Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #84000 next resume »»
CONTACT INFORMATION:
View contact information...

Principal Geological Engineer
Years of Experience
17 ( approx 2 years in Australia with PB, 15 in India, Bhutan, Nepal with others)
Residence Language
Australia; India English, Bengali, Hindi

Education
Master of Science (Applied Geology), Indian Institute of Technology, India;
Bachelor of Science, University of Burdwan, west Bengal, India
Professional Affiliations
International Association of Engineering Geology and Environment: Member; International Society of Rock Mechanics: Member; Indian Society of Geological Sciences: Member; Australian Geomechanical Society: Member
International society of Rock Mechanics: Member
Key Qualifications
Mr. Mukherjee has more than 17 years experience in underground construction and related designs in Australia, Sweden, India, Bhutan, and Nepal. He has long valuable contribution in tunnels in large hydro projects, water transport tunnels in irrigation, and subway/metro tunnels relating to large rock caverns like powerhouse caverns, large storage caverns for fuels, deep subway stations and bus terminus, large span tunnels in difficult ground and cross over structures. He has lead teams in the planning and execution of geological–geotechnical and geological investigation campaigns using advanced geological and geophysical techniques including state-of-the-art 2-D and 3-D geological ground modelling software. He has produced technical reports on ground investigation and interpretation. His other areas of expertise include construction supervision, active design during construction / design optimisation, geotechnical instrumentation (planning, execution, monitoring, data production, interpretation), and project management (design coordination, planning, and delivery).
Apart from his core technical competence, Mr. Mukherjee has complementary exposure in contracts management, tendering, and business development experience.
Career Objective
To achieve a leading technical presence in geotechnics in the Australian and Regional Market place fulfilling the key senior role within the geotechnical group with long term commitment, and providing leadership and technical advice to the team members including other teams when required. Instilling best practice through the work process, skill development, innovation and technical excellence, leading by example and to act as a mentor to function staff to ensure that they benefit from working with an engineer of recognized standing in the industry

Aspire to be trained directly in depth for the new technical & management packages / modules (company's In-House / globally practised: software, approach plan, best management practises).

Overseeing the delivery of projects to meet or exceed time, quality and budgetary targets in line with Clients' expectations. Marketing the Company's services through meetings with Clients, bid and proposal preparation and general promotional activities. Seek opportunities and encourage work packaging internationally. Fulfil other internal company roles as mutually agreed from time to time.
Project Experience
Road/Traffic Tunnels
* Airport Link Project, Brisbane, Thiess – John Holland Joint Venture.2008-2009. Principal Engineering Geologist, detail design submission for 5.8billion AUD combined toll road and busway project.
Project is part of Brisbane's key TransApex strategic development plan and includes 3.5 km of dual three-lane and two-lane road tunnels with complex ramp cross overs (totaling more than 12 km of TBM driven and road header driven tunnel). Airport Link toll road, a PPP project, will provide a primary orbital function for traffic to bypass Brisbane's central business district via North–South Bypass Tunnel and Inner City Bypass. It will also deliver a secondary radial traffic function between south central and northern suburbs, Brisbane Airport and Australia TradeCoast precinct. Where it connects with existing surface road infrastructure at its three major interchanges it includes multiple large span shallow ramps, bridge, and cut-and-cover structures, and large ventilation buildings. Northern Busway design and construction includes approximately 1 km of shallow large span busway tunnel provisioned for two new bus stations and stops on a 3 km long two-lane, two-way bus-only facility.
Major role played in APL project (PBA JV: a joint venture between PB & Arup) consisted of:
* Planning and execution of comprehensive ground investigation campaign including extensive ground geological mapping, drilling, RAAX and acoustic probing, in-situ and laboratory testing of rock and soil, pile testing, assisting in hydro-geological charactierisation
* Quality screening, data collation and building up of the ground investigation of database; presentation of database using GIS, gINT,
* interrogation and interpretation geological database; characterization of ground and its behavior to the tunnel & other structures; modeling of the global project geology base upon 2-D and 3-D analysis (using CADD, VULCAN, Google sketchUp)
* development of rock mass classification system and interrelating it to the rock material parameters for seamless interfacing with tunnel design system and numerical modeling
* assisting in developing the project construction supervision manuals and quality procedure for ground inspection, characterization and tunnel mapping
* supervising, training and mentoring of the junior team members
* Pir Panjal Railway Tunnel, Srinagar, Jammu and Kashmir, India, Northern Railways.2004-2006. Coordinator and Project Geologist. Responsible for detail design and construction supervision for 11-km-long railway tunnel design in Himalayan geology (deep shear zone, karstic topography, high overburden over 2,000 m) using NATM concept, tendering, and evaluating of contractors. Works included geological mapping, geotechnical and rock mass assessment, technical parameters for tunnel design and support system.
* Delhi Metro Subway Corridor MC1a, New Delhi, India, Client: Delhi Metro Railway Corporation.2002 – 2004. As Manager - Rock Support and Geology. Responsible for detail designing and construction execution of 4.5-km-long stretch of underground metro corridor including four underground metro stations using top-down and cut-and-cover method and active design optimisation during construction. Carried out detail geotechnical and geological investigation, factual and interpretive geotechnical report preparation, geotechnical inputs for designing of cut-and-cover rock slopes, pile foundation characterisation, and soil stabilisation. Complete campaign for geotechnical instrumentation for the project from design to implementation, including data acquisition and processing.
* Delhi Rapid Transit Underground Metro Corridor, New Delhi, India. 2001. Responsible for contractors' bid design, geotechnical site characterization, risk assessment and construction methodology.
* Rohtang Hillroad Highway Road Tunnel, Manali, Himachal Pradesh, India. 2007. External Expert to contractor's bid design and tender input. Carried out risk assessment for 8.8-km-long road tunnel at high altitude Himalayan snow-bound area with extremely high overburden over 2,000 m. input for tunnel construction, and evaluation of TBM/mined tunneling option.

Large Span Rock Cavern
* Unlined Rock Storage Cavern Storage of Crude Oil, Visakhapatnam, India.2006 -2008.
Client: Engineers India Ltd., Ministry of petroleum & Natural Gas, Govt. of India. Assignment included tender design, detail design verification and construction supervision. Worked as Principal Geologist & Assistant Project Director being responsible for geotechnical aspects, technical coordination and invoicing / payments. The project used advanced 3rd generation design concept of hydrological confinement of hydrocarbons with modified cavern floor avoiding sludge formations in an unlined rock storage cavern 50m below the groundwater table, average 75m below ground.
Project involves 2.33-million-metric-tonne capacity underground unlined crude oil storage cavern with 1.8-million-cubic-metre underground rock excavation for five caverns of cross section of 600 m², 3 caverns 840m long and 2 of 320m. Other components: 2x95m deep 75 m² main shafts, 3x 80m deep inlet shafts, 1750m access tunnel, 1350m long water curtain tunnels; 80 m long water curtain bore holes. The project is situated in Archean gneissic craton in eastern coast of India adjoining creek and shear zone. Job also involved contractors' bid evaluation and recommendation. The project is presently under construction and scheduled for completion in 2010.
* Detailed Feasibility Study For Unlined Rock Storage Cavern Storage Of Crude Oil, Multiple locations in India (Mangalore, Mumbai, Vizag) for storage volume of 0.5 million metric ton to 2.5 million metric ton.2000 -2001.
Client: Engineers India Ltd., Ministry of petroleum & Natural Gas, Govt. of India. As Lead Geologist, carried out detailed feasibility study of strategic storage of crude oil at sites being responsible for geotechnical investigation campaign, geological mapping and geo-hydrological characterisation, drilling and geophysical studies, preparation of Geotechnical Baseline Reports, compilation of final Detailed Feasibility Report.

Hydropower Tunnels & Caverns
* 1,500-MW Nathpa Jhakri Power Project, Rampur/Simla, Himachal Pradesh, India, Nathpa Jhakri Power Corporation.1993 – 1998. Senior Engineering Geologist. Carried out rock mass classification for tunnel. Involved in stabilisation of slopes and foundations, and support recommendation using NATM concept. Responsible for geotechnical instrumentation, installation, monitoring and studies in tunnels and shafts during excavation, on-site validation of tunnel support design based on observed rock mass conditions during tunnel excavation.
* Tala Hydro-electric Project, Chukha, Thimpu, Bhutan, Tala Hydro Power Authority.1998 -2000. Senior engineering geologist for 1,020-MW project consisting of 7-km-long head race tunnel with access adit. Responsible for technical documentation of geological details encountered during excavation, providing back up for portal development, and optimising cycle time for construction. Monitored and interpreted geotechnical instrumentation for safety. Responsible for contract management.
* 60-MW Hanol-Tuini Hydropower Project, Dehradun, Uttaranchal, India, SunPower India Ltd. 2007. Engineering Geology Expert. Carried out geotechnical assessment of project components (barrage, tunnel alignment, in-ground powerhouse, construction adits), construction material and excavation methodology, preparation of detailed project report.
* 340-MW Teesta Hydro-power Project, Sikkim, India, National Hydro Power Corporation.2001. Project Tender Geologist. Carried out site geotechnical assessment, risk assessment, study of rock class distribution, suitability assessment for power house, water diversion structure, adit and portal location.
* 80-MW Middle Marsyangdi Hydro-power Scheme Stage II, Kathmandu, Nepal, Nepal Electricity Authority.2001. Project geologist for contractor's bid submission. Carried site geotechnical assessment, risk assessment, study of rock class distribution, suitability assessment for power house, water diversion structure, adit and portal location.
* 240-MW Alaknanda Hydro-power Project, Badrinath, Joshimath, Uttaranchal, India, Malana Power.2007. Engineering Geology Expert. Assessed dam foundation, constructability, construction material.
* 750 x 2-MW Nyamjung Chhu (Stage I and II) Valley Hydro-power Development, Tawang, India, Bhilwara Malana Power Company.2007. Engineering Geology Expert. Responsible for study of virgin valley for development of cascade type hydropower projects. Assessed project components and optimisation of power production. Assessed geotechnical risks, and alignment of head race tunnel, dam foundation.
* Rapid Valley Assessment for Hydro-power Project Development, Spiti Valley, India, Bhilwara. Malana Power Company.2006 – 2007. Engineering Geology Expert. Assessed river valley for hydropower generation. Carried out rapid feasibility study of underground structures and foundation for various components of project, and construction material.

Contract Management
* Delhi Metro Subway Corridor MC1a, New Delhi, India, Delhi Metro Railway Corporation.2004. Contract Manager. Assessed subcontractor billing and claims, subcontract agreement finalisation, and settlement of dispute.
Bid/Proposal Management and Business Development
* Detail Feasibility Study for Road Tunnel Network, Various Locations, India, Himachal Pradesh Road and Infrastructural Development Corporation (HPRIDC).2005. Bid Manager. HPRIDC invited request for proposal for detail feasibility study assignment for decongestion of Simla, the capital city, by road tunnels underneath existing buildings etc.
* 320-MW Tapovan Vishnuprayag Hydropower Project, Uttaranchal, India, National Thermal Power Corporation.2006. Responsible for design, construction review and supervision of TBM tunnelling.
* 300-MW Devasari Hydropower Project, Dehra Dun, Uttaranchal, India, National Thermal Power Corporation.2007. Responsible for technical and financial proposal for detail project report preparation, detail design and construction supervision.
* Strategic Storage of Crude Oil in Rock Cavern, Mangalore, Karnataka, India, Indian Strategic Petroleum Reserve Ltd and Engineers India Ltd.2008. Responsible for bid for tender design and construction supervision for 3.25 million metric tonnes capacity strategic storage.
Technical expertise
* Engineering geological and geotechnical studies for prefeasibility, detailed feasibility studies and detailed design phases using geophysical techniques (seismic studies, optical televiewing of bores, RAAX, acoustic sounding), core drilling, geological mapping and modeling, geo-hydrological testing & characterization (pump out tests, packer testing);
* Comprehensive geological database management and 3-D geological modeling; utilization of outputs from software like gINT, VULCAN, WELLCADD, SketchUP; AUTOCADD
* Monitoring, presentation, interpretation of geotechnical instrumentation;
* Generating technical reports for various stages of studies from prefeasibility, detailed feasibility studies to detailed design phases;
* Project scheduling, tasking, budgeting, deliverable management and leading the large team of geotechnical /geological engineers;
* Interfacing, coordinating with interdisciplinary aspects of design delivery, construction management, E&M, environment impact management;
* Project reconnaissance study and reporting, proposal preparation, tendering and coordination;
* Client liaison, budgeting, invoicing

Publications
* Mukherjee, B, Kunar, S & Hassan A 2001, 'Geotechnical characterization of site for underground unlined cavern for crude oil storage', paper presented to New Frontiers in Tunnelling Conference, Kathmandu.
* Mukherjee, B & Hakansson, U 2004, 'Rock blasting in urban environment: New Delhi metro project', paper presented to Bergmekaniks Dagen (seminar in rock mechanics), Stockholm.
* Mukherjee, B & Samanta. G, 'Development of geological ground model for an urban tunnel project and its sequential optimization from conceptual to detail design stage: an useful tool for geotechnical risk identification and design inputs' (World Tunneling Congress Montreal' 2010; to be published)
Trainings
* Queensland Blue card holder for Construction safety, Queensland, Australia
* Safety tanning in confined space and rescue, Queensland, Australia
* Safety in Tunnels and underground construction, National Safety Council, India
Professional History

2008 – present Principal Engineer-Geology: Parsons Brinckerhoff Australia Pty Ltd
2006 – 2008 Asst. Project Director / Principal Geologist: Sweco International AB, Sweden/India
2004 – 2006 Country Manager: Geoconsult ZT GmbH, Austria/India
2004 – 2006 External expert in Engineering Geology: RSW, Canada & Indo -Canadian Consultancy Services Ltd, India
1999 – 2004 Senior Engineering Geologist: Skanska International Civil Engineering AB, Sweden/India
1998 – 1999 Senior Project Geologist: Larsen and Toubro Ltd, -Engineering and Construction Group, India
1994 – 1998 Asst. Manager-Geology: Impregilo s.P.a and HCC Joint Venture, India
1992 – 1994 Research Officer: Indian School of Mines, India

Summery of assignments and projects worked:

Service type code:
C: Construction / with Contractor
CDT: Contractor's Design Team
DC: Design Consultant

Assignment type code:
FS: Feasibility Study
DFS: Detailed Feasibility Study
DD: Detailed Design
CS: Construction Supervision
TE: Tender Engineering

Project Name, Project type Location & Project Details Service Type & agency Assignment type
1. Airport Link, Northern bus way & Airport Round About
DD Brisbane DC
Parsons Brinckerhoff –Arup JV (deputed from PB) DD,
CS Investigation, Geological assessment & Interpretive reprts, rock characterization, 3-D geological modeling and support design as part of detail design submission

2. Strategic Storage of crude oil in unlined rock cavern Visakhapatnam, India DC SWECO International AB. DFS, TE Detailed feasibility report, Tender engineering & FEED.
3. Delhi Metro rapid transit system New Delhi, India
CDT Kumagai-Skanska-HCC JV (deputed from Skanska International) DD Detailed design of rock support; geotechnical instrumentation, active design optimisation
4. Detailed feasibility for Strategic Storage of crude oil in unlined rock cavern Three sites in India: Mumbai, Mangalore, Visakhapatnam DC Skanska Teknik AB, Stockholm DFS Detailed feasibility report (basic design, cavern lining & stability, cost calculation, system studies)
5. Rohtang Road Tunnel Himalayan belt; Himachal Pradesh, 8.8 km long high altitude hill road tunnel C External expert to Larsen & Toubro Ltd. TE Risk assessment for construction and validation of construction method
6. Tala hydroproject Bhutan, 1020 MW runoff the river HEP C Larsen & Toubro Ltd, CS Rock classification, tunnel support, tunnel mapping, geotechnical instrumentation
7. Pir Panjal railway tunnel Kashmir, 11Km long railway tunnel;
DC Geoconsult, Austria Tendering, geotechnical investigation, detailed design and construction supervision
8. Nathpa Jhakri Hydroproject Himachal Pradesh, India
1500 MW runoff the river with 30km tunnel, underground powerhouse, 60m high dam
C
Impregilo sPa & Hindustan Construction JV CS Rock classification, tunnel support, tunnel mapping, geotechnical instrumentation
9. Rapid hydropower potential study: Spiti valley Upper Himalaya, India DC ICCS-RSW JV FS Rapid feasibility study of hydropower projects along valley
10. Various hydropower projects Himalayan belt, India DC Skanska, ICCS-RSW JV, Geoconsult FS, TE Tendering, feasibility study, estimation, construction method

View contact information...
«« previous resume next resume »»
Search Results (Resumes 401 to 450 of 4812)Go to Search Parameters...
Brief Description
Working field superintendent
I'm Civil Engineering Degree applying for Land Surveyor can operate total station,level,all survey purpose and have skill in autocad.
As a residential developer and general contractor I am committed to the principles of construction. I am prepared to advise and assist in making decisions with regards to land development, commercial & residential building and construction project management with cost effectiveness and proficiency
24 years experience in the Quality Control, inspection, supervision of pressure vessel, piping, pipeline and structural steel work. Certificated NDT level II in the UT/RT/MT/PT. Performed WPS/WQT and inclusive of Mechanical Testing witness. I have knowledge of ASME, ANSI, AWS and API code.
Construction Manager Construction Project Manager Project Manager Civil Engineer Construction Engineer Structural Engineer Estimator
With an impressive diversity of significant experiences, I have developed a familiarity with several field of work such as petrochemical refinement, water treatment, environmental protection and various power generation systems
Professional with Ten years experience which includes Document Controlling, Technical writing , Quality Control/Inspection, Contracts documents, Drafting and Development using AutoCAD, Adobe Acrobat, Ms office, Photoshop.
Structural inspector, Diploma in civil engineer
Engineer having 10 years of experience in Foundation,Erection,Stringing from 110 kv to 400 kv lines and also having exp in OPGW overhead installation
Plant Maint Engg
I am presently working VOLTAGE ENGINEERS LTD AT DOHA QATAR) as plant engineers / Automobiles maintenance engineers .managing a of workshop Transports in charge ( Company- Oil , Gas / power, infrastructure/ Energy/ Constriction. automobiles )
Survey Party Chief / Technician with experience with all phases of boundary,constructionand topographic surveys
Electrical Engineering diploma holder with more than 14 years experience in electrical oil and gas onshore construction field.
Graduate having experience of more than 14 yrs. in Secretarial and Administration
Factory Manager, Technical Manager
-Has wide working knowledge and experience on automotive production line.
My education background was Architecture but I have experiences in various multi cultural work environment, specially in multi national Engineering Company. Project execution on fabrication and construction for Civil and Mechanical according applicable international code/ standard.
Looking to join a progressive construction organization that needs an expert in planning & Cost control follow up engineer for senior position. my experience incorporates all types of construction projects - high-rise multi-dicipline buildings, touristic villages, etc.
Over 9 years UAE experience as CADD Operator in Khatib & Alami (CEC). Responsible in preparation of Design drawings and final drafting stages of Mechanical drawings.
Expereince in Total Station surveying
learner, can work under pressure, Good in oral and written communication, perceptive details, Friendly and approachable but firm when needed, Patient and dedicated to work.
A seasoned, highly organized construction professional with over 38 years of heavy industry experience which includes both industrial construction sites and field/shop fabrication locations in the Pulp & Paper, Petro-Chemical, Government, Hydro Electric, Institutional, Mining, Nuclear and Wind Power
As a person who has worked as a factory trained technician on erecting and lifting equipment and is a certified crane inspector I am currently seeking employment that will further advance my knowledge in this rapidly changing industry. I am looking forward to discussing any potential opportunities.
I am presently a Commissioning Turnover/Interface Lead at an oil sand plant constructing Hydrogen/hydrotreaters. Looking for ne international projesct with 28/28 rotation.
see below for cover letter breifling describing my 20 years in the civil construction industry
Welding Certificates
Materials and Warehouse Manager with over fifteen years experience in materials handling, logistics, warehouse, recycling and transportation industries. Proven success in improving productivity and service, while reducing costs through total quality management, goal setting and a participatory man
Heavy equipment operator
Uncommon ability to manage multiple tasks, meets deadline, and work overtime
Diploma in instrumentation eng ,15 years experiance in oil & gas field
More than 16 years in the field of Secretarial job, 4 years in the field of Accounting and Credit & Collection & 2 years in Office Clerical jobs. Expert in computer program applications like MS Word, Excel, Access, Outlook, PowerPoint, Mind Manager, CRM. Also, PC assembly and trouble shooting.
Mining 20 years South Florida dig wet or dry prossess every type of material. Experence with Hoe,Loaders,Buldozers,Pumps, Screeners,Stackers, Crushers, Machanic, People, Customers, Bidding, Truck Broker 20 years to move material, IMSHA,Permits, South Florida Water Management .
Constructions, Erections, Installation, Maintenance, Inspection of Static& Rotating Equipment Piping Acessories and Structural steel and Computerized Maintenance Planning’s System ,Familirize with API , ASME and ASTM standard . Understand to read P&ID, Hyd/Pneum Circuit, Isometric Drawings.
Senior Geotechnical / Civil Engoneer
Heavy equipment - mining
■ Quality-driven professional with over 25 years of experience■ Verifiable track record for successful completion of projects in EUROPA ,SOUTH- AFRICA.RUSSIA and QATAR. ■ Business oriented; able to understand and execute broad corporate policy. ■ Implementatio
PRINCIPAL ENGINEERING GEOLOGIST-GR LEADER
Good interpersonal and communication skills. Able to work in a team as an individual. Various working experiences and willing to learn for a new things. Interested with a new experience and computer software. Discipline and be able to lead a group. Appreciation of outdoors and the e
Design Coordination, CAD Drafting , Site Supervision
Quality Assurance/Control * Inspection & Project Engineering * Welding * NDT * Coating * Fabrication * Construction * Offshore and Onshore Gas / Oil / Gas Plants*Jackets / Topsides / Well sites / Pipelines / Piping / Structural / Pressure Vessels / Tanks /
Efficient planning for execution of project
Ph.D. materials engineer with 23 years of R&D experience in: a) Program management; b) Measurement of material properties Test method development and fixture design; c) Polymers, composites and their processing; d) Laboratory supervision and management of technical personnel.
13+ Years of Experience in Overhead Power Transmission Line Projects/Construction
Senior Geotechnical engineer with 7 Years of experience and having Masters Degree in Geotechnical engineering
Thirteen (13) years Experienced as Procurement Administrator with a Swedish Company in Riyadh Saudi Arabia
computer skilled--ms word/excel/autocad, hardworking and honest
Document Controller - A professional who values integrity, quality and accomplishment. Proven ability to adjust well in a challenging environment. Demonstrates strong organizational skills. Quick to adapt to new situations and processes
Geotechnical Engineer
Over 20 years operating track hoes, dozers, loaders, rock trucks, etc., in construction of water treatment, sewer plants, and road construction.
27 Years of Indian and abroad experience as a worker, Foreman and as a Supervisor in Aluminium fabrication, Aluminium Cutting, Site fitting, Glazing, Glass, Silicon works and Site maintenance
First   1   2   3   4   5   6   7   8   [ 9 ]   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com