Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #9946
next resume »»
CONTACT INFORMATION:
View contact information...
CONSTRUCTION ENGINEER - INSTRUMENTATION
D.O.B. - 26 July 1945 – Toronto, Ontario, Canada
Nationality – U.S. Citizen,
Qualification – AS Physical Science; Senior Status BSET; Numerous industry courses (see bottom)
CAREER SUMMARY:
Control Systems Design Specialist & Engineer with over 25 years of energy engineering experience, four years of civil engineering and five years of aerospace work. Over the last ten years, moved from home office work to field engineering work, and reclassified by Fluor from Design Specialist to Construction Engineer.
Between recent major field assignments, own and operate a construction materials and light engineering company in West Java, Indonesia. (Recently closed down).
Construction Coordinator and Block Valve Engineer for the 45 block valve sites on an 1,100 kilometer crude pipeline in West Africa. Besides coordinating multiple construction contractors, and approving all aspects of construction at the widely spread remote valve sites, also verified and pre-commissioned the functionality of the control systems with the valve vendor reps.
On the previous assignment, managed I/E based (Instrument/Electrical) engineering/design packages, from conception through operations turnover in a maintenance and operations contract for a Minnesota refinery.
Most of my projects in Minnesota involved developing complex Process Control and Logics, and meanwhile, managing the other design disciplines involved on the project, such as process, piping, civil and mechanical. Developed the scope and budget documents, and during this design phase, assured the delivery and conformance of vendor materials and equipment, and verified the DCS/PLC reprogramming. That old refinery used many PLC vendors' equipment and various interfaces with the DCS equipment, which made control loops much more complex than normal.
After the engineering design packages were completed, then issued for construction, as the Commissioning Engineer, was heavily involved in coordinating the various construction contractors and refinery operations, and scheduling the required shutdowns with the numerous refinery and customer entities. Following that, the operator training for the new process control procedures had to be completed. Every one of my projects was successfully completed within budget and schedule.
Before that assignment, I was involved in authoring and technical negotiations for a large I&E construction contract, including progress reporting, turnover procedures, and documentation content. Between the contract support activities, controlled project P & ID's (Piping & Instrument Flow Diagrams), instrumentation databases, and specified off line instruments.
Have been the Lead Designer on multiple hydrocarbon revamp projects. Early on, was the Lead Field Engineer on a pilot coal liquefaction project in West Virginia and more recently; at a large geothermal project in Indonesia. Have learned to speak simple Indonesian, and prefer to spend my off-time in that country.
When the energy sector was down in the mid 80's I was a Project Manager on several small civil projects involving land development, drainage and highway design. New to that field, one highlight was the hydrology calculation spreadsheet program I developed. Those old supervisors are still asking me to recreate that program on MS Excel, even 15 years after I left that field.
Prior to the bottoming of energy work, was the Control Systems Design Supervisor on two nuclear energy projects for the United States Department of Energy using high vacuum technology. The GCEP project was the largest that Fluor E&C has ever had, and my promotion to lead the design group was a big surprise to me in a company with hundreds of designers to choose from for that position. It turned out to be a seven year assignment. (US DOE Q Clearance)
Prior to my energy industry work, there were five years of experience in quality control in a jet engine overhaul facility.
Owned a computer store for several years, and have a high degree of P.C. experience and literacy. Ten years of AutoCAD experience.
SIGNIFICANT EXPERIENCE DETAILS:
CV BOJA JAYA – Parangkuda, West Java, Indonesia (05/02 to 05/04)
Owner-Director
This was a construction materials and light engineering firm that I created with an Indonesian partner. The firm managed to stay above water whenever I was there, but the corruption required in securing and performing every project was way beyond what I had envisioned. Whenever I was not in Indonesia, things got out of hand and I was forced to shut down the business.
FLUOR GLOBAL ENTERPRISES - Chad & Cameroon, West Africa (10/02 to 02/03)
Construction Engineer
Block Valve Engineer & Construction Coordinator
Chad-Cameroon Pipeline Project (Major $) COTCO CPMT Management Team
Project Office in Douala, Cameroon
This short-term assignment involved being responsible for the pipeline contractor's construction of the 45 pump stations and valve sites along the 1,100 kilometer length of this project. Aside from the pipeline construction contractor, there were also fiber optic, instrumentation, telecommunication, coatings and other subcontractors involved at each site. My job was to coordinate their activities, and commission the valves and controls for turnover to the client. This involved everything from the civil work to the control systems.
The technology on this project was simple, but the logistics in this dangerous and primitive part of the world were very difficult. It was my first experience in the upstream portion of the petroleum/energy industry, and a very valuable, albeit short term, experience.
General Responsibilities:
- Overall responsibility for all valve stations, control valves and pig launchers/receivers.
- Schedule & coordinate construction contractors' activities at valve sites.
- Monitor progress, completion, and acceptability of all work at valve sites.
- Report work progress and compliance for incremental payments to contractors.
- Monitor and witness vendor reps acceptance testing of valves and equipment.
- Precommission valve sites for turn-over to Operations.
- Coordinate my activities with, and support
* Overall Project Managers (Africa & U.S.)
* Overall Engineering Manager
* Overall Construction Manager
* Contracts Manager
* Project Controls Manager
* Security Manager
* Project Administrative Manager
* Site Construction Superintendents
SPECIFIC MANAGEMENT AND ENGINEERING DUTIES, by Discipline or Contractor:
Civil:
- Site Access - both road and helicopter (fast growing, dense jungle and bandit considerations)
- Grading & Compaction (we either had dust or mud for local conditions)
- Fencing & gating
- Telecommunication antenna towers
- Fiber Optic trenching, vaults & stations
- Telecom structures and foundations
- Solar power panel foundations
- Electrical Grounding & Lightening Protection
- Control Valve Foundations and Supports
- Cathodic Protection Wells
Piping:
- Monitor Installation of Control Valves
- Verify NDT weld testing & Pressure Testing at valve stations
- Engineer on-site modifications and fixes for non-compliant installations and equipment
- Verify construction and performance of pig launchers/receivers (Required modifications field designed by myself)
Coatings
- Verify that in-spec coatings and wrappings are used
- Perform coatings testing when inspector is unavailable
- The Coatings contractors were not professional, and required almost constant supervision.
Cathodic Protection:
- Verify CP installations meet specifications
Instrumentation:
- Inspect valve controls and alarms for compliance
- Engineer modifications required for proper installation and functionality.
- Monitor & approve instrument controls pressure testing
- Monitor and approve performance testing & stroke timing done by vendor representatives
Telecommunications
- Monitor & approve telecommunications testing
Electrical:
- Verify proper installation, including orientation, of large solar panels.
- Verify proper function of electrical supply & storage.
- Verify Grounding and Lightening Protection
Security
- Assure physical security of valve sites
- Monitor security guards for attentiveness
- Usually neglected by construction contractors; assure that security personnel had adequate sustenance supplies and weather protection
FLUOR GLOBAL SERVICES - Pine Bend, Minnesota (03/00 to 10/01)
I/E Design Lead & Commissioning Engineer
Refinery M&O Contract ($100K/yr) Koch Petroleum
Pine Bend Refinery Pine Bend, Minnesota
Duties at this petroleum refinery included project conceptual feasibility, detailed design and checking of I/E engineering packages before being issued for construction. Once issued for construction, I would take the role of Commissioning Engineer, managing client and construction resources through project turnover. Prior to turnover, would develop process operation procedures and conduct operation training. Following project completion, managed the document closeout. Operated as Project Engineer on medium and small packages (under 1000 manhours), and Lead Designer on larger projects. We primarily used AUTOCAD 14, Microsoft Office, and client proprietary relational database software at this site.
FLUOR DANIEL – Irvine, California (12/97 to 11/99)
Instrument Engineer
Refinery Upgrade Project (Major $) Irving Oil
Crude and RFCCU Units Saint John, New Brunswick, Canada
(5/98 – 11/99)
On loan to Engineering, specified off-line instruments, and managed the instrument databases and P & ID modifications. Also wrote and negotiated E&I construction contracts, both lump sum and unit price, and developed system turnover philosophy during several site trips.
Design Specialist
Yanpet (Major $) Saudi Arabia
(11/97 – 5/98)
Detailed design of Control Systems design in polymers processing plant. (Fill-in assignment) Used PDS for instrumentation design locations, and wrote instrumentation installation specifications.
FLUOR DANIEL-IKPT (1996 to 1997)
Field Engineer
Salak Geothermal Project (Major $) Unocal
(12/96 - 11/97) Gunung Salak, W. Java, Indonesia, S. E. Asia
This project was a major expansion of an existing geothermal electric power facility atop an Indonesian mountain. Lead Control Systems Field Engineer for process and mechanical instrumentation. Continued to manage and maintain instrument databases. Often got my hands dirty when local contractors didn't know how to install or modify instrumentation. PLC & DCS installation was by others. Most of my subordinate Engineers & Designers, and all construction crews were Indonesian locals. I learned Bahasa Indonesia to more effectively manage the construction phase. Difficult assignment, the detailed engineering package produced in Jakarta was inadequate, and local construction contractors were inexperienced. Was able to stay barely ahead of design errors and construction contractors' inexperience, but managed to turn over project to client ahead of schedule, and under budget.
Design Specialist
Salak Geothermal Project (Major $) Unocal
(01/96 – 12/96) Jakarta, Indonesia, S. E. Asia
Control Systems adviser to IKPT (Indonesian Engineering partner) in Jakarta during the detailed design phase of the above the project, while managing and maintaining the project instrument databases. Also functioned as the IKPT liaison with California and English speaking contractors for all IKPT disciplines. Contractually, I was forbidden by project management from involvement in the actual detailed design work, and was limited to answering conceptual questions from the local engineering firm.
FLUOR DANIEL (1991 to 1996)
Design Specialist
Salak Geothermal Project (Major $) Unocal
(10/95 – 01/96) West Java, Indonesia, S. E. Asia
This was the front-end portion of the above contract, done in California. Developed the P & ID's (Autocad) from blank paper (screens) to the final issue. Established and issued control systems standards, typical installation details & computer generated loop diagram graphic forms.
Yucca Mountain Project (Major $) U.S. Department Of Energy
CRMWS - M&O
(03/95 – 10-95) Las Vegas, Nevada, North America
Design support for the procurement, fabrication, installation and documentation of the site characterization Data Acquisition System for the U.S. mined geologic nuclear waste disposal project. This project required US DOE security clearance, and numerous government project-training classes. The assignment was short-lived as funding was temporarily withdrawn in a political battle in the U.S. Congress.
Continuous Catalyst Regeneration & LSFO Chevron
(1993 - 1995) El Segundo, California, North America
This was an upgrade of a catalyst unit to provide continuous catalyst regeneration. I was the unit lead designer, and besides the normal scope of work, innovated several highly lauded construction interface tools to smooth out the required plant shutdowns. The client and contractors were very pleased with the unsolicited initiative and extra effort that facilitated minimal shutdown time, and very smooth contractor & operations interface. My demonstrated detailed understanding of construction processes and sequences alerted Fluor management to my value in construction roles.
Shell Tabangao Asset Renewal (Major $) Shell International
Petroleum MIJ.B.V.
(1992 - 1993) The Hague, Netherlands, Western Europe
Control Systems Design - Area Lead for 25 new process units in this STAR Petroleum Expansion project. Led a crew of about 20 designers in the detailed design packages, and also did all of the analyzer and nuclear instrumentation design myself. Fluor was in the habit of using me for all complex instrumentation design, based a lot on my superior depth of knowledge in physics, chemistry, material properties and construction techniques.
Arco Clean Diesel (Major $) Arco Petroleum Products Company
(1991 - 1992) Carson, California, North America
Control Systems design of a new processing unit and revamp of existing facilities to meet new California and E.P.A. requirements. On this project, was the Lead Designer, and performed all of the instrumentation design functions, from P&ID development, design specifications, location plans, installation details, loop diagrams, instrument index database, vendor submittal checks and interdisciplinary coordination.
9.2 Expansion ($20M – tiny for Fluor) Intel
(1991) New Mexico, North America
Control Systems Design of an expansion project to increase production of computer processing chips. This was an interim position, and my scope was primarily to logically develop the physical layout of the process facility.
ASSOCIATED ENGINEERS (1989 - 1991)
Project Manager Rancho Cucamonga, California
Managed several small (max $500K) land development and highway improvement projects working with private sector clients and governmental agencies, including design check of state route 5-55 interchange bridges in Santa Ana, California. Other projects included apartment complex and subdivision layout and grading, golf course drainage design, and also configured and managed all of the small offices' computers and AutoCAD configurations. Also guest lectured on small engineering office computer configuration and application at Riverside City College.
ASL CONSULTING ENGINEERS (1987 - 1989)
Senior Designer Rancho Cucamonga, California
New to Civil Engineering, I quickly became to office go-to guy for complex problem solving. As the Civil Engineering designer of a 1400-Acre land development (housing) project, my focus was on drainage/flood control (hydrology) and street design. Also designed several small dams in the hills above the large subdivision, and did the complete flood control drainage system. Other skills quickly learned were earthwork and legal descriptions. This is where I co-developed a highly productive spreadsheet hydrology program, based on California hydrology standards. The program was very complex, but saved hundreds or thousands of design hours, providing instant "what if" results for the hundreds of complex calculations needed in each revision in a large drainage system. After leaving that company, they were unable to migrate the program to later versions of spreadsheet programs. The old bosses, still friends, beg once a year or so for me to recreate the program in Excel, but that would take at least two months of my free time.
FLUOR ADVANCED TECHNOLOGY (1979 - 1986)
Design Supervisor
Hanford Waste Vitrification Plant U.S. Department of Energy
(1986) Richland, Washington, North America
Design of nuclear waste handling - Control Systems. This project was temporarily dropped, but before it was, my scope was front-end conceptual design development.
Gas Centrifuge Enrichment Project U.S. Department of Energy
(1979 - 1986) Portsmouth, Ohio, North America
This project was the largest Fluor has ever had, and peaked at 500 engineers and designers in the California office. Involving the design of a nuclear fuel processing facility, I lead a group of 30 designers over the seven year duration of Fluor's involvement. This was a big move up from the previous assignment as a Principal Designer. Many older, and much more experienced Design Supervisors were bypassed for this assignment.
I got this assignment because of my dedication to detail, but also my knowledge of advanced Physics and Fluid Mechanics. I was able to effectively challenge, and revise the opinions of some of the nation's top deep vacuum technology PhD's on the implementation of Deep Vacuum processing.
Aside from my supervision duties, and as a pioneering computer store owner, I introduced the use of desktop computer use to Fluor, by bringing in one of my own to do my complex control level scheduling and progress reporting. Also put on several seminars on computer use, and pioneered the introduction of desktops with upper management.
Not satisfied with supervision and administrative functions, I took on the most complex design work, and especially all process analyzer installations. Was installed as Chairman of Fluor's Analyzer Committee.
Another role taken on was Chair of Fluor's Safety Committee
Previous work eliminated due to file size restrictions. See my wesite for more info.
TRAINING:
* Four Years of College Credit, Engineering Technology; Calif. State Polytechnic University, Pomona. (3.6 GPA)
* AS degree in Physical Science at Chaffey College, Alta Loma Calif.
- Also completed 2-year drafting program as top student
- President of Engineer's Club
- Frequent Dean's List honors
- Outstanding Engineering Student Award (one student per year honored)
- Minored in U.S. History
* Fluor Flow Diagram (P&ID) Course – Top Student - 1974
* Fluor Control Systems Design Course – Top Student - 1974
* Pasadena City College – Advanced Instrumentation Course - 1975
* Fluor Engineers Supervision Series - 1979
* Fluor Daniel Electrical Design Courses – 1991
* Numerous short courses and seminars in Instrumentation provided by vendors
* Guest lectured at UCR on P.C. use in small engineering offices
LANGUAGES
English – Fluent
Indonesian (very similar to Malay) – basic conversational level. – getting rusty
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 1801 to 1850 of 4374)
Go to Search Parameters...
Brief Description
Civil engineer with extensive experience in overseas contract management including West Africa.
To utilize my acquired background in the field of Electrical Engineering as well as my higher education in Engineering Management and to perform quality work in a professional career related to my technical skills
management experience of a wide variety of environmental projects including international HSEMS, development and implementation of environmental management systems, development and provision of audits and training courses.
Twenty nine years of engineering management experience for which 24 years in the oil, gas and shipping industry -EPC projects which includes: Project management, conceptual, feasibility studies, FEED and detailed design engineering, procurement, planning, organizing, QA /QC, construction,
Senior piping designer
Planning Engineer
Onshore/Offshore Medic,very experienced medical doctor with long years of medical service
HSE Manager
Instrument & DCS Specifications datasheets, I/O list preparation, JB,Cable schedule, Logic Diagrams, Wiring Diagrams, Cable and Tray routing, hook-up Drawings, Installation Standards, MTO, Technical Procurement assistance, DCS Detailed Engineering, Project, construction and commissioning activitie
Lead Structural Designer
Worked Northern Canada pipelining for 6 years,seasonal. Ran my own crew, operated various machinery over the years. Side Booms, Dozers D6-D8's, Loaders, Haul Trucks, Excavators. Have Done lease builds and reclamation. Also pipefitted for several years aswell. Finally a back ground in sales.
Document Controller
Familiar with onshore and subsea pipeline design criteria / requirements, codes and standards: Familiar with offshore pipeline installation and design requirements. Proficient in the use of MS Project, Word, Excel, and Power-point. Familiar with stress analysis procedures ANSYS and Orcaflex
Master marketer, business developer, facilities and maintenance manager, technical engineering savvy, director level International experience of 28 years
Safety and Health Professional with 35 years experience
An Electrical Engineer with over 2 decades of experience in Project Management, Operations & Maintenance, Installation & Commissioning and Quality Assurance at Mining/ Quarry. Currently associated with MILLENNIUMVEST SDN BHD., Malaysia as Head of Operations. Expertise in handling the complete projec
Manager of Projects; Operations manager for OSV,DSV AHTS etc. Construction manager;Workshop manager
Welding positin utilizing technical skills for a growth-oriented organization.
Graduated in 2000 with a BSc in Architecture. Since then, I have been involved in the supervision of site works and the execution of architectural finishes in addition to the review of shop drawings for major mixed-use developments and tourist resorts in Egypt.
Highly experienced Planning Enginner (scheduler) in the Nuclear sector. Very computer literate and from a unique and enviable IT/Engineering background. A deep background in projects and technology exploitation. Very well regarded and likable.
Pipe and structural welder, heavy equipment operator
Engineering Diploma Holder with14 years experience - Auto CAD, Unigraphics,Master Cam,Catia V5.
I ama Graduate Quantity Surveyor currently working in Dubai asa Project Quantity surveyor
Piping & pipeline constructions
Mechanical Engineer with more than fifteen (15) years of combined experience in engineering in various industries, which includes plant operations in various industries, which includes offshore and onshore oil & gas design, petrochemical, chemical manufacture, gas processing, and other industries.
I offer a Civil Engineering background specialized in Soil Mechanics and Foundation Engineering with a total of four years of working in various projects in India.
Please Contact ASAP
National sales & marketing rainmaker; F1500 specialty; top five on every sales team.
Communication engineer
8 YEARS EXPERIENCE:-
Skills: Critical thinking, active listening, negotiation, persuasion. Qualifications: Product /Proyect /Marketing Manager
Tax Specialist
15 years Domestic and International Management experience. B.Sc. Mining Engineering.
Diploma in electrical engineering
Electrical planning engineer, currently working on the network under supervision and currently training to become fully authorized.
-Self-starter and ability to work independently.-People friendly and good communication skills.-Ability to adapt and learn quickly.
Presently employed as E & I QA/QC Inspector , Diploma in Chemical Engineering
I have the experience of complete Electrification of UP Petrochemical Plant and commissioned various Coal Handling Plant in various projects in Fenner India Ltd. I was working in Hyundai engineering and construction company ltd, Korea as Astt. Manager(Electrical) in Abu Dhabi for 19no. 33/11 KV
Construction Engineer, Commissioning Engineer, Instrumentation Designer, Field Engineer, Construction Coordinator, Lead I/E Designer, Instrumentation Design Supervisor, Instrument Engineer, Project Engineer, Pipeline Block Valve Engineer - these are some of my more recent job titles.
Functioning in a project/program management consulting role for MAXAM and CYANCO Companies on highly sensitive processes. In these assignments, I assembled high-performing teams that delivered a complex project plan ahead of schedule, despite a demanding timeline and aggressive business objectives
To work in oil and gas refineries, high rise buildings, jet fuel storage, cross country pipelines to international airports, road works and other related industry that may acquire my skills and knowledge.
Free!
Experienced HR professional; MBA in HRM; International compensation, recruiting, employee relations, performance management, training and development, health and safety
Planning Engineer/ Project Management/ Consultancy
Responsible for assisting in driving the organization
Seeking an International and challenging position in the field of Quality Assurance / Quality Control in the large Oil & Gas Sector in an established company where I will be able to contribute my full efforts for the prosperity of the company and at the same time enrich my knowledge and experience.
Master's in Mining Engineering.Experienced in dam engineering, Rock Drilling, Grouting and Excavation.Expert in Tunnel and Slope Stabilization (like Rock Bolting,Soil Nailing,Shotcreting,Dentition and Rok Buttress)
International Project Manager
Please consider this letter as an application for employment within your company. I wish to apply for the position as HVAC ENGINEER /Design Drafter/Quantity surveyor that will give me an opportunity for growth and career challenges particularly in the areas of design engineering and technical drafti
Land Surveying, Setting Out, GIS, Cadastral, Photogrammetry, Remote Sensing, CAD
Seeking a mining /Geotechnical Engineering position
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
[ 37 ]
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2008 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com