June 01 to date                Company; (NMC) Excel energy
                    Position; Stock analyst
                    Project; Prairie Island
                    Location; Red Wing, MN, USA

Reassessing against usage & lead-time, the stocking levels of all the line items in the material inventory, re-ordering where required. Review of the quality assurance levels of equipment & piece parts to ensure compliance with NRC recommendations.

Mar 01 to May 01            Company; (Caliper) Con. Edison
                    Position; I&C Technician
                    Project; Hudson Avenue Power Station
                    Location; Brooklyn, New York, USA

Perform Current, Ratio & Polarity checks on CTs & PTs. List all instruments (field & control room) to define extent of work. Perform calibrations & loop checks on stream generator instrumentation, without the aid of any documentation. Installation of field instruments & components stripped off whilst equipment retired. Carry out fault finding on instrument loops & demolition of parallel loops no longer used or causing spurious signals.

Jan 01 to Mar 01            Company; (Entegee) Excel
                    Position; Materials dispatcher
                    Project; Prairie Island outage
                    Location; Red Wing, MN, USA

Assist warehouseman with accepting & inspection of materials where required during the outage. Assisted with line item level updating.

Jan 00 to Dec 01            Company; (CAPPO) Technip/KTI
                    Position; Instrument Superintendent
                    Project; Construction & Commissioning
                    Location; Saudi Arabia, Poland & China

Overall control of the instrument installation & commissioning of eight ethylene furnaces in Saudi Arabia. Precommissioning furnaces in Poland & an SRU in China. Solely responsible for the instrument progress report & punchlist. Created site reports recommending changes to the engineering/design department in Holland or Milan. Supervision of technicians carrying out extra works. Joint responsibility with the DCS Engineer for carrying out loop checks, pre-commissioning & commissioning activities. The plant is Saudi utilized a Honeywell TDC 3000 DCS.

Aug 99 to Dec 99            Company; Pritchard, Black & Veatch
                    Position; E&I QA/QC Inspector
                    Project; Shedgum NGL debottlenecking
                    Location; Abqaiq, Saudi Arabia

Responsible for the installation of field instruments & LV electrical equipment on a debottlenecking project. Kept all documentation updated & made all as built drawings. Answered technical queries from the sub-contractor (SA Kent) & resolved conflicts between Aramco & ISA standards. Liaised with Aramco QC department to enable the smooth flow of inspections & technical reviews of engineering documentation.

March 99 to July 99            Company; Fisher Rosemount
                    Position; Instrument QA/QC Supervisor
                    Project; Obaiyed Field Gas treatment
                    Location; Matrou, Egypt

Part of the construction team for a gas treatment facility in Egypt near the Libyan border. My duties consisted of inspecting the installation & completing ITR’s of all the field instruments supplied by Fisher Rosemount for the project. This included analyzers & the flare system. Assisted construction with engineering queries & hook up inconsistencies.

June 98 to February 99            Company; (Velosi) Fluor Daniel
                    Position; Instrument Engineer
                    Project; Koch refinery
                    Location; Pine Bend, Minnesota, USA

Part of the Fluor Daniel engineering design team. The upgrade consisted of turnaround work & small to mid-sized environmental projects. My duties were to specify instrumentation using preliminary P&ID’s, create the specification sheets, arrange for quotations, order the material, supervise construction & assist with fault finding during pre-commissioning & start up.

September 97 to June 98            Company; Bechtel (UK)
                    Position; Instrument Engineer
                    Project; Ras Tanura Refinery Upgrade
                    Location; Saudi Arabia    

Part of the engineering & design team at site. The upgrade consisted of constructing an additional Hydrocracker, Visbreaker, Hydrogen Plant & associated utility units. There were 5,500 instrument loops & over 35,000 instrument tag numbers. Answered technical queries compiled by the construction contractor (CCC). Ordered additional materials overlooked by the engineering team in London. Designed instrument loops & created MTOs’ to comply with ARAMCO standards. Assisted contractor to fault find when loop checking through vendor equipment.

November 96 to April 97            Company; Chiyoda Corporation
                    Position; Instrument Supervisor
                    Project; Bandar Abbas Refinery (NIOC)
                    Location; Iran

Part of the Project Management Team ensuring that the Instrument Contractor complied with NIOC & API standards. Advised the contractor on how to conform to the construction schedule. Witnessed all aspects of installation of the construction phase, compiled punch lists. Gave assistance to management in discussions with the client & offered alternative solutions to problems or deviations. Coordinated the contractors work with other disciplines working in the same area. Confirmed that progress claimed conformed to work carried out. Provided fault-finding assistance during loop checking through to two Honeywell TDC 3000 DCS & a relay based ESD system.

May 96 to November 96            Company; Foster Wheeler Energy Ltd.
                    Position; Instrument Supervisor    
                    Project; Aromatics Plant Construction                      Location; PAC Island, Singapore

Part of the design & engineering team on an aromatics plant in Singapore. Punch listing completed loops before hand over to the client. ‘Chasing’ outstanding work list items for system hand over. Troubleshooting problems of construction. Assisting engineering with technical queries by the contractor. Highlighting material shortages & expediting their delivery. Pre-commissioning of complex control system loops through to a Honeywell TDC 3000 DCS.


April 94 to April 96            Company; (GSS) Toyo Engineering Corp.
                    Position; Snr. Area Coordinator (E&I)
                    Project; Refinery Construction (MRPL)
                    Location; Mangalore, India.

Part of the Project Management Team (PMC) on the construction of a grass roots Oil Refinery in India. Responsibilities included advising and supervising contractors on proper work practices and industrial norms associated with Instrumentation/Electrical Installation. Reviewing design drawings, procedures, specifications and final documentation for two Honeywell TDC 3000’s & seven Satellite Rack Rooms. Carried out construction of a Tokyo Keiso Tank Gauging system.
January 92 to March 94            Company; (Dynarabia) Aramco
                    Position; Instrument Engineer
                 Project; GOSP & Gas compression
                    Location; Tanajib, Saudi Arabia.

Retrofit & commissioning of a mothballed GOSP. Four Honeywell TDC 3000’s installed with ‘smart’ transmitters increased throughput by 30%. Supervised 20 Expatriate & local technicians on the installation of. Assisted with the development & reviewed the ladder logic of a Triconex PLC ESD system. Carried out orifice plate (Oricalc) & control valve (Fisher, version 1.1) sizing calculations using PC. Witnessed loop checks through to SCADA & supplied the contractor the solutions to design or engineering problems.

January 89 to January 92        Company; (Shika Griffin) Brunei Shell
                    Position; Consultant (Instrumentation)
                    Project; LNG plant
                    Location; Brunei.

Part of the expatriate team of supervisors on a LNG plant. Supervised eight technicians & assisted with the maintenance of the utilities instrumentation, pneumatic & analogue electronic field devices. Duties included day to day running of the department, & standby duty outside of normal working hours. Also involved with the construction/pre-commissioning phases of a Foxboro I/A DCS system. Assisted with the creation of a control valve spares catalogue for the plant.

February 88 to December 88        Company; (Creole Plant Services.) ADNOC
                    Position; Instrument/Electrical Engineer
                    Project; Data upgrade
                    Location; Abu Dhabi

Responsible for correcting the database of an ICL Warehouse computer. Correcting part numbers & descriptions of instrument & electrical items.

July 87 to January 88            Company; (M.W. Kellogg) K.N.O.C.
                    Position; Senior Supervisor (Insts)
                    Project; Gas plant maintenance
                    Location; Kuwait.

Responsible for maintenance of the instrumentation on a LNG plant. Equipment used included Honeywell & Fisher CV’s & Positioners, Masoneilan level transmitters, Kent electronic local controllers. The control room utilized a Yokogawa DCS.

August 83 to September 86        Company; (Saif Est.) Aramco
                    Position; Senior Instrument Technician
                    Project; GOSP pre-commissioning
                    Location; Saudi Arabia.

Pre-Commissioning instrument control loops to a process control computer and/or a SCADA system on GOSPs & NGL plant. Equipment worked on included, Fischer Provox Plus DCS & Foxboro Spec 200 cards.


June 82 to June 83            Company; (Pesaco) Aramco
                    Position; Senior Instrument Technician
                    Project; Metering skid Commissioning
                    Location; Saudi Arabia.

Commissioning & maintenance of UGC Microflo & Jiskoot Process control computers on gas metering skids. Signals sent back to Dhahran via SCADA. This work was carried out for the Custody & Transfer Group, acceptable error was +/- 0.25%.

November 80 to June 1982        Company; Azzawiya Oil Refining Co.
                    Position; Instrument Technician
                    Project; Refinery
                    Location; Libya

Maintenance of pneumatic control loops & on the job training of local technicians.

References: will be provided on request.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 6851 to 6900 of 15478)Go to Search Parameters...
Brief Description
Superintendent with over 25 years experience in maximizing performance and profits in a mill environment. Strengths include diversified technical engineering skills, large scale project management and ability/expertise in leading large teams of hourly and exempt personnel.
I am a Civil / Structural / Underground Services / Architectural, Designer / Detailer, CAD Technician fully conversant with all versions of AutoCad, Microstation and RC Packages including Reoforce
All phases petroleum supervisor. 25+ years of experience in the oil and gas industry. strengths: rig supervision, completion, workover, production.
Businessman nearing 10 years of various downstream oil/energy experiences. Created new money streams and expanded business exposures. Dynamic manager with exceptional profit building skills within operating oil trade and retail chains, consulting and instigating strategic business alliances.
Over twenty years experience in Instrumentation & Control, Petro-chem construction, first as a technician, then supervisor/engineer to superintendent. Computer literate, able to liaise with clients & run a multi-national team.
An instrument/electrical professional with 19 years in the process/plant control industry. Excellent hands-on site and office experience ranging from Instrument Technician through Field Service Engineer to Project Engineer, both in the UK and overseas.
Available 7/7 days as I'm single. Free like a bird. Highly self-motivated, open minded, easy communication with people, dynamic, patient, courageous, sense of initiavtive, responsible, and persistent.
Multiskilled Engineer as Electrician/Electrical Technician/Tour Pusher/Driller
Geotechnical or Port and Coastal engineering
Certified Project Management Professional (PMP), and very organized, articulate and detailed-oriented professional architect, with a strong educational background and more than twenty years of professional experience, a superior work ethic, developed skills and commitment to excellence.
Over 17 years pre-commissioning and commissioning experiences with proven experience in working with utility & power plant equipments.
A challenging position as a Mechanical Engineer where I can effectively utilize my engineering & personnel skills gained through Eleven years of experience
Petroleum engineer
Production Engineer in several methods as: Gas Lift, Rod Pump, Jet Pump, Plunger Lift. High knowlegment in the surveallence of production process. I´ve been working to Petrobras since 1998 in the Eastern & Western of Venezuela. Now I´m finishing a MBA I hope to finish in July 2006.
Coiled Tubing Field Engineer
Instrumentation Engineer with 3 years experience
Heat treatment of steel specimens. Sectioning, grinding, polishing, etching specimens. Sampling, prepping, floating and drying ore. Project management, design, and presentation skills. Microsoft office.
Accountant with O&G company experience in USA. I am holding Bachelor of Science in Physics plus Accountuing Certificate earned in U.S. Russian is a native language, Fluent English. Managerial experience in Germany.
I am graduate in Petroleum Engineering currently working with PETRONAS Carigali (Pakistan) Ltd. My major responsibilities are: To supervise & execute rigless jobs i.e Slick line/Wire line & CTU, CPLT & RST jobs, Presenting (Technical Committee Meeting & Operational Committee Meeting) to Partners.
I have a wide range of Regulatory Experience. I am very organized, adaptable to changing priorities and enjoy working on multiple tasks.
Comprehensive problem solving abilities. Excellent verbal and written communication skills. Ability to deal with people diplomatically, willingness to learn and team facilitator.
B.Tech Petro chemical Engineering and Diploma in Industrial safety with 3 years Experience
PRODUCTION AND REVENUE ACCOUNTANT
BE,DIPLOMA IN MECHANICAL ENGINNERING,CSWIP 3.1,specilise in piping and welding
Testing resume with 3+ years of experience
As i have 3.6 years experience in field as Field Application Engineer, Have installed and commissioned automation projects, GPS clocks, Servicing and given Demos and Presentations of our Products and Softwares.
12 years of exprrience in total
design engineer catia v5
i'm working in australia by at 457 visa and i'm as a fitter. tolaly i have 12 years experince welder and boilar maker. and machanical. currently i'm working precision labour hire. my visa going to finish end of aug31.I would like to pursue a career in the technology/ engineering industry, with
3 years field experience in oil and gas. Degree in Petroleum Engineering. Hard worker, quick learner and very ambitious.
experience in consulting to the Petrochemical and alternative fuel industries . Degree in Chemical Engineering /Process Engineer
Electrician
PLC,SCADA
AutoCAD, ProE,
Materials expertise, inventory,issue and received handler
Iam Diploma Holder in Mechanical Engineering and having 9 yrs of oil and gas experience.Maintenance and construction experience.Both as a technician ans staff level coordinated activity
Sales chemical engineer
Bs in Petroleum engineering , field engineer
Reliability engineer, plant engineer, manufacturing engineer, expert in kiln and ball mills, hydraulics pneumatics
DRILLING ENGINEER, EXPERIENCE - 4 YEARS IN OIL FIELD AS DRILLING ENGINEER
Free! A motivated self starter and team player/builder with 30+ years of Canadian and International upstream oil industry experience. Skilled project manager and problem solver. High level of computer literacy.
I having more than 9 years of experience as a Piping Designer PDS in the field of Oil and Gas (Offshore /Onshore), LNG, Refinery and Petrochemical Industries
Mechanical Engineer - Maintenance / Planning / Project - 13 years of experienc.
Geological and Geotechnical Core Logging for Exploration drill core and Mining. Have experience Training and Supervising technical staff in this field.
Creative, tenacious, analytical, result-oriented professional with proven success in streamlining procedures, managing projects, analyzing products or processes, and increasing department efficiency through effective business strategy. Seeking admission to be as world class Quantity Surveyor
Geologist/geophysist (seismic processor) was working in WesternGeco (Schlumberger) for 16 months.
Seeking for challenging and rewarding opportunities in a dynamic and reputable organization where mutual interests and achievements will be maximized.
I have completed Mtech in applied geology,i can do mining plan in iron ore,core logging,quality control of ore,
I have HND in Building Technology. I also have good knowledge of AutoCAD. I had been involved in construction work at different capacities.
I have and engineering management degree and currently in an MBA program , and will be through this quarter. Very proficent in MS project tool, MS office tool, minitab
First   Prev   101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120   121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   [ 138 ]   139   140   141   142   143   144   145   146   147   148   149   150   Next   Last
Seach Parameters

Goto Advanced Search...
Keywords: (e.g. mining engineer)Find results with:
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com