Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #12562 next resume »»
CONTACT INFORMATION:
View contact information...

SYNOPSIS: ESTIMATION ENGINEER: Preparation of detailed forecast, expenditure, contracts, costing and control systems, invoices and scheduling for Projects. Construction progress payment, Standard Cost, Fixed and variable overhead rates and Cost Inventory. Preparation of Monthly Financial Statements, including balance sheets and statement of income for projects. Calculated labour and material earned value analysis (EVMS) provided bidding support including development of real time spread sheet analysis tool. Supported engineering office staff using complex critical path method network schedule (CPM) and bar charts: analysed, evaluated and determined impact of forecasted current status (EAC) against established baseline schedule using earned value (EVMS) and prepared monthly report to Management Team. Controlled Costs, Revieved contractors estimate, developed/analysed control budgets, cost to schedule integration. Liaison with Client, Consultant, Sub-contractors and Internal departments to get complete information on assignments and instructions to Discipline Managers. Explain the cost variance to the Discipline Managers/Financial Controller/Client/Consultant. Overall responsibility for controls the resource mobilization, costing & billing, project MIS, etc.
I was reporting to Management Team and Finance Officer and had active participation in Internal as well as External Meetings (Client, Consultants).

PLANNING ENGINEER: Liaison with Client, Consultant, Sub-contractors and Internal departments to get complete information on assignments for further instructions to Project Engineers. Conduct daily planning/production meetings with Site Manager/Project Engineers for discussing critical activities/project schedules/constraints. Issue Daily Work Schedule/Resource Allocation as well as Plans/Look-Ahead (weekly, bi-weekly, monthly, quarterly). Explain the daily plan versus actual (including variance) to the Client/Consultant. Overall responsibility for control of manpower allocation, resource mobilization, Materials Controlling, costing & billing, project MIS, etc. I was reporting to Management Team and Construction Manager and had active participation in Internal as well as External Meetings (Client, Consultants).
CONTRACT'S ENGINEER: Tendering- Drafting of Contract documents i.e. like Instruction to Bidders, General Conditions of Contract, special Conditions of contract, subcontract Agreements etc, Preparation of Bid Inquiry, Issue of Bid inquiries, coordination with Subcontractors, Commercial evaluation of their offers and negotiation, Issue of Contracts / work order And their amendments, change orders etc, Analyse & settle extra claims of Sub – Contractors through negotiation and formalization, sub- contractor's performance monitoring & reporting in coordination with Construction Manager/ project Manager. Sourcing, evaluating & qualification of Subcontractors. Maintaining and updating the company's qualified Subcontractor's list.

SUMMARY OF QUALIFICATIONS:
Qualification: Bachelor of Engineering (Mechanical) – from RVS College of Engineering, Dindigul, India.
Bachelor of Science (Physics) from NMC College of Arts & Science, Kanyakumari, India.

OBJECTIVE:
Objective: Looking for a challenging position in an international organization where I could use my knowledge and experience and grow with the organization. Since 1992, working as Project Quantity/Estimation/Planning/Contracts engineer in Construction Industry (E&P Facilities, Pipeline) in India and the Middle East.

WORK EXPERIENCE:
Details of Exposure and Responsibilities:

* Gulf Petrochemical Services (GPS),EPIC PLANNING ENGINEER Since May 2003 till date: PDO (Shell) Harweel & and Birba EPIC Project-Planning/ Estimation Engineer

Work involves Design, Engineering, Procurement, Installation and Commissioning, (Civil, Mechanical, Electrical and Instrumentation) of underground GRE flow line, hook-up of 11 Wells, X-mess trees, Remote Manifolds, etc. to the Birba Gathering/Production Station, through a Bulk Line of 85 km, upgrading the various facilities - Gas (Recovery, Booster and Injection) Compressors and EOT Cranes, Separators (Level 1, 2 and 3), Shipping Pump, Condensate Pump, AP Flare Package, Nitrogen Receiver, Instrument air Receiver and Skid, Vent Flare Scrubber, Chemical Injection Skids, Multi-phase Flow Meters, Drain Drums, modifications to existing Columns, Tanks, Pipe Racks and, installation of New Pipe Racks.

* ALGHALBI TRDG & SVCS, Oman: Planning/Costing Engineer – SEP 2001- APR 2003.
Mechanical Service Contract to PDO (Shell)- Construction of flow line, PE Lining, workshop activities, execution, pigging, hydro testing of flow lines and hand-over to client. Demolition of existing facilities - gathering stations, storage tanks and field manifolds - and scrapping of old flow lines. I was also responsible for organizing meetings - internal as well as external - and MIS.

* BHAGHEERATHA ELECTRICALS & STRUCTURALS LTD, India
Depty Manager – Estimation, Costing, Planning & Coordination, NOV 2000 - SEP 2001
Assignment: Construction of CNG Gas steel grid underground network (12 km) for MAGHANAGAR GAS LIMTED under BRITISH GAS, which involved installation of gas monitoring station, HDPE/MDPE pipes and Cathodic Protection Systems. I was responsible for Estimation, Costing, Tendering for EPC Projects, Planning, managing project engineers, coordination (clients, consultants, and sub-contractors) for issue of engineering drawings, schedules, plans and, liaison with local bodies and other departments for various clearances.

* DHEERAJ ELECTRICALS&STRUCTURALS LTD, India
Project/Estimation Coordinator – June-November 2000
Responsibility included Costing, Estimation, and Tendering for EPC & LSTK Projects.

* SPACE ENGINEERING, India: ESTIMATION/PROJECT ENGINEER – Aug 1999 - May 2000
Responsible for overall coordination of Planning, Materials, Purchase, Work Shop, Execution, etc. for the following two projects:
- Mechanical Piping and Construction of HDPS Plant for HPCL.
- Shutdown for Reliance Industries, Patalganga Plant for their PTA Division.

Work involved management of site engineers, providing required materials, clearances, drawings, planning schedules and guiding them to achieve production targets as per schedule. Coordination of various activities within the organization (Corporate Management, Planning department, QA/QC, HSE, Stores & Purchase, Administration, Finance, etc.) and outside (Client, Design Consultants, Sub-Contractors, etc). Reported to Resident Engineer and was responsible for reconciliation of materials during project execution.
* ARABIAN INDUSTRIES, Oman: Planning/Costing Engineer – Sept 1997 – July 1999
DCME& I Mechanical service contract to PDO(Shell) for construction of flow line and station, wellhead hooks-up, shut-down, demolition of old facilities, section replacements, leak clamping, pigging, hydro-testing, and commissioning. I was responsible for Document Control and Project Management.

* PETRON ENGG LTD, India, Planning/Costing Engineer – Jan 1995 – Sept 1997.
Assignment: Construction of MRPL (Mangalore Refineries) Unit - Hydro cracker, Marx, Hydrogen Plant, GSFC Gujarat (Ammonia-004 Plant) and IPCL Gujarat (BDR Plant). Work involved Mechanical Equipment Erection & Piping, Prefab Erection, hydro test of piping and grid loops, erection and alignment of equipment and overall coordination including MIS, Document Control. Also worked as Shut-Down Shift In-charge for 45 days (Butadiene Revamp works) in HPCL Baroda during 996-97 and was responsible for entire shut-down activity from identification of tie-ins with consultants and client, issue of Plan to project engineers, arrange resources, manpower and materials, update activity cards for completion, and hand-over the system for commissioning.

* AA Erectors, India: Engnr Trainee/Site Engineer: Jun 1992 – Jan 1995.
Work involved site supervision and coordination to achieve project completion (piping construction) sub-contracted to Petron Engineering India Limited on time. Controlled a workforce of more than 80 (~10 crews) for fabrication, erection, welding of piping and structural, mechanical clearance, hydro testing, handing over loops, tie-ins, timely supply of required materials from stores (client scope), workshop (prefabricated piping spools and structural, painted spools, raw materials), engineering drawings approved by the consultant/client, etc. and reported to Site Manager.

EDUCATION & CERTIFICATION:
Training & Computer
Skills: Introduction to Sure Track Project Manager by PROJACS(1997)in PDO.
Primavera Project Planner (P3), MS Project, Sure Track Project Manager, MS Access, Power Point, Auto-cad, Excel, Word etc.,

ADDITIONAL INFORMATION:
Achievements: 12 years in various positions – Contracts, Estimation, Planning, Construction, Project Engineer, Deputy Manager (Estimation & Planning), for Petrochemical and Construction Industries in Oman (PDO Projects) and India where I got thorough experience in using State of Art Technology, Systems, Standards and Procedures and developing the following skills.

- Preparation of Detailed Estimates for Projects, Work Variance Reports (Changes During Execution)
- Preparation of Logic Plan for the Project CPM, Cost Loading and Drive S Curve, Resource Loading, Histograms, EPIC Schedule, Variance Reports, Cash flow Statements, Earned Value Report, Project Control Budget and Expenditure, and Stage-wise reports.
- MIS (Project Progress/Completion Reporting, Performance – Actual vs. Plan, etc.)
- Liaison with Directorate and Corporate Finance on budget and expenditure projections.
- Thorough with Engineering Standards & Practices (API, ANSI B31.3, ASTM, PDO ERD).
- Estimation, Costing, Tendering, Invoicing etc.

LANGUAGE KNOWN: English, Tamil, Hindi and Malayalam, Arabic.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 7601 to 7650 of 15497)Go to Search Parameters...
Brief Description
I am a geology masters student at Baylor University (May 2009 graduation). My training has included all of the basic geological branches with focus on sequence stratigraphy, depositional systems (both carbonate and clastic), and isotope geochemistry.
During 19 years, I have gained some practical field experiences & knowledge as a construction civil engineer/ manager which includes, projects construction supervision, project management, quality control, coordination & liaison in the project team, field survey
electrical/mechanical maintenance supervisor
Snubbing / Workover Supervisor, Field Technician.
I am seeking employment on construction/shutdown projects as a QA/QC inspector or planner.
Mechanical Cement & Power plant Projects Installation, Commissioning & Maintenance
I am 38 years old, good health and have 12 years solid experience on project management for several types of large, complex and fast track International projects.
Working Offshore as an engineer and mechanic for 15 years
PDS Piping designer Engineer
Sr. Technical Assistant in Soil & Water testing lab atleast `15years experience
PLANNING ENGINEER: Liaison with Client, Consultant, Sub-contractors and Internal departments to get complete information on assignments for further instructions to Project Engineers. Conduct daily planning/production meetings with Site Manager/Project Engineers for discussing critical activities
Process Engineer in Refinery, Oil&Gas and Petrochemical Industries
Construction Mgr.- Piping Eng.
Senior Electrical Control Eng. / PLC Programmer / Scada System Specialist
Senior Construction/ Field Engineer/Superintendent with HND Mechanical Engineering and a member of the institute of incorporated engineers. I have 15 years of experience in Construction management in various roles and locations around the world, working for major EPC contractors.
I have a diploma in mining engineering with 1st class manager's certificate, and15 years of experience in opencast mining operations. Skills like active role in mine production planning, cost control, inventory management ,equipment productivity, team-building & training, statutory requirement.
Relay Protection coordination (by Captor software); motor starting, load flow, fault studies by ETAP software; DBs and MCCs selection; AFD selection and implementation; Frame6 power generation commisioning and maintenance; Switchgears up 110 kV commisioning and maintenance.
v A First class (60%) Bachelor of Chemical (B.E.) engineering graduate from Poona university in 1992, having a total (Cryogenic Air Separation/LNG Terminal & Regasification Unit /Refinery/Petrochemicals) industrial work experience of ~ 12 years.
5 Yrs plus experience in overseas construction project in Singapore
aws cawi
Mining engineer
PDS administration, Complete project setup and support on multiple large scale projects using PDS 7.2, 7.1,7.0 and 6.4 Microstation J/SE, PDS Piping specifications and RDB Support, Isogen setup and support, INTools support, SmartPlant Review Administration, and other 2D and 3D CAD tools.
M.Tech in Mining Engineering,having about 4 year mining experience in production and planning, Knowledge of 12D Model Software.· Received environmental training in Environmental Requirements,Integration of Reclamation & Mine Planning , Received Safety Training in Mine Safety Programs, Philosophy ,
Engineering / Construction Mgmt – Over 25 years combined experience supporting large domestic & international project assignments in both Home Office & Field locations. Business lines include Mining & Metals, Nuclear Power, Nuclear Waste Handling, & Refinery / Chemical (Oil / Gas, & Hydrogen) Plants
Industrial Journeyman Electrician-28 years
I have 18 years experience in the Oil Service Industry, involved in all aspects of Coiled Tubing, Nitrogen Services, Fluid Pumping, N2/He Leaktesting(HLD), Pipeline Pigging/Testing & Well Testing. My last permanent position was Service Supervisor II for Halliburton Coiled Tubing in Australia. Since
Experienced Senior Civil/Structural Designer with mostly Petro-Chem background
B.E in E.C.E with 2.5 yrs of exp as Desktop admin and 2.5 Yrs of system admin
Present Bachelor of Petroleum and Natural Gas Engineering (Designing counstruction and exploitation of oil and gas pipelines,piping and storage facilities faculty )
Rotating Equipment Engineer
Experienced (11 years) General Manager, Plant Manager, Maintenance Manager, H&S Manager
Chemical engineering degree in oil&gas field, experiance at project engineer and vice-project manager, control project, cost stimate, coordinate engineering desceplin, etc.
Senior technician instrument
I would like to announce my availability to any professional company in need of a Senior HSE Officer with an Engineering and Medical Degree. My vast experience and capabilities and the ability to get along with people will prove to be an asset to the company, client and workers. As a professional,
Linux, Ansoft designer, Auto CAD, C++ and Microsoft Office
MECHANICAL ENGINEER & QUALIFIED ASNT LEVEL II IN UT.RT,PT & MPT....
litigation lawyer
Welding inspector
Lease Acquisition
Dear Sir, I believe that I have the capabilities and the experience that enable me to match the requirements of this job. I have had a considerable experience in many companies and many domains.
disiel mec h with experience trucks;earthmoving and hydroluics
Seeking challenging assignments as PDS Structural Designer and Senior Draughtsman with a reputed organisation in the Construction Industry.Based on my skills in Civil/Structural Designer Using Application PDS, SPR, AutoCAD, Microstation, I am confident that I would be a great addition to your team.
Apply for post of Electronics and Instrumentation engineering
I have well experiance in building construction work with sound technical skills.
i am graduate from electrical engineering and i,m good at computer . i have ability to work any time and any place
i have one year experience iin leading post tensioning company . I have completed B.E civil Anna university Chennai. I have skill set in AUTOCAD, STAAD.Pro,ADT ,MS Project
18 Years of experience in Electronics & Instrumentation field at supervisory level in Construction & Maintenance, including 3 ½ Years of Gulf Experience. Known for superior integrity, accommodative nature, sincere & honest team member.
In June 2003, I completed Diploma in Mechanical Engineering from M.S.University, and recently I passed NDT LEVEL II Examination from FLAWTECH INSPECTION SERVICES. And I have 3 years work experience in mechanical field.
strong drilling, geological, petrophysical, coring/core analysis, OH/CH log interpretation & reservoir studies background,worked with Halliburton,Reslab,QP & Schlumberger,Involve in Operations/Well Site/Petroleum Development,reservoir characterization,Image analysis, FMI/OBMI/MSD,Mentor &training
Senior Welding Inspector
First   Prev   151   152   [ 153 ]   154   155   156   157   158   159   160   161   162   163   164   165   166   167   168   169   170   171   172   173   174   175   176   177   178   179   180   181   182   183   184   185   186   187   188   189   190   191   192   193   194   195   196   197   198   199   200   Next   Last
Seach Parameters

Goto Advanced Search...
Keywords: (e.g. mining engineer)Find results with:
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com