Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #84225 next resume »»
CONTACT INFORMATION:
View contact information...

A. PERSONAL DETAIL
Place / Date of Birth: Duri, 4 February 1966
Sex: Male
Marital Status: Married + (2 Children)
Healthy: Excellent
Passport No.: AH 531076

B. EDUCATION BACKGROUND

1. Primary School: SDN 2 Caltex Duri – Riau 1979
2. Secondary School: SMPN 1 Caltex Duri – Riau 1982
3. Senior High School: SMAN 1 Caltex Duri – Riau 1985
4. Engineer Certificate: University in Bandung – West Java
(Graduated Of Technical Division) 1993
Electrical Degree.
C. SKILLS

1. Thorough knowledge of Electrical Principles.
2. Computer literate.
3. Speak and Write English.

D. WORK EXPERIENCE (briefly)

Engineering Abilities: To manage the electrical installation project Electrical Industry; Refinery, Mining and Combine Cycle work on site, Field Design Electrical System pre-commissioning installation. Supervise Installation of High voltage equipment for Switchyard, Transmission line and, Substation. Medium and low voltage Switch gear, Circuit Breakers and MCC with controls and relay systems.
QA/QC Abilities: QA/QC Documentation, Electrical Specification and Installation to commissioning Procedures. Inspection and testing all electrical equipment in accordance to assist in updating Operations Function codes, standards and procedure are ANSI (American National Standard Institute), NEC (National Electrical Code), NEMA (National Electrical Manufactures Association).
PROFESIONAL EXPERIENCES (1992 – 2008)
15 (Fifteen) years experience on Electrical Systems, Maintenance Service and Construction – Plant for Petrochemical, Nickel / gold Mining, Oil and Gas, On-Shore & Off- Shore.

D.14 British Petroleum
Designation: QA/QC - E&I Inspector
Job Location: Guna Nusa Fabricator Cilegon & LNG Tangguh Papua.
Project: BP Tangguh GPF Project (Constructed & Installation Two Platforms - FPSO) & LNG Tangguh Onshore Project ; 2 Train, 3 unit Gas Turbine Power Generation
Reason for leaving: Project completion – 2006 - 2008

Facility Portion of Tangguh LNG Projects Are:
Two (2) Platforms (GPF), Two(2) Train Process Facilities and Three Units Emergency Diesel Generators, Three Unit Gas Turbines & Boilers 3 x 35 MW, and Utiliy Facilities + Main Substation and 8 (Eight) Substation. Perform routine inspection and document result in accordance with approved Project Owner procedures and specifications.

* HEALTH AND SAFETY
* Take leadership in assuring that electrical activities are performed safely and in accordance with the LNG safety policies
* Knowledgeable of and audit compliance to BP Safety and Maintenance Procedures HSE regulations
* Provide guidance for safe work practices and personal protective equipment (PPE) used by crafts and contractors
* Ensure proper documentation of special operating and maintenance instructions associated with electrical equipment
* Knowledgeable of the following:
- National Electric Code
- National Electric Safety Code
- IEEE Documents and White pages

D.13 Tripatra/Fluor Chevron – Duri.
Designation: SLN Construction Superintendent Supervision
Job Location: Chevron Duri (Oil & Gas)
Project name: Flexible Project Management
Present: April. 2006 – Dec'26. 2006
Reason for leaving: Project completion – 2006

D.12 Combine Cycle Gas Turbine Suban Pahse 2 Gas Plan Project
Designated: Pre-Commissioning & Commissioning and Facility Acceptance Coordinator.
Reason for leaving: Completion of Contract (March 2006).
PT. Thiess Contractors Indonesia / Conoco Phillips.
Expansion to an existing Gas Production Facility.

DUTIES AND RESPONSIBILITY
Consist of review of quotations from the vendor and conduct T.B.E technical Bid Evaluations. Witness F.A.T and at the conclusion of site installation conduct S.A.T.
Source calibration equipment for site process instrumentation and personnel.
My team consists of one site Instrument Engineer and one site Electrical engineer along with a crew of 70 personnel to carry out site installation and site acceptance tests by means of a Quality Controlled hand over system to the client.
I then had the over all responsibility of supervising other Engineers in the Mechanical and Piping fields to full fill engineering interface between the client and the J.V partner Hyundai Engineering. Cleared all punch lists.

D. 11 Construction Service CHEVRON Project 2004
Thiess Contractors Indonesia.
Designated: Estimator Engineer and Monitoring E/I Construction Activities
Job Location: Caltex Construction Service Duri Project, Oil and Gas
Present: February.' 04. 2004 – March' 01. 2006

DUTIES AND RESPONSIBILITY
Handling some of electrical & instrumentation, civil work and mechanical work order incoming from Client ( Chevron Pacific Indonesia) to estimate / Calculate and negotiate. To conduct Kick of meeting Work Order Approved between Client and THIESS Contractor C/W Construction Teams. Witness F.A.T and at the conclusion of site installation conduct S.A.T. Organize and supervise Electrical & Instrument construction activities, quality, testing, documentation, Pre-commissioning, commissioning and start-up.

D. 10 ABERDEEN - (FPSO) Off-shore oil and Gas Industry, Shell
Power Generator System Installation' 2003
Designated: Operating Engineer - Electrical Inspector Eng. (QA/QC)
Job Location: North East of Aberdeen (Shell Oil Company – Aggreko).
Reason for leaving: Project completion (July 24' 02 – Jun' 03).

DUTIES AND RESPONSIBILITY
Full Inspection and monitoring Portable Power Plant Installation, Diesel Power Generator Systems (300 KW / 200 MW) Multi Voltage /50Hz/ 60Hz and Load Banks Precision testing for Both Resistive/ Reactive Loads (2.5 Mw – 100 Mw).
Perform routine inspection and document result in accordance with approved Project Owner procedures and specifications.

D.09 PT. Caltex Pacific Indonesia Steam Flood project
Designated: QA/QC – Electrical & Instrumentation Inspector/ Engineering
(Pre-commissioning and Commissioning) Owner Representative
Job Location: Central Gathering Station – 10. Duri Project.
Oil & Gas Facilities – Sumatra.
Reason for leaving: Project completion. (September. 04' 00 – September. 2001

Combine Cycle & Gathering System Project:
Coordinated construction activities 3 x 100 MW Siemens Westinghouse combustion turbines 501D.
Controlled daily activities of the sub-contractor PT. Siemens Indonesia on schedule requirement and engineering interface. Respond to (RFI) request for information and worked with engineering in Head Office.
In addition to my task of completing electrical system for hand over, I controlled the following: E & I, millwright, Building's, and Painting. Compiled all check sheets, involved with pre commissioning, commissioning and start up achieved contractual acceptance of plant hand over by the client.

DUTIES AND RESPONSIBILITY
1. QA/QC documentation and review Contractor construction electrical procedures.
2. Supervise and Monitor Installation of Cable, Cable tray, Lighting, Distribution control panel, all electrical equipment and Grounding system, etc.
3. Perform routine inspection and document result in accordance with approved CPI procedures.
4. Monitor activities of supervision contractor and construction Contractors.
5. Witness and verify Continuity, Merger, HI-POT and Component testing for Medium Voltage & Low Voltage equipment.
6. Monitor Quality control on construction progress activities.
7. Responsible from equipment installation and continue energizing of electrical equipment to pre-commissioning and commissioning.
8. Issued punch listing for out standing works.
9. Review Tested documentation, witness and accept all required Testing for CPI (Client).
10. Etc

D.8 Middle East UAE. Oil Refinery & Power Generation Plant
Designated: Electrical Maintenance Eng.
Job Location: Al – Mubaraz island – (FPSO) Abu Dhabi Oil & Gas Company (ADOC)
Abu Dhabi – GULF (UAE).
Reason for Leaving: Project completion. (Augustus'04' 99 – April. 04' 00).

DUTIES AND RESPONSIBILITY
Maintenance and operational of plant facilities. Turbine generator power supply to Transformer, and than going to switch gear, from switch gear going to ALL WELL HEADS Platform / Central Platform, MCC, Distribution Panel, Motor Electric Over Hauls, Lighting and lighting Panels Distribution, all Electrical Equipment and Modification.

D.7 Newmont Gold Mining (COMBINE CYCLE) Project
Designated: Field Engineer Electrical and Quality Control Engineer
Job Location: PT. Flour Daniel – Sumbawa Batu Hijau Project (Power Plan &
Gold Mining) New-Mont Nusa Tenggara.
Reason for Leaving: Completion of Project. (October 1998 – July'30. 99)

Power Facility Portion of Batu of Batu Hijau Four (4) 28 MW Coal Unit and Nine (9) Diesel Generator Units, and a 150 KV Transmission Line. Project Cost US $ 1.8 Billion.

Combine Cycle Project ( Coal Power House & Diesel Generator)
DUKE FLOUR DANIEL INDONESIA
Coordinated all construction activities on a diesel powered power plant. (Associated Switch Yard 11 KV-150 KV).
Phase two of the contract, coal-fired power plant with four turbines. Responsible for electrical trades
With Electrical speciallist Commissioning bringing total to a round 25 personnel.
Controlled all QA/QC documentation. Involved with commissioning team for client hand over, and acceptance.
DUTIES AND RESPONSIBILTY
1. Manage the electrical Contractors daily construction activities, schedule and progress.
2. QA/QC documentation and specification and verify, contractor procedures.
3. Generate Field Change Request (FCR), Field Purchase Request (FPR) and Request for Information (RFI). Inspect and approve Electrical Installation on site.
4. Witness and verify Continuity, Merger, HI-POT and component testing for Medium voltage & Low voltage equipment.
5. Inspection of Connection and Installation switch gear and MCC panel.
6. Expedite materials for construction and issue field instruction to contractor.
7. Supervise and Inspect Subcontractor (SIEMENS) construction activities.
8. Witness Pre commissioning and commissioning testing.
9. Review all test packages; prepare QA/QC documentation for Turn over to client.
D.6 INCO Nickel Mining Project, Flour Daniel
Designated: QA/QC - E/I Engineer.
Job Location: PT. SNEF/ Fluor Daniel – Soroako, PT. Inco Expansion Project
(Soroako South Sulawesi) (Feb 1998 – Oct 1998).
Reason for Leaving: Project completion 1998 – Certificate.

DUTIES AND RESPONSIBILITY
1. Responsible for project operational safety requirement
2. QA/QC documentation and review contractor installation procedures.
3. Implement & enforce all company policies, procedures and practices.
4. Planing construction electrical and Instrumentation schedule.
5. Monitor construction activities and progress.
6. Witness and monitor electrical and Instrumentation equipment testing.
7. Responsible for test packages documentation from pre-commissioning to final hand over to client.
8.
D. 5 UNOCAL' 76 Combine Cycle Project Unit # 4. 5. 6, Bectel
Designated: Electrical Engineer for Start-up to Commissioning/ Owner Represent.
Job location: Unocal Salak Geothermal Project Unit # 4,5 & 6 (West Java)
Reason for Leaving: Project completion (1998) / Certificate.

DUTIES AND RESPONSIBILITY
1. Perform evaluation and recommendation for power generation project electrical operation system start-up to commissioning acceptance.
2. Assigned as Commissioning Electrical Engineer. Trouble shooting, maintenance for power plant and distribution during shut-down Unit # 4,5,6 and MCC panel and local panel for lighting Power Generation Facility Area and-Resource Production Facility Area.
3. Responsibility too for cleaning ISO-phase Bus Duck and prepared, termination element Space heater and confirmation main transformer. Install and link grounding clutiss on generator out put for Turbine Generator Unit # 4, 5, 6.
4. Inspected and Cleaned Unit # 400, 500, 600 Lube oil Clarifier Heaters.
5. Verify Drawing & specification of Electrical Equipment.
6. QA/QC Electrical Documentation.
7. Verify Punch listing for all Electrical works prior to final acceptance.
8. Planed schedule for electrical start-up, cables modification, installation and other construction activities.
D.4 AMOCO Petrochemical Project
Designated: QA/QC. Electrical Engineer
Job Location: Merak – PTA 1 AMOCO Petrochemical Plant Project
Cilegon – West – Java / PT. IKPT – CHIYODA – J/O
Reason for Leaving: Project Completion (1997) – Certificate.

DUTIES AND RESPONSIBILITY
1. Supervise and Monitor Installation of Cable, cable tray, Lighting, Distribution control panel, electrical equipment and Grounding system, etc
2. Prepare and Verify construction Drawing, Specification and installation procedures of Electrical Equipment.
3. Supervise & Inspection of electrical equipment Installation, testing to - commissioning.
4. Witness cable termination for Medium and Low voltage Power to Switch Gear, MCC, MV/LV electrical Motor.
5. Responsible to QA/QC and Construction Managers.

D.3 Unocal'76 Geothermal power Generator Project Unit # 4, 5 & 6.
Designated: Field Engineer / Engineering Dept.
Job Location: Salak Geothermal Project (West Java)
Fluor Daniel JO IKPT.
Reason for Leaving: Project completion (1996 – 1997) – Certificate.

Combine Cycle Geothermal Power Generation
Directed construction activities on caterpillar generators series 3512.
Controlled all QA/CC documentation pre commissioning, commissioning and start up.
I controlled a very small and dedicated local craft force to achieve start up in a very isolated and troubled province.
We achieved start up on schedule and I trained local staff to switch over to maintenance duties.

DUTIES AND RESPONSIBILITY
1. Verify all Drawings and Specification of Electrical and Instrument.
2. Support the project program for verifying construction quality.
3. Supervision and Inspection to Subcontractor in construction Activity Installation and Hook-Up some Instrument Equipment and Planning Installation Electrical Motor Connection, Power Supply and Compressor.
4. Handling RFI from Subcontractor and Connected all Paper Work
5. Reporting to Engineering Manager.

D.2 Mivan Apartment Project.
Designated: QA/QC – Electrical Engineer.
Job location: Dukuh Golf Apartment Project, Kemayoran,
Jakarta Utara
Leaving for Job: Project completion (1995 – 1996) - Certificate.

DUTIES AND RESPONBILITY
1. Verify Drawing, Specification and Equipment.
2. Inspection of connection pooller and control cables.
3. Supervisor of Installation cable Tray, Lighting and Light distribution panels.
4. Direct Medium Voltage & Low Voltage Equipment testing (continuity, Megger test and HI-pot test. (Feeder, pncc & swgr panels).
5. Prepare document & record or documentation for turn over package)

D.1 Unocal Power Generation Project Unit # 123.
Designated: Unocal Electrical and Instrument Supervision.
Job Location: Gunung Salak Geothermal Plant Project Unit – 1,2,3, (West –
Java) UNOCAL' 76.
Reason for Leaving: Complete Project (1993) – Certificate.

DUTIES AND RESPOSIBILITY
1. Supervise to Subcontractor in Construction Activity Installation in Hook up all Instruments on general Electric (Gas Turbine) Ingersoll (Condensate Pump) and Installation such (Installation Cable Tray). CCS (Compressor Anti Surge Control), PLC.
2. Control all Drawing & Specification of electrical and Instrument.
3. Supervises of Connection all Electrical Motor, Blacke Dur (welding Procedure Specification) Bailey Controls (West Pump Station) Pneumatic Products (Installation Operation & Maintenance).
4. Inspection & Check for Pre Commissioning & Commissioning.
5. Report to Construction Manager

An ambitious and experienced electrical engineer with significant industry knowledge gained via working continuously with management teams, coordination with supervision of various projects Off-Shore, On-Shore and Construction. Pursue a career that will provide a rule of:
E & I Inspection, Construction Manager & QA/ QC manager

View contact information...
«« previous resume next resume »»
Search Results (Resumes 151 to 200 of 4814)Go to Search Parameters...
Brief Description
Civil Engineer. Formwork Specialist. Experience: 14 years. Mounting, Scaffolding, Precast Concrete.
Fujitsu LV-III Installer, OSP Field Engineer, Structure Cable Lead Installer, Fiber and Copper Splicer, Network Tech, Antenna Tech
Self-motivated, results-oriented professional with extensive international experience with multinational firms and government-owned facilities in the construction, shutdown, and refurbishing of oil, gas, petrochemical, and power facilities and plants.
Over 20 years of extensive experience as an international consultant. Provider of structural software for the analysis and design of concrete & steel according to ACI, AISC & API codes of practice. Expert in; structural systems & forensic investigation. Professional in; STAAD III & MS office Suite.
Graduated in B.Eng civil 1976 and Post grad Hydraulic in 1982, total 28 years experience in civil, infra such as steel, timber, road, car park structures and sewer and pipe laying as well as tunnels and pipe jacking works.
Free! Experienced Heavy Civil & Design Build Construction Project Manager with additional experience with Project Controls/Scheduling/Claims Resolution Management.
Refractory sales and Technical support
B.E.(Mech.) & BEE certified Energy Auditor
I am a civil engineer with more than 12 years of experience in Mauritius. I hold a first degree in civil engineering, a master degree in environmental engineering and another master degree in business administration. I already got my Permanent residence for Australia since July 2008.
Licensed Journeyman Electrician, thirty four years experence, Industrial, commercial, residential, and oil field
Mechanical project &maintenance engineer with 17 years of industrial experiance.
Mechanical engineer in cement Plant
Over 16 years of experience in construction industry local and abroad. Responsible for completing the project within time and within cost.
HVAC Professional Having 17 Years of rich Experience in Major MEP projects,expert in handling fast track projects with in project time frame and budget..
Engineering and construction executive with MS in civil engineering and construction management and BS in general engineering, with extensive hands on and executive level experience in project, construction, and contract management in multi-deceiplinary projects in the international arena.
Quantity Surveyor 3 yrs experience in Gulf
MEP Cad Designer / MEP Cad Coordinator / HVAC Designer
Knowledgeable in electrical, mechanical, and some electronics
electrical contractor for 25 years and have a ton of experience in the electrical field.
all-round civil engineering background with experience in traditional building constructions and special structures, such as bridges, tunnels, towers, piers and offshore structures including design, planning, project management, quality assurance and supervision.
Extensive experience and skills to help industrial organizations improve their effectiveness through better use of processes and systems. Also very proficient in development and use of integrated improvement teams.
Knowledgeable and experienced Design Procedures with 15 years road construction experience
Construction project manager
20 years in Oil/Gas in Eng. ,Procur.and Construction including Piping Design in accordance with international codes, Procurement Technical Services & Construction Supervision. Management of Eng. Staffs in Multinational and International Environments Conversant with ARAMCO and SHELL DEP Specs
Instrument technician - PLC/DCS programmer
Civil Marine, Dredging & Coastal Engineering. record: 70 projects
Road works
I have 15 yrs experience in construction supervision of roads and bridges (RCDG), concrete slope prot. works, RCBC and concrete retaining walls. Presently I am working in Saudi Arabia as Civil Engineer handling big highway proj. designed for asphalt pavement.
Sr Instrument Engineer with over 15 years experience in the design and specifications of instrumentation for petrochemical plants, and 2 years for offshore platforms
Structural/Geotechnical Engineering jobs such as Pile design, Retaining wall design and project management
Hands on site experience in infrastructure works (roadworks ) and buildings works with total 19 + years experiences ( supervision and project management)
Licensed professional engineer with over twenty-seven years of structural design and deliverables production experience for Industrial, Commercial, Residential, Oil and Gas, and Transportation projects
I have 17 years of Planning experiences within oil and gas, petrochemical, mining, power plant and industrial plant construction. I am also an advance user of P3/P5/P6.
B.E. with 22 years of experience in Highways, Industrial and Building construction, out of which 3 years in Saudi Arabia. The experience includes-
I am a sri lankan working in oman -presently in the field building services as an engineer. Capable of designing - cold & hot water supply systems, sanitary plumbing stsems and fire fighting systems)
Pressure Welder, Pipe Welder with 20+ yrs experience, Hard working
I have been in Truss deaign,layouts,and engineering for approx.36 years. I have experience in single family commercial,spealizing in multifamily design of beams, componets,floors and roof trusses
QA/QC Electrical Engineer
Total station operator
15 year of experience in the glass and aluminium industry
Application for the post of project manager/ section manager
heavy equipment operator sewer and water forman
Project/site /operations manager
Debasis is a geotechnical engineer and numerical modelling specialist within Scott Wilson’s Ground Engineering team. He is currently responsible for numerical modelling and geotechnical design input for tunnel linings, retaining structures and earthworks working on a variety of infrastructure sche
hi looking for job
Professional individual having Soil Investigation, Soil Improvement, Diaphragm wall construction, Quay wall construction, Piling, Drilling Techniques (All Types) Geotechnical Special Testing, Material Testing, Geotechnical & structural Instrumentation & Geological Mapping skills.
Electric Engineer
International Project Management Residential Commercial Industrial
Dip Elect & Mech Engineering + LLB + MBA
Over fifteen years experience as Certified Business Continuity Professional with over ten years experience as Project Management,Technical Writer and trainer and over a year as a SEI/CMMI Auditor, completing projects ontime and within budget.
First   1   2   3   [ 4 ]   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com