Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #9262
next resume »»
CONTACT INFORMATION:
View contact information...
CAREER OBJECTIVE
My career objective is to apply and further develop my Project Management skills within the building industry, particularly high-rise sector. As a project manager at Advanced Precast I have developed my engineering and management skills to a level which now allows me to take full responsibility of larger scale projects.
EDUCATION (Tertiary)
Bachelor of Engineering Degree (Civil)
(Majoring in Structural Design)
Completed in 1999
Swinburne University of Technology, Hawthorn, Melbourne
Associate Diploma of Engineering (Manufacturing)
Completed in 1993
Swinburne TAFE Division, Hawthorn, Melbourne
EMPLOYMENT HISTORY
Project Co-ordinator
Commenced: April 2008 – (current position)
Hansen Yuncken
Hansen Yuncken is one of the largest privately owned building companies in Australia with a turn-over of more than $1 billion AUD per year. Having the opportunity to work at Hansen Yuncken has been the greatest highlight of my professional career.
Current Project: National Ice Skating Centre (NISC) - Project commencment - Jan 2009
Developer - ING RED/ Victorian Goenrnment, Architect - Cox, Engineers - ARUP
Having just completed Waterfront City Shopping Centre, I have moved to a new project in the Waterfront City precinct, (it is located across the road). This project is a design a construction of two international standard ice skating rinks seating approximately 3,000 spectators. The main rink, (Rink 1) has been designed to meet Olympic standards and specifications. Sports catered for are ice hockey, figure skating, curling and speed skating.
Being part of a small team, namely 6 people, as the project coordinator work closely with the project manager and am I am involved with all facets of this project as listed below;
* Architectural & Structural co-ordination – working closely with Cox architects and Arup's engineers to meet design changes whilst maintaining program deadline
* Co-ordinating Sub-contractor's works, including quality assurance, also ensuring they can achieve the project's deadlines
Project: Waterfront City Shopping Centre & Apartments
Developer - ING RED, Architectt- Hassell, Engineers - Winwards, Lincolne Scott
A design and construct project of the premier mixed-use development at Waterfront City, comprising of retail, residential and commercial space which covers more than 20 hectares.
The project is valued at $400 million ($AUD) and features 60,000m2 of retail space split over two open levels with interconnecting bridges, along with the Southern Star Observation Wheel..
The client is ING Real Estate Development, for much more information visit the website www.waterfrontcity.com.au
My position at Waterfront City primarily consists of two roles, as follows:
1) Tenancy Retail coordinator for the Shopping Centre
* Management of 130 retail shop fit-out works, including clothing, food and beverage.
* Liaised with shop tenants regarding service requirements, gas, water, kitchen filtration, mechanical, electrical modifications. Tenants include Esprit, Forever New, KFC, Nandos, Boost Juice, The Coffee Club and EB Games.
2) Building Defects Manager
* Management of defects for the complete construction of 1 B North base building. Including retail, apartments, roads, landscaping.
* Involved with hand-over of practical completion to the client for the separate stages.
Project Engineer Jan 2006 – April 2008
Advanced Precast
Advanced Precast is Australia largest manufacturer of precast panels with factories located in Melbourne, Sydney and Brisbane. My role here is to co-ordinate projects with our draftsman and external engineers, architects and builders. Typically I would run 6 or 7 projects totalling approximately 5 million dollars.
Some of my projects include:
Waterfront City – Docklands $3million, South Melbourne Lifestyle Centre, $3 million, 900 panels (photos available) Liquor Warehouse $0.5 million Canberra, 200 panels (photos available) SPOTLIGHT Carnegie $3.5 million, Mornington Hospital and King St – Sydney
* Checking/redesigning panels to ensure they have appropriate strength for lifting from the casting table and also for transportation
* Undertaken structural analysis of panels during their erection sequence, ensuring propping is adequate and wind loads are resisted, collating a final "erection procedure"
* Co-ordinating with draftsman regarding shop drawing issues, technical queries etc.
* Attending site meetings and representing the company, ensuring panel manufacture and erection dates are adhered to.
* Liaising with the factory manager on issues relating to the manufacture of panels and site crew with the erection of panels
* Ordering of dowels, brackets, angles etc. for connections
Site Engineer/Foreman Oct 2005 – Jan 2006
CDL Constructions
At CDL Constructions my role was a Site Engineer/Foreman. CDL is one of Melbourne's major excavation/site retention contractors. I ceased employment after the project was completed.
I performed the following tasks:
* Helped the surveyor with the set out for bored piers, footings, shot-crete walls and excavation
* Used a laser level to control the depth of excavation, concrete pours for piers, capping beam, footings etc..
* Procurement of reinforcement for bored piers, footings and shot-crete walls
* Set-out and formwork to capping beams, pouring and finishing of concrete
* Directing labourers, steel fixers, formworkers and the shot-crete crew
* Management of all site labour and OH&S issues
Project Manager/Estimator Oct 2004 – Oct 2005
Reidy the Wrecker Pty Ltd
At Reidy the Wrecker I was employed as a Project Manager/Estimator. This company is a major demolition contractor which prides themselves in working on multi-level inner-city projects.
Project Manager/Estimator Started in Oct 2000 – April 2004
City Circle Demolition & Excavation Pty Ltd
At City Circle Demolition and Excavation Pty Ltd I was employed as a Project Manager/Estimator.
General responsibilities include:
* Calculating and submitting prices for demolition, excavation, site remediation and asbestos removal tenders
* Managing demolition projects and coordinating demolition workers
* Ensuring the achievements of project time frames and budget targets
* Client liaison and negotiation, includes property developers, architects, builders and government authorities
* Ensuring OH&S precautions are implemented as per industry standards
* Developing and ensuring the achievement of a demolition time program
* Calculating monthly progress claims and variations
Estimator Oct 1999 – Oct 2000
DVP Engineering Pty Ltd
My position as Estimator at DVP Engineering Pty Ltd involved the calculation of final costings, for the supply and erection of structural steel for construction tenders.
I performed the following duties for any given tender:
* Liaising with builders in order to clarify the tender's contract requirements (ie. specification, drawings and B.O.Q.)
* Structural steel "take off" and summation of material quantities
* Calculating an estimate cost for fabrication, drafting and erection for the project
REFEREES
Reference Available
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 901 to 950 of 1619)
Go to Search Parameters...
Brief Description
Contracts Manager
Entry level geologist, mining, environmental science
geology, geotechnical, geological engineering, geology and environment, hydrogeology, prospection and groundwater abstraction, geohazards, geological mapping, interpretation of seismic reflection profiles, stratigrafic, sedimentology. Very experience in topography, cartography, mapping and autocad
All kinds of Fault finding in the Tower crane & Hoist from electrical department
Quality, Safety, Health, Environment and Security Professional w/ 17+ years in International upstream and downstream O&G sectors
Extensive Autodesk AutoCAD and Autodesk Inventor Professional Experience
RESUME
Project Management / Production Control
B.E.(ECE) in College of Engineering, Guindy, Anna University, Chennai having experiences in working in Integrated Systems Laboratory (Anna Univ) on various projects and interested in taking up a career in Analog VLSI Design
im a hard worker and want to learn and server the company. im willing to relocate and travel anywhere in the world
A self-directed, high organized individual who is able to easily identify and achieve priorities. Significant broad based experience in the areas of facilities planning, production, engineering, maintenance, environmental, staffing, and safety. Excellent communication and technical report writing
Assisant professor, PhD environmental biotechnology, expert in biological treatment of hazardous contaminants.
I have experience with SCADA system using Citect and RSView (Allen Bradley) as Man Machine Interface (MMI) and control system such as Allen Bradley PLC5, SLC500, ControlLogix, SimaticS5 and SimaticS7.
Zinc and Lead Smelter Plants Metallurgical Engineer with experince in operations, consultancy & Project Execution & Management
Seeking an opportunity in the oil and gas industry to develop and utilize expertise in electrical/electronics, control, instrumentation and/or automation as a new entry or trainee engineer.
Looking for management position in mineral (gold and precious metals) exploration and environmental engineering consulting.
I graduated in July 2006 with a BE Honours Degree in Manufacturing Engineering. I have over two years’ experience as a Process/Project engineer in a multinational company. I have completed courses on DOE & PDA and Project Management. Proficiency with Microsoft Word, Excel, PowerPoint, AutoCAD,etc
BE,MBA graduage having 13+ years experience in Sales & Marketing of Engineering, Flow Control & Instrumentation Process Products
i have complited a MSc degree from pune univeristy,worked as a geologist in geotechnical field,wel known to GPS ( Trimble Geoexplorer 3 )
M.Sc. Environmental Engineering and B.Sc. Civil Engineering holder seeking more experience. Although I do not have long working experience, I assure you that I am a keen learner and will work hard for the department if I am selected.
Mechanical Engineer, Pro-E, Pro/Intralink, ECM System
Licensed professional engineer with multi-million dollar construction projects experience. Fully trilingual - fluent in English, Spanish & French. Highly proficient with AutoCAD, GIS, SewerCAD, MS Project, Primavera and Microsoft Office.
Professional EHS Manager
Fresher Skills : C,C++,Visual Basic, Java
Project Manager/Construction Supervisor/Contracts Manager/Claims Manager/Cost Engineer/Construction Manager/Site Supervisor/Civil Engineer/Quantity Surveyor etc.,
I'm a recent graduate in Metallurgical Engineering and have an extensive Internship experience in the Oil and Gas Industry.
Excellent experience, coupled with a strong quantitative and analytical background, makes me an excellent candidate
Controls I&C Engineer
Electronics/Instrumentation Technician Specialist
Consultant, Project Management, Mechanical, Marine Engineering, HSE and Quality.
Project Controls Cost Engineer / Analyst (EVMS, Change Management, Cost Forecasting Planning and Budgeting)
Geologist with good expertise in planning, follow-up and reporting of geotechnical and geophysical site-/soil-investigations.
To contribute strong background in project management, civil engineering, contracts and along with unique drive for excellence and success to your firm in a Planning & Control Engineer position.
Civil engineer having knowlegde and working exposure of AutoCad 2000 and Staad 2004
Junior geologist with some prior experience in both exploration and mining. Skills include mapping, core loging, sampling, 3D modeling (Gemcom), statistical evaluation, grade control and reconciliation. Strong communication skills. Available immediately.
Construction Project Manager, Property Development Manager
Olympic Ice Skating Rink, Muliti-storey, Apartments, Precast Panels, Site Retention, Post Tensioned slabs, Structural Steel,
To obtain a challenging position that utilizes proven experience and skills.
Excellent interpersonal, oral and written communication skills, Good computer skills (MS-Word, MS-Excel, MS-Power Point, MS-Access, Oracle etc.). Excellent knowledge and Training on ISO 9001, ISO 14001, OSHA and OHSAS 18001. Master degree, Diploma in Safety, Training on HSE.
I have completed B.E,(Electrical & Electronics Engg) in may 2006 with 70% as the aggregate from Anna University(Kamban engg College) India.Having 2 years experience in transformer manufacture, Being given to understand that you are entertaining candidates for various positions
Over 15 years in Fuels Distribution, Storage and Transfer / Commercial Truck driver
A highly experienced Sr. Chemist with postgraduate qualification in Analytical Chemistry from AMU Aligarh University, India. Possessing 14 years of experience in operation and management of environmental protection, power and desalination plant and R&D laboratories. Expert in analytical technique
Well qualified Tunnelling professional with broad experience in several technical key areas like microtunneling,dewatering,piling and CCTV sewerage inspection includes management,administration and team building skills in Project Management, troubleshooting, execution in Infrastructure industry.
laboratory, mechanical, electrical, computer, supervisory and leadership skils
Civil Engineering graduate with over 16yrs of experience in Civil Works (12yrs in Middle East) with a versatile potential to utilize & develop the vast experience gathered in the field of pipelines & infrastructures, dedicated to contribute the best efforts for growth of the company.
I have 10 years experience in instrumentation and control field. I have designed, installed, tested, calibrated, start up, commissioned, maintained and repaired industrial electrical and instrumentation control systems and skilled in PLC, DCS, Programmable drive based control systems.
I have 10 total years in the environmental field ranging from conducting historical research on irrigation and water use in 17th and 18th century New Mexico to conducting site investigation field activities, including soil and ground water sampling and monitoring well installation, conducting enviro
Civil engineer, Project Manager, contract Manager
Over 15 years of engineering and project management experience in commercial and industrial construction. Demonstrated ability to manage a diverse array of projects, including hospitals, stadiums, FAA airport projects, casinos, biopharmaceutical, and semiconductor facilities.
Strategic thinking Executive leading environmental, health and safety area. Recognized for assessing environmental, health and safety protocol, formulating and implementing highly effective policies, procedures and training to meet compliance, minimize injuries & reduce worker’s compensation claims.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
[ 19 ]
20
21
22
23
24
25
26
27
28
29
30
31
32
33
Seach Parameters
Change search parameters...
CATEGORIES:
Engineering/Technicians;
INDUSTRIES:
Environmental;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com