Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #84385
next resume »»
CONTACT INFORMATION:
View contact information...
CAREER SYNOPSIS
Sixteen (16) years in Engineering, Procurement and Construction projects associated with cost control, planning and scheduling fields. Project categories includes petrochemical, gas and oil refining, power, and industrial, buildings, roads and a sports complex. Conversant with project cost control systems and techniques, analysis, estimates, reporting, statistics, curves and histograms. Proficient with Microsoft products and Auto Cad. Supervised and executed construction of Residential & Commercial Buildings and various civil projects.
TRAINING and SEMINARS
ľ Project Control Cost System (FD Cost)
Fluor Field office, Jubail Industrial area, Kingdom of Saudi Arabia
ľ AUTOCAD 2002-2D, 3D Computer Aided Design Drafting and Color Rendering
Meralco Foundation Institute, Pasig City Manila Philippines
ľ Steel Reinforced Concrete Design for Building Construction
Construction Manpower Training Center, Philippines
ľ Anaerobic Waste Water Treatment Technology
Paques BV Environmental Technology, P.O. Box 52 8560, A.B Balk, Holland, The Netherland
ľ Water Works Supply Program
Pasar / Philphos Training Center, Isabel Leyte, Philippines
PROFESSIONAL EXPERIENCE
FLUOR ARABIA LIMITED (FAL) COST ENGINEER
Sipchem ¡V Jubail Acetyls Complex (JAC) Project March 2008 to Present
Jubail, Industrial Area, Kingdom of Saudi Arabia
Acetic Acid (AA), Vinyl Acetate Monomer (VAM) Plants and new Utilities including cooling water, steam generation, and associated other utilities. EPC Project with a Construction Cost of $455MM USD and 20MM construction hours.
* Prepare and update the In Kingdom (IK) cost reports that includes, contractors / vendors contract and invoices status, commitment modification work based on CSI log.
* Preparation of Monthly Staffing plan, forecast and budget including housing, vehicle and equipment schedules, analysis of policy and escalation.
* Monitor the field purchased order commitments incurred and expended.
* Evaluation of subcontractors progress billings, value of work done (VOWD) and review of quantities.
* Quantity Surveyor assistance with Quantity take-off by contract pay items.
* Prepare weekly and monthly construction progress status report (PSR), hours spent, statistical S-curves, Power point slides including progress photos for internal management references and client coordination meetings.
* Development a project deviation log with cross references for all types of changes. The log tracks prime accounts and areas and is also used for back-charges purposes and reconciliation between extra works against contract quantities.
* Cost estimation for additional works, modification, with respect to design and field changes.
* Check and evaluate contractors and vendors invoices, to ensure that the man-hours and unit rates are in line with the approved timesheets and contracts.
* Purchased Order log, segregation of cost using Fluor standard cost codes, and by prime commodity.
SAIPEM CONTRACTING NIGERIA LIMITED (SCNL) COST CONTROL ENGINEER
Gbaran Pipelines, Field Logistic Base; Offshore Wellhead Project July 2006 to February 2008
Aker Base, Rumuolumeni, Port Harcourt, Nigeria.
Onshore and Offshore Project for SHELL Field Logistic Base and Fabrication of Wellhead Platforms for Exxon Mobil. Engineering, Procurement, Construction and Management (EPC) Project.
* Develop and manage effectively a cost control system which allowed the project to complete within the approved budget using a WBS based on Saipem standard coding.
* Maintained the control budget (revenue & costs) with all agreed changes and necessary internal transfers.
* Monitored subcontracts for progress, value of work done (VOWD) and milestone completion against invoices.
* Reviewed forecasts, deviations and analyzed SAP data to recommend corrective actions.
* Supported the contract claims process providing the cost impact analysis and the close-out report.
* Preparation, Cost Control Report (CCR), Budget and Project Status Reports (PSR).
* Coordination with the Planners on any revision of schedules.
* Develop an operating budget, from the approved bid contract amount for cost control monitoring.
JOINT VENTURE: TOYO ENG, IDRO, JGC & DIC (TIJD) COST CONTROL ENGINEER
South Pars Gas Development Phases 6, 7, & 8, Onshore Project October 2004 to May 2006
Assaluyeh, Bushehr Province, Iran
National Iranian Oil Company (NIOC) for Pars Oil and Gas Company (POGC). Engineering, Procurement, Construction and Management (EPC) Contract.
* Developed cost procedures for weekly and monthly job cost, man-hour, productivity and cost detail reports to determine expended, earned value and the variances against project baselines.
* Prepared back charges, costing of work orders and change orders based on the approved unit rates.
* Develop project cost reports and maintain project cost control system.
* Cost forecasting, contingency and escalation analysis, evaluations, estimate reconciliations, scope comparisons, quantity analysis and cost studies utilizing historical data, statistical analysis, committed cost, activities to-date, productivity and cost quantity comparisons
AL-YUSR TOWNSEND & BOTTOM CONSTRUCTION (AYTB) COST ENGINEER
Titanium-Tetra Chloride Production Facilities Project April 2003 to July 2004
SABIC Industrial Complex for Research & Development, Riyadh K. S. A
* Developed and established the overall project budget by cost code to segregate elements based on the approved bid estimates.
* Cost coding of all invoices to monitor costs against the proper Budget items.
* Prepared and updated equipment costs, direct/indirect labor and monitor against forecasts and budgets.
* Monitored costs and identified changes and impacts to in budgets, cash flows and profit/loss analysis
* Prepare weekly job cost, man-hour, progress and earned value reports using BCWS (budget cost work scheduled), BCWP (performed) and ACWP (actual) methods.
* Estimated changes, prepared invoices and administered back charges.
* Site visits to verify and monitor the actual progress status of the project.
PRIVATE CONSULTANT PROJECT ENGINEER
Libas, Merida, Leyte, Philippines July 2001 to January 2002
* Contracted to design and construct a two story residential building (PHP 3,875,000) and miscellaneous Barangay infrastructure projects. Create plans, design, and specifications, Bill of materials, schedules, cost estimates and building permit. Supervise Contractors.
DAELIM SAUDI ARABIA CO. LTD (DSA) COST CONTROL ENGINEER
Petrokemya Olefins III Project April 1999 to January 2001
Jubail Industrial Area, Kingdom of Saudi Arabia
EPC Project for Arabian Petrochemical Company, Jubail, Saudi Arabia assigned to Project Controls.
* Cost coding of all invoices to monitor costs against the proper Budget items.
* Prepare and update equipment costs, direct and indirect labor and monitor against forecasts and budgets.
* Monitored actual costs and identified changes in budgets or cost impacts.
* Prepared weekly job cost, man-hour, productivity and cost detailed reports for expended, earned values progress and variances as to the forecasts.
* Site visits to verify and monitor the actual progress status of the project.
DAELIM MALAYSIA SDN. BHD. (DMSB) CIVIL QS - SCHEDULER
Gas Processing Plant 5 & 6 Pipeline and Marine Terminals January 1997 to January 1998
Paka, Terengganu, Malaysia
Gas processing plant 5 & 6 Pipeline and Marine Terminals. A joint venture with Mitsubishi and Marubeni of Japan, Snamprogetti of Italy, IJM in Malaysia and Management by Petronas Gas Berhad (PGB).
* Assigned in Engineering and Construction contracts that included all disciplines.
* Reviewed and verified submitted quantities, calculations and approved take off quantities.
* Worked with Project Controls on budgets, estimates, and weekly progress and manpower reports.
* Coordinated with Finance, Planning and other disciplines to monitor and report against budgets,
* Participate in the preparation of technical information for change orders.
* Review contractors' monthly invoices and quantity measurement based on actual site progress.
* Field planning, resource identification/allocation, man-hour estimates and equipment hour estimates.
* Developed, and evaluated schedules for milestones, trends and problems and suggested corrective actions.
PNOC ¡V ENERGY DEVELOPMENT CORP. CIVIL SUPERVISOR
Tongonan, Ormoc City, Philippines May 1996 to November 1996
* Repaired damage to miscellaneous foundations, access roads, pipe supports and staff housing.
TIERRA INTERNATIONAL CONSTRUCTION (TIC) CIVIL/STRUCTURAL ENGINEER
Upper Mahiao Geothermal Power Plant (128 MW). July 1995 to March 1996
Tongonan, Ormoc City, Philippines
* Performed evaluations, construction drawing checks and prepared material lists for each structure.
* Structure analysis, preparation of sketches and proposals for client approval.
* Coordinated with the site engineer/ supervisor during execution until completion of the project.
* Prepared field designs in accordance with project agreements.
* Implemented project construction quality control requirements.
* Prepared deviation reports to document and control nonconforming conditions as required.
* Implemented design document distribution and control for the project.
* Prepared field material requisitions for permanent plant materials as required.
* Performed system/area turnovers including as-built documents and inspection.
SUPERMAX ENGINEERING ENT. CO. LTD. (SEECL) CIVIL SUPERVISOR
Pushin Brewery Plant Project February 1994 to May 1995
Taoyuan,Taiwan R. O. C
* Construction of a wastewater treatment plant and a packaging building. Supervision and monitoring subcontractor's daily work activities, quality and schedule within the Project guidelines.
* Preparation of daily and weekly progress reports, field mismatch reports, inspection Reports. Coordinate final structure inspections and punch list completion.
* Prepared material, tool and equipment requisitions to suit project requirements.
* Coordinated with subcontractors, anticipating problems and solutions to support construction activities.
* Supervised design of temporary construction facilities. Assured proper warehousing was in place.
* Reviewed specifications, purchase orders, subcontracts, inspection reports, delivery schedules, instruction manuals and technical data to assist and advise management.
* Reviewed, analyzed, supervised or prepared construction estimates, cost studies, schedules and budgets.
* Assisted procurement in inspection and acceptance of field materials against project specifications.
* Developed punch lists and administered the clearance of punch list items.
MANSTEEL INTERNATIONAL CONSTRUCTION (MIC) Civil / Structural Supervisor
Disteleria Bago Incorporated La Tondena Distillery March 1992 to December 1993
Bago City, Negros Occidental, Philippines
.
* The Project included the fabrication and installation of four unit 36-meter diameter, 10,000 metric tones tanks and associated with civil, buildings and piping.
* Responsible for construction of the expansion facilities. Prepared weekly plans, schedules and progress reports. Conducted weekly progress status meetings and coordinated inspections and punch list completion. Prepared documentation required for project turnover.
MILITANTE CONSTRUCTION (MILCON) PROJECT ENGINNER
Building Construction Project, Cebu City, Philippines August 1989 to June 1991
Responsibilities included construction of a ten story residential/commercial building, steel structure warehouse, hotel bank building and a five million peso sport complex. Prepared field estimates, material requisitions, equipment requirements, tool requisitions and schedules for project execution. Prepared daily work schedules, progress reports and conducted Safety meetings
CABEA CONSTRUCTION & DEVELOPMENT CORP. PROJECT ENGINEER
Isabel Leyte, Philippines May 1988 to July 1989
Executed a ten (10) kilometer concrete road project. Prepared progress and field-testing reports. Responsible for a laboratory building renovation and access road. Procured materials, equipment and tools for the project.
PRIVATE CONSULTANT PROJECT ENGINEER
Libas, Merida, Leyte, Philippines February 1987 to March 1988
Contracted to design and construct a one unit residential building (PHP 1,685,000). Create plans, design, specifications, Bill of materials, schedules, cost estimates and building permit. Supervise Contractors.
MANCAO CONSTRUCTION CE AIDE / DRAFTSMAN
Pasar, Isabel Leyte, Philippines July 1986 to January 1987
Prepare field material take-offs. Create drawings, sketches and revisions for site implementation. Coordinate with Site Supervisor during Construction. Update daily work progress charts and manpower schedule.
PROFESSIONAL SKILLS
Ability to do Cost Control Works, Supervise and execute construction of the following structures: Residential & Commercial Buildings, Flood channel, pipe rack Foundation, pipe supports, box culverts, pipe sleepers equipment & tank foundations. Computer Aided design drafting works.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 2301 to 2350 of 4757)
Go to Search Parameters...
Brief Description
To obtain full time employment with a Prominent company in the Construction Industry that offers stability, growth, and advancement opportunities where I can utilize my skills as a Heavy Equipment Operator.
For the post of Design and draughting
Six years of experience in Project Management, Contract Management, Quality Control and site supervision of high-rise residential and commercial project. About four year of experience in Project Management of an industrial projects.
Objective: To contribute my technical skills and to be part of professionally managed Organization that provides excellent opportunities for learning and scope for Individual development.
Vast Experience in Business Development, Administration and Management, Business correspondence.
Architect and Environmental Planner Total Job Experience-2.5 yrs as an Architect 2 Months as a Planner
Bilingual engineer with experience in engineering and teaching. Experience in administration, group management. Dynamic and outgoing by nature.
MSc in Environmental Engineering from University of Nottingham, UK
Well rounded journeyman electrician looking for industrial, commercial or residential position. Experienced with supervising apprentices and other jw's.
I am piping engineer with diploma in mechanical engineering to Poli- Technic institute "GH.Asachi" Iasi, Romania
Piping Designer with Over 20 years experience within the Oil and Gas, Petro Chemical, Refinery, Textile, Pharmaceutical and Nuclear Waste Industries
hardworker STORE KEEPER
NDT technician RT MPT LPT UT
Young academically accomplished geotechnical engineer, practical experience in the mining industry both domestic and overseas.
Application for the post of Safety officer
EXPERIENCED PIPING ENGINEER WITH PDS ADVANCED EXPERTISE / TECHNICAL DATA SPECIALIST
Make, Review and implement Engineering design, construction work,inter-diciplinary interfaces, Construction Specifications, Progress reports, Quality Plans and all the commssioning and Maintenance Procedures.
Construction Project Manager Restaurant (Swiss, 39, Trilingual E/F/G) is looking for a new international career opportunity. 10 years experience in construction project management (McDonald's restaurants and General Contractor). Willing to re-locate in the US/Australia/NZ/Canada.
Knowledge of Hydrotreating & Hydrocracking, Catalytic Cracking, Distillation and Amine plants. Knowledge of Process simulation (HYSYS, ASPEN Plus, PRO II and HTRI), PFD, P&ID, Flare and Relief systems, LDT, Hydraulic calculation, HAZOP review, Equipment sizing, TBE, DPDT and process data sheet
Electrician
I'm a proficient, reliable and a technical sound welder.
QA/QC, CERTIFICATION, TURNOVER
Work on a farm all my life, I went to school last year for heavy equipment
Experienced Buyer/Purchaser, very versatile background from different countries and industries.
I have over twenty years pipefitting experience. Most of this experience has been in industrial chemical and paper processing. Five years of this experience has been as an foreman. I have used computers for report writing, maintaining records and numerous other tasks, have worked internationally.
Interior fitouts Project Manager - expertise in Site execution, Management, Planning , Procurement, Coordination between Services. A Go-Getter and Self-Motivated Engineering Professional.
19 years of experience as a Camp / Accommodation-Facilities Management (Staff Welfare Operation and Maintenance) in Oil & Gas, EPCC, Company (Road & Bridge, Electro-Mechanical Contractor.
I have a master degree from the American University in Cairo, excellent computer skills, English & French languages, Excellent communication skills, and presentable. I prefer workin in construction management field
Develop & implement Contractor’s Quality Control Plan in accordance with contract & technical specifications including writing the Inspection & Test Plan, Quality Audits, Record Keeping, Prepatory Phase Meetings, Resolve NCR's, Process Control, Sub-Contractor Control, every aspect of Quality Control
Im certified coating inspector B-GAS grade2&SSPC-PCI
Senior Electrical, Energy Model, LEED, sustainable, Head, Manager, renewable, coordinator, building commercial, residential, healthcare, Education, industrial, parks, Hotels
Career Objective
Twenty five years experience in ten manufacturing sites with four integrated major and three independent oil companies. Responsibilities include Unit Operator through Refinery Manager, and span operations, maintenance and technical departments. Steady promotion and career growth.
Experienced Autocad drafter with 5 yrs. structural steel detailing experience seeking employment.
Highly experienced Project Mgr in construction and environmental projects. Extensive experience in Federal & State projects, contaminated soils & groundwater, demolition. Hands on and takes ownership. Extensive experience in massive soil relocation and placement. Available for overseas projects.
Construction verification, Cost estimation for mechanical systems involving process piping, heavy civil structures, Plumbing, and fire protection. Project management with Profit-Loss responsibility, Project cost control, Project execution, project control & close out.
I am Danish construction engineer. I have worked as a construction manager for about 3 years. The projects have been large infrastructure projects, commercial, and industrial projects. I have experience in site management and project management,
6+ years of software design and development experience with specialization in Client/Server programming, Object Oriented Analysis and Design. Proficient in, C/C++, MFC, Visual C++, Win32 API, COM/DCOM, multithreading.
Curtain Wall Civil Structural Engineer Manager
A structural engineer with experience in design, construction and inspection of buildings and bridges.
11 years of experience in Erection & Installation, Engineering, Design, Commissioning, Inspection and other Management activities in the field of Terminal Automation, Gas Metering, Refinery, Gathering Centers and others.
Engineer with practical business, design and management experience in the areas of Civil and Geotechnical Engineering. Educated professional, committed to continuous improvement, ethics, teamwork and quality service. Detail oriented, excellent communicator, and capable of managing multiple projects
16 years in Engineering, Procurement and Construction projects associated with cost control, planning and scheduling fields. Project categories includes petrochemical, gas and oil refining, power, and industrial, buildings, roads and a sports complex. Conversant with project cost control s
Willing to accept challenging career in telecom Development Equipment Environment with management and seeking for a position where I can utilize my technical skills and professional experience, to provide the best of mine for the success and growth of the organization and gain satisfaction thereof.
To obtain Position in Project Management or Project Engineering in an International Environment
SAP knowledge,Material engineer,controller.Thorough knowlege of Isometric drawing,fabrication,material manual,and inventory.oil and gas field,gulf and offshore experience.
Senior Project Coordination/Management Engineer-Oil Gas Petrochemical Energy & Infrastructure
Chartered Electrical Engineer and Member of the Institution of Engineering & Technology (IET).
I am having Five years of experience in the field of Refinery construction, petrochemical shutdown job and steel erection. I was done courses in IOSH Managing safety, fire fighting, Industrial safety course, MS office etc.
Instrumentation / Control System Engineer
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
[ 47 ]
48
49
50
Next
Last
Seach Parameters
Change search parameters...
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com