000m3 gaz /day here i was responsible of ( 500 person including 4 engineers ) responsibles of 4 unites of phosphor production icluding ( MV,LV, Control, Lighting fixtures & cable pulling, 3 x 95m gaz towers, Cable trays, Conduiting, all earthing and lightning system as well as all cables megar test and termination.

Ýn these projects we finished our activities before the target date.

2- Bechtel – Enka – kazaghistan ( 01April2006 – 20Augost 2006 ):

This project was the mega project of kazaghistan in petrol refinery field and i was responsible of ( 60 person ) for heat tracing system activities supervision. Ý been for ( 4 month ) in this project because all turkish staff been attacked by local workers and most of turkish staff forced to leave the project after unusual event.

3- BÝR- ER ELEKTRÝK ( 10March 2003 – 20March2006 ):

A- Alstom thermal power plant - Turkey: in this job site i was responsible engineer for installation of ( 145 kv ) out door type switchyard my team was ( 20 person ).

B- Baiji Power plant – Ýraq: Ýn this project I was rented to Turkish company USLUEL ENERGY as asupcontractor for ( Odebrecht – Usa Corp Engineering) and Ý was job site responsible manager for ( 400 person including 10 engineers ) to install

1- 400 KV outdoor type switchyard
2- Busduct
3- MV,LV and lighting cable pulling
4- Cable tray and grounding system
5- Electrical rooms panel erecting.
6- 2 x 400 KV transformer
7- Test and commissioning
8- Material control c- Siemens – Turkey
Ý went to Germany and Austria for training in Siemens transformer and CB factories and i was coordinating between my company and Siemens and the Ýraq companies and i went for siemens job in Ýraq.

4- TEKNOTES CO. – ALSTOM – Turkey ( 10Jan2002 – 15 Fab.2003 ):

Ý was in position of site engineer responsible of all thermal power plant electrical activities which includs:

1- MV, LV, Control, lighting and grounding cables pulling
2- Electrical rooms panel installation & transformers
3- All Coal mixtures, breakage and conveyors belt electrical installation
4- Cable trays, grounding and lightning systems
5- 2 no. Of Coal stacker
6- Cables test, terminations and QC paper preparing
7- Material Control
8- All fire, security, lighting fixtures and cctv systems

5- GRUP TEKNÝK – Turkey ( 02Augost 1999 – 12Dec.2001 ):

Ýn this company Ý was electrical engineer rsponsible for below projects:

A- ALÝ AGA REFÝNERY ( GAMA - FOSTERWEEHLER ): Ý was responsible for ( 3 ) unites of petrol purifying includs:

a-MV, LV, Control, lighting and grounding cables pulling b-Electrical rooms panel installation & transformers c- Ýnstrumentation d-Cable trays and grounding system e- Material Control f-Cables test, terminations and QC paper preparing g-Material Control h- All fire, security, lighting fixtures and cctv systems my team was ( 75 person ).

B-ÝSTANBUL OLYMPÝC STADUÝM ( SNEF - FRANCE ): Ý was responsible of all electrical activities which includs:

a-MV, LV, Control, lighting and grounding cables pulling b-Electrical rooms panel installation & transformers c- All fire, security, lighting fixtures, VAD and cctv systems d-Cable trays and grounding system e- Material Control f-Cables test, terminations and QC paper preparing

Ýn this project our company finished the job down the budget my team was ( 120 person )

C- GARANTÝ BANK MAÝN OFFÝCE ( ÝSTANBUL ): This building made of 27 floor and we finished our scope on time as below activities:

a-MV, LV, Control, lighting and grounding cables pulling b-Electrical rooms panel installation c- All fire, security, lighting fixtures and cctv systems d-Cable trays and grounding system e- Material Control f-Cables test, terminations and QC paper preparing my team was ( 100 person )

6- ALSTOM COM.- Ýstanbul( 01May 1998 – 25Jun 1999 ):

This project was TAKSÝM – 4 LEVENT metro project and i was started as site supervisor responsible for:

a- LV, Control, lighting and grounding cables pulling b-Electrical rooms panel installation c- Fire, security and cctv systems d-Cable trays and grounding system e- Material Control f-Cables test, terminations, pre-commissioning and QC paper preparing my team was ( 150 person )

7- MERT CONSTRUCTÝON COM.- AZERBAÝJAN(05 JUN 1997 – 14APRÝL 1998 )

As project engineer responsible of all electrical erection a- LV, Control, lighting and grounding cables pulling b- Cables test, terminations and QC paper preparing c- All fire, security and cctv systems d-Cable trays and grounding system e- Material Control my team was (80 person )

Note: I been in Qatar for 3 month as an advisory for AGAMEP Qatar company from ( 10 Dec 2008 – 25 Fab 2009 ).

View contact information...
«« previous resume next resume »»
Search Results (Resumes 551 to 600 of 4806)Go to Search Parameters...
Brief Description
I can run just about any kind of equitment you have To do a job in construction, I ran a crew of 20 men for 6 year's and built forms, poured concrete,built house's and metal buildings I can read blue print's I do have about 2 year's of oil field exp. Motorman and Floorhand, Some Driller asst. exp.
Executive Director, Operation In Charge, Managing Director
CAD Technician
Free! Experienced Project Manager, Divisional Manager, with a proven track record of success in Construction, Interiors and Finishing works. MEng Degree Mechanical Engineering, ILM level 5 Diploma in Management,CITB Appointed Persons.IOSHI Certified.B S Construction Health and Safety
Skill : Computer microsoft office, Auto CAD, GPS application and Mapping
Graudation in Political Science and Post Graduation
Survey and layout subdivision lots for rural and urban development and established and marked legal boundaries of properties using different kinds of surveying instruments.
A highly motivated technically superior supervisor/ senior engineer who works especially well as part of a team. Seeks employment with emphasis on continual professional development.
elevator systems installation
Twenty six years of experience as Chemical Engineer working on different facilities, on Production, Power House, Operation, Commercial, Safety, Hygiene and Environmental Control Departments.
Fire Protection design with construction experience in installation of fixed fire protection systems. Possess in-depth expertise in the bid criteria, layout, hydraulic design, estimating, sales, contracting, installation, repair, inspection and testing.
Sub : Application for the post of Project Manager
Summary: • Civil Engineering with 30 years Experience • 6 yrs construction experience in the Arabian Gulf, Dubai and Oman, as Senior Construction Manager. Hold Expired UAE/Oman driving Licences. Speak Arabic.• 18 yrs Consultancy Experience.
I am a successful Industrial Construction Manager with extensive experience on domestic and international projects of various magnitudes (mostly heavy industrial). I have been a valued contributor to all of my employers.
Registered Civil Engineer in Philippines. Vast experience in contract and cost eng'g., qty surveying and estimating gained mostly in international environment in projects such as high-speed train station, MRT undergrd struc., stadiums, industrial plant, high-rise bldgs, foundations and civil works.
The summary of my resume is included in the first paragraph of my resume.
My experiences in the field of mechanical mostly covered construction/maintenance of power plants and oil/gas/petrochemical plants. Pls. see attachments.
Interested in project management position.
I have 25 years of experience working in the Construction Management field. Seeking Project Manager position with your International Company in the Middle East. Fluent in Arabic, French, Spanish and English. BA Degree from the Monterey Institute of International Studies.
Results-oriented Mechanical Engineer with strong analytical and effective interpersonal skills. Corporate site and office experience in all facets of Engineering at design/build, manufacturing, consulting and telecommunications companies in Canada, USA and Europe.
I have done bsc in civil engineering and have an experience of 20 years in it.
Senior Planning Engineer
Highly organized, efficient, presentable lady with excellent computer skills, with over 9 years proficient experience gained in the field of Engineering, which includes proper Interfacing or coordination within the projects, also assigned and assist Proj. Manager in all documentation and supervision
Welding Engineer / Welding Inspector
I am a Heavy Equipment Operator, I have been in the Land Development Industry for over15 years, I have operated scrapers (657, 651) I have operated rollers, water wagon, rock truck ( material haulers) on Landfill, Subdivisions, Highways, Dams, and Golf Courses.
Hands-on and Classroom training in Welding,Blueprint Reading,Pipefitting,Machineshop, and Residential Wiring
An experienced planner, purchaser and qualified welder/instructor as per NAVSEA/DoD standards in SMAW, GMAW, GTAW. With eleven years of US military experience, a Bachelors Degree in Mechanical Engineering (Inter-American University of Puerto Rico, 1998), fully bi-lingual (English/Spanish)
10 experiences in construction field
Construction, Pre Commissioning, Commissioning E & I Project and Project Management
I’ve done a lot of projects in the past 21 years. My past experiences have typically been in 24 hr/day industrial plants including pulp & paper, Alcoa, and several utilities. I can handle any part of the project from concept to start-up.
More than 25 years experience in electrical field and overseas on-shore,off-shore oil/gas projects in construction,commissioning,preservation,maintenance,training/very good communication skills:English-Russian fluent,French-Italian good level.
Work as Senior Civil engineer in all aspect but mostly in Quality control and Materials control
Experienced Construction manager with additional strong experience in Contract Administration. Track record of successful projects completed ahead of schedule and under budget. Willing to relocate/work either domestic or international locations.
Joint Ventures, Contract Administration, Business Development, Contract Proposals, Project Restructure, Human Resources, Multi-Million Dollar Budgets, Corporate Profit and Loss and Financial Controls
The majority of my working experience has been in Oil & Gas construction as Project Manager, Director and Engineer.
I am a Degree Petroleum Engineer with 23 years of broad experience in the industry. My expertise is well work, projects, engineering, supervision and education. Specifically developing programs and site supervision for Drilling, Workover, Completion and Abandonment operations.
A young physically fit 55 year old with 30 years worldwide Maintenance Management experience. Speaks 3 languages.
To obtain a key Project Manager, Project Engineer or Construction Management position where leadership, experience and action skills will contribute to organization, profitability and effectiveness.
Objective: Looking to obtain a career in the Management or Supervisory area. A career position within a progressive corporation where my management experience and training can be utilized to be beneficial to the company in reaching their goals and objectives.
My resume is a brief description of notable experiences of which I believe is necessary.
x
I am a self employed, highly motivated and innovative Engineer. I have much experience in the management of projects for the construction of Rail Equipment plants, Aircraft Facilities, Paper and Steel Mills.
Managed and implemented product, equipment, and process design/modifications in industrial manufacturing plants. Extensive experience in facility/manufacturing interface, acceptance testing, and hazardous material handling.
Thirty years in the industrial design and construction services. My pledge is to be the "best" in quality, safety, and providing a better working environment in the industry.
ELECTRICAL ENGINEERING PROJECT MANAGER
If you are looking for a seasoned project manager/construction manager offering 25 years experience directing multi-million dollar construction projects, please take a few moments to review my resume. I have been instrumental in successful management of many large construction projects.
Dynamic HSE leader with impressive global accomplishments in safety, industrial hygiene, medical services, regulatory compliance and training. Key successes as Construction HSE Director, Corporate Safety Director, Military Scientist, Research Chemist and Certified Industrial Hygienist.
I am skilled in carpentry, concrete forming, metal studs and drywall, scaffolding, etc. However, I also have expeirence in reading blueprints and filing out reports.
Safety Management Position
Structural Design Engineer
First   1   2   3   4   5   6   7   8   9   10   11   [ 12 ]   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com