Engineer, Alstom Projects India Ltd. July 2007-Sept 2009.
CORE COMPETENCIES:
* Presently Hands on experience in Alstom's ALSPA P320 DCS system.
* Design and testing of Close loop and Open loop controls in Water Steam Cycle area using ALSPA P320 system.
* Designing and testing of HRSG Sequencer, Unit Master Sequencer & AGC logics.
* Design of Logic/Process Function Plans (PFUP) with the help of CONTROCAD tool.
* Designing of Dynamic Objects & Mimics and uploading them into Centralog
* Complete HMI Engineering.
* HMI database management.
PROJECTS UNDERTAKEN
1. MUARA TAWAR 5(INDONESIA) Duration: Jan'09 –Sept'09
The MUARA TAWAR 5 consists of a Gas Turbine, a water cooled Generator for the GT, a two casing Steam Turbine, a water cooled Generator for the ST and all auxiliaries to operate plant. The Gross power output of the plant is 242.5 MW with a gross Heat Rate of 6758.3 kJ/kWh.
Key responsibilities:
Implementation and testing of the Water Steam Cycle open loop and closed loop systems like Feed Water tank Temperature Control, Feed Water Tank Level Control, Condensate Level Control, HP/LP Feed Water Pump System, HP/LP Turbine By-Pass, Fuel Gas preheater System, Air Removal System, Clean Drain System etc. in ControCAD.
2. CSS-F GCOM, CSA ATLANTIC PROJECT Duration: Nov'08 to Dec'08
The CSS-F GCOM is from the gateway designed to interface the P320 system with the ABB Gas turbine control system Egatrol. The CSS-F Gcom gateway enables the P320 to receive digital points and analog measurements From the ABB systems, including time-tagged events, and to transmit digital commands and set point commands to the ABB systems. The project was the first in its kind because it focused on minimum communication with the ABB control system Egatrol.
Role:
Undergone 3 weeks of on job training in ABB Baden (Switzerland) on CSS-F GCOM HMI Engineering along with External FAT.
Responsibilities:
* Designing of Dynamic objects considering Inputs coming from ABB ADVANT EGATROL System through GCOM.
* Designing of truth tables and full HMI Engineering based on Inputs coming from ABB ADVANT EGATROL System through GCOM and the commands going from ASPA to ABB ADVANT.
* Testing of the created ALSPA Dynamic Objects with ABB ADVANT.
* Updating GCOM signal list of controlled objects.
* Loading of CSS-F with ALSPA.
* Preparation for External FAT and completion of Successful FAT with customer in ABB Baden (Switzerland).
3. GTX COGENERATION PROJECT Duration: Dec'07 to Oct'08
The GTX Cogeneration project is an ALSTOM Turnkey Combined Cycle based on one GT 13E2 Gas Turbines, one Heat Recovery and Steam Generator (HRSG) and associated interconnection with existing steam network of Condor(CCP16,18), Kestrel(CCP 20) and desalination plant. The global power output will be of 146,48 MW.
Role:
HMI (DB) and Graphics part of the project. Implementation and testing of Automatic Generation control, HRSG Sequencer and Unit Master Sequencer.
DCS Responsibilities
* Creation of Logics and Testing of HRSG Sequencer, Automatic Generation Control & Unit Master Sequencer.
* Implementation of Logic in the ControCAD according to Process Functional Plans (PFuPs).
* Creation of Mimics (graphics) from P&ID using Controcad and uploading them to Centralog.
* Views creation (mimics, extended & windows) in View tree, creation and implementation of static and dynamic drawings.
* Version instrumentation, trouble shooting and subsequent loading of views in Centralog.
* Creation of GT Interface Variable list with Egatrol system (ABB GT Automation System).
* Designing of GTX, Kestrel and Condor Network Termination Details using AutoCAD.
* Creation of Common Mimics (Mimics common for all three plants GTX, KESTREL, CONDOR).
* Documentation of HMI Logs, Graphs and MIMICS.
* Creation of input/output variables in the ControCAD as well as in I/O Management file according to the I/O list and updating I/O list with new variables if required Involved in Preparation of Mimics using CENTRALOG HMI tool.
* Modification in the existing Mimics of Kestrel and Condor due to GTX extension.
* Preparation for External FAT (Factory Acceptance Test) in Massy (France).
4. CONDOR UPGRADATION PROJECT Duration: Oct'07 to Oct'08
The CONDOR Upgradation Project is an ALSTOM Turnkey combined cycle based on four Gas Turbine, four HRSG and two Stream Turbine. The global power output will be of 14,648 MW.
Role:
To Upgrade HMI, Graphics and create document for HMI with reference of ALSPA P320 Series4 to ALSPA P320 Series5 along with External FAT.
PRACTICAL TRAINING
Undergone training on ALSPA P320 system at APIL, Delhi, which includes
* Hardware structure definition in Alspa P320 s/w.
* Use of libraries- system and business, Creation of MVM's & SVM's.
* Definitions and use of: PFUP functions, Function diagrams, owners, closed loops and open loop functions.
HMIDB
* Views creation -(mimics, extended & windows)
* In-house training of wiring schedule for ALSPA DCS system with Marshalling and Local Junction boxes.
* External Training at Dadri Power Plant and Badarpur Power Plant for Thermal & CCPP Processes.
EDUCATION QUALIFICATION
Institute of Engineering and Technology (IET), Lucknow Jun '03 – Jul '07
B.Tech. in Electronics and Instrumentation Engineering May 2007
RESULT: 72.7 %
B.N.S.D.Sinksha Niketan, Kanpur
U.P.Board Intermediate Examination, 2002 RESULT: 83.4 %
O.E.F.Inter College, Kanpur
U.P.Board High School Examination, 2000 RESULT: 83.0 %
PERSONAL DETAILS
* Date of Birth: 05th April' 85
* Sex: Female
* Marital Status: Single
* Nationality: Indian
* Languages Known: English, Hindi
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 1301 to 1350 of 4814)
Go to Search Parameters...
Brief Description
Wth 3 yrs of experience in HVAC and completed B.Tech.
PLC HMI Programmer
A Site Area Manager presently on an overseas assignment with over 25 years of experience, a broad background in site construction, project management and contract administration. Highly developed people skills, interfacing with vendors, clients, owners and virtually all project stake-holders.
project management\coordination-planner in primavera concepts
Completed bachelor of engineering in electrical and electronics from V.T.U,Belgaum.India.presently working as installation testing and commisioning engineer for ADWEAs DMS project with siemens ag from 25-02-07.before i was worked as a operation and maintenance engr for 110substain for K.S.E.B.
1+ years of experience in Ideas NX as a design Engineer
Subject : Applying for the Land Surveyor post
Safety Officer, Mechenical / Electrical, 10 years exp
I recently qualified as an architect from Robert Gordon University, and am keen to join your highly reputed and internationally successful organization. It has always been my interest to be a member of a highly motivated team engaged in the design processes of medium to large scale projects.
Autocad operator (HVAC)
I have passed MSc in Geology from Nepal and Professional Master Degree in Geological Engineering from the Netherlands in 2003. I have about 10 years work experience. My experience is especially on core drilling and tunnel excavation. A present, I have been looking for a job in Australia.
ERP, Consultancy, Movex, HumanResources Implementation, Payroll Implementation, Managment, Consulting Services, Independent
Presently Working with Samsung Engineering in Seoul Head Office as Lead Project Controls Since Nov 04 Trend/TIC program Implementation Contracts Management & Control
The past ten years in the construction industry has been most fruitful and challenging as I have found that supervision work includes duties of engineers,architects & contractors at times, from co-ordinating M&E & Architectural activities down to helping the main contractor to arrange meeting with c
Construction Manager / Superintendent /Commercial
Project Manager/ Superitendent/Estimator
reated designs for electrical equipment, conduit, and cable in power plants. created equipment schedules, conduit schedules, and cabling schedules to be used in the field. also created wiring lists to keep track of cables and wiring documentation in excel format and gsn
20 years of project management, EPCM international experience in Oil & Gas. On shore, chemical, petro chemical, LNG, power plants, offshore platforms, from inception of project through design to built up & close out. Cost estimation of global tenders of capital projects,.
The above given details are true to best of my knowledge & if any wrong I agree to do your needful.
More than 8 Years of experience in the field of ELV System specialist well versed in Installation testing and commissioning of systems Including Building management system, CCTV System, Access Control system , Structured cabling etc..Having gained extensive experience as a team leader in execution
DCS AUTOMATION SYSTEM DESIGN ENGINEER
COmputer Literate--AutoCadd,Primavera,MSoffice Applications
Extensive diverse EPC Management, Operations, Consulting - domestic & world=wide, all disciplines Refinery, Petrochem, Chemical and Pharm. projects, operations and plant trouble shooting with associates power and infrastructure.
If you are looking out for someone who can 'Make a difference', Daring, Challenging, 'Thinking out of the box', Multi-tasking ability, is not afraid to speak up his mind plus Business Development, People Management proven experience & skills, please read this application.
Dedecative, Passionate for work excellence,Creative,New Idea Planner... PGDM Graduate In Dual Speciaization In Marketing and Retail Management
Industrial Maintenance Electrical and Intrumentation Technician
I have gained experience in followings i. Heat Exchange Installation and Valves Package; Expansion Tank and Air Separators; Diffuser Installation; Booster Plump Installation; AHU/FCU Installation and Valves Package
Substation Design Engineer
Sr. Project Manager - pipelines, mining, heavy oil, oil and gas. International experience. Projects to $12B USD.
Quality Assurance, Quality Control, Construction, Project, ISO 9001, System Development, Implement, Audit, Corrective & preventive actions, Continuous improvement, Oil & Gas, power & petrochemical industries
Over 15 years exp in construction company as Technical office Engineer, Document controller, Quantity Surveyor etc
Have worked in the electrical industry for 10 years with the last 4 years running my own signs and lighting installation company. I am educated to ONC level in Electrical Engineering and have the IEE 16th Edition Wiring Regulations Certificate.
I am an Engineering Planner with 10 years EPCM experience.
I HAS AN EXPERIENCE ON CONSTRUCTION FOR MORE THAN 12 YEARS.
Greaduate civil engineer, 4 years experience as highway design engineer, proficient in working withMX Road, Autocad, MS Office, excellent communication skills, good leadership qualities, good team player, quick learner, dedicated and hard working
construction laborer/ operator -10 years experience- very dependable
To procure an innovative job in the field of Engineering, where by my skills can be enhanced and utilized in a myriad procession.
Servicing and Repairing Electrical and Electronic Equipments. I have a Diploma in Electrical Engineering, a New Zealand Trade Certificate in Electrical Theory and Practice, and a New Zealand Registered Practicing Licence
To approve Method statements, Quality procedure, Inspection test plan as per specification / Vendors specification and co-ordinate with clients for approve Ensure all inspections are carried out as per ITP at work don
Multi-talented/Multitasker - Facility / Safety Management, Hazardous materials Paramedic, trainer, Construction/General Industry background, Environmental compliance
currently located in Milan, Italy. I have all documents to work here in Italy. I am looking for job related to CAD, MICROSTATION, FRAMEWORKS. I have good experience in CIVIL RCC, STEEL, Underground drafting & detailing. I have good experience in 3D Modelling using PDS, FRAMEWORKS.
Possess ten (10) years of experience in design of various civil engineering facilities providing shelter and access to fellow humans in Pakistan, Yemen and Oman.
Interested in Construction jobs.
Planning Engineer/ cost controller using Primavera P3 Construction Experience as Project engineer
I am post graduate in HR & 15 yrs of experience in Administration & HSSE
A self-motivated hard working individual with a wide range of experience and knowledge including time spent in the Middle East. Has operated within teams and as an individual and is accustomed to dealing with staff at all levels. Easily adapts to new environments and quickly learns new systems.
Newly Graduated Civil Engineer with over experience
Electrical Engineer (Specialized in tendering, BOQs, RFQ, etc)
Certified Prince2 practitioner with experince in managing Construction Projects. Bsc.Quantity Surveying Experinced in quantity surveying practice and CAD technology skills and Microsoft Office Packages Particularly Excel And MS project
I have excellent communication skills, adept in preparing business correspondence, very good in documentation and with administration experience
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
[ 27 ]
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com