Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #82374 next resume »»
CONTACT INFORMATION:
View contact information...

I am seeking a position within your organization.
I am currently based in Tanzania as a Lead Document Controller on a large construction project (Gold Process Plant and Infrastructure).

As indicated on my resume, I have many skills which have been acquired working within both a corporate and project environment.

I have had various roles within Document Control and administration sector including: Document Control, Expediting, HR & GA Officer, Project Co-coordinator, Project Secretary and Purchasing Officer.
I believe I am an asset for any organization as I am responsible, hard working, dedicated to achieving team goals, have excellent communication skills, enjoy working within a team or autonomously and have exposure to various computer packages including Access Database, QDMS, Excel, Word & payroll software.
QUALIFICATION/SKILL

Computer: Microsoft Word, Microsoft Excel, Microsoft Power Point
English Language: Spoken – Very Good, Written - Good

WORK EXPERIENCE

Aug. 08 up to Present:
LYCOPODIUM TANZANIA Ltd Pty
Project: Barrick - Buzwagi Gold Project
Position: Lead Document Controller – Eng. Dept.
Job Description: Responsible for preparation and recording of transmittals with DrawCon access software, management of all drawings register and filling. Data Entry for Commissioning report in PAWSDB access software and assist QA/QC filling systems.

Nov. 07 up to Aug. 08:
LEIGHTON CONTRACTING (QATAR) W.L.L –
Project: AL Shaqab Equestrian Centre
Position: Document Controller –Eng. Dept.
Job Description: Responsible for preparation and recording of transmittals with QDMS software, management of all document registers

Sept. 06 up to Nov. 07:
PT. LEIGHTON CONTRACTORS INDONESIA – Coal Mining Company
Position: HR & GA Officer
Job Description: Payroll administration, government tax 21 report, insurance report preparation, recruitment assistant, medicals for new employees, preparation of expatriate working permit, preparation of all expatriate reports, general human resources tasks

Feb. 06 up to Aug. 06:
PT. KOTA MINYAK INTERNUSA – National Company, Oilfield Equipment & General Supplier.
Position: Expediting
Job Description: Responsible for Tracking and making sure all material by airplane or shipping from factory (Singapore, Texas, France) will be arrive on time and delivered to client before the deadline.

Sept. 05 up to Feb. 06:
Hospitality industry, in Sturminster Newton - Dorset
South West, United Kingdom

April 05 up to Sept. 05:
PT. SUCOFINDO – Indonesian Company, Inspection, Supervision, Assessment, Testing, Construction and Engineering Services, client of TOTAL Indonesie and UNOCAL 76, location in Balikpapan, East Kalimantan.
Position: Senior officer
Job Description: General assistant of division for Integrated Maintenance Engineering Service, controller of expatriate documentation for all work permits and Insurance for all personnel (national & expatriate).

August 04 up to Dec. 04:
PT. IPEDEX Indonesia – French Oil & Gas Services Company. Client: Total Indonesian. Location: Balikpapan, East Kalimantan.
Position: Project Coordinator
Job Description: Preparation of Tender documentation before submission to clients, personnel recruitment assisted by our office in Kuala Lumpur

Nov. 03 up to July 04:
PT. PETROSEA Tbk – Australian Company, Namuk Dam Tailing Project. Client: GHD Perth and PT KEM (Rio Tinto). Location: Kelian, East Kalimantan.
Position: Project Secretary
Job Description: Secretarial and administration duty, travel & accommodation coordinator, assistant to project manager and general assistant Internal departments.

July 03 up to Oct. 03:
PT. PRASMANINDO BOGA UTAMA, Balikpapan
Catering Company, client of TOTAL Indonesie, PT KEM, KPC Sangatta, PT Petrosea, Schlumberger, Sempec, Vico, Komaritim Offshore and SEDCO.
Position: Executive Secretary
Job Description: Secretarial duties, General Internal Company duties, Travel & Accommodation Coordinator.

July 1996 to June 2003:
PT. PETROSEA Tbk – Australian Company
WEST SENO Onshore Facilities Project, between Unocal 76, Makassar, Hyundai Heavy Industries, Korea - Ulsan, and Clough Engineering Offshore Division, Perth
From March 2002 to June 2003
Position: Project Secretary
Job Description: Person in charge in Project Office Balikpapan - East Kalimantan, Secretarial and Administration, Travel & Accommodation Coordinator, Assist. Procurement and Logistic Material to/from Project Site and General Project assistant.
Project Manager: Frank Mason & Ian Macdonald

Branch Office Balikapapan, East Kalimantan.
Position: ASSETS ADMINISTRATOR, in Management Information System Department

From April 2001 to March 2002
Job Description: Controlling IT Assets for PC Equipment, assistant Help Desk for all Project
Avantis Manager: Rahmad Novirsal
MIS Manager: Gary Doucet

Tunu Project Phase 7 EPSC2, client TOTAL INDONESIE, location East Kalimantan
Position: SITE SECRETARY
From October 1999 to April 2001
Job Description: Monitoring project filing systems, assistant administrator and accounting, administration of accommodation, ticketing and transportation for personnel (National & Expatriate) from/to project site (Offshore)
Project Manager: Kim Smith
Installation Engineer Manager: Scott Anderson

Batu Hijau Project, client PT. NEWMONT NUSA TENGGARA & FLUOR DANIEL INDONESIA, location Sumbawa island
Position: ADMIN. CLERK
From October 1998 to October 1999
Job Description: Filling Correspondence, typing letters and contracts for clients, receptionist, radio operator, administration assistant, HRD section, cost control and procurement works, payroll data entry, monitoring expatriate time records monthly and reporting to Jkt Office, organizing tickets and accommodation for expatriate personnel.
Project Manager: Rob Harris

Inco Expansion Project, client PT. INCO, location Soroako South Sulawesi
Position: ADMIN CLERK/RADIO OPERATOR
From April 1997 to October 1998
Job Description: Radio Telex operator, receptionist, typing letters and contracts for clients, administration assistant for HRD section, accounts and payroll data entry, material requisition registration, monitoring expatriate time records, providing tickets and accommodation for personnel (National & Expatriate) in / out of project site.
Project Managers: Mark Hewitt, Rob Harris

Project at Branch Office Ujung Pandang, South Sulawesi
Position: RADIO - TELEX OPERATOR / RECEPTIONIST
From July 1996 to April 1997
Job Description: Radio Telex operator, organizing tickets and accommodation for personnel (National & Expat) going on R & R, assisting in expediting and buying material for the project site in Soroako.
Expeditor Officer: Alfian

Aug. 1995 to May 1996:
PT. GATRA SULAWESI – National Company in Ujung Pandang, South Sulawesi.
Position: BUYER/PURCHASING MATERIAL.
Job Description: Ordering materials and travel arrangement coordinator.
Office Manager: M. Jufrie

View contact information...
«« previous resume next resume »»
Search Results (Resumes 2451 to 2500 of 4758)Go to Search Parameters...
Brief Description
Geodetic Engineer exposed to various types of horizontal and vertical survey and can handle different geodetic engineering position.
17+ years Experience of Supply Chain (Materials Planning, Purchasing & Inventory Management). Track record in statistical base forecasting, scheduling, presentations, negotiations and software based Purchase & inventory control, warehousing management and team leadership. Highly organized, analytica
Geologist / Geotechnical engineer
Piping Field Planner/Engineer through 15 plus years journeyman experiece in the industrial construction industry.
Working in Saipem and SNC lavalin joint venture Saudi Aramco water supply and injection project in SA, as a Instrument Pre-commissioning Supervisor (sub contract) last one year.
Over six years of experience in geotechnical engineering including earthquake engineering and mining engineering. Has performed numerous analyses in ground deformation, lateral spread and foundation settlements caused by static and seismic loading using both traditional analytical methods and advanc
Financial Controller or Accountant
Automobile Engineer with more than 12 years expertise in Maintenance of HEMM, with MBA and MS(Software) qualifications
Qualified and certified electrician, intensive troubleshooting skills
Heavy Equipment Operator
20+ years of experience working in Materials Management, Inventory Control, Materials Planning Scheduling & Logistics, in both home office and field site locations on the construction of large petrochemical plants, natural gas plants, electrical power plants, and mining facilities.
Skills include: mechanical maintenance management, process engineering, project management, documentation and training, planning, procurement and contract management, budgeting, and sales.
Experience: Contract Management: Lining up contacts, Qualification: M.Tech.
INSTALLATION PIPELINES
Hardworking, motivated and responsible individual with 4 years experience in construction and operating heavy equipment currently seeking a rewarding opportunity within a reputable company. Current Class 5 Operator’s License. Seeking a Class 3.
Broad knowledge base and experience in both the design and construction of oil and gas facilities. Forward thinking individual with the ability to take on many tasks at one time. Motivated leader focused on building strong professional relationships.
Near 13 years of professional work experience in the oil and gas industry, working experience on the on/off shore in Iran and extensive experience in oil and gas unit processing, reservoir engineering and well completion engineering.
Qualify E&I Site Supervisor, QA/QC Inspector, Project Coordinator, Project/Electrical Engineer and as well as Construction Manager. Excellent Documentation Skill for Project Management.
I am a Postgraduate Civil Engineer trained in "PROFESSIONALS IN PROJECT MANAGEMENT( PRIMAVERA 6.1 & MY PRIMAVERA)" FROM CADD CENTRE .I have both Bachelors and Masters Degree in Civil Engineering.My specialization in M.Tech was Construction Technology and management,.
Electrical Installations and Commissioning Engineer in Low/High Power Distributions
Open Pit Slope Design, Tailings Dams, Plant Foundation Investigations, Earthworks
Design, Detailed Engineering, Engineering of DCS-Honeywell EPKS & Yokogawa Cenum CS. valve CV, Flow Element, PRV sizing. Foundation Fieldbus. FATof DCS. INTOOLS, InstruCALC, SPR. P&ID development. HSE member at FLUOR
5 years experience in piping stress analysis using CAESAR II in reputable companies
Contract Safety and Construction Inspector for companies ,such as Conoco Phillips and Shell
I have had various roles within Document Control and administration sector including: Document Control, Expediting, HR & GA Officer, Project Co-coordinator, Project Secretary and Purchasing Officer.
Experienced in Construction of Offshore/Onshore Oil &Gas plants in the field of Fabrication, Installation, Hydrotesting & Pre-commissioning of In-plant/Well Head Piping and cross Country Pipe Line. Qualification: Bachelor of Engineering (Mechanical)
10+ yrs experience in construction field with specialized in RCC structure & refractory material installation.
Completed Amusement and water Parks project in India and Bangladesh. I am Civil Engg. Diploma Holder. It is 3 year course.
Just I have graduated from Sheffield Hallam University in UK on October 2002 and looking for work opportunities throughout USA
11 years experience with Home Office and Field Cost Control Management and Planning of work primarily in Cryogenic Air Separation Plant installations With contract values ranging from £6million to £50 million. Interests Travel, Swimming, Photography, Archaeology, Popular Science.
I am a recent college graduate who majored in Civil Engineering Technology and is seeking the opportunity to gain experience, as an Entry Level Civil Engineer.
Engineer looking for job in construction industry in Los Angeles area.
The purpose of this resume is to define and highlights the skills and ability to work as a Planning Engineer. I secures 5 year of working exp. as Maint. Planning Engineer and Proj. Plan Engr. in Petroleum Refinery and for the const. of Pet.chem. & Steel Plant respectively.
Objective: My main objective has always been to construct any job in a timely manner, excellent quality, and safety conscience. I like to work about 20 hours a week overtime, and I feel like I have gone as far with this company as possible.
Experienced Project Manager/Engineer
Stakeholders Mgt, Social Impact assesmment, Negotiation skill, Participatory devt Planning, Monitoring/Evaluation, Team Player (B.Sc. M.Sc, Ph.D)
Diploma in Mining Engg, AMIE Sec A&B in Mining Engg from IEI.
Urban Planner with GIS and AutoCAD skills
-Planning and scheduling using Primavera Project Planeer P3.1 &P6, Microsoft Project Professional / Structural Engineering Design Using Computer Softwares such as STAAD-PRO 2007, ETABS, SAP2000
Over ten-years of progressive experience and responsibility in the areas of Heavy Equipment Operation & Landscaping at various organizational levels
Passed in diploma in civil engg in 2009 with 84.9%.
Moniitoring and implementation of all related painting/coating/lining works involved in the construction packages managed under co project department.this also includes the major painting works associated with the major overhauling of crude oil storage tanks in oil and gas co under control environm
I am an experienced professional with excellent communication and interpersonal skills, persuasive ability and sound understanding of business conceptsand issues related to Business Administration, Sales, Marketing and General Administration;
Electrical Technician/Cell Phone Technician
Experience, professionalism, skills, physically fit, able to work long hours in tough environment and stressful conditions, availability for traveling abroad.
Project Management
Mining engineer and experienced manager with over 20 years of successful executive management, project development, engineering, construction and operations experience in the mining, tunneling, fossil power, rail and heavy construction sectors.
Procurement, Supply Chain and Contracts Professional
Seeking position as HSE/Training/Emergency Management for Petrochemicals or Refinery Operations
Construction Management professional with Heavy Industry ,Power, Energy, Mining sector experience
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   [ 50 ]   Next   Last
Seach Parameters

Change search parameters...
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com