Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #78089
next resume »»
CONTACT INFORMATION:
View contact information...
EXPERIENCE SUMMARY
Over thirty three years of diversified experience as Lead Electrical Outage & Project Planner, Senior Electrical Planner, Mechanical Supervisor, Safety & Environmental Manager, OSHA Certified Instructor, QA Supervisor, QC Field Supervisor and Lead Electrical Inspector. Maintenance Planning Software includes PIMS, Ventyx/INDUS (Passport Portal G and J), Word, and MS Project.
EMPLOYMENT HISTORY
March 2005 to Present: SUN Technical Services, Inc.
Lead Electrical Outage/Modification Project Planner * DC Cook Nuclear Plant
Using INDUS/Vytex (Passport J) and MS Word, planned electrical, I&C and HVAC preventative maintenance, corrective maintenance and design changes. Performed field walk downs to identify and resolve job hazards, installation problems and to identify support work such as temporary power, scaffolding, etc... Interfaced with design engineering, procurement engineering and system engineers to resolve installation issues. Researched drawings, specifications, vendor manuals, maintenance history and change documents to ensure work was planned and performed per codes and plant requirements. Ordered equipment, materials and parts as needed and initiated required BOM requests, Engineering Evaluations and work permits. Wrote detailed job sequences identifying critical parameters to ensure the successful execution of the task or project. As a Lead and Senior Planner other Planner's work was reviewed for completeness, accuracy and that the task could be successfully performed as planned. Trained planners on INDUS and the DC Cook work control process.
February 2005: Babcock & Wilcox
Electrical Modification Project Planner * Quad Cities Station
Using Passport J, planned outage corrective maintenance and design change electrical work activities through field walk downs, researching one-line, elementary drawings and wiring diagrams, ordering materials and interfacing with the design group and engineering organizations as needed. Using Word wrote detailed job sequences identifying critical parameters that ensured successful execution of the task or project.
July 2004 to December 2004: SUN Technical Services, Inc.
Senior Electrical Planner * DC Cook Nuclear Plant
Using PIMS (NPM) and Word, planned electrical and HVAC preventative maintenance, corrective maintenance and design changes. Performed field walk downs to identify and resolve job hazards, installation problems and to identify needs such as temporary power, scaffolding, permits, etc. Interfaced with design engineering, procurement engineering and system engineers to resolve installation issues. Researched drawings, specifications, vendor manuals, maintenance history and change documents to ensure work was planned and performed per codes and plant requirements. Ordered equipment, materials and parts as needed. Wrote detailed job sequences identifying critical parameters to ensure the successful execution of the task or project.
May 2004 to July 2004: NESTLE USA
Safety & Environmental Head (Manager)
Managed the safety, emergency plan, training and environmental programs of a half-million square foot facility with over 450 union associates with oversight over process safety management, ergonomics, Job Safety Analysis, control of hazardous energy, confined space, storm water, air emissions, hazardous waste, contractor safety, material handling, etc.
April 10-17 2004: NIC
Electrical Quality Inspector (ANSI N45.2.6 Level II) * Browns Ferry
QC Training
March 2004: Atlantic Group
Electrical / I&C Quality Assurance Inspector (ANSI N45.2.6 Level II) * St. Lucie Unit 1
QA Surveillance and oversight on modifications and updates to instrumentation systems in the control room (fiber optic Foxboro power supplies and input/output and communication modules).
October 2003 to December 2003: * SUN Technical Services, Inc.
Safety Root Cause Analyst * DC Cook Nuclear Plant
Safety expert on a team performing a PII root cause analysis of a commercial diving accident at the Donald C. Cook Nuclear Plant in Michigan. Responsible for assessing the client's safety program, culture and risk assessment process and providing recommendations for effective corrective actions.
December 1995 to July 2003: IPC Communication Services
Safety & Environmental Manager
Responsible for the safety, environmental and security programs of six facilities in four states (Michigan, California, Tennessee, and Texas). Developed company policies and written procedures to comply with government safety and environmental regulations (MI-OSHA/OSHA, NESHAP, AHERA, DOT, CWA, CAA, CERCLA, RCRA and EPA/Michigan DEQ). Monitored employee work practices and coached employees to recognize unsafe behaviors. Experience includes the development of company-wide Business Continuity and Emergency Plans and managing company security programs of high tech OEM customer products (software).
* Initiated and implemented strategies that resulted in reductions of direct medical costs by 50%, Medical (OSHA Recordable) rates by 30% and Lost Time rates by 41%.
* Authorized OSHA Certified Instructor (General Industry Safety Standards - 29CFR1910).
* Authorized OSHA Certified Instructor (Construction Safety Standards - 29CFR1926).
* Performed Job Hazard Analyses of work sites and of monitored employee safe work practices.
* Maintained MSDS program.
* Negotiated service contracts (security, hearing exams, regulated hazardous waste, used oils, etc.)
* Inherited Clean Air Act compliance issues were resolved without litigation or fines.
* Developed and led Pollution Prevention initiatives that reduced VOC emissions by 60 tons.
* Performed "New Source Reviews". Prepared and submitted 'Air Permits to Install' for new equipment.
* Registered and sold VOC Emission Reductions Credits in the Michigan Open Market Trading Program.
* Recognized as a leader in Pollution Prevention efforts by the Michigan Environmental Council, Michigan Department of Environmental Quality, and the Print Industries of Michigan.
* Charter member of the Michigan Great Printer's Project.
* Prepared and submitted EPCRA/SARA Toxic Chemical Release Reports and Tier II Reports.
* Emergency Coordinator for Business Continuity Plan, Emergency Plan, and Fire Emergency Plan.
* Developed many close working partnerships with State of Michigan MIOSHA and DEQ representatives.
February 1995 to June 1995: NISCO/AQA, Inc.
Mechanical Supervisor * DC Cook Nuclear Plant
Supervised union sheet metal workers, ironworkers, carpenters and laborers during refueling outage. Monitored activities in the field to keep projects on track. All work was finished ahead of or on schedule and per outage milestones. Ensured work was in accordance with applicable codes, customer procedures and specifications, per approved design documents and in the safest, most cost-effective manner. Completed work walked down for completeness and as-built documentation prior to obtaining quality inspections and acceptance.
December 92 to June 1995: NISCO/AQA, Inc.
QA & Safety Supervisor * DC Cook Nuclear Plant
Audited and performed surveillance of welder qualification and weld procedure qualification tests for compliance to AWS D1.1 and ASME Boiler & Pressure Vessel codes and reviewed welder qualifications and weld procedures qualifications for acceptance per AWS D1.1 and ASME B& PV codes. Managed OSHA Safety program, establishing policies and procedures along with conducting training as needed to ensure compliance with all OSHA and MIOSHA, NESHAP, AHERA, and EPA regulations.
January 1991 to October 1992: Raytheon/UE&C-Catalytic
Procedure Writer * DC Cook Nuclear Plant
Developed and maintained the AEP Construction Department's electrical, mechanical, ISI. ASME Section XI and civil/structural procedures. Performed 10CFR50.59.e reviews and co-chaired the Design Change Compliance and Design Change Close-Out task teams.
June 1987 to January 1991: Raytheon/UE&C-Catalytic
QC Inspector: Level III Electrical, Level II: I&C, Structural, Visual Weld * DC Cook Units 1 &2
Trained, tested and certified Level I/II electrical inspectors, inspected all phases of electrical work from embedded installations to equipment pre-operational testing. Reviewed completed Job Orders for final acceptance.
April 1987 to June 1987: Basin Engineering
QC Inspector: Level II Electrical/I&C * Trojan Nuclear Plant
Performed EQ inspections on MOVs. Inspected Raychem splices, cable pulls, control room panel and MOV wiring modifications. Witnessed MOVATS testing of MOVs.
October 1986 to March 1987: Nuclear Energy Services, Inc.
QC Inspector: Level II Electrical, I&C, Mechanical/Piping, Visual Weld * Three Mile Island Unit 1
QA oversight of motor operated damper functional testing and Start Up/Pre-Op tests of the ESF ventilation system. Performed inspections on Technical Specification Surveillance Tests and I&C calibrations (bench/loop) of Foxboro multiplier, summers & signal characterizer modules, effluent radiation monitors, transmitters, transmations, level and pressure indicators, flow meters, chlorine detectors, etc. Also inspected Appendix R work & TSI thermolag installations, flamastic coatings, etc..
July 1986 to August 1986: R. A. Weirich & Associates
QC Inspector: Level II Electrical * LaSalle County Station
Performed inspections on Raychem splices and Okonite taping on MOVS, solenoids and Conax ESCAs.
December 1984 to April 86: Butler Service Group, Inc.
QC Inspector: Level II Electrical, instrumentation &Control * Clinton Power Station
Performed surveillances and inspections on the calibration (bench/loop) and maintenance of transmitters, transmations, pressure and level indicators, optical isolator cards, PCBs, flow meters, radiation monitors and associated instrument lines (impulse, pneumatic, signal and ample). Performed inspections and surveillances on the maintenance and rework of Limitorque valve operators, Hydramotors, solenoid valves, switchgear/MCCs, diesel generators, electrical penetrations and various electrical components.
November 1982 to November 1984: Butler Service Group, Inc.
QC Inspector: Level II Electrical, Instrumentation & Control * Enrico Fermi Unit 2
Inspected Hangers, conduit, tray, cable installations and terminations. Inspected control rod drives and control rod position indicating probe work. Performed Quality Engineering reviews on electrical and I&C work packages prior to issuing for work to assign witness and hold points and to identify necessary inspection procedures and checklists to verify work. Reviewed 10% of all test packages assigning witness and hold points, reviewing the remaining 90% of test packages after testing for acceptance of test results.
April 1982 to November 1982: Henry J. Kaiser Co.
Lead Electrical Inspector: Level II Electrical, Visual Weld * Zimmer Nuclear Power Plant
Working Assistant Lead Electrical Inspector performing inspections on electrical installations; anchors, hangers and raceway. Welds inspected per ASME B&PV code, ANSI B31.1, AWS D1.1 and AISC. Provided direction to three electrical inspectors in the drywell/wetwell areas of the plant.
October 1981 to March 1982: Ebasco Services, Inc.
QC Inspector: Level II Electrical, Instrument & Control * WPS 3
Performed surveillance on several subcontractor electrical installation and inspection activities, assuring compliance to their procedures, specifications, codes and standards and acceptance reviews of installation, welding and inspections procedures to AWS D1.1, ANSI and IEEE. Reviewed completed inspection records and work packages for acceptance and close out.
September 1980 to September 1981: Lord Electric Co.
Lead Electrical Inspector: Level II Electrical * WPS 3 & 5
Supervised the inspection activities of five electrical inspectors, assuring in-process installations were inspected and documented in a timely manner. Assisted the QC Manager in initiating and revising installation and inspection procedures. Also performed indoctrination and training of inspectors.
May 1978 to July 1980: Fischbach/Lord Electric Co.
QC Field Supervisor: Level II Electrical, Visual Weld * WPS 2
Supervised twenty five electrical and weld inspectors. Coordinated with Construction Management to provide QC coverage as required to support their activities and schedules. Interfaced with the Client and Construction Management to resolve any perceived quality program deficiencies and quality concerns.
February 1978 to May 1978: Bechtel Power Corporation
QC Inspector: Level II Electrical * Palo Verde Nuclear Generating Station
Performed inspection on embedded electrical installations.
January 1976 to February 1978: L. K. Comstock & Company, Inc.
QC Inspector: Level II Electrical, Visual Weld * Fermi Unit 2 & DC Cook Nuclear Plant
Performed inspections of welds per AWS D1.1 and on conduit and tray installations. Witnessed cable pulls and inspected cable terminations and splices. Worked with the Westinghouse representative verifying the installation of the full and part length coilstacks into the reactor head (DC Cook Unit 2).
EDUCATION
1973 Graduate St. Joseph High School, St. Joseph, Michigan 49805
1981 Transformers and AC circuits – Ebasco Services, Inc.
1981 Welding Principles – Ebasco Services, Inc.
1986 MOVATS Signature Analysis Systems – MOVATS inc.
1986 Thermal Lag Coatings – TSI, Inc.
1991 Leadership & Teambuilding – AEP Electric Power Company
1993 Asbestos Abatement Contractor Supervisor – WMI Educational Services
1994 HUD Guidelines on Metallic Lead Abatement – WMI Educational Services
1994 Asbestos Abatement Supervisor Re-qualification – WMI Educational Services
1994 OSHA Certified Instructor Construction Industry Standards – Dept. of Labor OSHA Training Institute
1996 Air Permit to Install workshop - Michigan DEQ
1996 Hazard Waste Management - Environmental Resources
1999 OSHA Certified Instructor General Industry Standards – Eastern Michigan University
2001 Process Improvement – Southwestern Michigan College
2002 Ergonomics - University of Michigan
2002 Critical Materials & Wastewater Discharge Reports - Michigan DEQ
2003 ISO14001, Michigan DEQ and Honda Manufacturing
2004 OSHA 30 Hour Course "General Industry" – Nestle University
2005 Industrial Suite (Passport J) Training – DC Cook
2005 OSHA 10 Hour Course "Construction" – DC Cook
2006 Industrial Suite (Passport J) Training – DC Cook
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 1101 to 1150 of 1623)
Go to Search Parameters...
Brief Description
B.E – Ceramics & MBA, having with 12 years of experience in an integrated Steel Plant Projects & Maintenance of Refractory -Applications/Installations/Selections/Inspections in India and Abroad
I have spent about 8 years, applying innovative approaches to spatial data development, Integration and Management practices in my various capacities.
PhD in Chemical engineering with lots of laboratory experience including, but not limited to design of experiment. Cummulative GPA 3.52. Specialized in electrochemical synthesis.
I Mohammed Yaseen Kajee hereby wish to apply for employment through your company in the capacity of Client Projects Quality Manager, Senior Client Quality Assurance Engineer / Inspector and Client Safety Representative. I have had extensive experience in Quality Management Systems , Pressure Vesse
Autocad. Pro engineer
HSE Engineer
Since April 2004: Aeronautic Source Inspector “hardware” in Bourges and Méru (only 1 to 2 missions of 4 hours/month) for a diversified technology and manufacturing leader, serving customers worldwide with aerospace products and services (40% of sales); control technologies for buildings, etc
Project Management / Engineering Coordination / Process Engineering / Business Development
Registered EU Mech. Eng w/ 15 years experience in the oil and gas environment - North America, North Africa, Middle East,. High-energy individual whose best attribute is my ability to work well with other people.
Experienced and hands on work on MTS, SEM, XRAY, Hardness, Optical Microscopy, Metallography, Lecos etc.
I completed a Master Degree in Business Adminitration and Bachelor of Science Degree in Mining Engineering, and have more than eight (8) years experience working in the mining environment.
I am an experienced member of a Cost Management company based in Abu Dhabi with previous experience as a Quantity Surveyor in a variety of fields including construction, development and consultancy services. As an industry professional with a Diploma in National Building Science, extensive technical
HVAC, Facilities Maintenance
Precision Millwright w/ Machinst and Electrical Background
Instrumentation & Commissioning Analyzer Engineer
Welding and electrical and management and mining class 32 hour certified fork lift operator
Free!
DYNAMIC PROFESSIONAL - MASTER OF SCIENCE - CONSTRUCTION SAFETY COORDINATOR - PROJECT MANAGER -ADVANCED FIRST AID, SAFETY, & RESCUE
With over 9 years of experience in U-verse (IPTV, HSIA and CvoIP) Secornd Level Technical Support (Tier 2) and Fiber Optic (Video, Voice and Data) installation, Cable TV technical communication, satellite installations, hard work, imagination and commitment, together with strong communication and in
Programming Languages: C, Embedded C & Assembly level programming for ƒÝP and ƒÝC ,8 Bit (8051, PIC), 16/32 Bit processor (ARM7 TDMI), PIC 16F73, 8051, ARM7,PCB Designing using Or CAD,RS 232, SPI, IIC, CAN V2.0,MS Windows 9x and upward,networking, service manager
I hold Higher National Diploma in chemical Engineering, from Kaduna Polytechnic. My skills are; water treatment processes, safe chemicals handling,process valve control, Pumps operations, safety (HSE), Chemicals preparation, Process monitoring, Instrumentation, Chemical cleaning, etc
Engineer with 15 years of experience in Supply Chain, Operation, Project & Construction management
Under general supervision, I can inspect, isolate, troubleshoot and repair electrical malfunctions using various test instruments; maintain and repair programmable lighting and access systems; test electrical equipment for safety and efficiency; plan the layout and wiring of new plan
I am diplomaed Engineer - geologist/hydrogeologist, having some experience in micropalentology.
I¡¦m a Canadian/ Syrian citizen with Business, Engineering, Water/Wastewater and (HSE) Health Safety Environment Background I have been working in the field of HSE (Health Safety Environment) management for past 10 years/ 5 yr Management HR BUS PR Project GS ADM OPS
Field Project Manager (Crosswell Seismic). Highly motivated, enthusiastic Borehole Seismic Project Manager with 11 years of wireline and seismic experience. Successfully managed numerous projects in diverse locations around the world.
I & E Inspector, Electrical GF, Lead Electrician - 20 + years experience in industrial and commercial
Chemical/Process/Project/Field Engineer/Chemical/Process/Project/Field Engineer
Safety Officer, Process Supervisor and Marine Engine Driver and experienced in Petrochemicals, Power Plant and Marine Industry
HSE Specialist
1. Implementation of Quality Management Systems (New and Old versions)
Senior Process Engineer with 14 years of Experience in Oil and Gas and Petrochemical
Geologist
Automation and Instrumentation Specialist. College diploma in industrial electronics (Teccart Institute) option: regulation, instrumentation and automation. Graduated with distinction, May 1999.
Diverse experience in the fields of failure analyses, corrosion of steels, protective coatings and paint film systems, welding and materials selection, complemented by a strong background in mechanical engineering. Excellent communication and organization skills, dedicated to quality and accuracy wi
CCNA, CCVP ,C, C++, HTML, DHTML, ASP, JavaScript 1.2, Java 1-2, CGI-PERL, MS Office, MS Exchange Server, windows, Windows NT 4.0, windows 2000,2003,SQL Server, MS Access
Geologist
I am proficient in critical thinking, research, and writing skills; the spirit of teamwork; and the ability to effectively communicate, both verbally and orally, graphic design and functionality to an audience. I possess a wide range of graphic skills from manual to computer aided.
Twenty five years experience in Safety, Health and Environmental Inspections, Supervision and Management
MSc Engineerign Geology, experienced in geotechnical engineering designs and SI
Vast experience in Engineering, Construction, Mining and Design:
I did BE Mech in 1999. I've Five years Experience in Die Casting field. Experience in Design and Manufacturing of Pdc dies. My skill is to prepare the fmea meeting of designing area with checklist presentation ie. functional & design related points and then all the drgs are submitted to Mfg team.
BS EE, Program/Project Management, Business Development, MS Project, Oracle Financial Analyzer, Data-Voice Value Added Service projects & business, GSM 900 infrastructure (Ericsson) deep knowledge, Wireless and Service Engineering Planning, MS Office, IP Networking
A generalist HSE Manager with experience in oil & gas industry at several international locations with HES / Project Engineering / Operations background. HES Program development focus. Culturally sensitive.
Logistics, Technology, Transport and Management Professional
Highly motivated Ph.D. Chemist with a broad range of skills looking for a position that involves challenge and innovation.
Electrical Engineer with Project Management experience in construction and power
Geoscientist looking for work
Quality, Health & Safety and Environment Management/Auditing
Lead Electrical Outage/Modification Project Planner, Senior Electrical Planner, Mechanical Supervisor, Safety & Environmental Manager, OSHA Certified Instructor, QA Supervisor, QC Field Supervisor and Lead Electrical Inspector.
A seasoned, highly organized construction professional with over 39 years of heavy industry experience which includes both industrial construction sites and field/shop fabrication locations in all major industries worldwide
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
[ 23 ]
24
25
26
27
28
29
30
31
32
33
Seach Parameters
Change search parameters...
CATEGORIES:
Engineering/Technicians;
INDUSTRIES:
Environmental;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»