Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #17451 next resume »»
CONTACT INFORMATION:
View contact information...

OBJECTIVE
To be an analytical, innovative and dynamic project management professional where I can use my experience, knowledge, skill and creativity.

SUMMARY
Have international experience in project planning/scheduling, cost estimating/control, and project procurement, which includes oil and gas projects, hydropower projects, water treatment projects, and commercial buildings. Hold advanced education and research background in project management and international construction management, and proficient knowledge and skills in applying P3, PRISM, and CONVERO.

EDUCATION
Master of Science
Jan 2000 – May 2002 Project Management in Civil Engineering, University of Calgary, CANADA

Bachelor of Engineering
Jul 1994 – Sep 1998 International Construction Engineering and Management,
Tongji University, Shanghai, CHINA

PROFESSIONAL EXPERIENCE
Field Project Control Specialist
Jul 2004 – Now Suncor Energy Inc., Fort McMurray, CANADA
Millennium Vacuum Unit (CDN$ 400M) Construction
- Prepared monthly progress and performance reports including progress of all construction contractors on site by disciplines.
- Developed monthly construction taskforce report: manpower planned, forecast and actual.
- Prepared monthly cost report using (PRISM) which includes actual, invoiced, commitments, and forecast cost. Integrated the PRISM report with corporate finance system.
- Monitored daily taskforce reporting.
- Coordinated and oversaw cost reporting of labor, equipment and material (LEMs) with multiple contractors.
- Involved in project change management (trending process).

Project Control Specialist
Sep 2002 – Jun 2004 Suncor Energy Inc, Calgary, Canada
5C-99 Fractionator Project (CDN$ 89M) – Closeout
- Developed final cost analysis report. Analyzed the final closeout reports from contractors and the associated project change orders.
- Defined the cost coding structures and archived final cost information in PRISM cost and progress module.
Millennium Coke Project (CDN$ 1.8B) - Design Basis Memorandum and Engineering Design Specifications
- Developed project Work Breakdown Structure (WBS) to serve project control function and integrate with change management system, cost reporting and scheduling.
- Conducted Sensitivity Study upon Alternative Project Plans – developed plans in response to fast-track approach vs. conventional construction production schemes.
- Developed Project Acceleration Alternatives – studied engineering/process requirements, analyzed utility requirements, and prepared cashflow profiles.
- Established and Monitored Project Master Schedules – created baseline schedule reflecting current project scope, developed schedules to align with overall corporate long-term strategic project plans.
- Integrated PRISM with P3 system – developed project budget, cost forecasting, commitment and actual cost through phased reporting periods.

Voyageur Projects (CDN$ 5B) - Scoping and Pre-DBM study
- Developed integrated schedule for Pre-DBM study, which incorporated inputs from engineering, construction, procurement, operation, environmental and regulatory approvals.
- Created planning model in P3, which incorporated Level I schedule, engineering/construction manpower loading, and annual cashflow spending profiles.
- Reviewed factoring estimate at scooping study phase.

Long-range Strategic Planning for Major Oil Sands Projects
- Developed and Reviewed Strategic Project Plans – studied the capital investment and cashflow plan of Oil Sands Projects over the next decade.
- Created Project Key Recourse Demand and Supply Profile – analyzed the market availability of Engineering Professionals and Construction Labors.
- Developed Long-range Project Staffing Plans – defined positions and assignment duration for home office engineering, project management and site construction management personnel.
- Benchmarked against Existing and On-going Projects – analyzed the project re-work factors in engineering and construction and make recommendations.

Project Scheduler
Apr 2002 – Aug 2002 Fluor Canada Inc., Calgary, CANADA
Syncrude UE-1 Project BCA (Bitumen Conversion Area)
- Updated and Developed the Schedule Logic and Key Resource Loading Profiles – tracked and published critical CWP IFC dates, created interfacing schedule for engineering, procurement, module fabrication and construction.
- Monitored Critical Equipment and Modules Required Delivery Dates – coordinated among expediting, vendor data and engineering.
- Measured and reported Project Progress by using CONVERO – prepared monthly engineering and procurement progress reports, monitored disciplinary staffing plans.

Project Engineer
May 1998 – Jan 2000 Impregilo. S.p.A. Shanghai Representative Office in People's Republic of CHINA
- Prepared and analyzed cost estimation for tendering purpose – developed BoQ estimate, and analyzed the detailed labour rates, welfare, overtime rates, machinery operating and depreciation rates, etc.
- Prepared, tracked, and updated project schedules, using PRIMAVERA Planner
- Developed statement of construction methodology for tendering works, proper construction organization plan, and work breakdown structure.
- Involved in International and Domestic purchasing and logistics.
- Searched for Domestic Partner for International Joint Venture and Developed Vendor Relationship.
- Prepared FIDIC contractual documentation.
- Conducted feasibility studies, and economic analyses for BOT projects.

Major Projects List:
ShanXi WANJIAZHAI Yellow River Diversion Project, Lot IV/V, ICB, Civil Works, CONNECTION WORKS
- The total length of the connection works route is 139km, which includes 43-km Pressured Concrete Cylinder Pipe (PCCP) 3.0 m inner diameter.
- Construction of 13.5 km long tunnel by using Tunnel Boring Machine.
BEIJING NO. 10 Water Plant Project (BOT Project)
- Capacity of 500,000m3 a day, with a 25-year concession period.
GuangXi BAISE Multipurpose Dam Project (BOT Project)
- The RCC main dam is 130 m in height and a crest length of 700 m. The underground powerhouse complex is 50 m high.

Project Estimator
Jan 1998 – Apr 1998 East China Architectural Design & Research Institute Shanghai, CHINA
- Got involved in periodical review and approval of the contractor's construction design, scheduling, progress reports
- Carried out the estimations of the foundation, wall and column works of a hospital expansion project
- Made construction drawing modifications by using AutoCAD

OTHER EXPERIENCE
Research & Teaching Assistant
Jan 2000 – Apr 2002 University of Calgary, Canada
- Consulted in Supply Chain Management for PanCanadian Energy – Plan the transformation of traditional purchasing department into supply chain management department, Coordinate the integration of SAP.
- Implemented Industrial Interviews and Seminars of Trust Relationship in Oil and Gas Projects.
- Prepared and delivered tutorials in construction organization and operation.
- Gave tutorials in using software of PRIMAVERA Planner, and MS Project.

PROFESSIONAL AFFILIATIONS
2000 – Present PMP, Project Management Institute, USA
2000 – Present International Association of Advanced Cost Engineers, USA

SPECIAL SKILLS
- Read, write and speak English, Mandarin and Shanghai Dialect fluently
- Proficient in using Primavera Planner, PRISM Project Manager, Aspen Kbase, Microsoft Project, VISIO, Corel Draw, and Windows based applications including: MS Word, Excel, PowerPoint and Access.

REFERENCE
Available upon request

View contact information...
«« previous resume next resume »»
Search Results (Resumes 751 to 800 of 1032)Go to Search Parameters...
Brief Description
I have 12 years experience in the South African Police ( VIP Protection , Access Control , Cime Prevention , Investigatins ) , 3 Years experience in The Private Security Industry ( Regional Manager ) and 1 year experience in conflict zones ( Baghdad , raq as a Mentor / Advisor )
Specialized in International Human Resources, I am currently in Dubai responsible for personnel management in a multicultural environment. In France, I also actively participated in Rio Tinto Alcan to the setting up of a European HRIS.
I started my career in 1991. I am a qualified fitter & turner (trade) Currently working as a workshop foreman. Did courses in inspection (QC) and management.
Hard working and Dependable Environmental Professional
I have been involved in developement and implementation of various safety programs and helping create safety cultures within organizations on and off the job. My most recent assignments have been in UAE and Mexico as a HSE Manager and I would like to continue in this role.
Experienced Automation/Process Control Engineer
Master Mariner and have experience as Senior Officer on LPG Carriers
FRAMME (Intergraph), Microstation (Bentley Systems), Projectwise, C++, Microsoft Office, HTML, Matlab, AUTOCAD,
10+ Years Experience PLC Programming PC Board Testing/Repair Test Point Systems
* MBA in Asset Management and Graduation in IT. * Proven ability to manage complex projects. * Building motivated teams to accomplish capital projects.
Proficient in Microsoft Office Programs; Familiar with OSHA and NFPA federal standzards; Technical Skills; Research Skills
My experience have given me a broad adaptation of works in various areas. I can and will succeed in almost every area of work as I am a practical and fast learner. I have sufficient knowledge in computer basics and literacy. I am a fast typist and can create text documents
Organizational Development •Procurement & Purchasing Systems & Hardware • Operations Management •Business Development • System Analysis • MIS Administration • Inventory System Control • Team Management • Regional ICT Management • Regional MIS Management • Regional Database Management
ms word,internet marketing,power point,quality control assuransce,NIM nigerian institute of management , NISLT nigerian institute of science and lab technicaince , PGD post graduate diploma in industrial chemistry , HND in polymer technology
Initially degree qualified as an Electrical/Electronic Engineer, I have been working in the field of DCS Control systems for the past 25 years. I have worked as a Field Service Engineer, Application Engineer, Systems Engineer, Commissioning Engineer. Primarily with Foxboro systems.
Free! In excess of 15 years Health and Safety experience. Strong coaching. Leadership skills and experience in BBS. Experience includes large 3D programs in all types of terrain including mountains, Arctic, and cold weather conditions.
Seeking a position in Quality Control/Assurance Management where my extensive background, abilities and expertise will be used efficiently.
Extensive working experience in Chemical Processing, Power Generation and Oil & Gas Industries. Versatile team player with an ability to incorporate new concepts and interact with all levels of professionals. Expertise in Project, Maintenance, Materials Management and ERP (SAP, MAXIMO, Primavera R3)
Environmental Consultant (Engineer/Scientist)/Geoscientist
Dear Sir, I am a highly motivated person who works hard to accomplish my vision for the Future. The success of your company fits perfectly within my vision, and I firmly Believe I possess the tools to help your company thrive. In my most recent experience, I took on a leadership position a
I am a professionally qualified Process Engineer with experience of process and product development, as well as quality control at Energy and Telecommunication Industries. I am accomplished to multinational environment, related to process modeling, project leadership, quality control and auditing.
Chemical Engineering, Control System engineer. Pipeline operation. Catalyst
pdms 3d cad autocad cadworx sr designer mechanical drafter field engineer walkdown
Results-driven Industrial Maintenance Planner/Scheduler offering 15+ years of extensive hands-on industrial maintenance experience, committed to efficiently manage and plan machine maintenance.
Livelink Administrator, Causeway Collboration Administrator
I completed my Bachelor of Science in Agricultural Economics and Agribusiness in the year 2001 and have completed the MBA programme majored in International Business in August 2008.
Catia, Solid Works, Solid Edge, Pro/ENGINEER, Adobe, Microsoft Office ( PowerPoint, Access, Project ), Photoshop, Blue Prints, Design, Product Development, Plant Layout Strategy, Six Sigma, Lean Manufacturing, 5S, , Injection Mold Press, Class A/CDL license, Lathe, Forklift, Donkey-lift, Milling
I have project management experience in all phases of pump installations, well development, geothermal installs. I can run almost any type of equipment. I have worked at geothermal powerplants and mines all over the western states. I all keep my crews safe and productive. Can work well with others.
Mining Engineer with Business Administration experience in one of the world's largest cement company
With 20yrs of my experience, I have developed a sound background in infrastructure civil project and management, methods and procedures, which includes Commercial & Residential buildings, Roads, bridges, Tunneling, Dams, Environmental Remediation and Extensive Construction Quality Assurance/Quality
A young, dynamic, astute, confident, result-oriented and self motivated person with the ability to handle pressure of a working environment and also work well within a team. Smart in appearance, proven starter with strong analytical skill and an enthusiastic fast learner.
4 years experinece in electronincs and electrical related works and in embeddeded sytems
HUMAN RESOURCE PLANNING, ADMINISTRATION, RECRUITMENT & SELECTION, ORIENTATION, TRAINING & DEVELOPMENT, PERFORMANCE MANAGEMENT & EMPLOYEE RELATION MANAGEMENT
Master Mariner, Class 1: Graduate doing MBA: Employed as Planning Manager with a Container Company
As site Geophysicist/ project coordinator in UNICEF (United Nation Children and Education Funds), Geologist for GABIMO ENGINEERING CO LTD and National Water Resources Institute my principal responsibilities were to ensure that all projects were carried out in consonance with requirements and standar
HR Professional seeking Middle / Senior Management Position
All activities relating to Electrical Construction projects such as installation & commissioning of Electrical equipments namely generator, Transformer, HT. LT panel, Laying of power, Lighting cables & Lighting Fitting
COMPUTER SKILLS, AND CAPACITY TO DO WORK WITH EVERY KIND OF PERSON
Education: MSc - Newcastle University BSc - University of East Anglia 3 ‘A’ Levels + 8 ‘O’ Levels - Computer software including Primavera (P5), Microsoft Office -
I am a Civil Engineering Graduate from NED University, Karachi, Pakistan and hold a Master's degree in Environmental Engineering from USA. I have extensive professional consulting experience spanning over 10 years of EHS management and controls, involving Due Diligence reviews and audits, Environme
Planning/Schedule Engineer,Maximo IMplementor,
CMIOSH - Sr. Industrial Hygienist : Expertise in writing & implementing OH Procedures, conducting HSE Training, Inspection, Audits, Risk & Industrial hygiene Exposure Assessment & Monitoring etc. Able to work with little guidance, hold good inter-personal relations & transparent communication skill.
Electrical systems testing, quality control, repairs, troubleshooting, electronics, component design, and/or training and development
With a demonstrated commitment to establishing and maintaining safe work practices, I am seeking to positively contribute to a progressive organisation, and wish to be considered for employment as the Emergency Manager. I have over 14 years experience within the emergency services sector, consider
Corporate Finance, Program Management, Management Consulting, Audit, Accounting, Business advisory services
I am a multiskilled candidate with more than two years experience. I have acquired Engineering as well as Business Education. I am fully convesant with Corrosion Prevention system for Underground pipings, API 650 standards for tank design and HSE standards.
Logistician in all logistical related fields. All logistical work has been conducted overseas.
Projects Management / Technology Consultant / Business Development & Management of Information Systems
Have international experience in project planning/scheduling, cost estimating/control, and project procurement.Hold advanced education and research background in project management and international construction management, and proficient knowledge and skills in applying P3, PRISM, and CONVERO.
Graduate with 5+ yrs of experience
1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   [ 16 ]   17   18   19   20   21  
Seach Parameters

Change search parameters...
CATEGORIES: Management;
INDUSTRIES: Environmental;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com