Looking for a senior position in project management and planning to add value and enhance my technical and managerial experience

ACCOMPLISHMENTS
* Planned, scheduled and coordinated many short and long term projects and turnarounds in process plants, rolling mill plants, steel making plants, Utilities facilities (water treatment plants, substations, oxygen plants)
* Planned and controlled major construction projects in company new plants and revamping projects in existing plants
* Experienced and professional in utilizing project management software (i.e. Primavera and MS Project) in projects planning & control
* Participated in a committee for developing a CMMS (computerized maintenance management system) to substitute the exiting legacy systems
* Familiar with most commercial CMMS packages available in the market (i.e. MAXIMO, SAP R/3 release 4.6B)
* Participated in a committee to prepare equipment bill of materials and standardizing the equipment hierarchy and spare parts specifications

PROFESSIONAL EXPERIENCE

UAE, Dubai
Mott MacDonald
Senior planning engineer Currently

This is an EPC (Engineering, Procurement and Construction) project of two RO (Reverse Osmosis) sea water desalination plants at the PALM JUMEIRAH for the client PALM WATER and contractor ACWA Emirates

* Construct and review EPC master schedule (including all milestones) using CPM techniques in coordination with project manager and junior planners
* Review and incorporate contractor and subcontractors (Design & Build) schedules into the master schedule
* Ensure that Master schedule is properly resources loading
* Control and supervise all contractors works and coordinate between them and client
* Follow up and monitor construction activities (Civil works,steel structure installation works, MEP works, Mechanical and electrical equipment installations, marine works) and conduct frequent visits to sites in order to guarantee work is done as planned schedule and quality
* Attend project coordination meetings and progress meetings as a client representative
* Develop and review weekly and monthly progress reports for client including
 Master schedule updates and analysis
 Manpower histogram
 Variance analysis report (schedule, scope and cost) and recommended action plan
 Cash flow and progress S curves
* Review and log payment certificates to contractors, cost control, critical activities and corrective actions, claim letters
* Conduct delay impact analysis as required
* Follow up materials procurement in order to ensure proper supply of materials to site at the planned and suitable time
* Coordinate with all concerned parties logistics and safety at site

UAE, Sharjah
Green Line Interiors July 2006 ~ March 2007
Planning Manager

* Lead and supervise a team of technicians to execute and optimize machinery maintenance and repair programs in all company factories (sharjah factory, Yacht factory and Dubai factory)
* Direct and supervise building maintenance activities which include (fire fighting and alarm system, air conditioning units, building lighting system, building structure and roof)
* Construct preventive maintenance programs for (wood working, CNC and Laser machines) in order to improve the existing maintenance systems and increase its availability
* Plan and supervise implementation of new CMMS in the company
* Review equipment spare parts, production and maintenance tools and decide the needed quantities.
* Review and modify all design drawings for the new factory in JAFZA including machines locations, electrical power distributions and loads, compressed air distribution, Dust collection system, HVAC systems

Egypt, Alexandria
Alexandria National Iron & Steel Company (ANSDK) April 1997 – July 2006
Senior planner and controller

 Plant revamping, modifications and new investment projects
* Lead and coordinate meetings with all concerned sections (Mechanical, Electrical and operation) to prepare the bid documents and Request for proposal at tendering phase
* Define scope of work, project activities, schedules, budgets and required resources (tools, materials, supplies, manpower & outsourcing).
* Develop project plans schedules using Project Management Software Packages (Primavera 3.0& MS project)
* Resource loading for manpower skills and crafts
* Coordinate with contractors and subcontractors during mobilizations and work preparations
* Follow up and administer all materials needed through procurement procedures (requisition, tendering, supplier invoice, offers evaluations, contract and order placing for the selected supplier, inspection in warehouse) to ensure delivery at proper time
* Keep track and log sheets for material and drawings submittals and approvals
* Issue biweekly and monthly look ahead plans for all concerned sections and subcontractors
* Monitor all subcontractor performance (submitted in their original schedule) and actual progress against the project plans (schedule,scope,quality and cost cost)
* Ensure and enforce safety standards and regulations during site execution works and participate in safety meetings
* Construct and monitor project KPI's and Conduct variance analysis according to the actual progress and recommended corrective actions to work plans.
* Prepare financial reports to present the actual expenditure against the baseline budget and cash flow on monthly basis
* Conclude project activities and issue conclusive reports highlighting best practices and future enhancement to work plans.

 Preventive maintenance system
* Develop sand update preventive maintenance programs in order to ensure equipment availability and reliability
* Assign resources (material, spare parts, craftsmen) to all PM activities
* Ensure that job specification and procedures are updated and ready
* Schedule all PM activities based on equipment repair cycles, historical analysis and equipment condition
* Coordinate between maintenance and production sections in order to balance (leveling) work load and meet production requirements
* Release work orders for PM activities to work force (Mechanical, Electrical and Operation).
* Follow up work orders activities and revise feedback into MIS (Management Information System) PM (preventive maintenance) Module
* Monitoring the execution process and issuing Monthly PM Reports focusing on observed deviations and the control actions needed

 Turnaround (shutdown) maintenance Planning and scheduling for periodical, major and capital repairs
* Review the annual plant shutdowns according to targeted revenues, master production plan, and plant condition.
* Determine the shutdown scope and list up all maintenance work activities
* Assign resources (material, spare parts, craftsmen and special equipment or tools) to all activities
* Use project management software to schedule all activities, optimize resource's utilization and determine the maintenance workload, which needs to be outsourced.
* Develop the overall schedule (macro plan) the detailed schedule (micro plan) for all work packages using critical path analysis
* Lead and coordinate between concerned subsections to prepare all needed spare parts and materials and ensure enough lead-time for procurement.
* Track and control materials delivery and issue follow up reports
* Review bid documents for outsourced maintenance work and prepare necessary summary reports for management approval
* Follow up bidding procedures (bid document approval, tendering, contractor's offers evaluation and placing orders)
* Coordinate with contractors and subcontractors during mobilizations and work preparations
* Ensure that job specification, procedures and safety measures are updated and ready for all turnaround scope activities
* Release work orders for all activities to work force (Mechanical, Electrical, instrumentation and Operation, subcontractors).
* Monitoring activities progress in site and ensure turnaround work orders are executed in parallel with critical path activities then feedback into project management software
* Conduct daily progress meeting and update master schedule with the current situation
* Report the progress for monitoring and control
* Conduct variance analysis between baseline and actual data (schedule, man-hours, cost,….ect) for needed corrective actions and improvement purposes
* Monitor and follow up shutdown costs (materials, labor, subcontractors, equipments) and insure data entry in cost database system

 Equipment breakdowns
* Review and Supervise unscheduled equipment downtime data entry into the system
* Develop equipment condition parameters and failures database and revise its data in MIS.
* Perform failure statistical analysis to identify critical and repeated failures in equipments
* Perform root cause analysis for unscheduled down time and emergency shutdowns and recommends appropriate countermeasures.
* Issue equipment performance reports.

 Materials and spare parts procurement
* Coordinate with all department subsections budget preparation and issue final budget report
* Prepare the requisition plan for (spare parts, normal maintenance stock and tools) to ensure its availability at the planned shutdowns
* Maintain and optimize inventory system by keeping safety stocks and deciding the reorder level of spares
* Revise and administer all materials and spare parts procurement procedures (requisition, tendering, supplier invoice, offers evaluations, contract and order placing for the selected supplier, inspection in warehouse)
* Issue weekly report for materials and spare parts situation and expedition
* Issue monthly report for materials and spare parts stock, consumption and cost

 Department annual budget preparation
* Prepare annual shutdown plan for all department's plants
* Coordinate the preparation of the needed budget for (spare parts, materials, outsourcing and training) based on the actual previous year figures and the target production plan and revenue
* Coordinate the preparation of capital expenditure budget for upgrading and improvement projects
* Participate in budget deliberation and revision meetings
* Monitor budget expenditure
* Report variances against the approved budget highlighting the main reasons for variances

 Business plan preparation
* Set the department key performance indicators and measures
* Coordinate with all department's subsections to finalize the business plan document
* Present the business plan document to management for approval
* Issue weekly, monthly and semiannual progress reports for the actual situation of the business plan and to revise it according to the current condition

 Reporting of department performance
* Issue weekly backlog situation report
* Issue weekly and monthly maintenance performance report
* Issue weekly status report for work orders to central workshop
* Issue annual department report (highlighting major achievements, commitment to business plan, satisfying of performance indicators, target figures and maintenance cost)

Egypt, Alexandria
FARCO for Pharmaceuticals Company June 1996 - March 1997
Mechanical maintenance engineer (utilities)
* Direct and supervise maintenance activities in utilities section (diesel engine, HVAC systems, compressed air circuits and boiler)
* Plan and supervise implementation of required repairs during equipment stoppages.
* Revise equipment spare parts stock and decide the needed quantities.
* Initiate procurement based on bill of materials and evaluate suppliers' technical.
* Minimize equipment stoppages by conducting failures analysis, taking the necessary short and long term countermeasures.

Egypt, Alexandria
El-Nasr for paper and cartoon company August 1995 - May 1996
Mechanical maintenance engineer
* Direct and supervise maintenance activities (shift engineer) in row materials transportation line
* Plan and supervise implementation of repairs during equipment stoppages.
* Minimize equipment stoppages by conducting failures analysis, taking the necessary short and long term countermeasures

PROFESSIONAL ORGANIZATIONS
Syndicate for engineers (Egypt)

EDUCATION
M.Sc. Mechanical Engineering October 2003 – Present
Arab Academy for Science, Technology and Maritime Transport
* Thesis: Computational Fluid Dynamics and Heat Transfer
* Point of study: Simulation of reformer box to study heat transfer and reformer tube skin temperature on the reformer tube lifetime

B.Sc. Mechanical Engineering June 1990 - June 1995
Alexandria University, Faculty of Engineering
* Graduation project: Vibration analysis
* Grade: Very good
* Accumulated overall grade: Good

SKILLS
 Technical o Able to read and understand technical and construction drawings (mechanical, electrical, civil)
o Understand and make use of most international standards (ISO, BS, JIS, DIN, ASME, ect…)
o Experienced with safety regulations, standards and its applications at work places and sites o Able to read and interpret P&I and logic Diagrams o Able to read and utilize all major types of technical documentations (catalogues, work standers and procedures, manuals, ect…)
o Experienced in heavy industry equipments (rotating and fixed) with thorough knowledge of its accessories and components o Aware of contract administration standards FIDIC 1999 (EPC turnkey, Design & Built)

 Languages:
* Arabic - Mother tongue
* English – Very Good (speaking, writing and reading)
 Computer & IT:
* Project Management Software Packages:
- Microsoft project
- Primavera P3
* CMMS software packages: Familiar with most commercial packages available in the market like o SAP R/3 release 4.6B
o Maximo
* Office Software Packages:
- Microsoft office XP (Word, Excel, PowerPoint, Outlook)
* Database Software:
- Microsoft access – (developed production and maintenance reporting and historical analysis application).
- Oracle 8i developer.
 People:
o Team player with Leadership qualities and sound analytical skills o Maintain effectiveness when experiencing major changes in work tasks or the work environment, also adjusting effectively to new work structures or processes o Establish a positive working relationship with individuals within or outside the workgroup o Effectively managing time and resources to ensure that work is completed efficiently

TRAINING
 Summer training
* Alexandria petroleum company (from 10/7/1993 to 10/8/1993)
* Alexandria university –faculty of engineering in gear boxes maintenance and installations (from 1/7/1993 to 10/7/1993)
* Alexandria National Iron & steel company (from 1/8/1993 to 31/8/1993)
* Bolvara for textiles company (from 1/8/1992 to 31/8/1992)

 English language
Successfully attend and passed the following levels in the British council
* Intermediate level
* Upper intermediate level
* Pre-FCE (First Cambridge Certificate)

 Management
* Decision making (6~8/8/2000)
* Crisis management (3~6/5/1998)

 Technical
Predictive maintenance program by vibration analysis (10~15/10/1998)

 Information technology
* IBM (electronic commerce professional track) (Feb.'2001~Aug.'2001) which let to the examination certificate CIW professional
* MS-Access advanced (21~24/8/2005)

View contact information...
«« previous resume next resume »»
Search Results (Resumes 401 to 450 of 666)Go to Search Parameters...
Brief Description
Ex Firefighter 18 years, Breathing Apparatus, Confined Spaces, Fully Qualified Pllease view my CV
Master Mariner, Class 1: Graduate doing MBA: Employed as Planning Manager with a Container Company
HR Professional seeking Middle / Senior Management Position
International Trade such as Import & Export Business, Offers, Sales Promotion, Market Research, Different Business Reports / Information's, Estimations and Future Business Plans beside some Administrative Work etc
young and energetic graduate with professional experience in Land Surveying
I am doing Masters Graduation from Anna University, Chennai India and is eager for a position from which I will gain valuable experience in the industry. I will finish the course by April 30th
CMIOSH - Sr. Industrial Hygienist : Expertise in writing & implementing OH Procedures, conducting HSE Training, Inspection, Audits, Risk & Industrial hygiene Exposure Assessment & Monitoring etc. Able to work with little guidance, hold good inter-personal relations & transparent communication skill.
A geophysical graduate with 8 years marine survey experience, coupled to business, project and people management skills. Currently working for an international consultancy, integrating geophysical and geotechnical surveys into engineering projects worldwide.
Corporate Finance, Program Management, Management Consulting, Audit, Accounting, Business advisory services
Projects Management / Technology Consultant / Business Development & Management of Information Systems
Having Cement and Pharma R&D Experiences, I would like aquire a career in the same feild. My Skills includes that,I can work with part of team or indepentantelly. Fast decision making, analytical skill.
Possess a background in Security including BS Justice Studies, US Military, Federal Law Enforcement, and Int'l Security Mgmt experience.
My skills include operation of a voriaty of heavy equipment in the areas of enviromental, paving, dirt and utility work
Specialist in Security, Safety and Risk management
Senior Process Engineer with 13 years of Experience in Petrochemical and LNG process
First Aid Attendant and Field Supervisor Familiar with drilling rig and service rig operations. Able to do minor mechanical, plumbing and electrical work. Have some hours experience on a variety of machinery. Have proven abilities in first aid. Have proven leadership skills.
CMA (USA), ACIA (USA), ACMA.Internal/ext audit,budgeting and forecasting, project execution and evaluation, financial reporting,Accounts finalization (IFRS & US GAAP), Financial Analysis, Control self assessment, ERP implementation & dealing for financial arrangement.ERP SAP/Spiridon/Atlantis
EPC/EPL Manager, Rehab & startup projects. Polished broad based o/seas tech & mgmt skills
Diverse background in construction, logistics, remote location activity that can be used to meet your company's immediate and long-term needs. 15 years of increasing responsibilities in the construction industry. Multiple job responsibilities including blueprint reading and project layout.
SALES PROFESSIONAL with an impressive record of top performance and the proven ability to achieve solid sales growth….to effectively capitalize on both new and existing market opportunities
Certified security supervisors trainer from SITO. Certified courses on Fire fighting, First Aid and different courses on security operations.
I am a experienced safety coordinator, I am a (CSO) national construciton safety officer and have completed the UofA Occupational Health & Safety Program.
Working in construction for 15years,now working in engineering and industrial rope access
MECHANICAL ENGINEER HAVE MORE THAN 9 YEARS EXPERIENCE WITH WITH RANGE OF EQUIPMENTS . IN MY RECENT JOB, I AM RESPONSIBLE ABOUT SCHEDULING AND PERFORMING TH PREVENTIVE AND CORRECTIVE MAINTENANCE OF TWO VESSELS AND OIL POLLUTION CONTROL EQUIPMENTS .
I completed a B. Tech degree in Environmental Health at Peninsula Technikon. I also completed short courses in Environmental Management, HACCP, and Audiometry. I did my experimental training at the Worcester Municipality, Worcester Abattoir, and Maitland Abattoir.
Geotechnical Engineer specializing in rock/soil engineering and numerical modelling, based in Vancouver, Canada. Looking for a challenging career opportunity worldwide in natural resources sector, civil/mining geotech consulting or academia.
Rigger crane op scaf
Thirty years as city of Winnipeg Fire Paramedic Service working through the ranks to a position of Captain . Knowledge of field and operation within emergency field.Experience in organizing and directing personnel. Extensive training in safety sector as National Construction Safety Officer and Consc
Maintenance Manager/Supervisor - Direct hands-on experience in the start-up of a large hydroforming/manufacturing facility. Excel at directing a cohesive staff in the successful attainment of objectives. Major strengths in planning, problem solving and communication.
hnician/manager with over 15 yrs experience in train scheduling and safety. Expertise in train circulation graphing, train scheduling, and statistical analysis of safety and performance. Strong mathematical, analytical and problem-solving skills; demonstrated leadership; sharp eye for detail.
DBA database administrator oracle, system analyst, programmer
I am a Mechanical Engineering working in a Service company. I have two Msc one of them in Oil and Gas Engineering. I consider myself as a multi skilled Engineer
Experienced construction project manager with heavy background in petrochemical production operations
My experience in biological science ranges from working independently to working for, State, Federal Agencies and Environmental Companies. This experience has provided me with valuable skills in conducting field research, data collection and analysis on many threatened and endangered species.
With a Master degree in Remote Sensing and GIS, Bachelor degree in Information Technology, as well as 5 years of working period, I have programming experience in ESRI ArcView, ArcSDE, ArcIMS, ArcObjects, ESRI ArcGIS Server (.NET), ERDAS, MapServer, MapGuide
Accounts Professional having 5.8 years of an experience.
Graduated from Memorial University of Newfoundland(2007) with Bachelor of Computer Science degree. Skills include SAP R/3 4.6 and 4.7, Oracle9i, Java, SQL, PL/SQL, MS-Access
Professional bilingual Engineer with, mining, constuction, and maintenance experience
Detail oriented Geologist with QA, consulting, and lab experience. Strong team player, self-motivated, and fast learner. Work well with minimal supervision and guidance.
Recent graduate seeking challenging environmental science position
Production Manager with BS in Mechanical Engineering and 8 years of experience in CNC Machine Shops, QC, QHSE, Planning, Inventory Control, Cost Control, Budgeting, ERP (Great Plains), Pro / E, AutoCAD. Good experience in factories start ups. CPIM (Certified in Production and Inventory Management).
Industrial Electrician 20 yrs. experience in automated industries. PLC, instrumentation, construction, commissioning and maintenance / troubleshooting
My employment and education (B.S. and M.S. Geology) best qualifies my for a position as a Field Geologist. I am looking to relocate to the western central US.
Seeking Chemist or Laboratory Technician Position-will relocate
Senior project planner schedule with 12 years heavy industry and construction projects experience ,professional in using MS Project,Primavera P3&P5,MS office,CMMS systema like SAP R/3 , Maximo. Strong technical background , project management and cost control, contract and claim adminstration
Currently was working for a Contracting Company with the US Military, as Lead Site Supervisor in Kuwait with the International Forces from all Nations, and now looking for employment within the Middle East.
I am an M.Tech in Energy Technology and M.Sc in Chemistry. Have Experience Non Conventional Energy Field. Well aware of Electrochemical Power Sources like Fuel Cell, Battery etc. Basic computer skills including language C, C++, Matlab etc.
Management , strategic management , marketing +EXPERIENCED PAINTER !!!
IT & Technical Facility Project Manager, Systems / Application Design, Development, Deployment, and Integration Manager - Data Centers, Contact/Call Centers, Hospitals, Renewable Energy Sources and Systems, "Green" Engineering/Construction, Clean Energy Technology, Energy Managment Systems / BAS
Project Manager, Plant Technical Manager, Interface Engineering Coordinator, Pre-commissioning Engineer, Commissioning Engineer, Start-up Engineer, Process Engineer, Chemical Engineer
1   2   3   4   5   6   7   8   [ 9 ]   10   11   12   13   14  
Seach Parameters

Change search parameters...
CATEGORIES: Other;
INDUSTRIES: Environmental;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com