CONTACT INFORMATION:
View contact information...
U.S. Citizen
SUMMARY OF QUALIFICATIONS:
Significant Process and Project Engineering Experience with during design and engineering of process, and utility systems related to Oil/Gas, Refinery, LNG, SRU, Gas/Liquids Recovery Plants (Onshore/ Offshore-Topside processing units), CO2 Capture/Sequestration, Int. Gas. Comb. Cycle
Most of the experience with EPC but, some direct with Owners/Operations.
Listed below briefly are some of the duties I have performed as Chemical Engineer (process/project)
* Work as Sr Process/Project in PreFEED, FEED, Detail Engineering in staged gate project execution
* Developed Process Design and Engineering Scope, BED DOc, Prel. HMB, narratives
* Carried Process Studies checking technical feasibility, economic return on CAPEX and OPEX, risk and reliability, VIP, and historical experience
* Prepared PFDs, UFD, P&IDs, H&MB, Process/Mechanical Equipment Specs, Line/Tie-In Lists, Hydraulic calculations, Material Balances, HYSYS and T-Sweet, PIPEPHASE, PROTREAT, others
* Conducted PHA, HAZOP, Risk Assessment, LOPA, SIL, and Cold Eyes Reviews.
* 3-D Model Tag Review on SmartPlant ¡V Signed Off on corrective actions
* Provided process and project level input in plot plan design and piping layouts, blast studies, pipe rack interferences, and Criticality Assessment of major equipment
* Provided Interface Coordination for multi-companies projects process/project engineer
* Prepared Man Hour Estimates for eng. Disciplines-Process, Mech. I&C, CSA, Control/Scheduling.
* Low Cost Engineering Center Coordination of engineering work products sent offshore.
* Measured Earned Value Progress, MOC Execution during Gated Stage Work processes in EPC.
* Shown excellent communication skills
Experience: Currently On Hold..at
Bechtel, Houston 11/2008 to 5/2009, Area Project Engineer
Integrated Gasification Combined Cycle Power Project for Duke (Duke IGCC)
Incorporate Licensor's process and system changes Integrated Gasification Combined Cycle Technology, SmartPlant Review of 3-D Plant Model, Seek client approval of design changes.
Washington Group International, URS ¡V Houston, TX 8/2007 to 9/2008, Sr. Engineer
Interface Coordination Oil Sands Project for PetroCanada
U&O Coordination on 150000 BPD Bitumen Upgrader expansion.
LNG Peak Shaving for Williams Energy
Prepared Proposal for 10 MMSCFD LNG liquefaction, 200 MMSCFD regasification (SCV), LNG tank (100000 M3) double containment
Sour Gas Initiative Large Sulfur Recovery Unit PreFEED COP Abu Dhabi ADNOC: ¡V
Interfaced client representatives for their bid for 4 x 2350 TPD SRU trains, Cansolv (Can.) oxidation process for tail gas sulfur recovery, and CO2 capture
Prepared Statement of Requirements for Sulfur Terminal Design for Ruwais Sulfur Expansion.
S&B Engineering, Houston, TX 6/2006 to 7/2007, Sr. Engineer
Grass Root Refinery Design Shell/Motiva JV SRU Unit Port Arthur.
Carried out FEED3 to Detailed Engineering of ARU for 300 TPD SRU plant.
Flare Modifications at BP PS3 Refinery in Texas City: Process considerations, MOC resolutions, Coordination of work sent to India, company's low cost center.
FCCU Wet Gas Scrubber Proposal ConocoPhillips Ponca City.
Eng. Estimate for new FCCU Wet Gas Scrubber. OSBL/ISBL, caustic and make up water.
DIB Unit Modifications Enterprise; Mt. Belvieu.
Column modifications with NYE KG Superfrac Trays, compressor re-design.
Foster Wheeler, Houston, TX 1/2006 to 5/2006, PEM
El Sagundo Chevron Texaco Refinery Upgrade Upgrade of delayed coker, crude unit, coker fractionators, cooling tower, vapor compressors unit.
Refinery Proposal for COP Middle East. 400,000 BPD Export Refinery in SA for ConocoPhillips.
LNG Bid Evaluation Repsol Canada. Technical Bid Analysis for turnkey LNG Regasification project.
Delayed Coker Follow Up CHS; Laurel, Montana..
LNG Liquefaction and Regasification PMC for Repsol CANAPORT.
CBI Howe Baker, Houston, TX 5/2005 to 12/2005
600 MMSCFD Gas Plant Enterprise Colorado and Wyoming. Sr Process Engineer. Process equipment datasheets and equipment specs gas plant designs, PFDs, P&IDs, mol. sieves dehydration.
Paragon (AMEC), Houston, TX 4/ 2004 to 5/2005
ChevronTexaco Takula Platforms Process Evaluations Process design of topside systems for gas liquid gathering systems, compressor evaluation, liquid recovery evaluations offshore, PSV evaluations.
WorleyParsons, Houston, TX 3/2002 to 2/2004
BTX VOC Removal from Plant Wastewater Chevron Jubail, SA. Chemicals expansion of aromax unit. Design of the wastewater treatment system for the styrene monomer plant.
High Pressure Gas Cycling ExxonMobil, Alaska Gas Cycling Project; Alaska. Process design for ExxonMobil's Point Thomson liquid recovery from high pressure gas with disposal to 10000 psig resv.
Gas Plant Liquid Recovery and Gas Plant Chevron; Nigeria. Escravos Gas Plant EGP3. Process design and simulation of hot oil system for all fractionation columns.
Contract Process Engineer, TX and Alaska 4/1999 to 2/2002
Shell Gulf Coast Oil and Gas Developments Offshore. For W H Linders, Offshore platforms and FPSO compressor evaluations. Hydrate study.
ConocoPhillips, Kuparuk, Alaska. New drill site development for PALM 3S location in Kuparuk
British Petroleum; Prudhoe Bay, Alaska. HAZOP and HAZOP items resolutions, glycol treating unit design, produced water treatment, Risk Analysis, Fault Tree analyses
Nova Chemicals, Styrene Plant; Bayport, Texas. Converted continuous flare to non-continuous type
GDS Engineering (SNC Lavlin), Houston, TX 5/1995 to 3/1999, Sr. Process Eng.
ExxonMobil; Baytown Refinery, Texas. (3 plus yrs at refinery) Flare study, HAZOP resolutions of refinery units, Delayed Coker U&O tie-ins
Lyondell CITGO Refinery; Houston, Texas. Xylene/toluene column debottlenecking, psv evaluation of BTX system.
Lyondell CITGO Refinery; Houston, Texas. Polysulfide oil system design and retrofitting for expansion.
ARCO Chemical Complex; Channelview, Texas. POSSUM reactor oxygen feed line upgrade.
CDI Stubbs Overbeck, 4/1993 to 4/1995,
Dow [Union Carbide]; Texas City, Texas. Marine docks vapor destruction facility design including incineration, vapor balancing
Dow, Texas City, Texas. OSHA 1910 compliance related HAZOP resolutions of chemical plants
Fluor Inc. Houston, TX and Greenville, SC 8/1987 to 3/1993
Valero, Hydrocracker/Hydrotreater, Corpus Christi, TX
Debutanizer/depropanizer systems related hydrocracker and hydtrotreater design.
Genref, South African Major Oil Company. Conversion to unleaded gasoline storage.
Aramco, Marjan/Tanajib Oil Gas Units. GOSP II platform and Onshore Gas Oil Separation systems process and utility designs, flare evaluations, stabilizer column design, liquid recovery optimization
Additional Experience
„X Ethylbenzene-Styrene and vinyl chloride monomer plants P&ID preparation (Badger-1979-80)
„X SRC II Synthetic Refined Coal Demonstration, Coal To Liquid (CTL Gasoline) Project (1981).
„X Air Separation ¡V Liquid/gaseous oxygen, nitrogen plant design (Airco Cryoplants 1976-78)
EDUCATION AND CERTIFICATIONS:
M.S. Chemical Engineering, NJIT 1974
M.B.A., Rutgers State University of New Jersey, 1980
Professional Affiliations
PE, Texas #70392, PE Alaska #10422 both active ¡Vand obtained by Exam
OBJECTIVE:
------------
Field Construction / Area Project Engineer / Sr Process Engineer
------------
View contact information... |