CONTACT INFORMATION:
View contact information...
Curriculum Vitae
Date of Birth: 27th-April-1950
Marital Status: Married
Education & Qualifications:
1969-1974 University of Mining and Metallurgy, Cracow, Poland
Master of Science in Power Engineering, Grade A, Engineer in Mechanics
Work Experience:
Nov. 1, 2000 –present Project Manager in Industrial Installation
Company, Tarnow, Poland. The work on the Heat
Generating Plants dealing with assembly, maintenance
and modernization work including
coordination, negotiations with partners, compliance with
contracts, punch lists, work evaluation etc.
Oct. 1999 – Oct 2000 Manager -specialist – employed by Consortium FLS SMIDTH & ARESCO in Egypt for Cement Plant Sinai Project.
Being in charge of Technical and Preparation Office and responsible for ordering, delivery of materials being made locally and imported, documetation management.
On Site- work supervision during erection, starting- up,
commissioning and solving technical problems.
1998 – 1999 Engineer of Mechanics employed by Consortium Polysius S.A. France & Orascom ONSI SAWIRIS Egypt at ECC Project, Egypt. Site Engineer responsible for machinery and installation assemblying in the Raw Handling Area, starting-up and commissioning.
1997 – 1998 Specialist Supervisor and Engineer of Commissioning at Industrial Installation Assembly Company, Tarnow, Poland.
The work supervision on the boiler room installations: coal preparation system, oil and furnace system, pumping stations, filters, technological installations, central heating,air conditioning,fire protection, sprinkler and boiler itself during main repairs, overhauls. Modification work coverage.
1995 – 1996 Engineer of Mechanics at Cement Plants in Libya employed by ACC & Polimex. Being in charge of all mechanical work on Plants during damage, routine, major repair and scheduled preventive maintenance
1991 – 1994 Engineer of starting-up and Commissioning at Industrial Installation Assembly Company, Tarnow, Poland. The work on the Heat Generating Plants, Coverage of all mechanical work during scheduled preventive maintenance and overhauls.
1988 – 1990 Technical Manager at Municipal Investment Company, Tarnow, Poland.The whole coverage of industrial project in the fields of power engineering, water treatment plants and other heavy industries.
1985 – 1987 Site Engineer at Sewage Treatment Plants in Kuwait, employed by Sulzer, Davy-Bamag and Water Engineering Company respectively being a leader of mechanics and operators, coverage of routine operation and every aspects of mechanical failure.
1981 – 1984 Erection Site Manager at Polaniec Power Station, Poland. The main task was to assemble boiler /OP-680/ itself with all installations accompanied, industrial istallations in the boiler and turbine rooms. Starting-up and commissioning.
1976 – 1980 Boiler Room Manager- Specialist Supervisor at Jaworzno III Power Station, Poland. Engaged in all kind of mechanical repair on boiler equipment including steam boilers. Carrying out the modernization work due to the overxceeding max resuperheated
steam temperatures at the outlet of the steam boilers. Designing and changing the constructions of many boiler installations, for example: fluid ash cross runners, soot blowers, boiler coolant injections, the aim was to advance their working availabilities.
1974 – 1975 200 MW Block Manager at Kozienice Power Station, Poland. Working successively from the post of a boiler and turbine auxiliaries supervisor through a block operator finishing at the position of 200 MW Block Manager. Taking part in erections, starting- ups and running the 200 MW block installations on both sides: boiler – turbine, Commissioning after 72 hour trials.
Other Information:
English {FCE – Cambridge}, Russian
Full – Clean Driving License
Computer Basic: Microsoft Office Programs, AUTO CAD
Interests: travelling, swimming, and jogging
All credentials are accessible at request
View contact information... |