17 years experience of construction management employed on a variety of process and power generation projects, both in the U.K and overseas.

ConocoPhillips Ltd.
March 2003 to Present
Humber CRU Project - Conoco, Immingham, U.K.
Snr. Field Engineer.
Seconded to ConocoPhillips from Fluor Ltd, in order to co-ordinate site engineering activities with detailed design being carried out in the Fluor Head office and to liase with the sub-contractors in order to overcome construction generated technical queries. I was also required to review potential sub-contractors during the bid evaluation and clarification stages prior to contract awards, from the engineering organisational standpoint.
The senior field engineer's role also required me to direct project specific activities within Conoco's own document control department to ensure the timely review and transmittal of sub-contractors deliverables.
I was also given the responsibilities for setting up the on plot office for Conoco's site supervision.

Fluor Ltd.
Nov 2001 to March 2003
Humber Rebuild Project - Conoco, Immingham, U.K.
Field Engineer.
Responsible for the co-ordination between site engineering and related H.O engineering dept, in order to achieve the scheduled delivery of engineering documentation to sub-contractors. I was also responsible for the resolution of site generated technical queries, by utilising site based engineering personnel.
Document control and drawing transmittal were also a site-based functions, which came under the remit of the Field engineer.
I was also given the responsibilities of the General superintendent to construct an off-plots area of the project, which included tie-in work, whilst maintaining/carrying out my own 'normal' daily tasks.

Foster Wheeler Ltd.
Nov 2000 to May 2001
Dacion Project, Venezuela.
Senior Piping Field Engineer.
Responsible for all site piping engineering activities. Prior to my deployment to site, I was located at the piping sub-contractors workshop to oversee the spool fabrication and to solve engineering problems at source. I was required to liase at site with the sub-contractors engineering personnel and to co-ordinate piping installation with relevant supervisors.

Sept 1997 to June 2000
Fluor Daniel Ltd/ Mitsubishi Heavy Industries.
Slovnaft RHC Project, Bratislava.
Chief Field Engineer.
Responsible for all site engineering activities and liaison with home office engineering department, in order to resolve site generated engineering deficiencies. I was also responsible for the co-ordination of site inspection activities and production of the necessary documentation to gain local authority approval prior to the issue of the operations certificate. Part of my remit was to attend client/contractors weekly and monthly progress review meetings.

March 1997 to Sept 1997
Fluor Daniel Ltd.
Kodak RC2 project, Harrow, London
Piping Field Engineer.
Supervision of piping sub-contractor during installation and testing of carbon and stainless process pipe work, in accordance with Kodak specifications, Progress reporting and monitor of construction technical queries.

July 1996 to March 1997
Fluor Daniel Ltd.
Shell Refinery,Shell Haven,Essex,England
Piping Field Engineer/Deputy Construction Manager.
Supervision of both civil and mechanical sub-contractors during installation and pre-commissioning of 2.2 km Bitumen import line and associated unloading arms. During the final stages of the project, I was solely responsible for completion of project works and de-mobilisation of sub-contract personnel.

October 1995 to December 1995
Babcock King- Wilkinson Ltd.
ZTT Minerals Ltd, Caldwell, Texas, U.S.A
Construction - General Superintendent.
Co-ordination/scheduling of all construction activities, including shutdown works to allow tie-ins to existing facilities, on fast track second kiln project. Acceptance of completed works, which included witnessing of inspection and testing examinations..

February 1995 to September 1995
Babcock King- Wilkinson Ltd.
Aramco Haradh Gosp 1 Project, Saudi Arabia
Mechanical Field Engineer/Deputy Construction Manager.
Supervision of Mechanical sub-contractor during execution of installation works to install major process equipment, supporting structures and associated process pipe work.
I was also required to deputise for the construction manager during his absence from site, undertaking all his responsibilities, which included the reporting to Aramco Project management personnel of daily/weekly progress, and the scheduling of site based works.

March 1993 to January 1995
Babcock Contractors Ltd.
Combined Cycle Power Station,Lavrion,Greece
Project Engineer/Mechanical Field Engineer.
Compilation of inquiry package documentation and assessment of tenders prior to contract award.
Liaison with head office design department to solve site generated technical/engineering queries, visit local Greek fabricators to carry out audits and expedite work packages.
Supervision of installation of 62" G.R.P seawater cooling pipe work and associated pumps.

July 1989 to March 1993
Babcock Contractors Ltd.
Clyde Submarine Base,Faslane
Mechanical Field Engineer.
Co-ordination and supervision of mechanical sub-contractors, during installation and testing of low and high-pressure compressors and associated pipe work, HVAC ductwork and utilities.
Production and solution of site generated technical queries.
Attendance of project co-ordination meetings.

June 1988 to September 1988
Conoco UK Ltd.
Loggs Developement
Certification Engineer.
As the client's offshore representative, I was responsible for the checking and approval of Hook-Up and commissioning generated mechanical completion check lists and dossiers.

March 1987 to September 1987
Grootcon Ltd.
Phillips Compressor Project,Bacton Gas Terminal
Piping Field Engineer.
Punching process piping systems ranging from 0.5" to 36" diameter. Raising site generated technical queries and initiating field modifications. Updating piping isometrics to as-built status.

July 1986 to November 1986
Press Gt. Yarmouth Ltd.
South East Indefatigable Project,Bacton,Norfolk
QA/QC Engineer.
Overseeing the checking and compilation of mechanical completion dossiers for process pipe work and associated equipment, prior to submission to client for approval.

September, 1985 to June, 1986
Aker Stord A/S Norway.
Statoil Gullfaks 'A' Inshore Hook-Up
Piping Field Engineer.
Punching process and utility piping systems prior to hydro-test and Initiation of field modifications. Co-ordinating personnel during "Base line " checks of platform LP air system and tabulation of results.

EDUCATION
1987 to 1989
Lanchester/Coventry Polytechnic

Coventry, England
HND Mechanical Engineering

Organizations: Institute of Incorporated Engineers, London
Member

View contact information...
«« previous resume next resume »»
Search Results (Resumes 7601 to 7650 of 15488)Go to Search Parameters...
Brief Description
Sr. Technical Assistant in Soil & Water testing lab atleast `15years experience
PLANNING ENGINEER: Liaison with Client, Consultant, Sub-contractors and Internal departments to get complete information on assignments for further instructions to Project Engineers. Conduct daily planning/production meetings with Site Manager/Project Engineers for discussing critical activities
Process Engineer in Refinery, Oil&Gas and Petrochemical Industries
Construction Mgr.- Piping Eng.
Senior Electrical Control Eng. / PLC Programmer / Scada System Specialist
Senior Construction/ Field Engineer/Superintendent with HND Mechanical Engineering and a member of the institute of incorporated engineers. I have 15 years of experience in Construction management in various roles and locations around the world, working for major EPC contractors.
I have a diploma in mining engineering with 1st class manager's certificate, and15 years of experience in opencast mining operations. Skills like active role in mine production planning, cost control, inventory management ,equipment productivity, team-building & training, statutory requirement.
Relay Protection coordination (by Captor software); motor starting, load flow, fault studies by ETAP software; DBs and MCCs selection; AFD selection and implementation; Frame6 power generation commisioning and maintenance; Switchgears up 110 kV commisioning and maintenance.
v A First class (60%) Bachelor of Chemical (B.E.) engineering graduate from Poona university in 1992, having a total (Cryogenic Air Separation/LNG Terminal & Regasification Unit /Refinery/Petrochemicals) industrial work experience of ~ 12 years.
5 Yrs plus experience in overseas construction project in Singapore
aws cawi
Mining engineer
PDS administration, Complete project setup and support on multiple large scale projects using PDS 7.2, 7.1,7.0 and 6.4 Microstation J/SE, PDS Piping specifications and RDB Support, Isogen setup and support, INTools support, SmartPlant Review Administration, and other 2D and 3D CAD tools.
M.Tech in Mining Engineering,having about 4 year mining experience in production and planning, Knowledge of 12D Model Software.· Received environmental training in Environmental Requirements,Integration of Reclamation & Mine Planning , Received Safety Training in Mine Safety Programs, Philosophy ,
Engineering / Construction Mgmt – Over 25 years combined experience supporting large domestic & international project assignments in both Home Office & Field locations. Business lines include Mining & Metals, Nuclear Power, Nuclear Waste Handling, & Refinery / Chemical (Oil / Gas, & Hydrogen) Plants
Industrial Journeyman Electrician-28 years
I have 18 years experience in the Oil Service Industry, involved in all aspects of Coiled Tubing, Nitrogen Services, Fluid Pumping, N2/He Leaktesting(HLD), Pipeline Pigging/Testing & Well Testing. My last permanent position was Service Supervisor II for Halliburton Coiled Tubing in Australia. Since
Experienced Senior Civil/Structural Designer with mostly Petro-Chem background
B.E in E.C.E with 2.5 yrs of exp as Desktop admin and 2.5 Yrs of system admin
Present Bachelor of Petroleum and Natural Gas Engineering (Designing counstruction and exploitation of oil and gas pipelines,piping and storage facilities faculty )
Rotating Equipment Engineer
Experienced (11 years) General Manager, Plant Manager, Maintenance Manager, H&S Manager
Chemical engineering degree in oil&gas field, experiance at project engineer and vice-project manager, control project, cost stimate, coordinate engineering desceplin, etc.
Senior technician instrument
I would like to announce my availability to any professional company in need of a Senior HSE Officer with an Engineering and Medical Degree. My vast experience and capabilities and the ability to get along with people will prove to be an asset to the company, client and workers. As a professional,
Linux, Ansoft designer, Auto CAD, C++ and Microsoft Office
MECHANICAL ENGINEER & QUALIFIED ASNT LEVEL II IN UT.RT,PT & MPT....
litigation lawyer
Welding inspector
Lease Acquisition
Dear Sir, I believe that I have the capabilities and the experience that enable me to match the requirements of this job. I have had a considerable experience in many companies and many domains.
disiel mec h with experience trucks;earthmoving and hydroluics
Seeking challenging assignments as PDS Structural Designer and Senior Draughtsman with a reputed organisation in the Construction Industry.Based on my skills in Civil/Structural Designer Using Application PDS, SPR, AutoCAD, Microstation, I am confident that I would be a great addition to your team.
Apply for post of Electronics and Instrumentation engineering
I have well experiance in building construction work with sound technical skills.
i am graduate from electrical engineering and i,m good at computer . i have ability to work any time and any place
i have one year experience iin leading post tensioning company . I have completed B.E civil Anna university Chennai. I have skill set in AUTOCAD, STAAD.Pro,ADT ,MS Project
18 Years of experience in Electronics & Instrumentation field at supervisory level in Construction & Maintenance, including 3 ½ Years of Gulf Experience. Known for superior integrity, accommodative nature, sincere & honest team member.
In June 2003, I completed Diploma in Mechanical Engineering from M.S.University, and recently I passed NDT LEVEL II Examination from FLAWTECH INSPECTION SERVICES. And I have 3 years work experience in mechanical field.
strong drilling, geological, petrophysical, coring/core analysis, OH/CH log interpretation & reservoir studies background,worked with Halliburton,Reslab,QP & Schlumberger,Involve in Operations/Well Site/Petroleum Development,reservoir characterization,Image analysis, FMI/OBMI/MSD,Mentor &training
Senior Welding Inspector
ROV Pilot/Technician with two years experience on workclass ROV
Well experienced Financial Director with CA(SA) and Masters Degree in Accounting. Vast African and International experience. Was in charge of 18 African operations in 10 countries. Gets the job done within deadlines. Very accurate and technically astute.
SKILLS: Pipefitting and related works.
drafting 3D and 2D modeling and design of some plans from field work, mechanical, structural in different applications such as Cadworxs P&ID 2009, Cadworx Plant 2009, Autocad 2008
Completions Engineer, Mechanical Engineer, Technical Sales Representative
Piping designer
Skilled in Electrical and Instrumentation Systems, associated with sensors, machines, electrical generating units and switchgear systems and programing and applications of PLC, DCS
Experienced Oil and Gas HSE professional
Steward, Strong Organized Working Foreman, CNC Operator / Programmer, Fitter/Welder, Iron Worker, Millwright, Shop Machinery Operator, Material Handler / Inventory Auditor, Maintenance / Repair Technician, Entry Level CAD Draftsman Computer Tech, Network Administrator
First   Prev   151   152   [ 153 ]   154   155   156   157   158   159   160   161   162   163   164   165   166   167   168   169   170   171   172   173   174   175   176   177   178   179   180   181   182   183   184   185   186   187   188   189   190   191   192   193   194   195   196   197   198   199   200   Next   Last
Seach Parameters

Goto Advanced Search...
Keywords: (e.g. mining engineer)Find results with:
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com