-Exceptional Process Design Engineer skills acquired during the design and construction of large gas, refinery, petrochemical and industrial plants;
-Broad technical knowledge to solve problems;
-Interacted with clients, vendors, contractors and consultants;
-Very familiar with AS, API and EUR standards;
-Proficiency in chemical engineering software, Acad, MS Office, Internet.
AREAS OF SPECIALIZATION
Process Design Engineering:
-Developing PFDs and P&IDs;
-Calculating material and heat balances, pipeline hydraulic and thermal sizing with chemical engineering softwares;
-Preparing material requisitions for unit / equipment inquiries;
-Data supplying for mechanical, instrumentation, electrical and civil disciplines;
-Hazardous area classifications;
-HAZOP and SIL team member.
Project Engineering and Management:
-Commissioning and testing;
-Project cost estimation;
-Document controlling;
-Procurement;
-Technical writing.
Design Documents:
-Feasibility studies, Basic documents and Detailed engineering documents;
-Tender documentation;
-Documentations for authorities;
-Process descriptions, Process operating manuals;
-Commissioning and start-up plans.
Systems:
-Natural gas, refinery and chemical process systems;
-Storage and handling systems for oil, chemicals and gases;
-Boilers, heater units, coolers, water and steam systems.
Computers – Hardware & Software:
-Advanced experience in Hysys and Aspen simulation software packages,
STX heat-exchanger, ACX air-cooler sizing, AFT Fathom water reticulation system and Flaresim flare simulation software.
-Experienced customer in Acad-2D and -3D;
-Professional in MS Office Suite (Word, Excel, Power Point, Access, Internet);
-Routine in MS Project and Primavera.
INTERNATIONAL EXPERIENCE
-Demonstrated expertise in Australian, North American and European projects;
-10+ years experience in design engineering, operation and construction field;
-2005-2008 Process design engineering in WORLEYPARSONS Pty Ltd., Brisbane, Australia;
-1997-2004 Oil and gas process design engineering in OLAJTERV Co., Hungary;
-2004 Consultations with AXENS and FORTUM representatives in Porvoo refinery, Finland;
-2001 Process training at VECO Co. in Calgary, AB, Canada;
-2001 Natural Gas Underground Gas Storage tender in Turkey.
CONFERENCES
-2003 Presentation at AspenTech Eastern European symposium of process modelling softwares.
PROJECTS ASSOCIATED WITH
Natural Gas Plants:
-2006 Natural gas processing plant;
-2003 UGS plant surface facilities;
-2002 LPG plant;
-2002 LTS plant;
-2001 Natural gas sweetening plant;
-2000 Natural gas dehydration units.
Refineries:
-2008 Emergency response upgrade (firewater, foam system, active fire protection);
-2006 Diesel hydrotreater and hydrogen units revamp;
-2004 Naphtha desulphurization and light olefins etherification plant;
-2002 Atmospheric vacuum distillation unit;
-2001 Hydrogen plant.
Chemical Plants:
-2000 DEG and TEG regeneration plant;
-1999 Methanol regeneration plant;
-1999 Water treating units.
Industrial Plants:
-2004, 2002 Heating oil systems;
-2004 Furnace installation.
-2001 Steam generation units;
PROFESSIONAL MEMBERSHIP
-Registered engineer Queensland, Australia;
-Member, Engineers Australia (MIEAust);
-Member, IChemE
-Member, Hungarian Engineering Chamber; Gas and Oil Industry section.
EDUCATION
TECHNICAL UNIVERSITY OF BUDAPEST, HUNGARY
M. Sc. Chemical engineer, 1997
DETAILED PROFESSIONAL EXPERIENCE
EMERGENCY RESPONSE UPGRADE PROGRAMME, 2007-08
Project type:Conceptual design (Appraise and Select stages)
Position:Senior Process Engineer
Project details:
Engineering Contractor:Worley Parsons Services Pty Ltd
Client and location:BP Bulwer Island Refinery, Brisbane
Construction cost:100 M AUD
Personal activities, responsibilities:
-Developing Process schematics, Process Flow Diagrams and Piping & Instrumentation Diagrams
-Fire studies (water demand calculations)
-Engineering studies (pump station selection, tank farm fire protection, mobile systems)
-Hydraulic network calculation (existing system capability and gap analysis) Fathom modelling software
-Developing major equipment data sheets (floating barge and onshore booster pump stations)
-PEER review, Project risk review, Project Management support
Project objective:
The Fire Infrastructure Upgrade Project supports the site emergency response plan development. A detailed assessment has been completed of the current active and passive fire protection hardware infrastructure relative to what is required to execute response plans in the refinery.
Personal responsibility:
-Pump station (Capacity review (expansion from 20klpm to 100klpm), Hydraulic capability test)
-Firewater network (Network development, Hydraulic modelling (50+ fire scenarios))
-Refinery storage / process units (Detailed firewater demand calculations)
DIESEL SUPPLY RELIABILITY PROJECT, 2006
Project type: Conceptual design (Select stage)
Position: Senior Process Engineer
Project details:
Engineering Contractor:Worley Parsons and AGM Process
Client:BP
Location: BP Bulwer Island Refinery, Brisbane
Plant capacity: Diesel feed 1400 skld
Product quality 10ppmS diesel
Construction cost:5+15 M AUD
Personal activities, responsibilities:
-Developing PFDs and P&IDs
-Calculating material and heat balances, pipeline hydraulic and thermal sizing with chemical engineering softwares
-Furnace capacity checking, cooling water system hydraulics study
-Developing equipment, machine and instrument data sheets
-Data supplying for mechanical, cost estimator disciplines
Project objective:
Post legislated 50ppmS diesel (1/1/2006) the susceptibility of the refinery to production disruptions that could lead to stock-out increased substantially due to the reliance on hydrotreating to produce saleable product. The aim of the Diesel Supply Reliability Project is to increase the security of diesel supply from the refinery and support the business objective to be a high availability, low cost provider of clean fuels (10ppmS diesel) to the market.
Personal responsibility:
400 Unit (Diesel Hydrotreater)
-Feed heat integration
-Reaction section
-HP, LP separation
-Stabiliser column
1600 Unit (Hydrogen Generation Unit)
-New NGC installation (2×50% of capacity – 4500ACMH – 4stages)
PNG GAS PROJECT, 2005-06
Project type: Front end engineering design
Position:Senior Process Engineer
Project details:
Engineering Contractor:EOS Joint Venture (Worley Parsons and Kellogg Brown and Root)
Client: Exxon Mobil
Conceptual engineering:ABB Randall Gas Technologies, USA
Location:Papua New Guinea
Plant capacity:
Raw gas 825 kSm³/h
Sales Gas 707 kSm³/h
Construction cost:4.0BUSD
Personal activities, responsibilities:
-Coordination, organization of a process team (3 engineers)
-Developing PFDs and P&IDs
-Calculating material and heat balances, pipeline hydraulic and thermal sizing with chemical engineering softwares
-Developing equipment, machine and instrument data sheets
-Data supplying for mechanical, instrumentation, electrical and civil disciplines
-Technical writing
-Process descriptions and process operating manuals
-HAZOP team member
Project objective:
The Papua New Guinea Gas Project encompasses the development of the Hides gas field (PNG), pipelines to Kutubu Central Production Facility (PNG) and a sales gas export pipeline from Kutubu to Cape York (Australia) via Kopi (PNG). In addition to raw gas from Hides, the blow down of Agogo (PNG), Gobe (PNG) and Kutubu fields will be undertaken via the Kutubu Facilities.
Personal responsibility:
Kutubu Central Gas Conditioning Plant and Central Production Facility process development
-Inlet Separation
-Molecular Sieve Gas Dehydration
-Turbo-expander / Compressor Gas Processing
-Sales Gas Pipeline Compression
-NGL Fractionation
-Oil Stabilization modification
-Separated Gas Compression modification
Plant products
-Sales Gas 707 kSm³/h @ 156 barg, 60°C
-LPG 60 m³/h
-Stabilized Condensate 150 m³/h
NAPHTHA DESULPHURIZATION AND LIGHT OLEFINS ETHERIFICATION PLANT, 2004
Project type: Detailed engineering design
Position: Senior Process Design Engineer
Project details:
EPC Contractor: OTF-IGN Consortium
Detailed design: OLAJTERV Co. Ltd. (process, mechanical, electrical, civil)
Honeywell Hungary (instrumentation - MAC)
Client: Hungarian Oil and Gas Plc. (MOL)
Licensor: Desulphurization units - AXENS, France
Etherification unit - Fortum, Finland
FEED: Uhde Edeleanu GmbH, Germany
Location: Danube Refinery, Százhalombatta, Hungary
Plant capacity: 800 KTPY
Construction cost: 75,0M AUD
Personal activities, responsibilities:
- Coordination, organization of process teamwork (5 engineers);
- Developing PFDs and P&IDs;
- Calculating material and heat balances, pipeline hydraulic and thermal sizing with chemical engineering softwares;
- Developing equipment, machine and instrument data sheets;
- Data supplying for mechanical, electrical and civil disciplines;
- Continuous technical discussions with Honeywell instrumentation designers;
- Hazardous area classifications;
- Technical writing;
- Process descriptions and process operating manuals;
- Commissioning and start-up plans;
- HAZOP and SIL team member.
ZSANA UGS CAPACITY EXPANSION, 2003
Project type: Detailed engineering design
Position: Senior Process Design Engineer
Project details:
Detailed design: OLAJTERV Co. Ltd. (process, mechanical, instrumentation, electrical, civil)
Client: Hungarian Oil and Gas Plc. (MOL)
Licensor: Dewpoint unit - KVAERNER, Canada
Gas treating unit - KVAERNER, Canada
Propane chiller unit - AERZEN, Germany
Location: Zsana Underground Gas Storage, Hungary
Plant capacity: 8,0 MMSCMD capacity expansion
Construction cost: 20,0M AUD
Personal activities, responsibilities:
- Developing PFDs and P&IDs;
- Calculating material and heat balances, pipeline hydraulic and thermal sizing with chemical engineering softwares (Hysys, STX, ACX);
- Developing equipment, machine and instrument data sheets;
- Data supplying for mechanical, instrumentation, electrical and civil disciplines;
- Hazardous area classifications;
- Document preparation;
- Process descriptions and process operating manuals;
- Commissioning and start-up plans.
ORTAHAZA LPG PLANT, 2002
Project type: Detailed engineering design
Position: Process Design Engineer
Project details:
Detailed design: OLAJTERV Co. Ltd. (process, mechanical, instrumentation, electrical, civil)
Client: Hungarian Oil and Gas Plc. (MOL)
Location: Ortahaza Gas Plant, Hungary
Plant capacity: 10 KTPY European Standard LPG
Construction cost: 2,5M AUD
Personal activities, responsibilities:
- Developing PFDs and P&IDs;
- Calculating material and heat balances, pipeline hydraulic and thermal sizing with chemical engineering softwares;
- Developing equipment, machine and instrument data sheets;
- Data supplying for mechanical, instrumentation, electrical and civil disciplines;
- Hazardous area classifications;
- Technical writing;
- Process descriptions and process operating manuals;
- Commissioning and start-up plans.
RECONSTRUCTION IN DANUBE REFINERY, 2002
Project type: Detailed engineering design
Position: Process Design Engineer
Project details:
Detailed design: OLAJTERV Co. Ltd. (process, mechanical, instrumentation, electrical, civil)
Client: Hungarian Oil and Gas Plc. (MOL)
Location: Danube refinery, Százhalombatta, Hungary
Plants involved: Aromatic hydrocarbon extraction and Vacuum distillation units;
Construction cost: 3,5M AUD
Personal activities, responsibilities:
- Developing PFDs and P&IDs;
- Calculating material and heat balances, pipeline hydraulic and thermal sizing with chemical engineering softwares;
- Developing equipment, machine and instrument data sheets;
- Data supplying for mechanical, instrumentation, electrical disciplines.
UNDERGROUND GAS STORAGE PLANT, 2001
Project type: Tender documentation
Position: Process Design Engineer
Project details:
Detailed design: OLAJTERV Co. Ltd. (process, mechanical, instrumentation, electrical, civil)
Constr. partner: TEKNOTES, Turkey
Client: Turkish Petroleum Co. (TPAO)
Licensor: Gas processing unit - KVAERNER, Canada
Injection compressor station - Siemens, Germany
Location: Kuzey Marmara and Degirmenkoy, Turkey
Personal activities, responsibilities:
- Developing PFDs and P&IDs;
- Calculating material and heat balances with chemical engineering softwares;
- Developing equipment, machine and instrument data sheets.
HYDROGEN PLANT, 2001
Project type: Detailed engineering design
Position: Process Design Engineer - training
Project details:
Detailed design: VECO Ltd. (process, mechanical, instrumentation, electrical, civil), Canada
Client: Consumer's Co-operative Refineries Ltd., Canada
Licensor: Technip, USA
Location: Calgary, AB, Canada
Personal activities, responsibilities:
- Developing PFDs;
- Calculating material and heat balances with chemical engineering softwares;
NATURAL GAS SWEETENING UNIT CAPACITY EXPANSION, 2001
Project type: Detailed engineering design
Position: Process Design Engineer
Project details:
Detailed design: OLAJTERV Co. Ltd. (process, mechanical, instrumentation, electrical, civil)
Client: Hungarian Oil and Gas Plc. (MOL)
Location: Szank Gas Plant, Hungary
Plant capacity: 20000 SCMH Amine based sweetening unit
Construction cost: 3,0M AUD
Personal activities, responsibilities:
- Developing PFDs and P&IDs;
- Calculating material and heat balances, pipeline hydraulic and thermal sizing with chemical engineering softwares;
- Developing equipment, machine and instrument data sheets;
- Data supplying for mechanical, instrumentation, electrical disciplines;
- Hazardous area classifications;
- Technical writing;
- Process descriptions, operating manuals.
PUSZTAEDERICS UGS RECONSTRUCTION, 2000
Project type: Detailed engineering design
Position: Process Design Engineer
Project details:
Detailed design: OLAJTERV Co. Ltd. (process, mechanical, instrumentation, electrical, civil)
Client: Hungarian Oil and Gas Plc. (MOL)
Location: Pusztaederics Underground Gas Storage, Hungary
Plant capacity: 120.000 SCMH withdrawal capacity
Construction cost: 2,8M AUD
Personal activities, responsibilities:
- Developing PFDs and P&IDs;
- Calculating material and heat balances, pipeline hydraulic and thermal sizing with chemical engineering softwares;
- Developing equipment, machine and instrument data sheets;
- Data supplying for mechanical, instrumentation, electrical and civil disciplines;
- Hazardous area classifications;
- Document preparation.
ORTAHAZA METHANOL REGENERATION PLANT, 1999
Project type: Detailed engineering design
Position: Process Design Engineer
Project details:
Detailed design: OLAJTERV Co. Ltd. (process, mechanical, instrumentation, electrical, civil)
Client: Hungarian Oil and Gas Plc. (MOL)
Location: Ortahaza Gas Plant, Hungary
Plant capacity: 16 KTPY
Construction cost: 3,5M AUD
Personal activities, responsibilities:
- Developing PFDs and P&IDs;
- Calculating material and heat balances, pipeline hydraulic and thermal sizing with chemical engineering softwares;
- Developing equipment, machine and instrument data sheets;
- Data supplying for mechanical, instrumentation, electrical and civil disciplines.
LPG PLANT (L-TEX), 1999
Project type: Detailed engineering design
Position: Junior Process Design Engineer
Project details:
Detailed design: OLAJTERV Co. Ltd. (process, mechanical, electrical, civil)
FISCHER-ROSEMOUNT (instrumentation)
Client: Hungarian Oil and Gas Plc. (MOL)
Licensor: Process system - Fluor-Daniel, Germany
Gas drying unit - IPC, Canada
Location: Algyõ gas plant, Hungary
Plant capacity: 160.000 SCMH
Construction cost: 35,0M AUD
Personal activities, responsibilities:
- Developing PFDs and P&IDs;
- Calculating material and heat balances, pipeline hydraulic and thermal sizing with chemical engineering softwares;
- Developing equipment, machine and instrument data sheets;
- Data supplying for mechanical, instrumentation, electrical and civil disciplines.
PERSONAL INFORMATION
-Availability: 2Q 2009
-Driving licence since 1990
-Married since 2002
-Travel: made extended trips across Australia (ACT, NSW, Qld, Vic, WA), Europe and Canadian Rockies
-Sport: maintain a very high level of fitness with regular running and swimming workouts
PROFESSIONAL REFERENCES
Available on request
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 2601 to 2650 of 15477)
Go to Search Parameters...
Brief Description
Safety manager/coordinator
I am a Mechanical engineer with over 30 years working with steel, and anything technical.Spent the last two years contracting after spending ten years with a local company as their Technical manager.
APPLY IN TECHNICIAN TURBOMACHINERY AND PLANT OPERATORS KNOWLEDGE
Survey Party Chief / Technician with experience with all phases of boundary,constructionand topographic surveys
Piping design for PetroChemical,Refinery,Offshore,Marine,Mining,Pipeline,Power, Pulp and Paper fields. 15 years PDS experience. Field and fabrication shop experience. Capable of orienting towers and platforms. I pride myself with working with other disciplines. Willing to travel.
Senior/Principal Piping Designer/Checker
Structural Design, Stress Analysis, FE Analysis (Nastran / Patran, ANSYS 11.0) and Structural Calculations in MathCAD (Ref: Roark’s, API, ASME B31.3 and DNV)
Electrical Engineering diploma holder with more than 14 years experience in electrical oil and gas onshore construction field.
rig manager / toolpusher
Horz. Under balance Drilling is my best value.
24 years experienced Sr. Piping designer, well skilled in PDS, PDMS and microstation
Summary of Qualifications: Honest, hardworking and responsible. Excellent work history. Strong organizational skills, solid time management skills, good communicator, effective problem-solver, achieved production goals in a safe and cost effective manner, team player, proven ability to train
Planner/Scheduler experience in PetroChem maintenance, turnarounds, capital projects and construction.
Graduate having experience of more than 14 yrs. in Secretarial and Administration
SENIOR TOOLPUSHERE
I have worked on the rigs for over 20yrs,Being a senior rig manager for the last 5yrs in Pakistan,I pride my self on my skill & knowledge to run a safe and cost effective rig.
Factory Manager, Technical Manager
My career objectives can be summaries as follows: to obtain a challenging management, administrative, or technical position as deemed suitable to my skills, experience, and backgrounds, to help a successful organization or company expand further and to help myself grow further professionally.
Mining General Management, Project Management,Consulting, Engineering, Business Development Experience
Bachelor of Science(chemical) /Diploma in Industrial Safety/Diploma in Process control and Instrumentation
Wide experience leading project engineer assignments working with design/engineering teams in the supervision, development and preparation of engineering and construction documents and drawings.
-Has wide working knowledge and experience on automotive production line.
Mechanical Engineer - Project Engineer- Construction Supervisor – Mechanical/Construction Superintendent and Contract Administrator for Oil & Gas Industries.
Highly skilled in Electrical and Instrumentation field engineering and technical Advisor on GE control systems
My education background was Architecture but I have experiences in various multi cultural work environment, specially in multi national Engineering Company. Project execution on fabrication and construction for Civil and Mechanical according applicable international code/ standard.
Compounding & QA enginer
Mechanical Engineer
Over ten (10) years of extensive hands-on and supervisory experience in Operations and Maintenance, control and optimization of plant equipments, systems and procedures, control room and local operations of Diesel Power Plants operating through PLC - programmable logic controller. (Wartsila 18V32
Please accept this cover letter and enclosed resume as my application for the position of Instrument Technologist with your organization.
More than 6 years work experience as a Project Engineer and successful in running 40 gas station projects.
Senior Project Manager for Offshore Oil and Gas Industry With Detailed Experience in Decommissioning
Many years of work and academic experinces with the AutoCAD software and some classes in the ESRI -GIS software.
Mail – Document Controller \ Administrative Staff \ Computer Crew \ Accounting Staff
Exp in managing regional operations,Business administration in sales and post sales operations
NAME:JOHN GOODDY
Master Electrician \ Instrument Tech \ PLC Programmer
BEng(Hons. – 1st), C. Eng, MIMechE. Over 17 years experience in various aspects of engineering, planning, procurement, construction, installation, renovation, hook-up, pre-commissioning and commissioning of Offshore Fixed Topside Petrochemical and Living Quarter Facilities, FPSO topsides and MOPU’s.
Responsible for implementing and execution of water well drilling/work over programs given by Clients. Ordering materials required for Well Construction. Organizing and controlling the rig crew. Monitoring the daily drilling activity. Communicating with Client and Company.
Operation manager/Coordinator Fluids
SAFETY AND FIRE TRAINING OFFICER AND ALSO A QUALIFIED PARAMEDIC.
Looking to join a progressive construction organization that needs an expert in planning & Cost control follow up engineer for senior position. my experience incorporates all types of construction projects - high-rise multi-dicipline buildings, touristic villages, etc.
MEng is a Staff Petrophysicist with 14 years experience specialising in petrophysical evaluation and 4 years in wireline/LWD operations. Career history includes working currently as a petrophysicist to support logging and coring operations, and performing petrophysical evaluations
Currently working as Senior Corrosion Engineer. Experienced in routine and non-routine corrosion mitigation and control activities, Topside inspection.
I am a postgratuate with 15 years experience in Oil/Gas - design of HV and LV from 132kV, 66kV, 33kV, 22kV, 11kV, 6.6kV & 440V level
Static Equipment Mechanical Engineer
Simulation studies, preparation of detail feasibility reports, FEED package, detail engineering, HAZOP, licensor selection, debottlenecking of existing units etc.
A highly creative, goal-oriented process design engineer with strong communication and presentation skills. Demonstrated experience in design, simulation and engineering calculations. A team player and computer professional.
Petrochemicals Marketing Consultant
Senior Petroleum Engineer with Six Sigma Master Master Black Belt Proviciency. Best for Oil Company who need to IMPROVE its PRODUCTIVITY. High production, safe, with lower cost.
Gas engineer, pipeline engineer, gas distribution, transportation, metering reducing gas, midstream/downstream gas, gas facilities.
First
Prev
51
52
[ 53 ]
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
Next
Last
Seach Parameters
Goto Advanced Search...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com