Field Materials Management Lead Planner on a major refinery expansion in Louisiana, coordinating the issuance of all permanent plant and consumable materials to all subcontractors, site-wide. Active participation in various units' weekly progress meetings with FD Construction Management, Project Controls Personnel, and Subcontractor Leads to identify and respond to critical materials issues. Generation and distribution of various procurement, planning, and inventory reports to construction management, the subcontractors, and various other disciplines, including the client, defining what is in stock and available for issue/erection and defining ETAs/expediting notes on what is yet to arrive on site. Act as conduit between construction management and the home office/site buyers and expeditors to address needed delivery improvements to meet site construction demands. Participation in weekly expediting telecoms with home office procurement to review and address any late deliveries/slippages in delivery.
Field Materials Management on a biotechnical manufacturing plant expansion in Puerto Rico, including coordination of the conversion of commodity catalogs and material takeoffs from multiple engineering companies over to FD item codes, to accurately control and procure mechanical, structural, piping, electrical and instrumentation materials project-wide and achieve comprehensive program management efficiency.
Field Materials Management on a Gold Mine Expansion Project in Northern Peru. Included management of field procurement, expediting, material control, and warehousing personnel totaling 32 and the control over Structural, Mechanical, Piping, Electrical and Instrumentation Materials. Trained both Fluor Daniel field staff and client personnel on utilization of the MATMAN Material Management Database.
Management of the piping material take-off activities on various electrical power projects for Duke/Fluor Daniel. Coordinated the estimate and front-end piping material takeoff activity on a group of five sulfur plants constructed in Mexico. This included estimate quantities for new piping components, insulation & paint requirements, as well as demolition piping.
Established scope of work breakdown coding between the Irvine and Mexico City engineering offices on the grassroots Cantarell Nitrogen Project, to establish clear procurement responsibility for each of the offices which were work-sharing the engineering and procurement effort.
Developed a cost estimate of materials needed to complete work on the Rabigh power project in Saudi Arabia. Also assisted the field materials manager via email, fax, and conference calls in identifying and procuring those remaining materials needed on this power project.
Performed piping material takeoffs and associated RFQ and PO package development at the jobsite under adverse conditions on the Pemex Cactus Fire Project, a ten month rebuild of a natural gas plant which had suffered extensive explosion and fire damage in Chiapas, Mexico. Generated reports for the field construction which summarized type and quantities of materials needed (by circuit number).
Performed the coordination and expediting of the pipe spool work at a fabrication shop in Tulsa, Oklahoma for a Union Carbide Cogeneration Power Plant, erected in Taft, Louisiana. Did additional pipe spool coordination and expediting at two separate fabrication shops in the Philippines on a project for Pilipinas Shell Petroleum Corp.
At the Chevron El Segundo, CA. refinery jobsite, controlled the disposition of surplus piping materials via transfers between several locations, and kept home office accounting abreast of the corresponding movements in material dollars.
In the Houston office, assisted the material engineering group in development of new piping specs in Specwriter. Worked in tandem with engineering, design, procurement, expediting, and traffic groups to insure that the proper materials reach their correct destinations in a timely fashion. Performed critical status reporting to project management, via utilization of material status reports, to identify potential problem areas due to vendor slippages in ETA dates on critical material requirements. Called attention to and presented solutions to definitive as well as potential material delivery slippages which adversely affected construction schedules.
Additional exposure in request for quotation and purchase request proposal analysis, using methods of probability/reliability and cost control techniques in the decision-making process. Weighed potential extraneous factors which might affect timelines and quality control of delivered product(s) in vendor fabricator contract bids.
INDUSTRIES/TECHNOLOGIES EXPERIENCE:
Chemicals, Cogeneration, Ethylene, Facility & Plant Services, Gas, Geothermal, Offsites & Utilities, Oil Refinery, Oil & Gas Production, Petrochemicals, Power, Production/Pipelines, Refinery Products & Gases, Shutdown/Turnaround, Warehouse/Distribution
SIGNIFICANT EXPERIENCE:
FLUOR DANIEL (2006-2009):
FIELD MATERIALS MANAGEMENT, MATERIAL PLANNING LEAD
Oil Refinery Expansion Project Marathon Garyville Major Expansion
(2007-2009) Garyville, Louisiana
Field Materials Management Lead Planner on a major refinery expansion in Louisiana with a staff of five, coordinating the issuance of all permanent plant and consumable materials to all subcontractors, site-wide. Active participation in various units' weekly progress meetings to identify critical materials issues. Generation and distribution of various procurement and inventory reports to construction management, project controls personnel, estimating, subcontractors, pipe and steel fab shop expeditors, and the client, defining what is in stock and available for issue/erection and defining ETAs/expediting notes on what is yet to arrive on site. Coordinated the material tracking, planning allocation reporting, and expediting of all materials associated with time-sensitive critical hot tap, out of service, & tie-in work.
SUPERVISOR, MATERIALS MANAGEMENT
Biomedical Manufacturing Expansion Project Amgen Expansion Project
(2006-2007) Juncos, Puerto Rico
Field materials management and piping isometric coordination on a biomedical plant expansion involving large numbers of instruments and hygienic piping/fittings. Maintained an Access cross-reference database for the mapping and integration of other workshare engineering companies' bulk piping and instrumentation catalog items over to FD's project commodity catalogs and piping specs, and utilized this cross-ref database in order to "sanitize" engineering companies' MTOs from their item codes into corresponding FD item codes.
ARGO-TECH CORPORATION (2003-2006):
SENIOR MASTER PRODUCTION SCHEDULER
Responsible for analysis and schedule of manufacturing and production control issues utilizing Western Data Systems' MRP database. Established delivery promise dates and monitored progress of all make/buy parts required on sales orders. Created work orders for all make parts and prioritized them according to required shipping dates. Submitted weekly progress reports to General Management, quantifying deliverable monthly sales dollars, margins, at risk items and new order sales dollars. Worked with engineering, sales administration, manufacturing engineering, quality control and shipping/receiving personnel to maximize production efficiency and meet targeted shipping dates.
FLUOR DANIEL (1991 - 2002)
FIELD MATERIALS MANAGER
Gold Mine Expansion Project Newmont Yanacocha Mining Project
(2002) Cajamarca, Peru
Field Management of all project materials on a gold mine expansion project in Peru. Involved supervision of all field procurement, expediting, material control and warehousing personnel. Successfully identified and utilized $1.3 M in surplus materials which had been over allocated by a previous EP&C company from an earlier project.
SENIOR MATERIAL CONTROL SUPERVISOR
Electrical Power Generation Projects Waterford Power Project - Waterford, Ohio
(2000-2002) Lawrenceburg Power Project - Lawrenceburg, IN.
Newington Power Project - Newington, NH
LTV Power Project - Gary, IN.
Performed all material take-offs, RFQ and PO package development, and field materials interface for all piping material requirements on the above four combined cycle electrical power projects for the Duke/Fluor Daniel joint venture company.
PIPING MATERIAL CONTROL SPECIALIST II
Electrical Cogen Power Project Sonat West Georgia Generation Project
(1999) Thomaston, GA.
Solely managed all piping material take-off activities, all piping RFQ & PO package development, and all electronic piping BOM, RFQ, PO, & Matl Receiving Report data transfers between home office and jobsite. Monitored the home office master P&IDs for process changes and reacted as necessary with material impact advices back to the PPE and with PO cancellation change orders or restocking orders to suppliers via the procurement group, if necessary and logistically possible.
Sulfur Recovery Project (5 separate plants) Pemex Cactus/Nuevo/Ciudad/Matapionche/Poza Rica
(1998-1999) Various Locations in Southern Mexico
Performed front-end piping material takeoffs from sketches (including insulation, paint, and demolition requirements) for a group of five sulfur plants. Applied management defined contingency bumps to these takeoffs and submitted the resulting requirements by Area/Unit/Work Breakdown Structure to the estimating and project controls groups for calculating field labor rates and to use as a basis for reinforcing the contract proposal numbers.
Refinery Expansion Estimates Pemex Salamanca/Madero/Tula Exp. Projects
(1998) Various Locations in Mexico
Assisted the estimating group in assessing material and labor costs for three separate refinery expansion proposals in central Mexico. This was done by performing preliminary valve takeoffs from close to 400 P&IDs, and then summarizing these takeoffs for input into the estimating department's ICARUS database.
Grassroots Nitrogen Production Plant Cantarell Nitrogen Supply Project
(1998) Atasta, Campeche, Mexico
Performed valve takeoffs from master P&IDs into GMS, and processed Bill of Material file downloads from the piping design group's PDS database to material control's GMS database, for piping materials identification and RFQ/PO package development for the procurement group. Established unique scope of work breaks between the Irvine and Mexico City engineering offices by creating separate fabrication categories within GMS for each office's respective material requirements on each bill of material.
Refinery Expansion Irving Oil Refinery Expansion Project
(1998) New Brunswick, Canada
Established the home office GMS database and downloaded the piping specification files from material engineering's Specwriter database to material control's GMS database, and initiated material takeoffs from P&ID's and isometrics. Contacted various mechanical and pipe fabrication contractors in the eastern (New Brunswick) Canada area and solicited shop surveys from them, to help project management assess what local resources and labor were available for this refinery expansion project.
Refinery Expansion Amoco Refinery Expansion Project
(1998) Salt Lake City, Utah
Established the home office GMS database and downloaded the piping specification files from material engineering's Specwriter database to material control's GMS database. Conducted preliminary takeoffs from P&ID's and piping sketches to verify early cost estimates for this refinery expansion project.
Cogeneration Power Project Rabigh Steam Power Plant Extension Stage 4
(1997) Saudi Consolidated Electricity Company
Western Region
Kingdom of Saudi Arabia
Coordinated the identification of piping material shortages at shop and at jobsite toward the tail end of this power project. Investigated possible utilization of surplus material at one location to resolve shortages at the other, and initiated the procurement effort of remnant shortages for the field personnel. Issued the final 300 second-stage AFC isos to the shop and field and executed the downloads of the home office BM and PO data files to the jobsite materials manager.
Natural Gas Plant Rebuild Project Pemex Cactus Fire Rebuild Project
(1996 - 1997) Pemex Cactus Gas Production Plant Jobsite
Chiapas, Mexico
Performed piping material takeoffs from field designed and engineered isometrics into FD's inventory control database (GMS) at the Chiapas jobsite for the rebuild of a natural gas plant which had suffered an explosion and extensive fire damage. Created RFQ and PO packages and forwarded them to the jobsite procurement manager for purchase of these materials, and generated material requirement reports by individual circuit (work package) for the field construction leads to inform them of the types and quantities of piping materials needed to complete field erection.
SHOP FABRICATION EXPEDITOR
Cogeneration Power Project Union Carbide Taft Louisiana Project
(1996) Word Industries Pipe Fab Shop
Tulsa, Oklahoma, North America
Controlled the pipe fabrication work at the pipe fabrication shop and expedited pipe spool shipments in accordance to the scheduling needs at the jobsite. Consisted of the fabrication of 2,250 mark pieces, including 30" diameter 1.375 inch thick wall carbon steel spools, as well as various sizes of 304SS, 316SS, 1 1/4 Chrome spools. Ensured the completion of all phases of fab, radiography, spool marking/painting, tagging/barcoding, FD QC approval and shipment of all spool pieces from the shop in Tulsa to the jobsite in Hahnville, Louisiana.
PIPING MATERIAL CONTROL SPECIALIST
Reformulated Gas Project and Cogen Project Chevron Refinery
(1995 - 1996) El Segundo, California, North America
On-site Material Control Specialist, responsible for determining piping material requirements from isometric drawing revisions made by field engineers and designers and maintaining those changes in the GMS material management database. Developed RFQ and PO packages as necessary for field procurement personnel. Monitored material surplus and shortages from two different units, LSFO and Alky/Tame, and regularly published a report of these numbers to the two units warehouse managers, the home office, and the client so all were aware of material availability as field changes occurred. Coordinated the transfers of material between fab shops in Utah and California, the on site LSFO unit, Alky/Tame Unit, Cogen Project, an FCCU Jacobs Engineering unit, and Chevron's own warehouse to maximize the usage of surplus materials from previously completed CCR, Penex, Naphtha, NHT1 and offsites units.
Utilities & General Facilities Project KPJV Kuwait Refinery
(1994 - 1995) Shuaiba, Kuwait
Lead Material Control Specialist, responsible for front-end set up of the GMS piping material control system and the training of new hires. Assisted material engineering group in the development and review of material specifications in Specwriter, and conducted a materials estimate for a proposed ethylene unit, involving material from 124 process and instrumentation flow diagrams.
Reformulated Gas Project Chevron Refinery
(1994) El Segundo, California, North America
Lead Material Control Specialist, responsible for reviewing the integrity of material requirements text file downloads from CAD system (Intergraph) to Fluor Daniel's material control system (GMS). Included verification of proper fabrication category coding to insure that sufficient piping materials were bought and shipped to the appropriate shop(s) and field. Work on site included setting up field personnel with capability to generate periodic electrical materials status reports, and highlighting shortage materials for the electrical subcontractor to procure materials against.
PIPING SHOP MATERIAL FABRICATION COORDINATOR
Asset Renewal Project Pilipinas Shell Petroleum Corp.
(1993 - 1994) Tabangao, Philippines
Controlled the pipe spool fabrication work at the Interbeton (now Petrotech) shop facility in Tabangao, on the fabrication of 7,800 small bore (6" & smaller) diameter carbon steel mark pieces, within fluctuating material delivery/availability constraints from overseas manufacturers/suppliers and accelerated field construction demand. Upon my arrival, shop was only able to fabricate, X-ray, clear QC & ship 2,200 pieces in their previous 8 months of operation. By making production related changes with respect to piece marking and color coding procedures, bolstering the material handling manpower, adding additional pipe transport vehicles and streamlining the QC spool piece clearing operation, succeeded at expediting the remaining 5,600 mark pieces through all stages of fabrication and shipment to the jobsite in the 4 month period of January through April, 1994, and held the total fabrication costs down to a level which was 7% below the client approved funding amount.
Asset Renewal Project Pilipinas Shell Petroleum Corporation
(1993 - 1994) Bauan, Philippines
Controlled the pipe spool fabrication work at the AG&P shop facilities in Bauan on the fabrication of 4,800 large bore (6" to 36") diameter carbon steel mark pieces. Utilized the planning module programs of Fluor Daniel's Global Management System (GMS) database and shipping status reports from the home engineering office extensively as tools in determining both anticipated and actual material availability. This aided in guiding AG&P's project management and shop superintendents toward scheduling the work in the shops in a manner which would provide maximum support of field construction demand. It also prevented bottlenecks in production which otherwise would have risen from partially fabricated pieces left incomplete due to material shortages. Participated in weekly progress meetings with AG&P project management, AG&P shop production foremen, Fluor Daniel and G&P QC inspectors, and reported results back to field construction management, F.D. cost and scheduling personnel, and F.D. project manager in the home engineering office. Contract was completed on schedule, with full accountability on all surplus materials, within the budgetary requirements.
MATERIAL CONTROL SPECIALIST
Asset Renewal Project Shell International Petroleum
(1991 - 1993) Tabangao, Philippines
Lead Material Control Specialist coordinating the manual material take-off from process and instrumentation flow diagrams and isometrics (as well as via the downloading of data from a 3D CAD System) of the crude distillation unit, thermal gas unit, hydrotreater, liquid propane gas unit, and platformer.
Prepared and initiated distribution of RFQ and PO packages for the purchase of $26 million in piping materials, making certain that all vendor deviations from client's and Fluor Daniel's specifications were addressed. Prepared monthly Piping Material Commitment Dollar Reports for management, indicating total actual committed dollars vs. forecasted estimates.
TRAINING: APICS Orange County Chapter Master Scheduling Course Work
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 2451 to 2500 of 4812)
Go to Search Parameters...
Brief Description
Masters in Construction Management candidate.Worked in different positions such as junior field engineer, project controls coordinator, project engineer, supervisor, scheduler and quality checking for final deliveries. Strong working knowledge of Microsoft Word, Excel, PowerPoint, Access, Primavera
Site coordinator cum Safety supervisor
I am a 26 year old graduate who holds a Bachelors Degree in Computer Science from the National University of Science and Technology in Zimbabwe. I am very much interested in working in Botswana and South Africa.
Respected Sir/Madam, I have around two years of experience in construction from design phase to the project closeout with client interface.
Energetic young able body man to work for great company that wants to please their customers
I started my career as a structural engineer for more than 10 years. After some years on the field of Information Technology I want to go back to Civil Engineering. I prefer a position in Northern NJ or New York City, but I will consider relocation. I don’t mind some travel.
-Primavera Scheduler -SAP Experience -MS Office SME
Document controller with 6 years experience with EPC & well knowledge of EDMS and online documentation.
I am a qualified and Certified RED SEAL ELECTRICIAN / E&I Lead Hand with a broad background within the Petro-Chem industry both on and offshore. Experienced in leading teams, self-motivated with excellent communication skills,
ZTE Pakistan (Pvt.) Limited: - Currently I am working as MSS Engineer in the O&M Team in the Telecard CDMA WLL Project .Installed & Commissioned ZTE ZXC-10 MSC, HLR..Operation & Maintenance of ZTE CDMA Network Elements like ZTE MSC, HLR and VLR.
7 Year experience in working as a laborer and carpenter for various construction companies.
B.Sc. in Civil Engineering (CE), Bangladesh University of Engineering & Technology (BUET), Merit scholarship recipient in every under graduate level (Second grade)
Quantity Surveyor (Civil OR Joinery), Site Supervising, Read Drawings, Design for Interiors, Computer knowledge.
IM Supervisor, DM Manager, Expediter, Technical Writing skills in authoring procedures, Business Development with Green conceptual ideas
I have over thirty years experience working in the oil, gas & petrochemical industries on the maintenance, construction & commissioning of various rotating & mechanical equipment. The positions I have held have been hands on and supervisory, in both the UK and overseas, working onshore and offshore.
Accounting packages known: Daceasy, Tally, ATG (KSA), Digitek (KSA)
I have wide experience (more than 22 Years) in Maintenance & Project field in Ammonia Refrigeration Plant, ice-cream, Dairy & Pharmaceutical Industries.
Mechanical Engineer - Rotating Equipment Engineer
Supervisor maintenance and of trades/millwright / mechanic/water/rail
A results-focused manager and leader who drives project teams to deliver outstanding results. Professional Engineer with 21 years of diverse experience in the hydrocarbon processing and minerals processing industries. Has exceptional experience on owner & EPCM teams.
Heavy Industrial Fitter with extensive experience on Fixed & Mobile Plant & Machinery. I have worked in Cross Cultures as a Mechanical Trainer/Supervisor.
Geodetic Engineer exposed to various types of horizontal and vertical survey and can handle different geodetic engineering position.
17+ years Experience of Supply Chain (Materials Planning, Purchasing & Inventory Management). Track record in statistical base forecasting, scheduling, presentations, negotiations and software based Purchase & inventory control, warehousing management and team leadership. Highly organized, analytica
Geologist / Geotechnical engineer
Piping Field Planner/Engineer through 15 plus years journeyman experiece in the industrial construction industry.
Working in Saipem and SNC lavalin joint venture Saudi Aramco water supply and injection project in SA, as a Instrument Pre-commissioning Supervisor (sub contract) last one year.
Over six years of experience in geotechnical engineering including earthquake engineering and mining engineering. Has performed numerous analyses in ground deformation, lateral spread and foundation settlements caused by static and seismic loading using both traditional analytical methods and advanc
Financial Controller or Accountant
Automobile Engineer with more than 12 years expertise in Maintenance of HEMM, with MBA and MS(Software) qualifications
Qualified and certified electrician, intensive troubleshooting skills
Heavy Equipment Operator
20+ years of experience working in Materials Management, Inventory Control, Materials Planning Scheduling & Logistics, in both home office and field site locations on the construction of large petrochemical plants, natural gas plants, electrical power plants, and mining facilities.
Skills include: mechanical maintenance management, process engineering, project management, documentation and training, planning, procurement and contract management, budgeting, and sales.
Experience: Contract Management: Lining up contacts, Qualification: M.Tech.
INSTALLATION PIPELINES
Hardworking, motivated and responsible individual with 4 years experience in construction and operating heavy equipment currently seeking a rewarding opportunity within a reputable company. Current Class 5 Operator’s License. Seeking a Class 3.
Broad knowledge base and experience in both the design and construction of oil and gas facilities. Forward thinking individual with the ability to take on many tasks at one time. Motivated leader focused on building strong professional relationships.
Near 13 years of professional work experience in the oil and gas industry, working experience on the on/off shore in Iran and extensive experience in oil and gas unit processing, reservoir engineering and well completion engineering.
Qualify E&I Site Supervisor, QA/QC Inspector, Project Coordinator, Project/Electrical Engineer and as well as Construction Manager. Excellent Documentation Skill for Project Management.
I am a Postgraduate Civil Engineer trained in "PROFESSIONALS IN PROJECT MANAGEMENT( PRIMAVERA 6.1 & MY PRIMAVERA)" FROM CADD CENTRE .I have both Bachelors and Masters Degree in Civil Engineering.My specialization in M.Tech was Construction Technology and management,.
Electrical Installations and Commissioning Engineer in Low/High Power Distributions
Open Pit Slope Design, Tailings Dams, Plant Foundation Investigations, Earthworks
Design, Detailed Engineering, Engineering of DCS-Honeywell EPKS & Yokogawa Cenum CS. valve CV, Flow Element, PRV sizing. Foundation Fieldbus. FATof DCS. INTOOLS, InstruCALC, SPR. P&ID development. HSE member at FLUOR
5 years experience in piping stress analysis using CAESAR II in reputable companies
Contract Safety and Construction Inspector for companies ,such as Conoco Phillips and Shell
I have had various roles within Document Control and administration sector including: Document Control, Expediting, HR & GA Officer, Project Co-coordinator, Project Secretary and Purchasing Officer.
Experienced in Construction of Offshore/Onshore Oil &Gas plants in the field of Fabrication, Installation, Hydrotesting & Pre-commissioning of In-plant/Well Head Piping and cross Country Pipe Line. Qualification: Bachelor of Engineering (Mechanical)
10+ yrs experience in construction field with specialized in RCC structure & refractory material installation.
Completed Amusement and water Parks project in India and Bangladesh. I am Civil Engg. Diploma Holder. It is 3 year course.
Just I have graduated from Sheffield Hallam University in UK on October 2002 and looking for work opportunities throughout USA
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
[ 50 ]
Next
Last
Seach Parameters
Change search parameters...
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com