Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #9122 next resume »»
CONTACT INFORMATION:
View contact information...

Key Areas of Expertise Projects

Power Transmission Line & Lighting of Highways (design overhead lines, instillation, maintenance, modeling, coupling, pipeline, cable size, poles, illumination (lux) & cd/m2 calculation) (Refer to Publication Section)

Electrical Design & Low Voltage System (main & sub-main, sizing of cables, voltage drop calculation, design drawing for power, telephone, computer, fire alarm, central clock, TV, lighting, security & Audio Visual)

* Subbiah Rd 73 Km (300 kV)-Feb. 04-Kuwait
* Pipeline Coupling (Paper)-May 03-Australia
* New Overhead T.L Design- Oct.02 Australia
* EMF & Qaseem T.L 380kV-March 02 - KSA
* Pinjar Overhead TL 330 kV-Jun 01-Australia q Anwar Center Project-June 04-Kuwait q Kuwaiti Club for the Deaf-April 04-Kuwait q Jarrah Group Project-Feb. 04-Baghdad q Ministry of Defense-August 97-Yemen q Karrada Project-June 95-Baghdad

Low Frequency Electromagnetic Field (Transmission Line) Environmental Radiation Effects on Human Health/ Mitigation Solutions (EMF calculation & measurements, programming, numerical techniques)

* Mitigation Techniques-Sep.04-Kuwait
* Physical measurements-April 04 – Kuwait
* Optimization Techniques-Feb 03-Australia

University Lecturer-A/Professor (electronic & physics, high-voltage power transmission line, Pipeline, EMF field, power system, numerical techniques, logic systems & design)

q University of Western Australia - School of Electrical, Electronic & Computer Engineering - Energy System Center- Australia q Employment:

* Aug.04-Present (Electrical Power Consultant/ Associate Professor-KISR "Kuwait Institute for Scientific Research"-State of Kuwait).

* July 03-July04 (Project Manager/Senior Consultant Engineer-PACE "Pan Arab Consulting Engineers"-State of Kuwait).

* Feb. 03-June 03 (Assistance Professor-Energy Systems Center-University of Western Australia-WA-Australia).

* May 99-Jan. 03 (Power System Laboratory Demonstrator, Technician & PhD Student- University of Western Australia-WA-Australia).

* July95-Dec.98 (Power System Engineer/Technical Manager-Low and High Voltage Design, Power Transmission, OHTL, Transformers, Generators & Motors - Zubaidi Agencies & Marketing Consultancy-R.O.Y).

q Awards & Career Achievements:

* University Postgraduate Award (UPA)-University of Western Australia, Australia, Jan. 99.

* Second Place Prize Paper Award in Paper Title of "A Quantitative Study on the Feasibility of Electromagnetic Field Reduction by Phase Relocation in 3-Phase Systems" NAPS USA Oct 02

* Travel Award in Paper Title of "Temperature and Earth Resistivity Effects in Calculation of Electromagnetic Field Using Three-Point Formulae Based on Finite Difference Method ", AUPEC 2002 (Australasian Universities Power Engineering Conference), Monash University, Melbourne, Australia, Sep. 02.

* Session Chairman in TENCON2002, China, Nov. 02.

* IEEE Region 10 Student Paper Competition in Paper Title of "Numerical Techniques and Experimental Results for Evaluating the Electromagnetic Field Coupling Between Power Transmission Line and Pipeline", Center for Artificial Intelligence and Robotics, University of Technology, Malaysia, Kuala Lumpur, May 03.

* Ranked the (1st) out of (33) graduates at University of Technology, Baghdad, May 95.

* Special Courses at Organizational and Staff Development Services, University of Western Australia, School of Electrical, Electronic & Computer Engineering, Australia, 99-02.

q Publications

[1] M. A. Elhirbawy, T. T. Nguyen, L. S. Jennings, W. W. L. Keerthipala, "Calculation of Electromagnetic Field Established by Power Transmission Line Using Finite Difference Techniques" IEEE CCECE 2002, Vol. 1, p.p. 311-316, May 2002, Canada.

[2] M. A. Elhirbawy, L. S. Jennings, W. W. L. Keerthipala, "Variable Step Size for Calculation of Electromagnetic Fields of Power Transmission Line Using Finite Difference Techniques " IEEE TENCON'02, Vol. 3, p.p. 1830-1833, October 02, Beijing, China (Session Chairman).

[3] M. A. Elhirbawy, L. S. Jennings, W. W. L. Keerthipala, "Un-Symmetric Vectorized Sparse Solver And Finite Difference Method For Solving Electromagnetic Field In Long Conductor " IEEE EMC Europe 2002, Vol. 2, p.p. 1047-1052, Sep.02, Sorrento, Italy.

[4] M. A. Elhirbawy, L. S. Jennings, W. W. L. Keerthipala, "A Quantitative Study on The Feasibility of Electromagnetic Field Reduction by Phase Relocation in 3-Phase Systems " NAPS 02, Vol.1, p.p. 21-28, State of Arizona U.S.A (Prize Paper Award).

[5] M. A. Elhirbawy, L. S. Jennings, W. W. L. Keerthipala, "Boundary Conditions Around Discontinues Conductors Points for Calculation of the Electromagnetic Field in 3-Phase Systems " STCEX 02, Vol. 2, p.p. 114-121, Riyadh, Saudi Arabia.

[6] M. A. Elhirbawy, L. S. Jennings, W. W. L. Keerthipala, "Temperature and Earth Resistivity Effects in Calculation of Electromagnetic Field Using Three-Point Formulae Based on Finite Difference Method " Proc of the AUPEC Australasian Universities Power Engineering Conference, Monash University, ISBN 0-7326-2206-9, October 2002, Melbourne, Australia.

[7] M. A. Elhirbawy, L. S. Jennings, W. W. L. Keerthipala, "Finite Difference Method Simulation and Important Factors Affecting the Electromagnetic Fields Established by Electric Power Transmission Lines", Proc of the IUPEES2002, Inter University Postgraduate Electrical Engineering Symposium, October 2002, Perth, Australia.

[8] M. A. Elhirbawy, L. S. Jennings, W. W. L. Keerthipala, "Optimization of Transmission Line Phase Position for Electromagnetic Field Mitigation In 3-Phase Systems", 7th IASTED International Multi-Conference, Power and Energy Systems, PES 2003, Vol. 1, p.p. 406–411, February 24-26, 2003, ISBN 0-88986-335-0, ISSN 1482-7891, California, USA.

[9] M. A. Elhirbawy, L. S. Jennings, W. W. L. Keerthipala, "Numerical Techniques and Experimental Results for Evaluating the Electromagnetic Field Coupling Between Power Transmission Line and Pipeline", 7th IASTED International Multi-Conference, Power and Energy Systems, PES 2003, Vol. 1, p.p. 412 to 417, February 24-26, 2003, ISBN 0-88986-335-0, ISSN 1482-7891, California, USA.

[10] M. A. Elhirbawy, L. S. Jennings, W. W. L. Keerthipala, "Practical Results and Finite Difference Method to Analyze the Electric and Magnetic Field Coupling Between Power Transmission Line and Pipeline". (IEEE Region 10 Student Paper Competition) (ISCAS2003) Vol. 3, p.p. 431 to 434, May 03, ISBN 0-7803-7762-1, IEEE Catalog No. 03CH37430C, Bangkok, Thailand.
[11] M. A. Elhirbawy, "A Quantitative Study of the Electromagnetic Field Coupling Between Electric Power Transmission line and Railway" The Canadian Conference on Electrical and Computer Engineering, Vol. 1, p.p. 269 to 374, May 2003, ISBN 0-7803-7762-1, IEEE Catalog Number 03CH37430C, Montreal, Canada.

[12] M. A. Elhirbawy, "Simulation of Voltage Distribution Calculation Methods Over a String of Suspension Insulators", IEEE/PES Transmission and Distribution Conference and Exposition in Energy Delivery and Services, September 2003, ISBN 0-7803-8111-4, IEEE Catalogue Number 03CH37495C, Library of Congress 2003107837, Dallas, Texas, USA.

[13] M. A. Elhirbawy, "Investigation on the Characteristics of A String of Insulator due to the Effect of Dirt", IEEE/PES Transmission and Distribution Conference and Exposition in Energy Delivery and Services, September 2003, ISBN 0-7803-8111-4, IEEE Catalogue Number 03CH37495C, Library of Congress 2003107837, Dallas, Texas, USA.

[14] M. A. Elhirbawy, L. S. Jennings, W. W. L. Keerthipala, "Electromagnetic Field Coupling Between Single Phase Power Transmission Line and Telephone Cable" IPEC2003, The 6th International Power Engineering Conference, ISBN 981-04-8705-3, Nov 2003, Singapore.

[15] M. A. Elhirbawy, L. S. Jennings, W. W. L. Keerthipala, "Variable Step Length Finite Difference Methods for Calculation of the 3-Phase Electromagnetic Field in the long Conductor Approach" Taylor & Francis Group Electronic Journal, UK.

[16] M. A. Elhirbawy, L. S. Jennings, W. W. L. Keerthipala, "Phase Position and Phase Relocation for the Feasibility of Electromagnetic Field Mitigation" ACTA (Scientific and Technical Publishing Company), International Journal of Modeling and Simulation, p.p. 121 to 130 Volume 24/Number 3/2004, ISSN: 0228-6203 (205), USA.

[17] M. A. Elhirbawy, L. S. Jennings, W. W. L. Keerthipala, "New Formulation Based on Finite Difference Method for Solving Electromagnetic Field in 3-Phase Systems ". A journal paper submitted to IEEE Transactions on Power Delivery, North America.

[18] M. A. Elhirbawy, L. S. Jennings, W. W. L. Keerthipala, and "Finite Difference Method Effective Tool for Analyzing the Electromagnetic Field Coupling" A journal paper submitted to (IJEEE) International Journal of Electrical Engineering Education, UK.

[19] M. A. Elhirbawy, A. Qabazard, L. S. Jennings "Electromagnetic Field Coupling between Electric Power Transmission line and a Pipeline in 3-Phase System" A journal paper submitted to (KJSE) Kuwait Journal of Science and Engineering, Kuwait.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 2301 to 2350 of 4371)Go to Search Parameters...
Brief Description
Experienced Technician
Piping designer
21 Years Experience in EPC/LSTK Project estimation, proposal, marketing, planning, project procurement and project management for Refinery, Petrochemicals and Fertilizer Plants like Ammonia, naphtha Cracker, PTA, Hydrocracker, DHDT, Sulphur and other units. Presently working with L&T, india.
Worked as a Engineer Projects & Purchase.
I have many years of experience in customer service and administrative work. I am organized and skilled with many computer programs.
Objective: To work for a company as a Supervisor/Foreman/Journeyman carpenter. To use my skills to the best of my ability.
Construction Supervisor for Electrical and Instrumentation
Recent graduate with a Bachelor of Applied Science in Instrumentation seeking employment for supervisor positions within the instrumentation field or as an E & I Specialist.
I have 3 yrs of experience in multi-storey constructions.
ARCHITECT WITH 03 YEARS INDUSTRY EXPERIENCE
Planner / Scheduler: 2 Years Experience, Site Engineering: 1 Year Experience Developing Schedules, Resource Allocations, Planning Spreadsheets, Deployment Schedules, Charts, Progress Reports. Review of Contractor’s Programmes, Specifications, Contracts. Tracking Correspondences, Archives.
Positive thinking, motivating and making work to be done by others,accept responsibility, self confident, quick decision,
project management.contract management,business management.
HEAVEY DUTY DRIVER. (U.A.E) DUBAI, LIC.HOLDER
Just graduated from AVTEC Technical College in Seward, AK.
To work in an organization where I am given to excel in, to learn and gain experience and to be able to contribute to the organization in the long term.
Healthcare worker looking for career change. I have experience in construction and shop labor.
Commerical Truck Driver
Supervisor Production/Fabrication/Engineering Quality Control/Inspector
Professional Electrical Engineer
Total of 5years experience in Quality control, Welding, Heat treatment & NDT field a QC in EPC sector
Project enginer with 5 yrs experiece
Self-motivated young competent Mechanical Engineer with nine years experience with Oil companies and leading construction and contracting firms. Have proficiency in independent project execution. Possessing a Diploma in Mechanical Engineering. Able to independently plan, and execute Projects related
Microstation CADD Civil Engineer Utilities Specialist and GIS
Quality control and quality assurance of control systems and networking
Power Transmission Line & Lighting of Highways (design overhead lines, instillation, maintenance, modeling, coupling, pipeline, cable size, poles, illumination (lux) & cd/m2 calculation)Low Frequency Electromagnetic Field (Transmission Line) Environmental Radiation Effects on Human Health/ Mitigatio
I hold a JD as well as an MBA in finance and have been a land manager for mining companies for the last 10 years. I am very well trained at acquisition, due diligence, negotiation, sales, entitlement, permitting and construction techiques. I have excellent references.
A Mechanical Engineer with Masters Degree in Quality Assurance Technology (M.tech).IRCA certified QMS Lead Auditor; ISO 9001:2000, ASNT Level II in RI,MT & PT NDT techniques. Around 20 years professional experience in Manufacturing, Planning and QA/QC disciplines.
Mechanical Engineering Technician, MS Project, Premavera, Auto-CAD, SAP, Microstation, Planning , Maintenance
Planning, Scheduling, Primavera, Artemis, Cost, Project Controls, Metrics, Construction Manager, Site Manager
Construction & maintenace of installations, equipment and systems in hazardous areas (explosive gas atmosph.); Maintenance of el. equipment, installations in petrochemical industry.& el. Equip., systems in El.Power Plant ; Training el.personnel for preventive & predictive el. maintenace programs
Heavy Duty Diesel Mechanic/Fitter. 12 years experience with Volvo trucks and buses, hard working reliable skilled diesel technician.
Senior Project Management, Profit and Loss, Project Planning, development and execution. Consultancy in the areas of safety, risk management, and techncal writing and editing. Major contract administration for a multi-national firm in Saudi Arabia on two different assignments.
Ability to understand and learn new computer programmes accurately and quickly, Strong organizational skills, Ability to work under stressed conditions, Ability to work in multi-task duties, Excellent communication skills
AutoCAD, Surveying, Structural Surveying, Analitical Surveying
Chemical Engineer- Petroleum Industrial Processes Design
Experienced Nine Year Superintendent Commerical / Residential
Approximately 3 years experience in Production Planning, Scheduling & Inventory Control, ERP(BaaN)implementation, Production, Manufacturing, Industrial Engg., Production Management, Process Re-engg., Product Development, Product Costing.
civil engineer having a good knowledge of computers
Engineer’s degree in mechanics Speciality: “Construction and exploitation gas and oil pipelines, gas storages and petroleum storage depots”
Carrying out all Title & Non-Title Topographical, Engineering, Cadastral and Township Planning Surveys.
GIS Packages: MapInfo Products, AutoDesk Products, ArcGIS,
Well versed in P3e, P3 and MS Projects with very good knowledge of spread sheets and MS Access database. Have experience of Petrochemical, Oil & Gas and Chemical Projects. Have also seccessfully executed few projects as Project Manager.
• Preparing Material Approval Form.
Power generation, substations, transmission and distribution, circuit breakers, machines, service, plants, computer.
To acquire a technical/management position where engineering experience and managerial skills will significantly contribute to use the skills obtained through my experience and qualifications to benefit my employer and grow my self with organization.
MASTERS - Mechanical Engineering – [GPA: 3.6 / 4]
Preparation of Environmental Impact Statements (EIS) Report and of Resettlement Action Plan (RAP) Report for Mining Companies in Ghana
Structural Engineer with broad knowledge on design and analysis of Buildings (concrete and steel structures). Full knowledge in using Computer aided design Software such as Etabs, Staad pro, Prokon, Sap2000, CSI Safe, Xsteel, AutoCAD, Microstation, and other Computer programs (MS Office Word, Excel,
Project Management, Cost Control, Estimating
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   [ 47 ]   48   49   50   Next   Last
Seach Parameters

Change search parameters...
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com