Approximately sixteen years of experience as a civil/structural designer in the petro-chemical, exploration/production, paper and sugar industries. Responsibilities have included research, design and drafting as well as creating material and weight take-offs; contacting clients and vendors for information; approving custom vendor products and field work including climbing and surveying. She has experience with foundations, structures, stairs, pipe racks, railroads, roads, pop-up vehicle barriers, security fencing, dirt work, underground, weirs, catch basins, paving, logistics, Fire Marshal submittals, checking drawings.
Employment History:
Wink Companies, LLC - 2007 to present
Lead Senior Civil/Structural Designer
Software: Autocad 2005, Bentley 2004
Marathon Garyville - GME
Supervisory position over as many as ten people. Cladding under-strength pipe bridges, adding tall supports in areas with minimal clearance between pipes on an existing pipe rack, adding bracing and new columns/beams in an already over-stressed rack. New pipe racks tying into existing fire-proofed pipe racks in an area with complex undergrounds and minimal clearances using angled pilings when required. Re-routing firewater as required. Checking.
Shell Convent / Shell Norco
Many miscellaneous projects from thirty-five feet tall t-supports to analyzer buildings with slabs well above grade and tank ring walls with wick drain systems.
Arctic Slope Regional Corp - 2006 to 2007
Senior Civil/Structural Designer
Software: Autocad 2005, Bentley 2004
Pioneer Natural Resources-Oooguruk Production and Drilling Facilities
Designing Truckable building modules for shipment to the Alaskan North Slope. Structural steel, and architectural design with detailing for arctic conditions. Fiberglass hanging Drill Rig Building. Light supervisory duties.
Jacobs Engineering Group Inc. - 2004 to 2006
Civil/Structural Designer
Software: Microstation J, Frameworks, Laserscan, Smartplant Review
Georgia Pacific Paper Mill – Emergency Shutdown
Reworking old foundations, adding new foundations, designing cable tray/pipe rack structure to tie into existing Switchgear Building structure. Paving and drainage development.
Chevron Pascagoula – RNMCUP
Foundations, pipe supports, integration of new and existing underground drainage, seal boxes, Hubs.
Shell Geismar / Shell Norco / Shell Mobile – SVA
Eliminate potential terrorist entrances into the plant by upgrading fencing, installing extra strength barriers around perimeter and pop-up bollards at drive through access points. Find and eliminate other potential furtive entry points. Security background checks required for this work.
Ford, Bacon & Davis - 1999 to 2004
Civil/Structural Designer
Software: Autocad 1998, 2000
Murphy Oil, – Rose Reconstruction Project
Total reconstruction of fire damaged unit.
Pipe racks, Process Structures, Foundations, trenches and Paving.
W.R. Grace & Co, Lake Charles, LA
New structure placed between two buildings and over a roadway with tight constraints. Process Structure, walkways connecting to existing structures, stairs, foundations, site work and roadways.
Shell Geismar - Goal Venture
A conglomeration of small upgrades throughout the plant.
Shell Geismar - K5 Upgrade/ OIU
Steel platforms, stairs, supports.
C.S. Metals of Louisiana, Convent, LA –Catalyst & Metals Recovery Plant (grass-roots)
Catalyst Storage Building, Process Structures and Foundations, Pipe Racks, Sewers and Roads.
F.C. Schaffer & Associates - 1993 to 1998
Civil/Structural Drafter
Software: Autocad Ver. 10, Ver. 12
Finchaa Sugar Factory, Finchaa Valley, Ethiopia
Grass Roots Sugar processing Factory.
Multiple Process Structures, buildings, foundations, roads, trenches, paving, weirs and site work.
Education:
Two years Architecture – Louisiana State University
Associates Degree in Design – Wade's Design School, Dallas, TX