CONTACT INFORMATION:
View contact information...
1. PROPOSED POSITION
FOR THIS PROJECT: HYDRO GEOLOGIST
3. DATE OF BIRTH: 9 January 1966
5. EDUCATION: Post Graduate Diploma in Ground Water Resources Survey, 1998, ITC, The Netherlands
: M.Sc. Geology, 1993; Tribhuvan University, Kathmandu, Nepal
: B.Sc. Geology, 1991; Tri-Chandra Multiple Campus, Tribhuvan University Kathmandu, Nepal
6. OTHER TRAINING: Environmental Impact Assessment (EIA) Training; 19th September to 23rd October 2001(35 days), School of Environmental Management and Sustainable Development (SchEMS), Pokhara University
: Refresher Course on "Institutionalization of Geoinformation for Urban Disaster Management" (IGUDM) is jointly organized by ICIMOD, ITC, NSET-N, and ADPC from 15 to 26 September 2003 Kathmandu, Nepal.
: Training on GIS (PC Arc Info, Arc view 3.2)
8. MEMBERSHIP OF
PROFESSIONAL SOCIETIES: Life Member, Nepal Geological Society (NGS)
9. COUNTRIES OF WORK
EXPERIENCE: Nepal, The Netherlands and Spain
10. EMPLOYMENT RECORD:
FROM AUGUST 1998: TO Date
EMPLOYER: Nepal Environmental and Scientific Services (Pvt.) Ltd. (NESS)
POSITION HELD AND
DESCRIPTION OF DUTIES: Geo-Hydrologist, Hydro-geological and Geological survey and mapping, Geophysical Investigation of groundwater investigation, Groundwater survey, Supervision and monitoring of well drilling site, Lithological sampling, electrical logging and design of the well, Pumping test and its data analysis for calculation of hydro-geological parameters of the aquifers, Preparation of proposal for new project, and Report preparation
FROM Dec. 1995: To August 1998
EMPLOYER: National Drilling Company of Nepal Ltd.(Nedrill) -Semi Government Organization
POSITION HELD AND
DESCRIPTION OF DUTIES: Geo-hydrologist, Conduct feasibility study of ground water, prepare design, estimate and supervision of the well, sampling of the soil horizons of borehole in well construction site, resistivity logging of the bore hole, pumping test and analysis of the well, and also assist in pump installation works; report writing of the completed project for the client, proposal writing for new drilling project, and supervision and monitoring of all activities in the project site as a site In-charge.
11. WORK UNDERTAKEN WHICH BEST ILLUSTRATES CAPABILITY TO
HANDLE THE TASKS ASSIGNED
* November,2002 (Ongoing): As a geo-hydrologist involving in Feasibility Study, Detailed Engineering Design and Construction Supervision of Water Supply and Sanitation Sector Projects: Kusma - Parbat and Beni - Myagdi under His Majesty's Government of Nepal Ministry of Physical Planning and Works, Department of Water Supply and Sewerage, Small Town Water Supply and Sanitation Sector Project
* December, 2002 - February, 2003: As a consultant hydro-geologist, involved in construction of one number of 10" x 10" size tube well of 16 m depth at Middle Marsyangdi Hydroelectric Project (MMHEP), Udipur, Lamjung under DYWIDAG - DRAGADOS - CWE -Joint Venture (Contractor), Germany, from Water Engineering and Training Center Pvt. Ltd. in association with Namo Buddha Drilling Company Pvt. Ltd. My works were: Tube well designing, Electrical logging of borehole, preparation of geological logs of drilled wells, analysis of geological samples obtained during drilling, well development, Pumping test and analysis of pumping test data and preparation of report on tube well.
* December, 2002 - Jan, 2003: involved as a consultant hydro-geologist in Ground water investigation at the premise of Balaju Industrial District (BID), Balaju, Kathmandu, Nepal from APTCOS P. Ltd. The works involved were to carry out resistivity survey for the potentiality of ground water, to investigate the actual depth required for drilling for ground water exploitation, to design and estimate of the proposed well.
* June,2002 - February, 2002: As a hydro-geologist involved in water sampling, monitoring, supervision and sanitary inspection of Community Based Rural Water Supply Systems (Groundwater) in Dhanusha districts (Janakpur Municipality-14 & Devpura Rupaitha VDC) under WDSC/LEI, Dhanusha Community Development Project, Community Drinking Water Supply and Sanitation Program
* Oct-2000- Nov-2001: As a hydrologist involved in Pre and post - monsoon water quality sampling and flow measurement of Kolpu Khola and its tributaries at different sections as a part of Environmental Impact Assessment (EIA), Solid waste Disposal Site development at Simdol-ko-gairo, Okharpauwa VDC, Nuwakot, SWMRMC, MoLD
* Sep-2000- May-2002: As a physical environmental expert involved in IEE Study of Rural Electrification Scheme for Package - I (Dhanusha, Morang, Jhapa, Bara) NEA, JV With East Consult, Nepal Electricity Authority, Nepal
* Oct-2000- Nov-2001: As a hydrologist involved in Pre and post - monsoon water quality sampling and flow measurement of Kolphu Khola and its tributaries at different sections as a part of Environmental Impact Assessment (EIA), Solid waste Disposal Site development at Simdol-ko-gairo, Okharpauwa VDC, Nuwakot, SWMRMC, MoLD
* June - October 2002: As a hydro-geologist involved in pre-monsoon and post-monsoon hydrological analysis and flow measurement of different spring sources and streams, Monitoring of Spring Discharges around the Kulekhani III Hydropower Project Area.
* June, 2001 - February, 2002: As a hydro-geologist involved in monitoring, supervision and sanitary inspection of Community Based Rural Water Supply Systems (Groundwater) - Batch III & IV in Jhapa, Ilam, Dhanusha and Sarlahee districts under Rural Water Supply and Sanitation Fund Development Board (RWSSFDB).
* May - June, 2001: As a hydro-geologist involved in Hydrological analysis and flow measurement of different spring sources and streams, Middle Marsyangdi Hydroelectric Project NEA, TAEC/NESS JV.
* June- December, 2001: As a hydro-geologist involved in monitoring, supervision and sanitary inspection of Community Based Rural Water Supply Systems (Groundwater) in Jhapa, Ilam, Dhanusha and Sarlahee districts under Rural Water Supply and Sanitation Fund Development Board (RWSSFDB).
* July 25 - August 13, 2001: As a consultant hydro-geologist, involved in construction of one number of 8¡¨ throughout deep tube well of 40 m depth at the premises Balaju Industrial District, Balaju, Kathmandu from Balaju Industrial District (BID). My works were: Tube well designing, Electrical logging of borehole, preparation of geological logs of drilled wells, analysis of geological samples obtained during drilling, well development, Pumping test and analysis of pumping test data and preparation of report on tube well.
* June 16 -30, 2001: involved as a consultant hydro-geologist involved in Ground water investigation at Banepa Municipality under Nepal Water Supply Corporation (NWSC), Branch Office, Banepa, Kavrepalanchowk, from APTCOS P. Ltd. My works were to carry out resistivity survey for the potentiality of ground water, to investigate the actual depth required for drilling for ground water exploitation, to design and estimate of the proposed well.
* February- June, 2000: As a hydrologist involved in monitoring, supervision and sanitary inspection of Community Based Rural Water Supply Systems (Gravity Flow) - Batch II & III in Kathmandu, Bhaktapur, Makawanpur, Chitwan, Nawalparasi, Rasuwa, Nuwakot, Kavre and Sindhupalchowk districts under Rural Water Supply and Sanitation Fund Development Board (RWSSFDB).
* June, 2000 - Jan, 2001: As a hydrologist involved in pre and post - monsoon water quality sampling and flow measurement of Bagmati River and its tributaries at different sections as a part of Environmental Impact Assessment (EIA), under Melamchi Water Supply Project.
* July - August, 2000: As a consultant hydro-geologist, involved in construction of one number of 6¡¨ throughout deep tube well of 250 m depth at the premises of Kantipur Publication (P) Ltd, from GEOCE Ground Water Development Company (P) Ltd.. My works were: Tube well designing, Electrical logging of borehole, preparation of geological logs of drilled wells, analysis of geological samples obtained during drilling, well development, Pumping test and analysis of pumping test data and preparation of report on tube well.
* June - July, 2000: As a consultant hydro-geologist, involved in construction of one number of 4¡¨ throughout shallow tube well of 17m depth at the premises of Himalayan Hygienic Snax & Noodles P Ltd, from APTCOS P. Ltd.. My works were: Tube well designing, Electrical logging of borehole, preparation of geological logs of drilled wells, analysis of geological samples obtained during drilling, well development, Pumping test and analysis of pumping test data and preparation of report on tube well.
* June 1 - 15, 2000: As a consultant hydro-geologist involved in Ground water investigation at the premise of Balaju Industrial District (BID), Balaju, Kathmandu, Nepal from APTCOS P. Ltd. My works were to carry out resistivity survey for the potentiality of ground water, to investigate the actual depth required for drilling for ground water exploitation, to design and estimate of the proposed well.
* March - April, 2000: As a consultant hydro-geologist, involved in construction of one number of 12" x 8" deep tube well of 228m depth at Mandikatar, Kathmandu under District Water Supply Office (DWSO),Babar Mahal, Kathmandu Nepal, from GEOCE Ground Water Development Company (P) Ltd.. My works were: Tube well designing, Electrical logging of borehole, preparation of geological logs of drilled wells, analysis of geological samples obtained during drilling, well development, Pumping test and analysis of pumping test data and preparation of report on tube well.
* November 1999 - April 2000: As a physical environmentalist involved in Environmental Mapping of Kirtipur under NSET - Nepal from Nepal Environmental and Scientific Services P.Ltd. (NESS), Thapathali, Kathmandu. My responsibilities were: prepare baseline water, air and noise quality maps of Kirtipur Municipality for the post - monsoon period, identify possible sources of air, water and noise pollution, identify possible impacts of current air, water and noise pollution on human health and environment etc.
* May-July, 1999: As a geologist, involved in feasibility study of the roads section from Basgadhi-Maina Pokhar Road (8.25 km), Bardiya district, Far-Western Nepal, from MULTI Disciplinary Consultants (P) Ltd. jointly with DEIMOS Engineering Consultants, Kathmandu Nepal.
* May-July, 1999: As a geologist, involved in feasibility study of the roads section from Jogbudha-Simalkhet-Tatopani-Brahmakhel Road (16.75 km), Dadeldhura district, Far-Western Nepal, from MULTI Disciplinary Consultants (P) Ltd. jointly with DEIMOS Engineering Consultants, Kathmandu Nepal.
* September-November, 1998: As a Hydro-geologist, involved in designing, monitoring and construction of one number of 8''„e8'' dia-meter deep-tube well, 80m depth, at Refugee Camp, Sanischare, Morang under The Lutheran World Federation, Department For World Service- Nepal Programme, Bhutanese Refugee Project, Damak, Jhapa from National Drilling Company of Nepal Limited (Semi-Government Organization).
* November, 1998 to February, 1999: As a Hydro-geologist, involved in designing, monitoring and construction of one number of 10''„e8'' dia-meter deep-tube well, 80m depth., at Refugee Camp, Beldangi, Morang under under The Lutheran World Federation, Department For World Service- Nepal Programme, Bhutanese Refugee Project, Damak, Jhapa from National Drilling Company of Nepal Limited (Semi-Government Organization).
* June to October, 1998: As Physical Environmental Expert involved in Prefeasibility Level Technical and Environmental Study of Birethanti - Jomsom Ropeway Corridor under Muktinath Darshan Sewa (P) Ltd.,New Baneshwor, Kathmandu from Nepal Environmental and Scientific Services Private Limited. My responsibilities were: Study of the baseline environmental condition for physical environment along the ropeway corridor, survey of the proposed ropeway alignment for physical environment, identify and analysis of the significant environmental issues, recommend the mitigation measure with details of mitigation and monitoring plan and prepare environmental Impact Statement.
* October to December 1998: As a geologist in Biocoal Project Preliminary study in Jomsom area, Japanese Environmental Fund, from Nepal Environmental and scientific services Private Limited.
* May 1-21:Hydrogeological Study of Caldes River basin, Morella, Castellon Province, Spain, 1997
* May 22-June7: Hydrogeological Investigation in Hard Rock, Salamanka, Spain,1997
* December 1995 to August 1998: As a Hydrogeologist, principal investigator and site incharge to conduct the feasibility study on the potential use of groundwater, to prepare design, estimate and supervision of tubewell construction; to carry out the electrical logging of boreholes; to carry out pumping test and also assist in pump installation works undertaken by Nedrill in different parts of Nepal.
* May 1995: Investigation of Groundwater Potential at the premises of Banepa Municipality, Banepa, Kavrepalanchok, Nepal, 1995.
* January, 1994: Field Study of Geophysical and Engineering Geology in Lesser Himalaya, Melamchi Area, Nepal
* December, 1993: Field Study of Paleontology and Stratigraphy in Siwalik of Dang Area, Nepal
* January to February 1993: Field Study of Geology of Himalaya in Butwal Tansen Area of Western Nepal
12. SEMINAR, CONFERENCE
WORKSHOP AND AWARDS
: 9th Himalaya -Karakurum -Tibet Workshop, organised by Nepal Geological Society, Kathmandu, Nepal,1-4 April;,1994(Participant)
: Geoscience in Mountain Environment and Infrastructure Development, Jointly organised by Central Department of Geology, Tribhuvan University and Water Induced Disaster Prevention Technical Center, HMG/Nepal, Oct.12-14, 1993, (Participant)
: National Meeting and Seminar on Geoscientific Inputs in Natural Disaster Management, organized by Nepal Geological Society on the Occasion of International Day for Natural Disaster Reduction (IDNDR), Oct.13,1993(Participant)
: RONAST (Royal Nepal Academy for Science and Technology) Research Scholarship for Master Degree Thesis Awarded to the Top Five Students of each Department of Tribhuvan University
Netherlands Fellowship Program (NFP) for study Groundwater Water Resources Survey Course in International Institute of Aerospace and Earth Sciences (ITC), Enschede, The Netherlands
View contact information... |