Fourteen years of experience in cost control, estimating, planning & scheduling, financial analysis, procurement, commercial negotiation and contract administration. Five years of experience in management positions.

Industry experience: oil & gas (7 years), mining & metals (10 years) and infrastructure (5 years) for projects in Australia, New Zealand, Indonesia, USA, New Caledonia, Brazil, Russia, Saudi Arabia, West Africa and the UK.

Projects experience: Numerous conceptual, pre-feasibility & feasibility studies and construction projects (EPC, EPCM & Integrated Team) on both Owners and Contractor teams.

Proficient and experienced in most planning, cost control and estimating systems: Primavera P3 & SureTrak, MS Project, PRISM Estimator, PRISM Project Manager, and Computer Construction Software (Candy).

EDUCATION

Master of Engineering Science (1991 – 1993)
University of Queensland - Brisbane - Australia
Department of Mechanical Engineering
University of Illinois - Urbana-Champaign - USA
Department of Aeronautical & Astronautical Engineering

Bachelor of Engineering - honours (1987 – 1990)
University of Queensland - Brisbane - Australia
Department of Mechanical Engineering

PROFESSIONAL EXPERIENCE

2007 Bechtel - Brisbane, Australia

Jul 2007 – Dec 2007
Project: Sangaredi Alumina Refinery, Guinea, Africa.

Senior Estimator – short-term contract
- Development of Feasibility Study Estimate (USD$3.5 billion)

2006 Global Alumina - Paris, France

Sep 2006 – June 2007
Project: Sangaredi Alumina Refinery, Guinea, Africa.

Senior Estimator – short-term contract
- Verification and analysis of Contractor and Owners estimate (USD$3.5 billion).
- Development of estimating database.

2006 Bateman Litwin - Paris, France

Mar 2006 - Sep 2006
Project: Ma'aden Phosphoric Acid Project in Saudi Arabia

Commercial Manager - short-term contract
- Successfully negotiated a USD$400 million contract as part of the Commercial Team.
- Estimated Phase 1 (USD$5 million) and Phase 2 (USD$400 million) of the project.
- Familiar with FIDIC type contracts.

2005 - 2006 MACE

Jan 2006 - Feb 2006 (Moscow, Russia)
Project: Development of a Commercial Centre in the heart of Moscow.

Commercial Manager - short-term contract
- Developed the Estimate and Budget.

2005 - Dec 2005 (San Francisco, USA)
Project: Onça-Puma Nickel Project in Brazil for the Owner Canico - Mace was part of the Canico Owners team supervising the Bechtel Basic Engineering phase.

Cost Control Manager - short-term contract
- Developed summary capital costs estimates for Canico, for a one and two line process plant based on estimate data provided by Bechtel, input from Canico and data from other Nickel projects.
- Reviewed Bechtel's direct cost estimate.

2004 – 2005 Inco - Brisbane, Australia

Project: Construction of the Goro Nickel Project in New Caledonia (USD$1.9 billion) - Integrated team comprising Inco, Foster Wheeler and SNC Lavalin.

Senior Project Controls Engineer - long-term contract
- Managed a team of three estimators and two cost engineers.
- Supervised the development of trend, scope change, and trade-off study estimates.
- Responsible Senior Project Controls Engineer for Indirect Costs (USD$680 million).
- Performed the function of Project Controls Manager during his absence (team of 30).
- Assisted in the reduction of the Feasibility Study Estimate from $2.2 to USD$1.9 billion.
- Implemented the engineering progress system using PRISM Project Manager.
- Involved with recruitment of estimators and cost engineers.

2003 – 2004 Newmont - Perth, Australia

Project Controls Manager - Australasia
- Responsible for all Capital Project Costs (USD$300 million per annum).
- Achieved a Capital Project Costs under-run for the financial year.
- Implemented a project controls and reporting system for Australasia (Australia, New Zealand, Indonesia)
- Provided project controls training across six sites and performed frequent audits.
- Developed and implemented revised project controls procedures.
- Coordinated the development of the monthly management report for Australasia.
- Established and maintained "S" curves (budget, actual, earned and forecast).
- Developed the annual projects departmental budget and project AFE's.
- Collated estimates for uncommitted work and reviewed remaining contingencies.
- Calculated forecast costs and reported cost variances early via a trend system.
- Monitored and tracked project progress of any slippage or potential schedule impact.
- Assisted in commercial bid evaluations.

2002 – 2003 Southern Pacific Petroleum (SPP) - Brisbane, Australia

Acting Financial Manager - 2003
- Performed the duty of Acting Financial Manager after resignation of Financial Manager.
- Examined effects on IRR and NPV due to oil price, capital & operating costs, FX etc.
- Assisted in the development of the Financial Model.
- Studied the financial impacts of local tax legislation and greenhouse gas sequestration.

Project Controls Engineer - 2002
- Assisted the Project Controls Manager in the development of cost control procedures.
- Reviewed contract requirements and ensured invoices were accurate.
- Produced monthly management reports.
- Risk management (identification, analysis, assessment and monitoring of risks).
- Forecasted monthly cash calls and developed annual departmental budgets.
- Developed detailed capital & operating costs estimates for Stage 2 (AUD$600 million).
- Developed detailed capital & operating costs estimates for Stage 3 (AUD$5 billion).

2001 - 2002 HATCH - Brisbane, Australia

Project Controls Engineer - 2002
Project: Hail Creek Coal - EPCM
- Assisted in the development of a project work break down structure.
- Assisted in the relocation of the bid budget to the agreed work break down structure.
- Reviewed all costs made to the project and reported any over expenditures.
- Recorded commitments for all project costs and identified cost variances.
- Developed forecasts and provided timely warning of cost and schedule impacts.

Estimator - 2001
Estimated and won several EPCM projects:
- Mine infrastructure relocation (AUD$26 million)
- Coal load-out facility (AUD$38 million)
- Heat recovery project (USD$13 million)
- Magnesium Hydroxide plant (AUD$34 million)
- Permanent Causticiser project (AUD$16 million)
Major estimates prepared:
- Yabulu Nickel extension project (AUD$383 million)

1996-2001 Southern Pacific Petroleum - Brisbane/Gladstone, Australia
Joint Venture project between Southern Pacific Petroleum and Suncor.

Project Controls Manager - 2001
Project: Capital Refurbishment - AUD$10 million.
- Integrated EPCM team comprising Southern Pacific Petroleum, Suncor and Bechtel.
- Managed a team of one Cost Engineer and one Planner.
- Completed the project under the approved budget of AUD$10 million.
- Chaired review meetings for trends and project progress.
- Forward planned priorities and delegated responsibilities.
- Established communication channels and ensured co-operation between departments.
- Established and maintained cost trending & commitment monitoring systems.
- Liaised frequently with the Design and Construction Managers for better cost control.
- Established a system for measuring expenditure and earned value.
- Developed packaging and contracting strategies.
- Structured and implemented capital cost budgets and forecasted monthly cash calls.
- Monitored the performance of contractors and reported on trends and scope changes.
- Developed and implemented project controls procedures and a project execution plan.

Planning Engineer - 2000
- Developed and maintained commissioning and minor capital projects schedules.
- Prepared detailed area schedules, bar charts, resource graphs as required.
- Identified the critical path(s) and the non-critical operations.
- Produced weekly and monthly reports on the schedule status and resources.
- Attended progress, cost control and planning meetings and implemented changes.

Project Controls Engineer - 1998 to 1999
Project: Project Controls Engineer for the construction of Stage 1 (AUD$350 million).
- Established work break down structures.
- Attended to all aspects of contract administration including expediting.
- Assisted in the development of project controls procedures.
- Analysed capital and operating costs impacts on the Stage 2 financial model.
- Prepared home office budgets.
- Monitored and reported progress on engineering and procurement activities.
- Monitored the performance of the contractor (Bechtel).
- Co-ordinated and prepared monthly progress reports.
- Developed implementation and study schedules.
- Undertook cost studies and financial analysis.
- Prepared commitment and cash flow curves.
- Sourced potential bidders and prepared tender documents.
- Performed commercial evaluation of bids and was involved in post tender negotiations.

Estimator - 1996 to 1997
Project: Review of the Stage 1 definitive EPC estimate that was developed by Bechtel (AUD$350 million).
- Developed a detailed Stage 2 (Pre-Feasibility Study) operating & capital cost estimate.
- Developed a detailed Stage 3 (Conceptual Study) operating & capital cost estimate.

1993 – 1995 Stork - Brisbane, Australia

Estimator & Planner
- Assistant planner for two oil refinery shutdowns that were completed on time.
- Assisted in the preparation of numerous small capital cost estimates.
- Commenced the development of an estimating database.
- Prepared variation claims for oil refinery shutdown work.

PERSONAL SKILLS AND DETAILS

Personal Details: Married, Permanent Resident of Australia - Dutch passport, DOB: 17/06/1969.

Software: MS Excel, MS Access, MS Word, MS PowerPoint, MS Project, @Risk, Primavera P3, SureTrak, Maximo, Computer Construction Software (Candy), SAP, PRISM, Lotus Notes.

Languages: Fluent in English and Dutch with an intermediate level in French and a basic level of German.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 701 to 750 of 2395)Go to Search Parameters...
Brief Description
Requisition for Accounts Assistant / Any Suitable job
INVENTORY CONTROL SPECIALIST
CATIA 5 , ABAQUS, and Hydraulic system
M.SC environmental sciences with 9 years experience in HSE FIELD
My enriching years as an Engineering Manager developed me to be highly motivated, creative and versatile manager with extensive knowledge of machine utilization , overall equipment effectiveness ( OEE ) , calibration procedures , preventive and predictive maintenance and reverse osmosis operation.
To obtain a position in the field of Environmental Engineering and its related fields that will utilize and nurture my skills and knowledge.
Seeking a position that offers opportunity for advancement in fields related to environmental engineering
My background qualifications are in engineering and environmental law, and my experience to date relates to international environmental policy within a broad context (i.e. for the World Bank and UNEP in Thailand).
Objective: A position as a chemist or a chemical engineer. SUMMARY OF QUALIFICATIONS - M.S. in Chemical Engineering, B.S. in Chemistry. - Five years R & D experience in pharmaceutical industry. - Specialty research in Adhesive Bonding. - Strong problem solving abilities.
SAP - SD Certified as solution Consultant with 5 years experience and SAP R/3 6.0
8 years email administration.
I am a person with leadership qualities and easy going. I have good English level; ability to deal with hard situations and I am adaptable; I have enthusiasm and attitude to learn and to work.I have some experience in Risk because of my degree work: Formulation of Emergencies Plan for National Natur
Fourteen years of experience in cost control, estimating, planning & scheduling, financial analysis, procurement, commercial negotiation and contract administration. Five years of experience in management positions.
Geology, Management, Biostratigraphy, Sequence Stratigraphy, Palynology, Paleobotany, Basin Analysis, Carbonate, Clastic Sedimentology, Seismic, Geochemical, Geophysical, Exploration, Operations
RF Engineer in CDMA with exp of 8 months (B Tech In Electonics and Communication)
To extend the existing water distribution network to supply water to properties and to identify critical bottlenecks in the distribution system,„I To design and implement the new network in the demo zone for pressured and uninterrupted flow of water supply for 24 hours in the demo zone,
Communication Engineer
MBA, 100% Spanish and English.
Executive management, business development, supply chain, IT, embeded system
Labview Programmer
I am in search of employment overseas in the water or wastewater field. I do speak some Spanish
From August 1998, I am working as a Geologist. At present I am fully involved as Hydro-Geologist. As a manager of Well Logging Unit for Gujarat State I conduct geophysical Logging for Groundwater, prepare Lithologs and core logs. I had also worked on GIS software and GPS systems.
Motivated professional with excellent record of academic achievements, strong analytical and research experience. Strong awareness of complex socio-economic, cultural and ecological issues; able to adapt quickly in new and changing environments.
Continue acting in pipeline engineering construction and assembly independent of the site job and challenging new experiences.
Recent Grad _ Entry Level
Management
maintenence engineer
Microsoft enterprises systems, Great Plain ERP, SharePoint services SQL Server 7\2K\2k5, Exchange Server 2k\2k4, ISA Server 2k\2k4, IIS 6.0, Manufacturing (Planning ERP, Execution MES, SCADA, Process Controlling) Active Directory, DNS, Windows Servers, Desktop, POS, PDA NT\2K\2k3\XP\Vista VBA\Access
Experienced professional interested to work with oil companies.
• Leading a group of experts: - Environmental Health staff, Services staff including Hospital Staff and 440 contractor staff
I am hard working and highly motivated and enthusiastic about a career in the offshore industry, reliable and trustworthy, I work well as part of a team and can work well on my own. Available to start work immediately.
Typing,Computer Literate
Highly motivated BSc in Environmental Sciences and Management fresh graduate with strong analytical, communication and leadership skills.
Mechanical Eng., designing ACAD
Job Title : Service, Erection and Maintenance Engineer - Maintenance & Trouble shooting skills - Installation, Repair, commissioning and STart Up of Boilers. Stron Communication Skills. Training Courses
Working as a Engineer-HVAC in Jurong consultants (India) Pvt. Ltd., around 2yrs, orked as a designer-HVAC at DVP Consulting Pvt. Ltd., Ban galore. 3years. And worked as auto Draftsman/Engineer Around 2.5 Yrs.
I would like to work as an Environmental Geologist. I have no work experience as a new graduate and need companies that are willing to develop their employees.
Self motivated Environmental professional. Integrate technical knowledge with management skill to solve problems.
expertise in environmental water policy and economic background with relevant experience working. At a national and Mediterranean level I worked at the Ministry of Water and Irrigation in Jordan as an advisor and assistant to the Minister Dr Hazim El-Naser.
Mechanical engineer, looking for a job in Central Asia. Willing to work as junior engineer at low salary to gain experience in any engineering discipline.
Geologist with experience in environmental consulting
Sub.: Application for the post of Production Engr. / Food Tech
ACADEMIC DETAILS Academic qualification: BE in Environmental Engineering. College: Vidya Vardhaka College of Engineering, Mysore. Class Obtained: First Class with Distinction. (77.17%)
management experience of a wide variety of environmental projects including international HSEMS, development and implementation of environmental management systems, development and provision of audits and training courses.
I am a recent college graduate that is looking to share innovative thoughts about various fundamental environmental issues.
I have graduated Master degree from National University of Singapore. I have some experience working in environmental and health aspect. I am looking for a new job now
Work on all other electrical and electronics work with telecom power related issuse.
HSE Manager
Pharmacy graduate from Mumbai university having about 4 years of work experience in pharma industry as a analyst.
Design, Manufacturing & maintenance of injection moulds
1   2   3   4   5   6   7   8   9   10   11   12   13   14   [ 15 ]   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48  
Seach Parameters

Change search parameters...
INDUSTRIES: Environmental;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com