Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #83235
next resume »»
CONTACT INFORMATION:
View contact information...
Mustang Engineering - Lyondell Houston La Porte 09/2008 - 05/2009
Sr. Piping Designer / Lead
* Piping Lead for SIS Heater project, interfacing with other disciplines - Team environment.
* Fieldwork, sketches, dimensions, tie-in tags. Demo and Tie-in Photos.
* In-house and onsite updated preconstruction reviews w/client. Weekly progress meetings.
* Planning studies and extracted isometrics using CadWorx 3D modeling. w/AutoCAD 2006/8.
Preferred Engineering Nassau Bay 06/2006 - 09/2008
Sr. Piping Designer/ Lead / Checker
* Piping Lead for Environmental NOX/SCR project, interfaced with other disciplines.
* Fieldwork layout sketches, dimensions, preconstruction reviews w/client.
* Planning studies, sections and isometrics. MTO and requisitions, tie-in tags.
* Turnaround specialist as client's liaison.
Kaneka Texas - Quotient Alliance (onsite) Pasadena 05/2005 - 06/2006
Project Coordinator / Estimator / FEL Design
* Coordinate design and installation of several projects for a chemical facility-Vitamin CoQ10.
* Interfaced with disciplines and international office personnel for their input and design.
* Wrote job scopes and bid proposals. Scheduling, material take-off and requisitions.
ISP Alliance-M & K Engineering (onsite) Texas City 08/2004 – 04/2005
Sr. Piping Designer
* Piping design, equipment layout, fieldwork, sketches, preconstruction reviews.
* Structural design new platforms and supports for existing boiler stacks.
Nicol & Associates Dallas 04/2004 – 08/2004
Sr. Pipeline Designer
* Pipeline facilities piping and equipment layout. Equipment and meter skid design.
* GIS Mapping and Arc View training.
* Field trips to various clients for estimating and layout.
Tyco Gem Fabrication Ft. Worth 09/2002 - 02/2004
Estimator / Business Development / Project Manager
* Pipeline facilities bid proposals, Company's own estimating program. Define job scopes
* Responsible for generating new business and prospects.
* Estimated conceptual and lump sum cost of fabrication and material take-off.
* Scheduled completion and delivery dates. Checked pipe fabrication.
* Welding procedures-API-1104, ANSI B31.1, B31.3, and B31.8. Iso 9002 procedures - MTR
Howe Baker - Design Quest Tyler 03/2002 - 09/2002
Squad Lead-Checker / Sr. Piping Designer
* Squad Leader for 4+ designers to sketch and updated approx. 200 proposed PFDs for a "Gas to Liquid" project in Qatar, Africa. Completed the project two weeks prior to schedule.
* Drafted isometrics from piping plans, sections and 3D models w/Rebis AutoPlant 97-3D
El Paso Corporation - G.A.S. Houston 03/2001 - 03/2002
Pipeline Project Lead / Designer / Estimator
* Layout of pipeline facilities interfacing with other disciplines - Team environment.
* Designed regulator / meter / Pig launcher / receiver skids. Area classification, Cathodic protection.
* Involved w/ design team for reciprocating gas compressor stations, gas gathering and interconnect systems.
Page Southerland Page, A&E Dallas 08/1999 - 02/2001
Sr. Piping Design / Estimator
* Commercial, Semiconductor, Hospitals and Schools HVAC duct and plant utilities.
* Piping design lead of facilities utilizing other disciplines for input and design.
* Team player, responsible for the mechanical bid proposal
Bechtel-Amoco Alliance(onsite) Houston 09/1997 - 04/1999
Estimator / Sr. Piping Designer
Estimated bid proposals for process facilities. Projects-conceptual/ lump sum including deliverables, fabrication and construction cost and MTO using company's own program.
* Team environment with mechanical and process engineers.
GDS Engineers Houston 03/1992 – 09/1997
Estimator / Senior Piping Designer / Squad Lead-Checker
* Estimated project proposals using estimating program for conceptual and or lump sum cost including drafting hours, labor installation and BOM.
* Piping plans, equipment layout, sections, Isos., Stress analysis, preliminary vessel design-ASME.
* Attended meetings for project reviews and P & ID Hazop. Interfaced with client on all projects.
* Field trips to various clients' sites planning project reviews and constructability, dimension and design check.
* Squad Leader responsible for P & I D walkdown. Worked in a team environment.
Stubbs & Overbeck (onsite) Houston 08/1989 - 03/1992
Piping designer
* Piping design of petrochemical plants and refineries.
* Piping plans, sections, isometrics and material take-off.
* Fieldwork including layout sketches and dimensions.
Energy Drafting Concepts, DBA Houston 03/1981 – 09/1988
President / Business Development /Estimator
* Start-up contract drafting and design service company for the energy sector projects included but not limited to: Pipelines and facilities, Environmental, Mapping and Graphics.
* Generated new business and prospects. Maintain client relations
* Meetings with potential clients discussing projects and required personnel for job schedule.
* Estimated projects-conceptual and lump sum. Define job scopes.
COMPUTER PROGRAMS
CadWorx 3D, Bentley/Rebis-SmartPlant, CADPipe, Rebis AUTOPLANT 97 3D, FlexCAD
AutoCAD 12, 13, 14, 2000, 2000i, 2002, 2004, 2005, 2006 and 2008
Acrobat Adobe 7.0,,SAP, Excel Spreadsheet, PowerPoint and Microsoft Works,
EDUCATION
L. D. Bell High School Hurst, Texas 1972
Texas Tech University Lubbock, Texas 1972–1973
CLIENTS
Amoco
Conoco-Phillips
Eastman Chemical
Exxon
Lyondell- CITGO
Oxy-Chemical
PRSI
Petro-Fina Del.
Union Carbide
Valero
Vetrotex
Texas Instruments
Duke Energy
CrossTex
Houston Pipeline
El Paso Energy
VARIOUS PROJECTS:
PIPELINE
Delivery / Interconnect Meter Stations
Pig Launcher and Receiver
Compressor Stations
Offshore production platform risers
Amine plant proposal per MTO and facility layout including cost of fabrication.
Natural Gas interconnect w/ Process Plants
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 2751 to 2800 of 4814)
Go to Search Parameters...
Brief Description
5+ years experience in construction field which includes maintenance of heavy earth moving equipments and heavy vehicles.
MBA (Finance) Bronze Medalist with strong financial & credit analysis and risk assessment skils.
Maintenance Manager with BSEE degree & current MSHA electrical cards with hands-on experience in all aspects of mechanical, electrical, and hydraulic systems.
to obtaian a job
I've been working in the diesel business for over 10 years. I do everything from general maintenance to major rebuilds. From office type work to operating equipment when need be.
27 years experience primarily in oil & gas EPC/EPCM Project controls, Contracts, project management and engineering.
16 years exp. in Design/Drafting, Softwares AutoCad 2004, Microstation J/V8, IRASB, AutoCad Overlay, HVAC system layouts Duct layouts, Equip,Layouts, Utility/Fire prot.sys layouts,Steel Structural detail drgs, Familiar in Int.stands.Exp.in High Rise, Industrial/Commercial Bldgs, Housing, Airports
Entery level AutoCad Drafter/Desingner. Associates of Aplied Science in Computer Aided Engineering and Design, work expierence includes construction and mecnanical background.
I have been working in the mine industry for the past 30 years. Recently reassigned to site services for DeBeers Canada Snap Lake Project. Currently gaining experience on the several sizes of Komatsu loaders, Bobcat, Dozers, Water and Fuel Truck.
Many years of experience, very detailed orientated.
MEP Manager ,MS Office & Internet,AutoCAD,Communication ,Negotiation,Co-Ordination &Organization,Effective Time & Coast Management Skills
Senior Manager looking for a new challenge with expectations of executive advancement upon successful proof of capabilities
Electrical engineer with experience in oil field electrical construction works. Possess IRCA cerification for Quality Management System and MS project and autocad 2000 certification
Twenty plus years of experience in electrical construction, maintenance. International experience in Middle East and South America. Willing to discuss any and all opportunities available.
46 years international experience in EPC project management in oil, gas, power, petrochemical plants, refinery, iron and steel plants, mining, mineral processing plant and infrastructure design and construction. Activities include FEED to project delivery for greenfield and brownfield projects.
Civil Engineer with seven years experience in project control, construction and management of civil works for the most important projects in Ecuador, including oil and gas companies, power plants, access roads, fiber optic, pipelines. I am willing to travel anywhere.
I&C Technician with geothermal experience
QC Engineer/Inspector (Piping/Welding) with CSWIP 3.1
A well organized, dedicated professional, developing, presenting, and implementing value added recommendations for the improvement to the companies overall goals and employee¡¦s performance.
Manager of Metallurgy, Process Engineering, Project and Construction Management.
I am retired from the Royal Canadian Mounted Police (R.C.M.P.), having left in July 2006 with almost 25 years of service. Since then, I have obtained my P.I. licence and conducted investigations for different firms
21 Years Experience in EPC/LSTK Project estimation, proposal, marketing, planning, project procurement and project management for Refinery, Petrochemicals and Fertilizer Plants like Ammonia, naphtha Cracker, PTA, Hydrocracker, DHDT, Sulphur and other units. Presently working with L&T, india.
Worked as a Engineer Projects & Purchase.
I have many years of experience in customer service and administrative work. I am organized and skilled with many computer programs.
Objective: To work for a company as a Supervisor/Foreman/Journeyman carpenter. To use my skills to the best of my ability.
Construction Supervisor for Electrical and Instrumentation
Recent graduate with a Bachelor of Applied Science in Instrumentation seeking employment for supervisor positions within the instrumentation field or as an E & I Specialist.
I have 3 yrs of experience in multi-storey constructions.
ARCHITECT WITH 03 YEARS INDUSTRY EXPERIENCE
Planner / Scheduler: 2 Years Experience, Site Engineering: 1 Year Experience Developing Schedules, Resource Allocations, Planning Spreadsheets, Deployment Schedules, Charts, Progress Reports. Review of Contractor’s Programmes, Specifications, Contracts. Tracking Correspondences, Archives.
Project Management and Mining Engineering Professional with 19 years experience
QA/QC/Inspecion/Metallurgical Engineer
BACHELOR OF ENGINEERING in ELECTRICAL AND ELECTRONICS ENGINEERING, EXPERIENCED IN SUBSTATION AUTOMATION AND OPERATION SYSTEM
I have 35 years experience in the security field.
M.S. In HRM, BBA in Management with three years of contract management experience in Africa and Gulf.
An ambitious and highly skilled Quality engineer with extensive experience in quality engineering, ISO certification, production, management, product development and launch, and customer support.
Self-motivated young competent Mechanical Engineer with nine years experience with Oil companies and leading construction and contracting firms. Have proficiency in independent project execution. Possessing a Diploma in Mechanical Engineering. Able to independently plan, and execute Projects related
Microstation CADD Civil Engineer Utilities Specialist and GIS
Quality control and quality assurance of control systems and networking
Power Transmission Line & Lighting of Highways (design overhead lines, instillation, maintenance, modeling, coupling, pipeline, cable size, poles, illumination (lux) & cd/m2 calculation)Low Frequency Electromagnetic Field (Transmission Line) Environmental Radiation Effects on Human Health/ Mitigatio
Post Diploma In Automobile Enginee (4 1/2YRS) / Experience 17Yrs / Commercial Vehicles, Construction & Mining Equipments - Maintenance Management, Service Maanger, Workshop Manager, etc.
welder helper \ carpenters helper
I've been working as HSES Advisor more than 7 years in different oil& gas projects such as LNG OP-s,Offshore and Onshore Pipe laying operations,platform constructions, Flotel, diving operations etc.
Versatile, knowledgeable, exploration geologist
2 years of experience in Automotive & Power Industry, Cae ,TYRE, Design engineer, R&D
Construction & maintenace of installations, equipment and systems in hazardous areas (explosive gas atmosph.); Maintenance of el. equipment, installations in petrochemical industry.& el. Equip., systems in El.Power Plant ; Training el.personnel for preventive & predictive el. maintenace programs
Senior Project Management, Profit and Loss, Project Planning, development and execution. Consultancy in the areas of safety, risk management, and techncal writing and editing. Major contract administration for a multi-national firm in Saudi Arabia on two different assignments.
Field Engineer / Estimator / Senior Piping Designer / Squad Lead-Checker
With excellent communication and coordination skills, I have the ability to lead a team to success and deliver projects in the given time frame. I am confident that my positive approach towards my work will benefit the organisation. My strength lies in my hardworking nature, sincerity and the willin
SAP MM Module
First
Prev
51
52
53
54
55
[ 56 ]
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
Last
Seach Parameters
Change search parameters...
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com