Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #11388
next resume »»
CONTACT INFORMATION:
View contact information...
QUALIFICATIONS
1995 Bachelor Degree of Petroleum (Reservoir) Engineering
Southwest Petroleum Institute, Nanchong, Sichuan, China 637001
JOB APPLICATION
Reservoir Engineer and Related Positions
KEY COMPETENCIES
- Over 11-year offshore oil field exploitation experience.
- 3D stochastic Geo-modeling/flow simulation modelling and good at ECLIPSE,CMG, CSim/CView/ Sensor and Petrel/RMS softwares.
- Well performance analysis/welltest interpretation and good at WPM (Well Performance Model), OFM (Oil Field Manager), Saphir and PanSystem softwares.
- Material balance, formation evaluation, reserve estimating and development planning.
- Economic evaluation / risk analysis and good at the CrystalBall and ResACT /ProACT programs.
- Good experience on reservoir management, sand control, well completion, open hole / casing hole logging, production logging, water shut-off and stimulation.
- Microsoft Office / VBA (Visual Basic for Applications) programming
- Skillful at operating PC and workstation under such different operating systems as DOS, WINDOWS XP/2000/NT and UNIX
- Problem solving and conceptual thinking.
- Multilingual: English, Cantonese and Mandarin.
WORK HISTORY
2006/02 – Now Senior Reservoir Engineer
RPS Energy, RPS Group Plc.
RECENT PROJECT ACHIEVEMENTS in RPS
* Integrated G&G modelling, reservoir simulation(including well test production and pressure build-up match and production forecast sensitivity case study) for Swift-Swallow Oil Field, Coogee Resources.
* Integrated G&G modelling, reservoir simulation and history matching studies for Jingemia Oil Field, Origin Energy.
* Integrated G&G and reservoir simulation case study for Golden Beach Gas Field, Cape Energy.
* Oil Rim Geological and Simulation Modelling for South Chervil Field, Strike Oil Ltd.
* Golden Beach well performance calculations for two new proposed wells, Cape Energy
* Well Test Analysis of Swallow-1 well, Swift North Field, Coogee Resources.
* Gas storage case studies for Golden Beach Gas Field, Cape Energy.
* Integrated G&G modelling and reservoir simulation studies for South Chervil field, ARC Energy.
* Production decline curve analysis and forecast for Salamander and Benchmark Energy.
* Prospect evaluation project in Africa for Baraka Petroleum Corp.
2004/09 – 2005/12 Senior Reservoir Engineer
2001/11 – 2004/08 Reservoir Engineer
Xijiang Operations, Conocophillips China Inc., China
Responsibilities include:
- Monitoring well/reservoir performance and developing optimum field and project depletion strategies.
- Preparing field development plans for drilling, completions, stimulations, zonal managements and workovers.
- Initiating and leading reservoir studies and R&D work in order to improve reserves recovery, well deliverability, or improve drilling/completion practices.
- Working with geophysicists, geologists and other engineers to build multiple scenario stochastic static Geo-models integrating available 3D seismic, well log, core analysis, and reservoir analogue data.
- Constructing, history matching and updating numerical reservoir simulation models (black-oil, compositional, etc.) with appropriate quality control. Generating single-well, element and/or sector models by extracting some areas/cross sections from the full field models for fit-for-purpose investigation.
- Preparing reserve estimates for new and existing fields and stewarding the reserves system for assets.
- Preparing reservoir pressure transient test programs, analyzing the data, and ensuring submission of results is compliant with regulatory requirements.
- Identifying and recommending commingling and reduced spacing opportunities, including preparation of various regulatory applications and submissions.
- Providing economic analyses and risk evaluation for various new well development or facilities projects. Conducting evaluations for acquisition and divestiture opportunities.
- Preparing and submitting AFE (Authority for Expenditure) reports of different pool development/depletion plans to operation partners.
- Providing assistances in preparation and update of capital, income and expense budgets in order to reconcile actual to forecast expenditure, production, sales and lifting volumes.
- Providing reservoir-engineering evaluation on new project, data room visiting in order to justify for the feasibility study.
- Modelling wellbore and field production systems in order to optimize production and identify pipeline and facilities debottlenecking opportunities.
- Providing coaching and mentoring to junior or less experienced technical staff.
2000/01 – 2001/11 Vice Project Manager
Nanhai East Institute, Cnooc Research Center, China
Responsibilities include:
- Organizing and leading integrated G&G and reservoir engineering studies for different operators at disparate contract areas in the PRMB (Pearl River Mouth Basin), South China Sea.
- In charge of the management and control of the projects, ensuring completion on schedule and within the allocated budget and their conformance with company and client standard.
- Evaluating progress and results of projects and recommending major changes in procedures.
- Acting in liaison capacity with other departments.
- Formulating project planning and execution of work process (engineering, procurement and construction and commissioning).
- Leading in the preparation of Feasibility, AFD (Authority for Development) and AFE (Authority for Expenditure) packages.
- Discussing and explaining a cost control program and effectively utilizing the integrated project control system to identify potential cost and schedule deviations.
- Participating in the development of contracting strategies so as to discuss and explain some items with clients.
- Focus on handling all matters and actions related to the project, supervising the business process team created for the project and reporting to the Senior Project Manager.
- Participating in solving intractable issues in the projects and quality control at the key phase of project process.
- Reviewing and evaluating personnel performance.
- Real-time tracking manpower development and staff allocation, ensuring running the project smoothly.
1995/07 – 1999/12 Reservoir Engineer
Nanhai East Institute, Cnooc Research Center, China
Responsibilities include:
- Participating in building and updating appropriate 2D and 3D multiple scenario probabilistic Static Geological models integrating available 3D seismic, well log, core analysis, and reservoir analogue data.
- Building multiple scenario dynamic reservoir models integrating static geological models with production and reservoir rock properties and fluid data.
- Performing model construction, history matching, calibration, prediction runs, and analysis and develop value-added solutions to address reservoir management challenges and requirements.
- Running sensitivities on a range of recovery mechanisms and dynamic flow variables such as relative permeabilities and permeability profiles, aquifer strength, compartmentalization, fault sealing capacity, fluid composition etc.
- Preparing economically evaluated reservoir development proposals by conducting development optimization studies using various numerical reservoir simulation models. Proposing technical specifications for new requirements on wells and surface facilities, with due consideration of existing facilities and well completion schemes/strategies.
- Simulating a range of potential subsurface development scenarios to produce expected hydrocarbon recovery assessments (reserves estimates) and production profiles.
- Modelling off-take strategies for new development well locations and calculating incremental production.
- As a member of a multi-disciplinary team, participating in integrated reservoir characterization studies and preparing Kr-Pc (relative permeability - capillary pressure) modeling based on rock-typing scheme and laboratory data.
- As a multi-disciplinary team member, identifying key uncertainties that influence reservoir performance by conducting fit-for-purpose modeling studies for sensitivity analysis. Based on the results, propose as a team additional data acquisition requirements to reduce the uncertainties.
- Pressure transient test analysis and design using analytical simulation software, with formal report.
- Working in line with Company HSE Policy and complying with HSE procedures, rules and regulations.
- Developing, mentoring and training less experienced technical personnel.
APPENDICES
TECHNICAL EXPERIENCE
Field Development Background
* Xijiang 24-3/24-1 and 30-2 Fields – The typical multi-Zone offshore oil fields. And these fields are typical sandstone brachyanticlines and accumulations of oil trapped in unconsolidated upper Tertiary sandstone. Regional faults and the inter-bedding nature of these sandstone strata with the surrounding clay formations allowed the oil to migrate through a long distance of the upper Tertiary Formation. This made these three fields form the greatest number of reservoirs and the thickest oil column in the east portion of the Pearl River Mouth Basin (PRMB). ConocoPhillips is the operator for development of Xijiang 24-3/24-1 and 30-2 Fields. In order to effectively develop XJ24-1 field that is a marginal small oil field, the long distance extended reach drilling technology is used for this field relying on the Xijiang 24-3 Platform. Xijiang 24-3-A14 well is the first world record ERD (Extended Reach Drilling) deviation well (the longest horizontal displacement: 8,063 m).
* Liuhua 11-1 Field – The largest offshore oil field in the South China Sea and located in contract block 29/04 at the central part of Dongsha Massif of the Pear River Mouth Basin in the South China Sea, consists of diagenetically altered Miocene limestone comprising a shallow-water carbonate bank. This bank forms the topmost and youngest interval of a larger, extensively karsted buried carbonate platform. BP-Amoco is the operator for development of Liuhua 11-1 Field. After preliminary exploration studies, Liuhua 11-1A was drilled. It tested at rates of 2,240bbl of heavy crude per day. Confirmation drilling of two additional wells, the Liuhua 11-1-3 and the Liuhua 11-1-4, showed a significant reservoir accumulation of more than a billion barrels of oil-in-place. Reservoir study on Liuhua 11-1 oil reservoir was done mainly based on the 3D seismic data, vertical and horizontal well data, and field production performance. The study was divided into four phases as interpretation of 3D seismic data, integration, flow simulation model, and sidetrack opportunities. The objectives of reservoir study were to have a detailed reservoir description associated the field production performance and a flow simulation model working as an effective tool for future sidetrack opportunities. And horizontal well technology was used to develop this field entirely. So far all of producers in the field are horizontal wells.
* Lufeng 13-1 Field – The field is a sandstone anticline, which lies in a Contract Area 16/06 at the eastern part of Pearl River Mouth Basin, the South China Sea. And it locates about 250 kilometers southeast of Hongkong. Water depth of the field is about 145 meters. Lufeng 13-1 oil field situates in the southwest of Lufeng depression. It features a dome structure. The field consists of two major bottom-water reservoirs, namely Zone 2370 and Zone 2500, in the Zhuhai Formation. These two reservoirs deposit in different geological environment. With the efforts of three horizontal wells drilled at the west of the field, two in Zone 2500 and one in zone 2370, the sweep efficiency of the whole field has been greatly improved. Also untapped reserve inside of the main producing area has been better drained through sidetracking two existing high water-cut wells.
FIELD EXPLOITATION ACHIEVEMENT
2004 - Proposed total 5 effective sidetrack prospects (A11ST1, A7ST1, A13ST3, A14ST1 and A20ST1) of which two wells A14ST1 and A20ST1 are ERD (Extended Reach Drilling) well sidetracks in the past 8 months of Year 2004.
2003 - Proposed total 4 effective drilling opportunities (A12ST1, A3ST2_ML, A5ST2, A19ST1), of which A3ST2_ML is the first multilateral well in China completed by Hook Hanger System, and participated in designing one ERD well A24 (over 8 km distance) on the XJ24-3 Field in Year 2003.
- Prioritized and recommended 5 more sidetracks in XJ24-3 field for year 2003, and prepared the AFEs and composite AFEs which will help to fulfill the 2003 production target.
2002 - Proposed total 6 effective drilling opportunities (A13ST2, A19ST1, A4ST3, A6ST1, A21ST1, A2ST1) in Year 2002, which were directly led to the Xijiang great achievement of 30.55 MMSTBO produced and almost 20 MMBO reserves incremental that both were over the budget and the Xijiang stretch target. These successful sidetracks completely changed the picture of XJ24-3 in people's mind.
2001 - Fulfilled on-site supervision of PLT jobs of four wells (B14, B12ST1, B19 and B23) in XJ30-2 platform in November 2001.
RESERVOIR STUDY ACHIEVEMENT
2003-2004 - Actively participated in a high quality long term depletion plan that was generated on a basis of an integrated reservoir engineering study and the plan exhibited a clear future of Xijiang field to the top management and have got good comments.
2000 - Successfully completed the work order about Xijiang 30-2 Field Continuous Reservoir Simulation Study for the Xijiang Operations, Phillips China Inc.
1997-1999 - Accomplished following three work orders in the CNOOC Research Center for three international oil companies (BP-Amoco, Phillips China Inc., JHN):
(1) Liuhua 11-1 Oil Field 3D Geo-modelling and Reservoir Simulation Study
(2) Xijiang 30-2 Oil Field Reservoir Simulation Study
(3) Lufeng 13-1 Oil Field Reservoir Engineering Study
WELL TEST ANALYSIS ACHIEVEMENT
1997 - Fulfilled the project of Liuhua 11-1 Oil Field Horizontal Well Test Analysis for the Amoco Orient Petroleum Company.
1995-1996 - Finished the assignments of the Vertical Well Test Analysis on the Xijiang 30-2 and Xijiang 24-1 Oil Field.
MEMBERSHIPS
China Petroleum Engineer Association
PAPERS OR REPORTS
2003 Liu Lubing: "Investigate Remaining Oil Distribution and Seek for Potential Opportunities in Medium-High Water Cut Fields", PRMB, South China Sea. CNOOC, June 2003
1999 Liu, Lubing: "Reservoir Simulation Study on Xijiang 30-2 Field". Work Order Report for Phillips China Inc. September 1999
1999 Liu, Lubing/Li Xiaoling: "Reservoir Studies on Liuhua 11-1 Field". Work Order Report for Amoco Orient Petroleum Company. March 1999
AWARDS
2003 Third Prize (CNOOC Science & Technology Progress Award) - Investigate Remaining Oil Distribution and Seek for Potential Opportunities in Medium-High Water Cut Fields, PRMB, South China Sea, June 2003
2000 Second Prize (China National Science & Technology Progress Award) – Reservoir Studies on Liuhua 11-1 Field, June 2000
TRAINING
TECHNICAL
2004 Practical 3D Stochastic Modeling – Petrel Training Course – Bill Abbott, Schlumberger/GeoQuest.
2003 Advanced Integrated Reservoir Analysis Course – Dr. Eric Standen and Kenneth Mark Wolgemuth, the Heriot Watt University, ATM, the University of Oklahoma and Schlumberger.
2002 Well Completion Design for Reservoir with Sanding Problem Course – Juan J. Tovar D., Weatherford Completion System Global Training.
2002 Decision and Risk Analysis (D&RA) Course – Gene Gussis, ConocoPhillips.
2002 Economic Analysis Course – Y. J. Lai, ConocoPhillips.
2000 Advanced Project Management Training Course – Prof. Yifei Ma, Petroleum University (Beijing).
1997 Advanced Reservoir Simulation Modelling Course – Dr. Liehui Zhang, Southwest Petroleum Institute.
1996 Advanced Welltest Analysis and Interpretation Course – Prof. Zhiping Li, Southwest Petroleum Institute.
INDUSTRY REQUIRED
2004 Incident Command System Training Course, Jay Jones, ConocoPhillips.
2004 ISO14001 Refresher Training Course, Jan-Arne Johansen, ConocoPhillips.
2002 Diversity Awareness Training and Teamwork Training – David Fan, ConocoPhillips.
2002 Safety and Survival for Offshore Oil Operation – Yongshen Chen, CNOOC Skill Training Center.
2002 Basic Offshore Health, Enviornment and Safety Training Course – Harris Ning, First Solution Ltd.
SOFTWARE TRAINING
2004 ProACT/ResACT/CrystalBall – Project Risk Management – Jay Weaver, Richard A. Keen, Mike Maler, ConocoPhillips, Beijing
2004 Petrel – 3D Stochastic Reservoir Modelling – Dr. Longyan Li, Schlumberger/GeoQuest, Beijing
2003 Csim/Cview/Sensor/WPM – Reservoir Simulation & Well Performance Management – Rudy K. Sandoval, ConocoPhillips, Beijing
2003 Visual Basic 6.0 – Wenming Wu, Microsoft China, Shenzhen
2002 Microsoft Access 2000 (Basic and Advanced) – Dr. Jack Gao, Microsoft China, Shenzhen
2002 Microsoft Access 2000 – Dr. Jack Gao, Microsoft China, Shenzhen
2001 Saphir – Well Test Analysis – Vigen Ghazarian, KAPPA, Shenzhen
2000 OFM – Oil Field Manager – Zhen Wang, GeoQuest, Beijing
1997 Eclipse – Reservoir Simulation – Dr. Xu Zhang, GeoQuest, Houston
1996 PanSystem – Well Test Analysis – Prof. George Stewart, EPS, Shenzhen
PERSONAL BIO
Date & Place of Birth: 12 January 1972 – Ezhou, Hubei, China
Nationality: CHINA / AUSTRALIAN AND CANADIAN PERMANENT RESIDENCY STATUS
REFERENCES will be provided on request.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 5701 to 5750 of 15339)
Go to Search Parameters...
Brief Description
Broad knowledge of environmental chemistry and extensive experience in laboratory processes, instruments, equipment, quality assurance and control, analytical tutoring, and environmental auditing in 10 years of professional practice.
28 years exploration experiance in Africa. Two companies Anglo American & Union Carbide. Worked in remote locations, overseeing all personal and financial matters, budget control, oversaw logistics of exploation camps, responsible for safety, health and enviroment issues, conducted training.
To work for a great company as a driller or an advisor/trainer in the mining field or similar:(Exploration or other). My experience with and knowledge of drill bits may be of significant value to your company if many of your drill bits fail prematurely from broken or missing carbides.
I am a 29 year old white Kenyan. I am a Logistics consultant specializing in Warehousing and Mechanical handling training.
Past 20 years I been working as Document Controller, at present working for Saipem UK ltd as Senior Document Controller.
Over 30 years of Management/Supervisory experience in drilling and production of oil, gas and geothermal. With a total of 35 years of experience:
•Over 20 years of experience. •DCS- Delta-V , Foxboro I/A system and YOKOGAWA . •PLCs- Gould Modicon, Askawa, August Systems, HIMA etc. •Foundation Field Bus •Analytical systems Design and Engineering - Physical Property Analyzers, NIR •Field Inst. Engineering. •System commissioning.
Company representative on sales negotiations and jobs. Coil Tubing Operator on OTIS coil tubing unit. Heavy equipment maintenance, boilers, pumps, compressors, and turbines.
underground driller operater
EPC Project Contracts 'Interface/Liaison' Administration Specialist
Solid knowledge of Microsoft Office Suite, CoralDraw, Foltran, Qbasic, Visual Fox Pro and Mathcad, Autocad, Staad Pro, Sap 2000, Advanced knowledge of VISUAL BASIC applications for EXCEL, ACCES, WORD, POWER POINT, AutoCAD and STAAD PRO, electronic mail and Internet.
Fifteen years of experience in piping construction and piping engineering activities related to projects for oil production facilities, oil refining and industrial plants.
B.Eng in Chemical Engineering; Diploma in Mud (Drilling Fluids) Engineering.
Diploma in Mechanical Engineering, Diploma in Industrial Safety from Central Labour Institute- Mumbai, H2S Awareness & Rescue Operation, Safe Journey Management, Road Safety Management, Job Hazard Analysis, Permit to Work System, Gas Testing, Incident investigation & Accident reporting.
I have worked for multinational and International companies in the Middle East like General Dynamics, Babcock & Wilcox, and Delta Corporation. I look for a job as QA/QC Engineer/Specialist or Plant Manager.
Eleven plus years of providing Environmental Management and consulting services experience in Asbestos and Lead Abatement Surveys/Designs/ Monitoring, Health & Safety, Emergency Response, Water Quality Management, Hazardous Waste Remediation, Industrial Hygiene, and Indoor Air Quality.
I have 15+ years experience as an Instrumentation & Control Systems Design Engineer along with seven years I&C construction and commissioning experience at locations throughout the globe.
Experienced and degree Safety Engineer. Wish to utilize experience and skills to reduce accidents, eliminate and control hazards, lower Workers Comp costs, and develop a Safe Production Program that contributes as a Profit Center.
Jean-Francois Zaky is a construction manager in a well-established construction company in Houston, Texas. Mr. Zaky has more than 11 years experience in the construction business. He is a U.S. citizen born in Houston, Texas. Mr. Zaky speaks fluent Arabic language.
I have varied experience earned through honest means in Chemical, Oil & Gas, Petrochemical , Water treatment and other related areas by hard work, sincerity, dedication, team spirit and conviction.
Degreed Construction Superintendent for both Commercial and Residential projects with over 15 years of experience.
To secure a challenging position in the areas of Geographic Information system (GIS), Marine GIS, Remote Sensing (RS), Digital Photogrammetry, Nautical Charting, Electronic Navigational Charts (ENCs), Digital Cartography or Geophysics
A Mechanical Engineering PhD graduate seeking engineering and research work as a Mechanical Engineer.
•Ability to solve petroleum production problems involving design of petroleum production facilities •Engineering and project management experience in the oil industry •Strong planning, communication and presentation software skills
15 years experienced Mud engineer. Drilling fluids design, testing and well site engineering. Solids control equipment management
A Management position in an environment that offers quality-working opportunity in the fields of Photogrammetric Engineering & GIS and , in return, invest my long-term experiences, interpersonal skills, talents and abilities.
Drilling Engineer with 12 years of experience in drilling and workover supervision, including 2 years of well construction planning. Also 1 year of work as a Safety Engineer.
1 Six years of marketing experience specializing in petroleum products (industrial and automotive fuels and lubricants). 2 Over twelve years of mining industry experience, eight of which as Senior Geologist. Four years of project management.
Over 12 years of experience as research and mining engineer with experience in coalmine excavation, mine safety control, old mining area remediation, and rock mechanics. As a software engineer of AutoCAD, MDT, and GIS.
Electric Technical Officer (ETO)
I have over 11-year field exploitation and G&G Modeling and reservoir simulation experince and extensive competency in reservoir management, economic evaluation, reserve estimating and booking, risk analysis, welltest interpretation, well perfomance analysis and stimulations.
Heavy Equipment Operator
Bilinhual: Spanish / English, Computer Literate, International Experience.
Senior Civil / Structural Designer
Well engineering, daily drilling operations supervision, services coordinator
Registered Safety Officer (IBOESH, USA), Registered Civil Engineer-Philippines, IASP, IADC, RIGPASS Certified
Slick Line Expert.
Ability to design & detail automation for DCS systems and other interfaces.
SENIOR PLANT OPERATOR
I possess technical skills which includes the use of data anaylsis softwares, microsoft office applications and excellent communication and interpersonal skills. For that of my qualifications, i had BSc in geology and also MSc in Applied Marine Geoscience
Smart Plant Administrator,-Administration, spec,OracleDatabase, Workshair, Project Execution
I grew up in the United Kingdom and educated in Europe and the Mediterranean, I am fluent in English written and spoken and I have the ability to learn languages fast, and have an open mind to learn new programs and system, I am loyal and honest and hard working and love to work under a fast pace.
Arc welding all positions all 60 series, 70 series, and 80 series welding rods. Torching and brazing. Rigging of all materials over head either from crane or chain falls or sky track indoor and outdoor. Certified in erecting scaffling. Excellent in layout for installations. Certified in rigging, aer
Civil Engineer specialized on Structures working towards Masters Degree.
Mechanical Engineer,University Politehnica Bucharest
Bachelor in mining engineering
Technical and Application Engineering Support for the new concepts being introduced and promoted.
I have had both mechanical and condition monitoring experiences which will make me a very competitive candidate to fulfill condition monitoring and/or mechanical position. I have had ISO Cat-II vibration analyst for condition monitoring.
Responsible for liaising with customer representatives on completion designs, hydrostatic calculations & tubing movement simulations (Cyberstring/WellCat), work planning, and procedures.
I am a qualified mechanical Engineer specialized in Acoustics
First
Prev
101
102
103
104
105
106
107
108
109
110
111
112
113
114
[ 115 ]
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
Next
Last
Seach Parameters
Goto Advanced Search...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com