Supervisor, Materials Management
B.A., Economics, University of Southern California, Los Angeles, California

SUMMARY OF EXPERIENCE:

Field Materials Management Lead Planner on a major refinery expansion in Louisiana, coordinating the issuance of all permanent plant and consumable materials to all subcontractors, site-wide. Active participation in various units' weekly progress meetings with FD Construction Management, Project Controls Personnel, and Subcontractor Leads to identify and respond to critical materials issues. Generation and distribution of various procurement, planning, and inventory reports to construction management, the subcontractors, and various other disciplines, including the client, defining what is in stock and available for issue/erection and defining ETAs/expediting notes on what is yet to arrive on site. Act as conduit between construction management and the home office/site buyers and expeditors to address needed delivery improvements to meet site construction demands. Participation in weekly expediting telecoms with home office procurement to review and address any late deliveries/slippages in delivery.

Field Materials Management on a biotechnical manufacturing plant expansion in Puerto Rico, including coordination of the conversion of commodity catalogs and material takeoffs from multiple engineering companies over to FD item codes, to accurately control and procure mechanical, structural, piping, electrical and instrumentation materials project-wide and achieve comprehensive program management efficiency.

Field Materials Management on a Gold Mine Expansion Project in Northern Peru. Included management of field procurement, expediting, material control, and warehousing personnel totaling 32 and the control over Structural, Mechanical, Piping, Electrical and Instrumentation Materials. Trained both Fluor Daniel field staff and client personnel on utilization of the MATMAN Material Management Database.

Management of the piping material take-off activities on various electrical power projects for Duke/Fluor Daniel. Coordinated the estimate and front-end piping material takeoff activity on a group of five sulfur plants constructed in Mexico. This included estimate quantities for new piping components, insulation & paint requirements, as well as demolition piping.

Established scope of work breakdown coding between the Irvine and Mexico City engineering offices on the grassroots Cantarell Nitrogen Project, to establish clear procurement responsibility for each of the offices which were work-sharing the engineering and procurement effort.

Developed a cost estimate of materials needed to complete work on the Rabigh power project in Saudi Arabia. Also assisted the field materials manager via email, fax, and conference calls in identifying and procuring those remaining materials needed on this power project.

Performed piping material takeoffs and associated RFQ and PO package development at the jobsite under adverse conditions on the Pemex Cactus Fire Project, a ten month rebuild of a natural gas plant which had suffered extensive explosion and fire damage in Chiapas, Mexico. Generated reports for the field construction which summarized type and quantities of materials needed (by circuit number).

Performed the coordination and expediting of the pipe spool work at a fabrication shop in Tulsa, Oklahoma for a Union Carbide Cogeneration Power Plant, erected in Taft, Louisiana. Did additional pipe spool coordination and expediting at two separate fabrication shops in the Philippines on a project for Pilipinas Shell Petroleum Corp.

At the Chevron El Segundo, CA. refinery jobsite, controlled the disposition of surplus piping materials via transfers between several locations, and kept home office accounting abreast of the corresponding movements in material dollars.

In the Houston office, assisted the material engineering group in development of new piping specs in Specwriter. Worked in tandem with engineering, design, procurement, expediting, and traffic groups to insure that the proper materials reach their correct destinations in a timely fashion. Performed critical status reporting to project management, via utilization of material status reports, to identify potential problem areas due to vendor slippages in ETA dates on critical material requirements. Called attention to and presented solutions to definitive as well as potential material delivery slippages which adversely affected construction schedules.

Additional exposure in request for quotation and purchase request proposal analysis, using methods of probability/reliability and cost control techniques in the decision-making process. Weighed potential extraneous factors which might affect timelines and quality control of delivered product(s) in vendor fabricator contract bids.

INDUSTRIES/TECHNOLOGIES EXPERIENCE:
Chemicals, Cogeneration, Ethylene, Facility & Plant Services, Gas, Geothermal, Offsites & Utilities, Oil Refinery, Oil & Gas Production, Petrochemicals, Power, Production/Pipelines, Refinery Products & Gases, Shutdown/Turnaround, Warehouse/Distribution

SIGNIFICANT EXPERIENCE:

FLUOR DANIEL (2006-2009):

FIELD MATERIALS MANAGEMENT, MATERIAL PLANNING LEAD

Oil Refinery Expansion Project Marathon Garyville Major Expansion
(2007-2009) Garyville, Louisiana

Field Materials Management Lead Planner on a major refinery expansion in Louisiana with a staff of five, coordinating the issuance of all permanent plant and consumable materials to all subcontractors, site-wide. Active participation in various units' weekly progress meetings to identify critical materials issues. Generation and distribution of various procurement and inventory reports to construction management, project controls personnel, estimating, subcontractors, pipe and steel fab shop expeditors, and the client, defining what is in stock and available for issue/erection and defining ETAs/expediting notes on what is yet to arrive on site. Coordinated the material tracking, planning allocation reporting, and expediting of all materials associated with time-sensitive critical hot tap, out of service, & tie-in work.

SUPERVISOR, MATERIALS MANAGEMENT

Biomedical Manufacturing Expansion Project Amgen Expansion Project
(2006-2007) Juncos, Puerto Rico

Field materials management and piping isometric coordination on a biomedical plant expansion involving large numbers of instruments and hygienic piping/fittings. Maintained an Access cross-reference database for the mapping and integration of other workshare engineering companies' bulk piping and instrumentation catalog items over to FD's project commodity catalogs and piping specs, and utilized this cross-ref database in order to "sanitize" engineering companies' MTOs from their item codes into corresponding FD item codes.

ARGO-TECH CORPORATION (2003-2006):

SENIOR MASTER PRODUCTION SCHEDULER

Responsible for analysis and schedule of manufacturing and production control issues utilizing Western Data Systems' MRP database. Established delivery promise dates and monitored progress of all make/buy parts required on sales orders. Created work orders for all make parts and prioritized them according to required shipping dates. Submitted weekly progress reports to General Management, quantifying deliverable monthly sales dollars, margins, at risk items and new order sales dollars. Worked with engineering, sales administration, manufacturing engineering, quality control and shipping/receiving personnel to maximize production efficiency and meet targeted shipping dates.

FLUOR DANIEL (1991 - 2002)

FIELD MATERIALS MANAGER

Gold Mine Expansion Project Newmont Yanacocha Mining Project
(2002) Cajamarca, Peru

Field Management of all project materials on a gold mine expansion project in Peru. Involved supervision of all field procurement, expediting, material control and warehousing personnel. Successfully identified and utilized $1.3 M in surplus materials which had been over allocated by a previous EP&C company from an earlier project.

SENIOR MATERIAL CONTROL SUPERVISOR

Electrical Power Generation Projects Waterford Power Project - Waterford, Ohio
(2000-2002) Lawrenceburg Power Project - Lawrenceburg, IN.
Newington Power Project - Newington, NH
LTV Power Project - Gary, IN.

Performed all material take-offs, RFQ and PO package development, and field materials interface for all piping material requirements on the above four combined cycle electrical power projects for the Duke/Fluor Daniel joint venture company.

PIPING MATERIAL CONTROL SPECIALIST II

Electrical Cogen Power Project Sonat West Georgia Generation Project
(1999) Thomaston, GA.

Solely managed all piping material take-off activities, all piping RFQ & PO package development, and all electronic piping BOM, RFQ, PO, & Matl Receiving Report data transfers between home office and jobsite. Monitored the home office master P&IDs for process changes and reacted as necessary with material impact advices back to the PPE and with PO cancellation change orders or restocking orders to suppliers via the procurement group, if necessary and logistically possible.

Sulfur Recovery Project (5 separate plants) Pemex Cactus/Nuevo/Ciudad/Matapionche/Poza Rica
(1998-1999) Various Locations in Southern Mexico

Performed front-end piping material takeoffs from sketches (including insulation, paint, and demolition requirements) for a group of five sulfur plants. Applied management defined contingency bumps to these takeoffs and submitted the resulting requirements by Area/Unit/Work Breakdown Structure to the estimating and project controls groups for calculating field labor rates and to use as a basis for reinforcing the contract proposal numbers.

Refinery Expansion Estimates Pemex Salamanca/Madero/Tula Exp. Projects
(1998) Various Locations in Mexico

Assisted the estimating group in assessing material and labor costs for three separate refinery expansion proposals in central Mexico. This was done by performing preliminary valve takeoffs from close to 400 P&IDs, and then summarizing these takeoffs for input into the estimating department's ICARUS database.

Grassroots Nitrogen Production Plant Cantarell Nitrogen Supply Project
(1998) Atasta, Campeche, Mexico

Performed valve takeoffs from master P&IDs into GMS, and processed Bill of Material file downloads from the piping design group's PDS database to material control's GMS database, for piping materials identification and RFQ/PO package development for the procurement group. Established unique scope of work breaks between the Irvine and Mexico City engineering offices by creating separate fabrication categories within GMS for each office's respective material requirements on each bill of material.

Refinery Expansion Irving Oil Refinery Expansion Project
(1998) New Brunswick, Canada

Established the home office GMS database and downloaded the piping specification files from material engineering's Specwriter database to material control's GMS database, and initiated material takeoffs from P&ID's and isometrics. Contacted various mechanical and pipe fabrication contractors in the eastern (New Brunswick) Canada area and solicited shop surveys from them, to help project management assess what local resources and labor were available for this refinery expansion project.

Refinery Expansion Amoco Refinery Expansion Project
(1998) Salt Lake City, Utah

Established the home office GMS database and downloaded the piping specification files from material engineering's Specwriter database to material control's GMS database. Conducted preliminary takeoffs from P&ID's and piping sketches to verify early cost estimates for this refinery expansion project.

Cogeneration Power Project Rabigh Steam Power Plant Extension Stage 4
(1997) Saudi Consolidated Electricity Company
Western Region
Kingdom of Saudi Arabia

Coordinated the identification of piping material shortages at shop and at jobsite toward the tail end of this power project. Investigated possible utilization of surplus material at one location to resolve shortages at the other, and initiated the procurement effort of remnant shortages for the field personnel. Issued the final 300 second-stage AFC isos to the shop and field and executed the downloads of the home office BM and PO data files to the jobsite materials manager.

Natural Gas Plant Rebuild Project Pemex Cactus Fire Rebuild Project
(1996 - 1997) Pemex Cactus Gas Production Plant Jobsite
Chiapas, Mexico

Performed piping material takeoffs from field designed and engineered isometrics into FD's inventory control database (GMS) at the Chiapas jobsite for the rebuild of a natural gas plant which had suffered an explosion and extensive fire damage. Created RFQ and PO packages and forwarded them to the jobsite procurement manager for purchase of these materials, and generated material requirement reports by individual circuit (work package) for the field construction leads to inform them of the types and quantities of piping materials needed to complete field erection.

SHOP FABRICATION EXPEDITOR

Cogeneration Power Project Union Carbide Taft Louisiana Project
(1996) Word Industries Pipe Fab Shop
Tulsa, Oklahoma, North America

Controlled the pipe fabrication work at the pipe fabrication shop and expedited pipe spool shipments in accordance to the scheduling needs at the jobsite. Consisted of the fabrication of 2,250 mark pieces, including 30" diameter 1.375 inch thick wall carbon steel spools, as well as various sizes of 304SS, 316SS, 1 1/4 Chrome spools. Ensured the completion of all phases of fab, radiography, spool marking/painting, tagging/barcoding, FD QC approval and shipment of all spool pieces from the shop in Tulsa to the jobsite in Hahnville, Louisiana.

PIPING MATERIAL CONTROL SPECIALIST

Reformulated Gas Project and Cogen Project Chevron Refinery
(1995 - 1996) El Segundo, California, North America

On-site Material Control Specialist, responsible for determining piping material requirements from isometric drawing revisions made by field engineers and designers and maintaining those changes in the GMS material management database. Developed RFQ and PO packages as necessary for field procurement personnel. Monitored material surplus and shortages from two different units, LSFO and Alky/Tame, and regularly published a report of these numbers to the two units warehouse managers, the home office, and the client so all were aware of material availability as field changes occurred. Coordinated the transfers of material between fab shops in Utah and California, the on site LSFO unit, Alky/Tame Unit, Cogen Project, an FCCU Jacobs Engineering unit, and Chevron's own warehouse to maximize the usage of surplus materials from previously completed CCR, Penex, Naphtha, NHT1 and offsites units.

Utilities & General Facilities Project KPJV Kuwait Refinery
(1994 - 1995) Shuaiba, Kuwait

Lead Material Control Specialist, responsible for front-end set up of the GMS piping material control system and the training of new hires. Assisted material engineering group in the development and review of material specifications in Specwriter, and conducted a materials estimate for a proposed ethylene unit, involving material from 124 process and instrumentation flow diagrams.

Reformulated Gas Project Chevron Refinery
(1994) El Segundo, California, North America

Lead Material Control Specialist, responsible for reviewing the integrity of material requirements text file downloads from CAD system (Intergraph) to Fluor Daniel's material control system (GMS). Included verification of proper fabrication category coding to insure that sufficient piping materials were bought and shipped to the appropriate shop(s) and field. Work on site included setting up field personnel with capability to generate periodic electrical materials status reports, and highlighting shortage materials for the electrical subcontractor to procure materials against.

PIPING SHOP MATERIAL FABRICATION COORDINATOR

Asset Renewal Project Pilipinas Shell Petroleum Corp.
(1993 - 1994) Tabangao, Philippines

Controlled the pipe spool fabrication work at the Interbeton (now Petrotech) shop facility in Tabangao, on the fabrication of 7,800 small bore (6" & smaller) diameter carbon steel mark pieces, within fluctuating material delivery/availability constraints from overseas manufacturers/suppliers and accelerated field construction demand. Upon my arrival, shop was only able to fabricate, X-ray, clear QC & ship 2,200 pieces in their previous 8 months of operation. By making production related changes with respect to piece marking and color coding procedures, bolstering the material handling manpower, adding additional pipe transport vehicles and streamlining the QC spool piece clearing operation, succeeded at expediting the remaining 5,600 mark pieces through all stages of fabrication and shipment to the jobsite in the 4 month period of January through April, 1994, and held the total fabrication costs down to a level which was 7% below the client approved funding amount.

Asset Renewal Project Pilipinas Shell Petroleum Corporation
(1993 - 1994) Bauan, Philippines

Controlled the pipe spool fabrication work at the AG&P shop facilities in Bauan on the fabrication of 4,800 large bore (6" to 36") diameter carbon steel mark pieces. Utilized the planning module programs of Fluor Daniel's Global Management System (GMS) database and shipping status reports from the home engineering office extensively as tools in determining both anticipated and actual material availability. This aided in guiding AG&P's project management and shop superintendents toward scheduling the work in the shops in a manner which would provide maximum support of field construction demand. It also prevented bottlenecks in production which otherwise would have risen from partially fabricated pieces left incomplete due to material shortages. Participated in weekly progress meetings with AG&P project management, AG&P shop production foremen, Fluor Daniel and G&P QC inspectors, and reported results back to field construction management, F.D. cost and scheduling personnel, and F.D. project manager in the home engineering office. Contract was completed on schedule, with full accountability on all surplus materials, within the budgetary requirements.

MATERIAL CONTROL SPECIALIST

Asset Renewal Project Shell International Petroleum
(1991 - 1993) Tabangao, Philippines

Lead Material Control Specialist coordinating the manual material take-off from process and instrumentation flow diagrams and isometrics (as well as via the downloading of data from a 3D CAD System) of the crude distillation unit, thermal gas unit, hydrotreater, liquid propane gas unit, and platformer.

Prepared and initiated distribution of RFQ and PO packages for the purchase of $26 million in piping materials, making certain that all vendor deviations from client's and Fluor Daniel's specifications were addressed. Prepared monthly Piping Material Commitment Dollar Reports for management, indicating total actual committed dollars vs. forecasted estimates.

TRAINING: APICS Orange County Chapter Master Scheduling Course Work

View contact information...
«« previous resume next resume »»
Search Results (Resumes 101 to 150 of 840)Go to Search Parameters...
Brief Description
20+ years of experience working in Materials Management, Inventory Control, Materials Planning Scheduling & Logistics, in both home office and field site locations on the construction of large petrochemical plants, natural gas plants, electrical power plants, and mining facilities.
Open Pit Slope Design, Tailings Dams, Plant Foundation Investigations, Earthworks
Experience, professionalism, skills, physically fit, able to work long hours in tough environment and stressful conditions, availability for traveling abroad.
Seeking position as HSE/Training/Emergency Management for Petrochemicals or Refinery Operations
Acheived more than twelve years in pre-press and printing for major company's in the meddle east region. Excellent knowledge of all known desktop applications.
B.S in Environmental Science, B.A. in Geoscience (Geology). Not much experience, but willing to relocate and travel. Strong farm, mechanics, and computer background.
Experienced Project Manager
LARGE AND STRATEGIC PROJECTS MANAGEMENT - BUSINESS AND OPERATIONS MANAGEMENT
Senior mining professional with global risk management experience identifying and managing risk in mining operations and related construction projects
Executive level mechanical engineer with extensive experience in many enginering fields.
Versatile geoscientist/hydrogeologist with over 18 years professional experience. Looking for challenging and exciting opportunities world-wide. Fields of interest: groundwater resource exploration, development and management; groundwater/hydrogeological characterization and modeling.
In my last role I was a Senior Remediation Engineer assisting the Principal Engineer in ensuring the smooth running of all consultancy issues associated with live remediation projects within the Yorkshire region. I also have a strong background in conducting Geoenvironmental Appraisals (ground inves
Enviromental Geological Engineer and Regulatory Affairs Manager
I am an environmental professional with 20+ years of experience in private industry, county government and non-profit marine research. Areas of expertise include management and development of technical and non-technical staff; development of outreach programs, budget planning and management.
Geologist
Seeking career in wastewater field in Middle Eastern Country
Master's in Engineering and MBA + 28 years Global Multidiscipline Projects Engineering Management Experience
I am a brilliant and confident chemical Engineer with always in sight of practical aspects of Engineering. I am technically strong, but would like to have exposure at the Industry level. I promise that I would be a fast learner and an asset to the industry in the future
Environ and social impact expert, sustainable development project planner, monitoring and evaluation, stakeholders mgt, computer literate, B.Ag econs, M.sc, Ph.D (Rural sociology)
•Extensive ex-patriot experience in international, supply chain, logistics, inventory management, and project management across Asia, China, and Europe.
Competent and adept geologist with environmental investigations experience
Over 35 years experience in operating heavy equiptment. Can operate expertly all sizes Dozers, Loaders, Pans.excavators on Cats pc235 - pc3855B, Komtasos, pc 400 - pc12507, Hitachi, pc450- Ex1900, Hyundai pc360-R500 , loaders110 Trojan to WA 600 w/ a 20 ton lift, Willing to travel abroad.
Project, Project manager, maintenance, maintenance manager, production, production manager, mining, heavy equipment
Controls Engineer, ControlLogix, Manufacturing Engineer, Engineering Manager, PLC Programming, Robotics, Machine Vision
Electronic Engineer with more than 2.5 years experience in Quality Controlling / trouble shooting of all electronic/electrical components with good knowledge in circuit design (analog & digital) & programming using PIC.
sales, marketing, business development general management
I am a qualified analytical chemist, possessing extensive experience in international aspects of operations (U.S. EPA regulations, ISO 9001/14001/17025 standards, Project Safety Management PSM/OHSAS) with a wide range of technical proficiency in Health Safety Environment, waste management and docume
An ambitious and highly skilled Quality engineer with extensive experience in quality engineering, ISO certification, production, management, product development and launch, and customer support.
Quality / Environmental Senior Consultant
A challenging and creative technical position in a growth-oriented company in the United States.
Versatile, knowledgeable, exploration geologist
Geology MSc Graduate (Minor in Botany) seeking to establish a career that focuses on environmental concerns. Am willing to relocate anywhere around the globe
Well-rounded professional office/field experience in project controls, process engineering, environmental engineering, construction, management, sales, and business consulting. Industries: oil and gas, federal government contracting, residential construction.
Former Australia SF; SAS Regt. 19 yrs int'l experience, 3 yrs Regional Manager China & Sth EA. Strategic planner drawing on yrs in difficult & demanding environments.
Mining, Geotechnical and Environment professional
Logistics and Procurement Specialist
Master sailing on tankers looking for shore based job
Comprehensive international leadership in Environmental, Health, Safety and Sustainability. Extensive experience in Asia with top multinational firms. Excellent cross-cultural skills in Indonesia, Singapore, Malaysia, Thailand, Philippines and China. Speaks Bahasa Indonesia conversationally.
I have expertise in general operations, contract administration, budgeting and human resources, among others. I have years of experience working with the public, business owners, managers and government officials. In addition, I have on-the-ground experience in public works, drilling and pipelines.
Manage the Camp Administration,Team work skill,having attitude to manage.Result oriented & communication skills that to share to others
More than 15 years of environmental / safety experience in mining industry; 1.5 years of experience in exploration by drilling as geologist; 2.5 years of experience in exploration by drilling as environmental / safety specialist
HR Management, Project Management, Consultant
DIRECTOR OF GLOBAL SOURCING / Asia Procurement Strategist • Multi-cultural Relationship Development • Product Innovation / DEDICATED TO HELPING COMPANIES SUCCEED IN ASIA
Construction / Project / Property / Manager / Engineer / Estimator
Journeyman Electrician looking to advance
Environmental Manager/Top Wastewater Licenses
Licensed Professional Engineer registered in British Colombia and Alberta, and able to be registered in other Canadian, U.S. and international jurisdictions.
HR Generalist - Manual Payroll, employee Personal filing, Documentation, MOM related work, Policies & Procedure framework, Organizational Develoment, Performance evaluation & Appraisal, Issuance of Official Letters, Employee Engagement & Communication, Employee Retention, Training & Development, etc
Mechanical Engineer, Static Equipment, Pressure Vessel, Heat Exchanger, Tank
HSE Learning/Development Professional seeking position in an industrial setting.
1   2   [ 3 ]   4   5   6   7   8   9   10   11   12   13   14   15   16   17  
Seach Parameters

Change search parameters...
CATEGORIES: Operations;
INDUSTRIES: Environmental;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com